20
A B C D 1 2 3 4 5 6 7 RECEPTACLE LAYOUT PLAN POWER HOUSE (PWH) 1 Republic of the Philippines JAPAN INTERNATIONAL COOPERATION AGENCY NIPPON KOEI CO., LTD. NJS CONSULTANTS CO., LTD. JAPAN AIRPORT CONSULTANTS, INC. JICA DESIGN CONSULTANT JOINT VENTURE (ORIGINAL SIGNED) (ORIGINAL SIGNED) (ORIGINAL SIGNED) (ORIGINAL SIGNED)

1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

A

B

C

D

1 2 3 4 5 6 7

RECEPTACLE LAYOUT PLAN

POWER HOUSE (PWH)

1

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 2: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

A

B

C

D

1 2 3 4 5 6 7

LIGHTING LAYOUT PLAN

POWER HOUSE (PWH)

1

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 3: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

PANEL SCHEDULE

1

POWER HOUSE (PWH)

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 4: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

A

B

C

D

1 2 3 4 5 6 7

TELEPHONE AND DATA SYSTEM PLAN

POWER HOUSE (PWH)

1

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 5: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

A

B

C

D

1 2 3 4 5 6 7

FIRE DETECTION AND ALARM SYSTEM PLAN

POWER HOUSE (PWH)

1

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 6: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

A

B

C

D

1 2 3 4 5 6 7

B

GROUND FLOOR GROUNDING SYSTEM PLAN

POWER HOUSE (PWH)

1

A

C

E E E E

E

A

F F

A

F

D

A

DD

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 7: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

B63-4300-01B63-4300-02

B63-4300-03B63-4300-04

B63-4200-01

B63-4200-02B63-4200-03

LOCATION PLAN

LAYOUT PLAN FLOOR AREA SCHEDULE, EXTERNAL FINISHING SCHEDULEPLAN, ELEVATIONS, SECTION, INTERNAL FINISHING SCHEDULE

DETAIL SECTION, SCHEDULE OF DOORS & WINDOWS

FOUNDATION PLAN

ROOF FRAMING PLAN

FRAME ELEVATION

B63-6100-01

DOCUMENT IV: DRAWINGS

SHEET CONTENTS SHEET No. SHEET CONTENTSSHEET No.

DRAWING LIST

B63-6100-03

STP FACILITIES LAYOUT

B63-6200-01

CONTROL ROOM EQUIPMENT LAYOUT

PWR FEEDER LAYOUT

RECEPTACLE, LIGHTING & PANEL SCHEDULE

B63-6800-01TELEPHONE LAYOUT

B63-6100-02

FDAS LAYOUT

PLUMBING WORKSB63-5100-01 STP CONTROL ROOM (STP) MECHANICAL SANITARY & PLUMBING (1) GROUND & ROOF DECK PLUMBING PLAN,

TOILET 1 BLOW-UP PLAN, PLUMBING EQUIPMENT SCHEDULE & SANITARY FIXTURE SCHEDULE B63-5100-02 STP CONTROL ROOM (STP) MECHANICAL SANITARY & PLUMBING (1) SEWAGE AND SLUDGE PIPING PLAN

MECHANICAL WORKSB63-5200-01 STP CONTROL ROOM (STP) MECHANICAL VENTILATION AND AIR-CONDITIONING

FIRE PROTECTIONB63-5300-01 STP CONTROL ROOM (STP) MECHANICAL FIRE PROTECTION STP FIRE PROTECTION LAYOUT

AIR-CONDITIONING AND VENTILATION LAYOUT

B63-4200-04 RC SLAB DETAILS

SUBCOMPONENT-4-6: UTILITY BUILDINGSCOMPONENT-4: BUILDING WORKS (B)

(B63) STP CONTROL ROOM (STP)

ELECTRICAL WORKS

ARCHITECTURAL WORKS

STRUCTURAL WORKS

B63-4300

B63-4200

B63-5100

B63-5200

B63-5300

B63-6000

B63-6300-01

B63-6900-01 GROUNDING LAYOUT

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 8: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

GH-1

GH-2GH-2

GH-2

GH-2

GH-1

GH-1

GH-2

PARKING PARKINGTAXI STAND

COMPONENT-4 BUILDING WORKS (B)SUBCOMPONENT-4-6 UTILITY BUILDINGS(B61) STP CONTROL ROOM (STP)

STP

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 9: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

Parapet Coping

Ladder

Sky Light

Soffit

DownSpout

Parapet

x

x

x

PCR

LDS

SKL

PCASFCSFBSFA

DSBDSAPAF

Fascia

Roof Gutter

Roof

Floor

OUTLINE OF EXTERNAL FINISHING SCHEDULEAppl.

x

Portion

x

RGAROPRROPSROC

ROS

EVA

RGB

RODFLCFLSFLG

Symbol Finishing Material

wp-3: Water Proofing : Urethane Waterproofing Coating

Expansion Joint

Roller Doors

Base

Beam

RDG

EXJ

RDST

BMSBMFBMCBMRCNS

x

SKGBSFBSR

Finishing MaterialAppl.

Column

Doors

Windows

PortionWalls

CNRCNC

x SD

x AW

x

CNBCNF

WLDWLCWLRWLA

Symbol

xSynthetic Resin Emulsion Paint

Fluorine-resin Enamel coatingAcrylic Resin Enamel PaintEpoxy Resin Floor Paint

Synthetic Resin Emulsion Multi-Layer CoatingSynthetic Resin Mixed Paint type II (for steel)Synthetic Resin Mixed Paint type I (for wood)

P-3

Clear LacquerP-6

P-8P-7

P-5P-4

Legend for Paint Type

P-2P-1

STP CONTROL ROOM (STP)

x PAR

DSC

x AD

2m66.45

2

1

66.45 m

4350

15275

TOTAL

GFL

Floor Area

66.45

Floor Area No.FL

1 m2

SCALE 1 LAYOUT PLAN

1:200m. SCALE 2 STP CONTROL ROOM

1:200m.

STP CONTROL ROOM

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 10: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

SCALE 1 GROUND FLOOR PLAN

1:100m.

20000

600030006000

45501450 3588

4000 50

LINE OF CANOPY ABOVE

1235

1085

1680

4321

LABORATORY1-01

CONTROLROOM1-02

PAN.1-03

SHO.1-04

280

280

SD1

AW3

AW3

AW2

AW1

AW1

AW1

WD1

WD3

WD2 TOI.

1-05

50

SD1

SD2

1500 1500 1600

550

2000

1650

4200

OUTDOORSUBSTATION

400

5000

300

600

A

B

241260

060

0

600

600

1200

BLDG LINE

ROOF DECK SLAB

RD

SLOPE

DS 100MM

RD

BLDG LINE

RD RD

SLOPE

15000

6000 3000 6000

1130 1130

1130

4000

1130

SLO

PE

=1/

100

CO

NC

RE

TE J

OIN

T W

=25

mm

SLO

PE

=1/

100

SLO

PE

=1/

100

3000 3000 1500 1500 3000 3000

CO

NC

RE

TE J

OIN

T W

=25

mm

SLO

PE

=1/

100

SLO

PE

=1/

100

2000

2000

1 2 3 4

A

B

SCALE 2 ROOF PLAN

1:100m.

CO

NC

RE

TE J

OIN

T W

=25

mm

CO

NC

RE

TE J

OIN

T W

=25

mm

CO

NC

RE

TE J

OIN

T W

=25

mm

SCALE 3 REFLECTED CEILING PLAN

1:100m.

6000

15000

4000

C3

4000

1235

1680

TOILET

SHOWER

1-05

10851-04

6000

4550

3000

1450

CH=2400

1130 1130

1130

1130

1-03PANTRY

C3CH=2400

C3CH=2400

4321

A

B

1130

1130

CONTROLROOM1-02

LABORATORY1-01

3800

3300

500

FIN. FLR. LINE

TOP OF PARAPET

6260

2700

600

ROOF LOW POINTROUGH CONC. LVL.

BA

1100

SCALE 7 LEFT SIDE ELEVATION

1:100m.

113040001130

2700 38

00

SCALE 4 FRONT ELEVATION

1:100m.

3800

3400

FIN. FLR. LINE

TOP OF PARAPET

400

17260

30006000 6000 1130

ROOF LOW POINTROUGH CONC. LVL.

1130

150

4321

2700

200

900

2700

150

1100

3800

SD1

SD1

SD2

SCALE 6 REAR ELEVATION

1:100m.

3800

3400

FIN. FLR. LINE

400

TOP OF PARAPET

15000

30006000 60001130

ROOF LOW POINTROUGH CONC. LVL.

150

1234

2700

200

900

1130

2700

150

1100

3800

AW1

AW1

AW1

SCALE 5 RIGHT SIDE ELEVATION

1:100m.

500

330038

00

FIN. FLR. LINE

TOP OF PARAPET

1130

6260

ROOF LOW POINTROUGH CONC. LVL.

B A

1130 4000

1100

2700 38

00

AW3

AW3

AW2

SCALE 8 LONGITUDINAL SECTION

1:100m.

3800

3300

2700

FIN. FLR. LINE

TOP OF PARAPET

15000

600030006000

3000300045501450

500

600

2400

300

5027

0011

00

3800

2400

1400

1700

700

300

1130

1130

CEILING LINE

LABORATORY CONTROL ROOM

PANTRY

ROOF DECK SLAB

4321

100

2700

AW1

AW1

AW1

WD1

300

334038

00

2700

FIN. FLR. LINE

TOP OF PARAPET

B

460

640

900

1500

300

CEILING LINE

3800

2700

1100

1700

700

1130 1130

6260

300

600

500

CONTROL ROOM1-04

ROOF HIGH POINTROUGH CONC. LVL.

A

4000

SCALE 9 CROSS SECTION

1:100m.

AW1

300

Room Designation

1-01 Laboratory 2700 x1-02 Control Room 2700 x x1-03 Pantry 2400 x1-04 Shower 2400 x1-05 Toilet 2400 x

GFL

sq.m

= 6

6.70

Building Element

x xx x x

x x xx x xx x x

Room Designation

Roo

m N

umbe

r

C8C7C6C5C4C3C2C1B4B3B2B1Co8Co7Co6Co5Co4Co3Co2Co1W10W9W8W7W6W5W4W3W2W1S5S4S3 RemarksS2F12F11F10F9F8F7F6F5F4F3F2F1CH

Wall BeamColumns CeilingSkirting

Finishing

Floor

2

OUTLINE OF INTERNAL FINISHING SCHEDULESTP CONTROL ROOM (STP)

x

Legend for Paint TypeP-1 Synthetic Resin Emulsion Paint

wp-3: Water Proofing : Urethane Waterproofing Coating

P-2 Synthetic Resin Mixed Paint type I (for wood)P-3 Synthetic Resin Mixed Paint type II (for steel)P-4 Synthetic Resin Emulsion Multi-Layer CoatingP-5 Clear LacquerP-6 Epoxy Resin Floor PaintP-7 Acrylic Resin Enamel PaintP-8 Fluorine-resin Enamel coating

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 11: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

ELEV.= FL-150SIDEWALK LEVEL

GL= FL-300

ELEV.= FL±0GROUND FLOOR LINE

150

CONTROL RM.1-04

A

300

150

700

2400

1700

2700

300

600

3800

1100

500

CEILING FINISH LEVELBOTTOM OF PARAPET

ELEV.= FL+3300

ELEV.= FL+2700

ROUGH CONCRETE LEVEL

TOP OF PARAPETELEV.= FL+3800

ROOF LOWEST POINT

1130

425355 350

SLOPE=1/100

FILLING MATERIALCOMPACTED

0.25mm POLYETHYLENE SHEET

50mm LEAN CONCRETE

50mm GRAVEL BED REMARKS

- PASSAGE LATCH

- LAVATORY LATCH

WITH INDICATOR

- PUSH-PULL BAR

- FLUSH BOLT

- CRESCENT SASH LOCK

- CAMLATCH HANDLE & ARM

- ROLLER TIGHTNING HANDLE

- AIRTIGHTNESS

- INSECT SCREEN

- FRAMELESS DOOR

- BLIND BOX

- ROCK WOOL

SWINGRIGHT HAND

STAINLESS STEEL

SYMBOLS & CONVENTION OF DOOR & WINDOW

2

STAINLESS STEEL

TA

(SB)

FIXED

FIXED

SWING

TB

LEFT HAND

(SB)

DOOR & WINDOW

- ALUMINUM DOOR

- STEEL DOOR

- ALUMINUM SCREEN

- WOODEN DOOR

- ALUMINUM LOUVER

- ALUMINUM WINDOW

- ROLLING SHUTTER DOOR

AD

AL

AW

AS

WD

RS

SD

W1

W3

W2

D5

AW

3AW

AW1

2

WD

3WD

2

3

1

1

1

805 x 700

2370 x 700

780 x 700

700 x 2100

800 x 2100

DIMENSION

D4

D1

FIG

UR

E

WD1

SD1

MA

RK

TYPE

QU

AN

TITY

1

2

800 x 2100

1800 x 2100

W (

w)

x H

(h)

WIRED GLASS

GLAZING

- CLEAR FLOAT GLASS

- HEAT ABSORBING

- LAMINATED GLASS

- CLEAR WIRED GLASS

- HEAT ABSORBING GLASS

- FIGURED WIRED GLASS

- FIGURED GLASS

SLIDINGSINGLE

- TEMPERED GLASS

FINISH - ANODIZED

STAINLESS STEEL

- EPOXY-POLYESTER

PAINT TYPE-1 (WOOD)

- SYNTHETIC RESIN MIXED

- SYNTHETIC RESIN MIXED

- ANODIZING ELECTRO

- SCRATCH BRUSHED

- MELAMINE RESIN OVERLAID

- POLYURETHANE ENAMEL

PAINT (STEEL)

BAKED PAINT

PROJECT OUT/IN

STAINLESS STEEL

TC

(SB)

TD

PIVOTED

(SB)

P-3

UE

- HONEY COMB

- ALUMINUM

- STAINLESS STEEL

- TEMPERED GLASS

- WOOD

- STEEL

MATERIAL

ST

SST

AL

WD

HC

TG

70

70

70

120

120

AN

AED

P-2

MR

EPX

SB 40

40

AL AED

AL

AL

ST

ST

AED

AED

TG

SWINGDOUBLE

150 x 825 x 1NO.

150 x 825 x 1NO.

DEPOSITION

HAG 8

HAG

HAG

8

8

CWG

HAWG

HAG

FWG

CG

FG

LG

ST

ST

DIMENSION

120

120

FRA

ME

40

40

OR

SA

SH

DO

OR

PA

NE

L

ST

ST

MA

TER

IAL

P3

FIN

ISH

650 x 700 x 2 NOS.

150 x 825 x 1NO.

GLAZING

THIC

KN

ES

S

TYP

E

LOUVER

DIM

EN

SIO

N W

x H

ST

ST

MA

TER

IAL

- BUTT HINGE

- FLOOR HINGE

- PIVOT HINGE

- SPRING HINGE

LEVER HANDLE

- HOOK LOCK

- MORTISE LOCK &

- CYLINDRICAL LOCK

LEVER HANDLE

- DEADBOLT MORTISE LOCK

LOCK & LATCH/DOOR HANDLE

- EMERGENCY LOCK &

HC

EL

CL

ML

SLIDINGDOUBLE

CLH

CLH

CLH

ML

ML

X

P3

P3

X

X

X

X

PH

PH

BH

FH

PH

DL

SH

HINGES

X

X

X

X

FTG

RW

OTHERS

AT

BB

IS

X

X

X AL

X

X

AL

AL

TA

TACS

CLH

PL

LL

PP

RT

FB

ML

ML

LOC

K A

ND

LA

TCH

IRON MONGERY

& H

AR

DW

AR

EA

LL F

ITTI

NG

FIX

ING

P3

P3

FIN

ISH

X

X

PH

BH

HIN

GE

S

DO

OR

STO

P

DO

OR

CLO

SE

R

X

X

X

X

X

X

DO

OR

NA

ME

PLA

TE

OTHERS

WE

ATH

ER

MO

ULD

ING

SIL

L/TR

IM

DO

OR

TH

RE

SH

OLD

TA

TA

BLI

ND

S

FFL

FFL

W1

D1

FFL

D3 D4

FFL

W2 W3

FFL

D5

W=800W=1800 W=800 W=700

H=

2100

650

100

700100 700100100 100

H=

2100

825

825

150

125

150

150 150

H=

2100

150

825

H=

2100

825

150

150 100

1700

H=

700

W=2370

4 EQUAL PANELS

W=805

1700

H=

700

150

2080

P3

P3

P3

200

80

5030

100100

D3

W=830

H=

700

1700

75

80

140

50DRIP MOLD

100

SCALE 1 DETAIL SECTION

1:20m.

SCALE 3 SCHEDULE OF DOORS AND WINDOWS

1:20m.

2700

FG 8

MORTARCANTING

WATERPROOFINGMEMBRANE

SD2

1 800 x 2100 120 40 ST 150 x 825 x 1NO. ST MLP3 X PH X X XTAP3D2

FFL

D2

W=800

H=

2100

t=4.5 CHECKERED PLATE W/ P-3

CEMENT RENDER

D13

D10-250@

STEEL 40X40X4mm

130

500

130 556 130

CL

3mm NOMINAL GAP

10mm Ø DOWELS @ 500 O.C

SCALE 2 DETAIL SECTION

1:20m.

50

X = APPLICABLE

AN

TI-S

HA

TTE

R F

IXTU

RE

X

X

X

X

X

ST

ST

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 12: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

1 2 3 4

A

B

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 13: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

1 2 3 4

A

B

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 14: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

1 2 3 4

B A

GRID

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 15: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 16: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

PAN.

SHO.

TOI.

LABORATORY

PAN.

SHO.

TOI.OUTDOOR

SUBSTATION

1 2 3 4

A

B

CATCH BASIN SCHEDULE

SANITARY FIXTURE SCHEDULEPLUMBING EQUIPMENT SCHEDULE

1

A

B

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 17: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

LEGEND:

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 18: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

AIR TERMINAL DEVICES:

SEWAGE TREATMENT PLANTSPLIT TYPE AIR CONDITIONING UNIT:

EXHAUST FAN:

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

Page 19: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

1 2 3 4

A

B

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)

Page 20: 1 2 3 4 5 6 7 A · 2016. 9. 8. · stp control room (stp) x par dsc x ad 66.45m2 2 1 66.45 m 4350 15275 total gfl floor area 66.45 fl floor area no. 1 m2 scale 1layout plan 1:200m

GH-1

DN

DISTRIBUTION

CHAMBER

PARKING SPACE

GRIT CHAMBER/

PUMP STATION

DISINFECTION

TANK

DRYING BED

SLUDGE

DRYING BED

SLUDGE

TREATED WATER

TANK

OUTDOORSUBSTATION

CONTROLROOM1-02

PAN.1-03

LABORATORY1-01

GH-1

OXIDATION

DITCH

HANDRAIL

SEE DETAIL

OPENING

W1100xL2000

LADDER RUNG

SEE DETAIL

FROM

DISTRIBUTING

CHAMBER

300

FROM RETURN

SLUDGE PUMP

UP

THICKENED

SLUDGE TANK

SEDIMENTATION

C L A R I F I E R

MRF

4LPPN

4LPPN

0

GRAPHICAL SCALE

100 250 500 m.

STP FACILITIES LAYOUT

1

ESH-1 ESH-3

ESH-5

ESH-7

ESH-6

ESH-2

ESH-4

Tabulation of the Cable & Conduit in STP FacilitiesSection Classfication of cable Conduit

STP Power Cable PVC50 x 1

Remarks

2 - 5.5mm THHN Cable (To GH)PVC32 x 1

3

2 - 5.5mm THHN Cable (To GH)

2 - 5.5mm THHN Cable (To Road Light)

STP Power Cable PVC50 x 1

1

2

1 3

5

4

6 7

8

9

10

STP Power Cable PVC50 x 1STP Power Cable PVC50 x 1

2 PVC32 x 1

PVC75 x 1PVC75 x 1

PVC50 x 1PVC50 x 1

PVC100 x 12 - 5.5mm THHN Cable (To GH)2 - 5.5mm THHN Cable (To Road Light)2 - 5.5mm THHN Cable (To GH)2 - 5.5mm THHN Cable (To Road Light)

PVC32 x 1PVC32 x 1

4

5

6

PVC75 x 3PVC50 x 6

7

8

PVC32 x 1

PVC75 x 3PVC50 x 6PVC50 x 4PVC75 x 2PVC50 x 2

9

10

STP Power CableSTP Power Cable

STP Power CableSTP Power Cable

STP Power CableSTP Power Cable

STP Power CableSTP Power Cable

STP Power CableSTP Power Cable

STP Power Cable

EM-25 EM-23

EM-24

EM-22

Republic of the Philippines JAPANINTERNATIONAL

COOPERATIONAGENCY

NIPPON KOEICO., LTD.

NJS CONSULTANTSCO., LTD.

JAPAN AIRPORTCONSULTANTS,

INC.

JICA DESIGN CONSULTANT JOINT VENTURE

(ORIGINAL SIGNED)

(ORIGINAL SIGNED)

(ORIGINAL SIGNED) (ORIGINAL SIGNED)