6
Project Address: Project Data Architectural Interior Elevations- IFC 03-29-17 Sheet Title 16014 Project No: Issue Stronghold Companies Remodel Project Name: Date: 4802 County Road 69 Robstown TX 78380 D C B A 1 2 3 4 5 1 2 3 4 5 Copyright© 2017 CB1- A803 C:\EDR Projects\2016 Projects\16014 Stronghold Inspections-Robstown Forum Building\ArchiCAD 19\001 Stronghold Companies-Landscape.pln March 29, 2017 1 IFC: March 29, 2017 phone: 361.537.4400 [email protected] P.O. Box 271613 Corpus Christi, TX 78427 Revision Stop metal liner panel at bottom of Structure for ventilation, typical across Metal Liner Panel, Match Existing Metal Liner Panel, Match Existing Metal Liner Panel, Match Existing Open for ventilation Open for ventilation Open for ventilation Open for ventilation Stop metal liner panel at bottom of Structure for ventilation, typical across Metal Liner Panel, Match Existing Open for ventilation Open for ventilation Open for ventilation Fire Shutter with Fusable Link Fire Shutter with Fusable Link 3' 9' Window as scheduled Window as scheduled Window as scheduled Window as scheduled New Electrical Panel Location, RE: MEP Fire Shutter with Fusable Link Paint existing walls that separate warehouse from office with 25 mil thickness (Dry) of ForceField FireGuard E-84 to Warehouse side of wall to achieve 2 hour fire rating, typical Guardrail as scheduled, typical Guardrail as scheduled, typical Existing Window Existing Door SCALE: 1/8" = 1'-0" D1 Vented Shop Wall CB1-A803 SCALE: 1/8" = 1'-0" C1 Vented Shop Wall-Fab Side CB1-A803 SCALE: 1/8" = 1'-0" A4 Warehouse-Office CB1-A803 SCALE: 1/8" = 1'-0" A1 Fab Shop Office CB1-A803 SCALE: 1/8" = 1'-0" B1 Office Walls CB1-A803 Note: 1. Refer to sheet CB1- A200 for General Notes.

1 2 3 4 5 - Barcombarcom.cc/wp-content/uploads/2017/...plans_Part3.pdf · pln March 29, 2017 1 IFC: March 29, 2017 phone: 361. 537. 4400 erozypal @ edrarchitects. com P. O. Box 271613

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1 2 3 4 5 - Barcombarcom.cc/wp-content/uploads/2017/...plans_Part3.pdf · pln March 29, 2017 1 IFC: March 29, 2017 phone: 361. 537. 4400 erozypal @ edrarchitects. com P. O. Box 271613

Proj

ect A

ddre

ss:

Proj

ect D

ata

Arch

itect

ural

Inte

rior E

leva

tions

-IF

C 0

3-29

-17

Shee

t Titl

e

1601

4Pr

ojec

t No:

Issu

e

Stro

ngho

ldC

ompa

nies

Rem

odel

Proj

ect N

ame:

Dat

e:

4802

Cou

nty

Roa

d69

Rob

stow

n TX

7838

0

D

C

B

A

1 2 3 4 5

1 2 3 4 5

Cop

yrig

ht©

201

7

GC

B1-

A803

C:\E

DR

Pro

ject

s\20

16 P

roje

cts\

1601

4 St

rong

hold

Insp

ectio

ns-R

obst

own

Foru

m B

uild

ing\

Arch

iCAD

19\

001

Stro

ngho

ld C

ompa

nies

-Lan

dsca

pe.p

ln

Mar

ch 2

9, 2

017

1IF

C: M

arch

29,

201

7ph

one:

361

.537

.440

0 e

rozy

pal@

edra

rchi

tect

s.co

m

P.O

. Box

271

613

Corp

us C

hris

ti, T

X 78

427

Rev

isio

n

Stop metal liner panel at bottom of Structure for ventilation, typical across

Metal Liner Panel, MatchExisting

Metal Liner Panel, MatchExisting

Metal Liner Panel, MatchExisting

Open for ventilation Open for ventilationOpen for ventilationOpen for ventilation

Stop metal liner panel at bottom of Structure for ventilation, typical across

Metal Liner Panel, MatchExisting

Open for ventilationOpen for ventilationOpen for ventilation

Fire Shutter with Fusable Link

Fire Shutter with Fusable Link

3'

9'

Window asscheduled

Window asscheduled

Window asscheduled

Window asscheduled

New Electrical PanelLocation, RE: MEP

Fire Shutter with Fusable Link

Paint existing walls that separate warehousefrom office with 25 mil thickness (Dry) ofForceField FireGuard E-84 to Warehouseside of wall to achieve 2 hour fire rating,typical

Guardrail asscheduled, typical

Guardrail asscheduled, typical

ExistingWindow

ExistingDoor

SCALE: 1/8" = 1'-0"

D1 Vented Shop WallCB1-A803

SCALE: 1/8" = 1'-0"

C1 Vented Shop Wall-Fab SideCB1-A803

SCALE: 1/8" = 1'-0"

A4 Warehouse-OfficeCB1-A803SCALE: 1/8" = 1'-0"

A1 Fab Shop OfficeCB1-A803

SCALE: 1/8" = 1'-0"

B1 Office WallsCB1-A803

Note:1. Refer to sheet CB1-A200 for General Notes.

Page 2: 1 2 3 4 5 - Barcombarcom.cc/wp-content/uploads/2017/...plans_Part3.pdf · pln March 29, 2017 1 IFC: March 29, 2017 phone: 361. 537. 4400 erozypal @ edrarchitects. com P. O. Box 271613

Proj

ect A

ddre

ss:

Proj

ect D

ata

Arch

itect

ural

Millw

ork

Sect

ions

-IFC

03-2

9-17

Shee

t Titl

e

1601

4Pr

ojec

t No:

Issu

e

Stro

ngho

ldC

ompa

nies

Rem

odel

Proj

ect N

ame:

Dat

e:

4802

Cou

nty

Roa

d69

Rob

stow

n TX

7838

0

D

C

B

A

1 2 3 4 5

1 2 3 4 5

Cop

yrig

ht©

201

7

GC

B1-

A804

C:\E

DR

Pro

ject

s\20

16 P

roje

cts\

1601

4 St

rong

hold

Insp

ectio

ns-R

obst

own

Foru

m B

uild

ing\

Arch

iCAD

19\

001

Stro

ngho

ld C

ompa

nies

-Lan

dsca

pe.p

ln

Mar

ch 2

9, 2

017

1IF

C: M

arch

29,

201

7ph

one:

361

.537

.440

0 e

rozy

pal@

edra

rchi

tect

s.co

m

P.O

. Box

271

613

Corp

us C

hris

ti, T

X 78

427

Rev

isio

n

3'-0

"

3'-4"

10"

2 1/2" grommet,black

Countertop and splashas scheduled

Base as scheduled

Plastic Laminate onall exposed surfaces

Backsplash at sideswhere abutting walls

Window asscheduled

Note: All dimensions are clearto finish surface as required byADA

3'-0

"

1 1/

2"

3'-0

"

3'-4"

2'-1 1/8" 10"

2 1/2" grommet,black

Countertop and splashas scheduled

Base

Plastic laminate cladsupports, space tocreate equal spaces,3'-0" O.C. maxspacing

Backsplash at sideswhere abutting walls

Window asscheduled

Note: All dimensions are clearto finish surface as required byADA

4"2'

-10"

9"1'

-8"

3 1/

2"1

1/2"

6" Max

8" Min.1"

1'-2

"2'

-6"

1'-0"

2'-0"

2'-5

"

Ceiling Ht. Re: RCP

Backsplash at backand sides whereabutting walls

Removable P.Lam.knee shield. Attachto 1"x1" stainlesssteel angles fixedto end walls

Solid surfacecountertop andsplash

Max 6" deep sink,Re: MEP

3/4" adjustableMDF shelving,melamine finish onall edges

Provide 2Xblocking, typical

P.Lam. on 3/4"MDF on all exposedsurfaces

5 mm boring holesat 32 mm o.c.

Base as scheduled

Note: All dimensions are clearto finish surface as required byADA

4"2'

-10"

3'-0

"

9"1'

-8"

3 1/

2"1

1/2"

6" Max

8" Min.1"

2'-0"

Ceiling Ht. Re: RCP

Mirror asscheduled, do nottile behind mirror,typical

Backsplash at backand sides whereabutting walls

Removeable P.Lam. knee shield.Attach to 1"x1"stainless steelangles fixed to endwalls

Solid surfacecountertop andsplash asscheduled

Note: All dimensions are clearto finish surface as required byADA

2'-1

0"4"

1'-2

"2'

-6"

1'-0"

2'-0"

4"

Ceiling Ht. Re: RCP

Base as scheduled

3/4" adjustableMDF shelving,melamine finish onall edges

Provide 2Xblocking, typical

P.Lam. on 3/4"MDF on all exposedsurfaces

5 mm boring holesat 32 mm o.c.

Backsplash at backand sides whereabutting walls

Solid surfacecountertop andsplash

3/4" adjustableMDF shelving,melamine finish onall edges

Note: All dimensions are clearto finish surface as required byADA

SCALE: 3/4" = 1'-0"

B2 Receptionist-DrawerCB1-A804SCALE: 3/4" = 1'-0"

B1 Receptionist-Knee SpaceCB1-A804

SCALE: 3/4" = 1'-0"

C2 Coffee BarCB1-A804 SCALE: 3/4" = 1'-0"

C3 SinkCB1-A804SCALE: 3/4" = 1'-0"

C1 Base with UpperCB1-A804

Note:1. Refer to sheet CB1-A200 for General Notes.

Page 3: 1 2 3 4 5 - Barcombarcom.cc/wp-content/uploads/2017/...plans_Part3.pdf · pln March 29, 2017 1 IFC: March 29, 2017 phone: 361. 537. 4400 erozypal @ edrarchitects. com P. O. Box 271613

Proj

ect A

ddre

ss:

Proj

ect D

ata

Arch

itect

ural

Par

tial-F

urni

ture

Plan

s-Fi

rst S

tory

-IFC

03-

29-1

7

Shee

t Titl

e

1601

4Pr

ojec

t No:

Issu

e

Stro

ngho

ldC

ompa

nies

Rem

odel

Proj

ect N

ame:

Dat

e:

4802

Cou

nty

Roa

d69

Rob

stow

n TX

7838

0

D

C

B

A

1 2 3 4 5

1 2 3 4 5

Cop

yrig

ht©

201

7

GC

B1-

A900

C:\E

DR

Pro

ject

s\20

16 P

roje

cts\

1601

4 St

rong

hold

Insp

ectio

ns-R

obst

own

Foru

m B

uild

ing\

Arch

iCAD

19\

001

Stro

ngho

ld C

ompa

nies

-Lan

dsca

pe.p

ln

Mar

ch 2

9, 2

017

1IF

C: M

arch

29,

201

7ph

one:

361

.537

.440

0 e

rozy

pal@

edra

rchi

tect

s.co

m

P.O

. Box

271

613

Corp

us C

hris

ti, T

X 78

427

Rev

isio

n

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

161718192021222324

123456789101112

13 14 15 16 17 18 19 20 21 22 23 24

Vend

ing,

N.I.

C.

Vend

ing,

N.I.

C.

Vend

ing,

N.I.

C.

Ref

riger

ator

, N.I.

C.

Vend

ing,

N.I.

C.

Vend

ing,

N.I.

C.

Vend

ing,

N.I.

C.

3.5

3

2.1

2

1.1

1

123456789101112131415

16 17 18 19 20 21 22 23 24

D1CB1-A400

B1CB1-A400

A4CB1-A400Exterior Galvanized Steel Exit Stair, Re: Structural

Replace existing black tilein Entry/Reception/Hall(match existing), Addexpansion joints over theexisting conctrol joints inthe foundation and adjustlayout of joints toaccomodate expansionjoints

Hal

f bra

dely

,R

e: M

EP

Mop Sink, Re:MEP

Existing 3 Ton O.H. BridgeCrane Shall Remain

Copy/Fax

Cop

y/Fa

x

Copy/Fax

Training ACB1-104H: 10'-0"

Training BCB1-105H: 10'-0"

ClosetCB1-107H: 9'-0"

ClosetCB1-106H: 9'-0"

OfficeOffice

MenCB1-109H: 9'-0"

Copy/FaxCB1-117H: 13'-7"

OfficeOfficeOfficeOfficeOffice

OfficeCB1-118H: 9'-0"

OfficeCB1-119H: 9'-0"

OfficeCB1-116H: 9'-0"

OfficeCB1-115H: 9'-0"

OfficeCB1-120H: 9'-0"

OfficeCB1-121H: 9'-0"

OfficeCB1-114H: 9'-0"

ConferenceCB1-122H: 9'-0"

OfficeCB1-123H: 9'-0"

OfficeCB1-127H: 9'-0"

OfficeCB1-126H: 9'-0"

OfficeCB1-125H: 9'-0"

OfficeCB1-124H: 9'-0"

Entry

Hall

Reception

WomenCB1-108H: 9'-0"

TrainingReception

CB1-101H: 9'-0"

TrainingOffice

CB1-102H: 9'-0"

TrainingOffice

CB1-103H: 9'-0"

CoffeeCB1-112H: 13'-7"

Entry/Waiting

CB1-100H: 13'-7"

Jan.CB1-113H: 13'-7"

WomenCB1-110H: 9'-0"

HallCB1-111H: 13'-7"

OfficeCB1-139H: 9'-0"

OfficeCB1-138H: 9'-0"

OfficeCB1-137H: 9'-0"

BreakCB1-136H: 13'-7"

RestroomCB1-132H: 9'-0"

ToiletCB1-134H: 9'-0"

ClosetCB1-131H: 13'-7"

ClosetCB1-130H: 13'-7" Men

CB1-129H: 9'-0"

WomenCB1-128H: 9'-0"

Jan.CB1-133H: 9'-0"

HallCB1-140H: 9'-0"

HallCB1-135H: 13'-7"

HallCB1-155H: 13'-7"

TrainingOffice

CB1-157H: 9'-0"

TrainingOffice

CB1-158H: 9'-0"

HallCB1-159H: 13'-7"

B1CB1-A803

A4CB1-A803

Refrigerator, N.I.C.Vending, N.I.C.

24'-0"

25'-0

"

Mop Sink,Re: MEP

Chainlink Cage (20' tall)with pair of 4'-0"x7'-0"

Lockable Gates

Toilet

RestroomCB1-142H: 13'-7"

Room

EPC/ STS CageCB1-149

Break/ BullpenCB1-143H: 9'-0"

Shop ForemanCB1-146H: 9'-0"

OfficeCB1-145H: 9'-0"

OfficeCB1-144H: 9'-0"

OfficeCB1-147H: 9'-0"

ITCB1-148H: 9'-0"

HallCB1-141H: 13'-7"

A1CB1-A803

North N

orthSCALE: 1/8" = 1'-0"

B1 Furniture Plan-First StoryCB1-A900

SCALE: 1/8" = 1'-0"

B5 Furniture Plan-First StoryCB1-A900

Note:1. Refer to sheet CB1-A200 for General Notes.

Page 4: 1 2 3 4 5 - Barcombarcom.cc/wp-content/uploads/2017/...plans_Part3.pdf · pln March 29, 2017 1 IFC: March 29, 2017 phone: 361. 537. 4400 erozypal @ edrarchitects. com P. O. Box 271613

Proj

ect A

ddre

ss:

Proj

ect D

ata

Arch

itect

ural

Par

tial-F

urni

ture

Pla

n-Se

cond

Sto

ry-IF

C 0

3-29

-17

Shee

t Titl

e

1601

4Pr

ojec

t No:

Issu

e

Stro

ngho

ldC

ompa

nies

Rem

odel

Proj

ect N

ame:

Dat

e:

4802

Cou

nty

Roa

d69

Rob

stow

n TX

7838

0

D

C

B

A

1 2 3 4 5

1 2 3 4 5

Cop

yrig

ht©

201

7

GC

B1-

A901

C:\E

DR

Pro

ject

s\20

16 P

roje

cts\

1601

4 St

rong

hold

Insp

ectio

ns-R

obst

own

Foru

m B

uild

ing\

Arch

iCAD

19\

001

Stro

ngho

ld C

ompa

nies

-Lan

dsca

pe.p

ln

Mar

ch 2

9, 2

017

1IF

C: M

arch

29,

201

7ph

one:

361

.537

.440

0 e

rozy

pal@

edra

rchi

tect

s.co

m

P.O

. Box

271

613

Corp

us C

hris

ti, T

X 78

427

Rev

isio

n

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

161718192021222324

123456789101112

13 14 15 16 17 18 19 20 21 22 23 24

3.5

3

2.1

2

1.1

1

123456789101112131415

16 17 18 19 20 21 22 23 24

D1CB1-A400

A4CB1-A400

B1CB1-A803

A4CB1-A803

Office Office Office Office Office Office

Break Office OfficeIT

OfficeOffice

Office Office

Electrical MezzanineCB1-200

Closet

Office

Men Women

MECH MezzanineCB1-201

MECHCB1-203

HallCB1-204

North

SCALE: 1/8" = 1'-0"

B1 Furniture Plan-Second StoryCB1-A901

Note:1. Refer to sheet CB1-A200 for General Notes.

Page 5: 1 2 3 4 5 - Barcombarcom.cc/wp-content/uploads/2017/...plans_Part3.pdf · pln March 29, 2017 1 IFC: March 29, 2017 phone: 361. 537. 4400 erozypal @ edrarchitects. com P. O. Box 271613

Proj

ect A

ddre

ss:

Proj

ect D

ata

Arch

itect

ural

Par

tial-F

inis

h Pl

ans-

Firs

t Sto

ry-IF

C 0

3-29

-17

Shee

t Titl

e

1601

4Pr

ojec

t No:

Issu

e

Stro

ngho

ldC

ompa

nies

Rem

odel

Proj

ect N

ame:

Dat

e:

4802

Cou

nty

Roa

d69

Rob

stow

n TX

7838

0

D

C

B

A

1 2 3 4 5

1 2 3 4 5

Cop

yrig

ht©

201

7

GC

B1-

A902

C:\E

DR

Pro

ject

s\20

16 P

roje

cts\

1601

4 St

rong

hold

Insp

ectio

ns-R

obst

own

Foru

m B

uild

ing\

Arch

iCAD

19\

001

Stro

ngho

ld C

ompa

nies

-Lan

dsca

pe.p

ln

Mar

ch 2

9, 2

017

1IF

C: M

arch

29,

201

7ph

one:

361

.537

.440

0 e

rozy

pal@

edra

rchi

tect

s.co

m

P.O

. Box

271

613

Corp

us C

hris

ti, T

X 78

427

Rev

isio

n

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

161718192021222324

123456789101112

13 14 15 16 17 18 19 20 21 22 23 24

3.5

3

2.1

2

1.1

1

123456789101112131415

16 17 18 19 20 21 22 23 24

F1

F1

F1

F1

F1 F1

F1

F1

F1F1

F1

F1

F1

F1

F1

F1

F1F1

F1

F2

F2

F2

F4

F4

F4F4

F4

F4 F4

F4

F2F2

F3 F3

F3

F3

F1 F1

Exterior Galvanized Steel Exit Stair, Re: Structural

Replace existing black tilein Entry/Reception/Hall(match existing), Addexpansion joints over theexisting conctrol joints inthe foundation and adjustlayout of joints toaccomodate expansionjoints

Hal

f bra

dely

,R

e: M

EP

Mop Sink, Re:MEP

Existing 3 Ton O.H. BridgeCrane Shall Remain

Training ACB1-104H: 10'-0"

Training BCB1-105H: 10'-0"

ClosetCB1-107H: 9'-0"

ClosetCB1-106H: 9'-0"

OfficeOffice

MenCB1-109H: 9'-0"

Copy/FaxCB1-117H: 13'-7"

OfficeOfficeOfficeOfficeOffice

OfficeCB1-118H: 9'-0"

OfficeCB1-119H: 9'-0"

OfficeCB1-116H: 9'-0"

OfficeCB1-115H: 9'-0"

OfficeCB1-120H: 9'-0"

OfficeCB1-121H: 9'-0"

OfficeCB1-114H: 9'-0"

ConferenceCB1-122H: 9'-0"

OfficeCB1-123H: 9'-0"

OfficeCB1-127H: 9'-0"

OfficeCB1-126H: 9'-0"

OfficeCB1-125H: 9'-0"

OfficeCB1-124H: 9'-0"

Entry

Hall

Reception

WomenCB1-108H: 9'-0"

TrainingReception

CB1-101H: 9'-0"

TrainingOffice

CB1-102H: 9'-0"

TrainingOffice

CB1-103H: 9'-0"

CoffeeCB1-112H: 13'-7"

Entry/Waiting

CB1-100H: 13'-7"

Jan.CB1-113H: 13'-7"

WomenCB1-110H: 9'-0"

HallCB1-111H: 13'-7"

OfficeCB1-139H: 9'-0"

OfficeCB1-138H: 9'-0"

OfficeCB1-137H: 9'-0"

BreakCB1-136H: 13'-7"

RestroomCB1-132H: 9'-0"

ToiletCB1-134H: 9'-0"

ClosetCB1-131H: 13'-7"

ClosetCB1-130H: 13'-7" Men

CB1-129H: 9'-0"

WomenCB1-128H: 9'-0"

Jan.CB1-133H: 9'-0"

HallCB1-140H: 9'-0"

HallCB1-135H: 13'-7"

HallCB1-155H: 13'-7"

TrainingOffice

CB1-157H: 9'-0"

TrainingOffice

CB1-158H: 9'-0"

HallCB1-159H: 13'-7"

24'-0"

25'-0

"

F1

F1

F1

F3

F3

F3

F3

F3

Mop Sink,Re: MEP

Chainlink Cage (20' tall)with pair of 4'-0"x7'-0"

Lockable Gates

Toilet

RestroomCB1-142H: 13'-7"

Room

EPC/ STS CageCB1-149

Break/ BullpenCB1-143H: 9'-0"

Shop ForemanCB1-146H: 9'-0"

OfficeCB1-145H: 9'-0"

OfficeCB1-144H: 9'-0"

OfficeCB1-147H: 9'-0"

ITCB1-148H: 9'-0"

HallCB1-141H: 13'-7"

North

North

North

SCALE: 1/8" = 1'-0"

B1 Finish Plan-First StoryCB1-A902 SCALE: 1/8" = 1'-0"

B5 Finish Plan-First StoryCB1-A902

Note:1. Refer to sheet CB1-A200 for General Notes.

Page 6: 1 2 3 4 5 - Barcombarcom.cc/wp-content/uploads/2017/...plans_Part3.pdf · pln March 29, 2017 1 IFC: March 29, 2017 phone: 361. 537. 4400 erozypal @ edrarchitects. com P. O. Box 271613

Proj

ect A

ddre

ss:

Proj

ect D

ata

Arch

itect

ural

Par

tial-F

inis

h Pl

an-

Seco

nd S

tory

-IFC

03-

29-1

7

Shee

t Titl

e

1601

4Pr

ojec

t No:

Issu

e

Stro

ngho

ldC

ompa

nies

Rem

odel

Proj

ect N

ame:

Dat

e:

4802

Cou

nty

Roa

d69

Rob

stow

n TX

7838

0

D

C

B

A

1 2 3 4 5

1 2 3 4 5

Cop

yrig

ht©

201

7

GC

B1-

A903

C:\E

DR

Pro

ject

s\20

16 P

roje

cts\

1601

4 St

rong

hold

Insp

ectio

ns-R

obst

own

Foru

m B

uild

ing\

Arch

iCAD

19\

001

Stro

ngho

ld C

ompa

nies

-Lan

dsca

pe.p

ln

Mar

ch 2

9, 2

017

1IF

C: M

arch

29,

201

7ph

one:

361

.537

.440

0 e

rozy

pal@

edra

rchi

tect

s.co

m

P.O

. Box

271

613

Corp

us C

hris

ti, T

X 78

427

Rev

isio

n

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

161718192021222324

123456789101112

13 14 15 16 17 18 19 20 21 22 23 24

3.5

3

2.1

2

1.1

1

123456789101112131415

16 17 18 19 20 21 22 23 24

F4

F3

F3

F3

Existing 3 Ton O.H. Bridge Crane Shall Remain

Office Office Office Office Office Office

Break Office OfficeIT

OfficeOffice

Office Office

Electrical MezzanineCB1-200

Closet

Office

Men Women

MECH MezzanineCB1-201

MECHCB1-203

HallCB1-204

F3

North

SCALE: 1/8" = 1'-0"

B1 Finish Plan-Second StoryCB1-A903

SCALE: 1/8" = 1'-0"

C5 Finish Plan-Second StoryCB1-A903

Note:1. Refer to sheet CB1-A200 for General Notes.