A
B
C
D
1 2 3 4 5 6 7
RECEPTACLE LAYOUT PLAN
POWER HOUSE (PWH)
1
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
A
B
C
D
1 2 3 4 5 6 7
LIGHTING LAYOUT PLAN
POWER HOUSE (PWH)
1
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
PANEL SCHEDULE
1
POWER HOUSE (PWH)
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
A
B
C
D
1 2 3 4 5 6 7
TELEPHONE AND DATA SYSTEM PLAN
POWER HOUSE (PWH)
1
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
A
B
C
D
1 2 3 4 5 6 7
FIRE DETECTION AND ALARM SYSTEM PLAN
POWER HOUSE (PWH)
1
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
A
B
C
D
1 2 3 4 5 6 7
B
GROUND FLOOR GROUNDING SYSTEM PLAN
POWER HOUSE (PWH)
1
A
C
E E E E
E
A
F F
A
F
D
A
DD
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
B63-4300-01B63-4300-02
B63-4300-03B63-4300-04
B63-4200-01
B63-4200-02B63-4200-03
LOCATION PLAN
LAYOUT PLAN FLOOR AREA SCHEDULE, EXTERNAL FINISHING SCHEDULEPLAN, ELEVATIONS, SECTION, INTERNAL FINISHING SCHEDULE
DETAIL SECTION, SCHEDULE OF DOORS & WINDOWS
FOUNDATION PLAN
ROOF FRAMING PLAN
FRAME ELEVATION
B63-6100-01
DOCUMENT IV: DRAWINGS
SHEET CONTENTS SHEET No. SHEET CONTENTSSHEET No.
DRAWING LIST
B63-6100-03
STP FACILITIES LAYOUT
B63-6200-01
CONTROL ROOM EQUIPMENT LAYOUT
PWR FEEDER LAYOUT
RECEPTACLE, LIGHTING & PANEL SCHEDULE
B63-6800-01TELEPHONE LAYOUT
B63-6100-02
FDAS LAYOUT
PLUMBING WORKSB63-5100-01 STP CONTROL ROOM (STP) MECHANICAL SANITARY & PLUMBING (1) GROUND & ROOF DECK PLUMBING PLAN,
TOILET 1 BLOW-UP PLAN, PLUMBING EQUIPMENT SCHEDULE & SANITARY FIXTURE SCHEDULE B63-5100-02 STP CONTROL ROOM (STP) MECHANICAL SANITARY & PLUMBING (1) SEWAGE AND SLUDGE PIPING PLAN
MECHANICAL WORKSB63-5200-01 STP CONTROL ROOM (STP) MECHANICAL VENTILATION AND AIR-CONDITIONING
FIRE PROTECTIONB63-5300-01 STP CONTROL ROOM (STP) MECHANICAL FIRE PROTECTION STP FIRE PROTECTION LAYOUT
AIR-CONDITIONING AND VENTILATION LAYOUT
B63-4200-04 RC SLAB DETAILS
SUBCOMPONENT-4-6: UTILITY BUILDINGSCOMPONENT-4: BUILDING WORKS (B)
(B63) STP CONTROL ROOM (STP)
ELECTRICAL WORKS
ARCHITECTURAL WORKS
STRUCTURAL WORKS
B63-4300
B63-4200
B63-5100
B63-5200
B63-5300
B63-6000
B63-6300-01
B63-6900-01 GROUNDING LAYOUT
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
GH-1
GH-2GH-2
GH-2
GH-2
GH-1
GH-1
GH-2
PARKING PARKINGTAXI STAND
COMPONENT-4 BUILDING WORKS (B)SUBCOMPONENT-4-6 UTILITY BUILDINGS(B61) STP CONTROL ROOM (STP)
STP
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
Parapet Coping
Ladder
Sky Light
Soffit
DownSpout
Parapet
x
x
x
PCR
LDS
SKL
PCASFCSFBSFA
DSBDSAPAF
Fascia
Roof Gutter
Roof
Floor
OUTLINE OF EXTERNAL FINISHING SCHEDULEAppl.
x
Portion
x
RGAROPRROPSROC
ROS
EVA
RGB
RODFLCFLSFLG
Symbol Finishing Material
wp-3: Water Proofing : Urethane Waterproofing Coating
Expansion Joint
Roller Doors
Base
Beam
RDG
EXJ
RDST
BMSBMFBMCBMRCNS
x
SKGBSFBSR
Finishing MaterialAppl.
Column
Doors
Windows
PortionWalls
CNRCNC
x SD
x AW
x
CNBCNF
WLDWLCWLRWLA
Symbol
xSynthetic Resin Emulsion Paint
Fluorine-resin Enamel coatingAcrylic Resin Enamel PaintEpoxy Resin Floor Paint
Synthetic Resin Emulsion Multi-Layer CoatingSynthetic Resin Mixed Paint type II (for steel)Synthetic Resin Mixed Paint type I (for wood)
P-3
Clear LacquerP-6
P-8P-7
P-5P-4
Legend for Paint Type
P-2P-1
STP CONTROL ROOM (STP)
x PAR
DSC
x AD
2m66.45
2
1
66.45 m
4350
15275
TOTAL
GFL
Floor Area
66.45
Floor Area No.FL
1 m2
SCALE 1 LAYOUT PLAN
1:200m. SCALE 2 STP CONTROL ROOM
1:200m.
STP CONTROL ROOM
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
SCALE 1 GROUND FLOOR PLAN
1:100m.
20000
600030006000
45501450 3588
4000 50
LINE OF CANOPY ABOVE
1235
1085
1680
4321
LABORATORY1-01
CONTROLROOM1-02
PAN.1-03
SHO.1-04
280
280
SD1
AW3
AW3
AW2
AW1
AW1
AW1
WD1
WD3
WD2 TOI.
1-05
50
SD1
SD2
1500 1500 1600
550
2000
1650
4200
OUTDOORSUBSTATION
400
5000
300
600
A
B
241260
060
0
600
600
1200
BLDG LINE
ROOF DECK SLAB
RD
SLOPE
DS 100MM
RD
BLDG LINE
RD RD
SLOPE
15000
6000 3000 6000
1130 1130
1130
4000
1130
SLO
PE
=1/
100
CO
NC
RE
TE J
OIN
T W
=25
mm
SLO
PE
=1/
100
SLO
PE
=1/
100
3000 3000 1500 1500 3000 3000
CO
NC
RE
TE J
OIN
T W
=25
mm
SLO
PE
=1/
100
SLO
PE
=1/
100
2000
2000
1 2 3 4
A
B
SCALE 2 ROOF PLAN
1:100m.
CO
NC
RE
TE J
OIN
T W
=25
mm
CO
NC
RE
TE J
OIN
T W
=25
mm
CO
NC
RE
TE J
OIN
T W
=25
mm
SCALE 3 REFLECTED CEILING PLAN
1:100m.
6000
15000
4000
C3
4000
1235
1680
TOILET
SHOWER
1-05
10851-04
6000
4550
3000
1450
CH=2400
1130 1130
1130
1130
1-03PANTRY
C3CH=2400
C3CH=2400
4321
A
B
1130
1130
CONTROLROOM1-02
LABORATORY1-01
3800
3300
500
FIN. FLR. LINE
TOP OF PARAPET
6260
2700
600
ROOF LOW POINTROUGH CONC. LVL.
BA
1100
SCALE 7 LEFT SIDE ELEVATION
1:100m.
113040001130
2700 38
00
SCALE 4 FRONT ELEVATION
1:100m.
3800
3400
FIN. FLR. LINE
TOP OF PARAPET
400
17260
30006000 6000 1130
ROOF LOW POINTROUGH CONC. LVL.
1130
150
4321
2700
200
900
2700
150
1100
3800
SD1
SD1
SD2
SCALE 6 REAR ELEVATION
1:100m.
3800
3400
FIN. FLR. LINE
400
TOP OF PARAPET
15000
30006000 60001130
ROOF LOW POINTROUGH CONC. LVL.
150
1234
2700
200
900
1130
2700
150
1100
3800
AW1
AW1
AW1
SCALE 5 RIGHT SIDE ELEVATION
1:100m.
500
330038
00
FIN. FLR. LINE
TOP OF PARAPET
1130
6260
ROOF LOW POINTROUGH CONC. LVL.
B A
1130 4000
1100
2700 38
00
AW3
AW3
AW2
SCALE 8 LONGITUDINAL SECTION
1:100m.
3800
3300
2700
FIN. FLR. LINE
TOP OF PARAPET
15000
600030006000
3000300045501450
500
600
2400
300
5027
0011
00
3800
2400
1400
1700
700
300
1130
1130
CEILING LINE
LABORATORY CONTROL ROOM
PANTRY
ROOF DECK SLAB
4321
100
2700
AW1
AW1
AW1
WD1
300
334038
00
2700
FIN. FLR. LINE
TOP OF PARAPET
B
460
640
900
1500
300
CEILING LINE
3800
2700
1100
1700
700
1130 1130
6260
300
600
500
CONTROL ROOM1-04
ROOF HIGH POINTROUGH CONC. LVL.
A
4000
SCALE 9 CROSS SECTION
1:100m.
AW1
300
Room Designation
1-01 Laboratory 2700 x1-02 Control Room 2700 x x1-03 Pantry 2400 x1-04 Shower 2400 x1-05 Toilet 2400 x
GFL
sq.m
= 6
6.70
Building Element
x xx x x
x x xx x xx x x
Room Designation
Roo
m N
umbe
r
C8C7C6C5C4C3C2C1B4B3B2B1Co8Co7Co6Co5Co4Co3Co2Co1W10W9W8W7W6W5W4W3W2W1S5S4S3 RemarksS2F12F11F10F9F8F7F6F5F4F3F2F1CH
Wall BeamColumns CeilingSkirting
Finishing
Floor
2
OUTLINE OF INTERNAL FINISHING SCHEDULESTP CONTROL ROOM (STP)
x
Legend for Paint TypeP-1 Synthetic Resin Emulsion Paint
wp-3: Water Proofing : Urethane Waterproofing Coating
P-2 Synthetic Resin Mixed Paint type I (for wood)P-3 Synthetic Resin Mixed Paint type II (for steel)P-4 Synthetic Resin Emulsion Multi-Layer CoatingP-5 Clear LacquerP-6 Epoxy Resin Floor PaintP-7 Acrylic Resin Enamel PaintP-8 Fluorine-resin Enamel coating
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
ELEV.= FL-150SIDEWALK LEVEL
GL= FL-300
ELEV.= FL±0GROUND FLOOR LINE
150
CONTROL RM.1-04
A
300
150
700
2400
1700
2700
300
600
3800
1100
500
CEILING FINISH LEVELBOTTOM OF PARAPET
ELEV.= FL+3300
ELEV.= FL+2700
ROUGH CONCRETE LEVEL
TOP OF PARAPETELEV.= FL+3800
ROOF LOWEST POINT
1130
425355 350
SLOPE=1/100
FILLING MATERIALCOMPACTED
0.25mm POLYETHYLENE SHEET
50mm LEAN CONCRETE
50mm GRAVEL BED REMARKS
- PASSAGE LATCH
- LAVATORY LATCH
WITH INDICATOR
- PUSH-PULL BAR
- FLUSH BOLT
- CRESCENT SASH LOCK
- CAMLATCH HANDLE & ARM
- ROLLER TIGHTNING HANDLE
- AIRTIGHTNESS
- INSECT SCREEN
- FRAMELESS DOOR
- BLIND BOX
- ROCK WOOL
SWINGRIGHT HAND
STAINLESS STEEL
SYMBOLS & CONVENTION OF DOOR & WINDOW
2
STAINLESS STEEL
TA
(SB)
FIXED
FIXED
SWING
TB
LEFT HAND
(SB)
DOOR & WINDOW
- ALUMINUM DOOR
- STEEL DOOR
- ALUMINUM SCREEN
- WOODEN DOOR
- ALUMINUM LOUVER
- ALUMINUM WINDOW
- ROLLING SHUTTER DOOR
AD
AL
AW
AS
WD
RS
SD
W1
W3
W2
D5
AW
3AW
AW1
2
WD
3WD
2
3
1
1
1
805 x 700
2370 x 700
780 x 700
700 x 2100
800 x 2100
DIMENSION
D4
D1
FIG
UR
E
WD1
SD1
MA
RK
TYPE
QU
AN
TITY
1
2
800 x 2100
1800 x 2100
W (
w)
x H
(h)
WIRED GLASS
GLAZING
- CLEAR FLOAT GLASS
- HEAT ABSORBING
- LAMINATED GLASS
- CLEAR WIRED GLASS
- HEAT ABSORBING GLASS
- FIGURED WIRED GLASS
- FIGURED GLASS
SLIDINGSINGLE
- TEMPERED GLASS
FINISH - ANODIZED
STAINLESS STEEL
- EPOXY-POLYESTER
PAINT TYPE-1 (WOOD)
- SYNTHETIC RESIN MIXED
- SYNTHETIC RESIN MIXED
- ANODIZING ELECTRO
- SCRATCH BRUSHED
- MELAMINE RESIN OVERLAID
- POLYURETHANE ENAMEL
PAINT (STEEL)
BAKED PAINT
PROJECT OUT/IN
STAINLESS STEEL
TC
(SB)
TD
PIVOTED
(SB)
P-3
UE
- HONEY COMB
- ALUMINUM
- STAINLESS STEEL
- TEMPERED GLASS
- WOOD
- STEEL
MATERIAL
ST
SST
AL
WD
HC
TG
70
70
70
120
120
AN
AED
P-2
MR
EPX
SB 40
40
AL AED
AL
AL
ST
ST
AED
AED
TG
SWINGDOUBLE
150 x 825 x 1NO.
150 x 825 x 1NO.
DEPOSITION
HAG 8
HAG
HAG
8
8
CWG
HAWG
HAG
FWG
CG
FG
LG
ST
ST
DIMENSION
120
120
FRA
ME
40
40
OR
SA
SH
DO
OR
PA
NE
L
ST
ST
MA
TER
IAL
P3
FIN
ISH
650 x 700 x 2 NOS.
150 x 825 x 1NO.
GLAZING
THIC
KN
ES
S
TYP
E
LOUVER
DIM
EN
SIO
N W
x H
ST
ST
MA
TER
IAL
- BUTT HINGE
- FLOOR HINGE
- PIVOT HINGE
- SPRING HINGE
LEVER HANDLE
- HOOK LOCK
- MORTISE LOCK &
- CYLINDRICAL LOCK
LEVER HANDLE
- DEADBOLT MORTISE LOCK
LOCK & LATCH/DOOR HANDLE
- EMERGENCY LOCK &
HC
EL
CL
ML
SLIDINGDOUBLE
CLH
CLH
CLH
ML
ML
X
P3
P3
X
X
X
X
PH
PH
BH
FH
PH
DL
SH
HINGES
X
X
X
X
FTG
RW
OTHERS
AT
BB
IS
X
X
X AL
X
X
AL
AL
TA
TACS
CLH
PL
LL
PP
RT
FB
ML
ML
LOC
K A
ND
LA
TCH
IRON MONGERY
& H
AR
DW
AR
EA
LL F
ITTI
NG
FIX
ING
P3
P3
FIN
ISH
X
X
PH
BH
HIN
GE
S
DO
OR
STO
P
DO
OR
CLO
SE
R
X
X
X
X
X
X
DO
OR
NA
ME
PLA
TE
OTHERS
WE
ATH
ER
MO
ULD
ING
SIL
L/TR
IM
DO
OR
TH
RE
SH
OLD
TA
TA
BLI
ND
S
FFL
FFL
W1
D1
FFL
D3 D4
FFL
W2 W3
FFL
D5
W=800W=1800 W=800 W=700
H=
2100
650
100
700100 700100100 100
H=
2100
825
825
150
125
150
150 150
H=
2100
150
825
H=
2100
825
150
150 100
1700
H=
700
W=2370
4 EQUAL PANELS
W=805
1700
H=
700
150
2080
P3
P3
P3
200
80
5030
100100
D3
W=830
H=
700
1700
75
80
140
50DRIP MOLD
100
SCALE 1 DETAIL SECTION
1:20m.
SCALE 3 SCHEDULE OF DOORS AND WINDOWS
1:20m.
2700
FG 8
MORTARCANTING
WATERPROOFINGMEMBRANE
SD2
1 800 x 2100 120 40 ST 150 x 825 x 1NO. ST MLP3 X PH X X XTAP3D2
FFL
D2
W=800
H=
2100
t=4.5 CHECKERED PLATE W/ P-3
CEMENT RENDER
D13
D10-250@
STEEL 40X40X4mm
130
500
130 556 130
CL
3mm NOMINAL GAP
10mm Ø DOWELS @ 500 O.C
SCALE 2 DETAIL SECTION
1:20m.
50
X = APPLICABLE
AN
TI-S
HA
TTE
R F
IXTU
RE
X
X
X
X
X
ST
ST
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
1 2 3 4
A
B
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
1 2 3 4
A
B
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
1 2 3 4
B A
GRID
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
PAN.
SHO.
TOI.
LABORATORY
PAN.
SHO.
TOI.OUTDOOR
SUBSTATION
1 2 3 4
A
B
CATCH BASIN SCHEDULE
SANITARY FIXTURE SCHEDULEPLUMBING EQUIPMENT SCHEDULE
1
A
B
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
LEGEND:
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
AIR TERMINAL DEVICES:
SEWAGE TREATMENT PLANTSPLIT TYPE AIR CONDITIONING UNIT:
EXHAUST FAN:
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
1 2 3 4
A
B
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)
GH-1
DN
DISTRIBUTION
CHAMBER
PARKING SPACE
GRIT CHAMBER/
PUMP STATION
DISINFECTION
TANK
DRYING BED
SLUDGE
DRYING BED
SLUDGE
TREATED WATER
TANK
OUTDOORSUBSTATION
CONTROLROOM1-02
PAN.1-03
LABORATORY1-01
GH-1
OXIDATION
DITCH
HANDRAIL
SEE DETAIL
OPENING
W1100xL2000
LADDER RUNG
SEE DETAIL
FROM
DISTRIBUTING
CHAMBER
300
FROM RETURN
SLUDGE PUMP
UP
THICKENED
SLUDGE TANK
SEDIMENTATION
C L A R I F I E R
MRF
4LPPN
4LPPN
0
GRAPHICAL SCALE
100 250 500 m.
STP FACILITIES LAYOUT
1
ESH-1 ESH-3
ESH-5
ESH-7
ESH-6
ESH-2
ESH-4
Tabulation of the Cable & Conduit in STP FacilitiesSection Classfication of cable Conduit
STP Power Cable PVC50 x 1
Remarks
2 - 5.5mm THHN Cable (To GH)PVC32 x 1
3
2 - 5.5mm THHN Cable (To GH)
2 - 5.5mm THHN Cable (To Road Light)
STP Power Cable PVC50 x 1
1
2
1 3
5
4
6 7
8
9
10
STP Power Cable PVC50 x 1STP Power Cable PVC50 x 1
2 PVC32 x 1
PVC75 x 1PVC75 x 1
PVC50 x 1PVC50 x 1
PVC100 x 12 - 5.5mm THHN Cable (To GH)2 - 5.5mm THHN Cable (To Road Light)2 - 5.5mm THHN Cable (To GH)2 - 5.5mm THHN Cable (To Road Light)
PVC32 x 1PVC32 x 1
4
5
6
PVC75 x 3PVC50 x 6
7
8
PVC32 x 1
PVC75 x 3PVC50 x 6PVC50 x 4PVC75 x 2PVC50 x 2
9
10
STP Power CableSTP Power Cable
STP Power CableSTP Power Cable
STP Power CableSTP Power Cable
STP Power CableSTP Power Cable
STP Power CableSTP Power Cable
STP Power Cable
EM-25 EM-23
EM-24
EM-22
Republic of the Philippines JAPANINTERNATIONAL
COOPERATIONAGENCY
NIPPON KOEICO., LTD.
NJS CONSULTANTSCO., LTD.
JAPAN AIRPORTCONSULTANTS,
INC.
JICA DESIGN CONSULTANT JOINT VENTURE
(ORIGINAL SIGNED)
(ORIGINAL SIGNED)
(ORIGINAL SIGNED) (ORIGINAL SIGNED)