1

15th July 2015Teleconference

32nd IG Meeting South Gas Regional Initiative

Page 2: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

2

Agenda

Page 3: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

3

II.1. Results of the last auctions

(for information by TSOs)

II. CAM NC

Page 4: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

4

II.2. TSOs proposal of common methodology to maximize

technical capacity

(for information by TSOs)

II. CAM NC

Page 5: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

5

II.2. Capacity calculation and maximisation at interconnections

NRAs reaction:

II. CAM NC

1. NRAs welcome the TSOs studies on capacity calculation and maximization Interconnection Points (ENAGAS & TIGF) (ENAGAS & REN), to comply with the CAM NC (EU):

Article 6.1 of Regulation (EU) nº 984/2013, of 14th October 2013, states that:“(a) In order to maximise the offer of bundled capacity through the optimization of the technical capacity

transmission system operators shall take the following measures at interconnection points, […] , the transmission system operators shall establish and apply a joint method, setting out the specific steps to

be taken by the respective transmission system operators to achieve the required optimization.

2. However, the studies: Give little information about hydraulic simulations. According to the text, capacities could be completed with a dynamic approach;

i.e. giving information about additional capacities in spring and summer, interruptible capacities to be offered, etc.

They can be improved giving information about additional capacities and probabilities associated.

Page 6: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

6

II.3. Bundling capacity at the IPs: Update

(for information by TSOs)

II. CAM NC

Page 7: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

7

II.4. Status of TSO’s IT systems for adaptation to daily

auctions by 1st November 2015

(for information by TSOs)

II. CAM NC

Page 8: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

8

(for information by TSOs)

III. CMP: Common methodology of OSBB for the Region

Page 9: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

9

III. CMP: last development of OSBB proposal

NRAs reaction to OSBB proposal• NRAs welcome the proposal evaluating it positively, as a first

step in the right direction to comply with European and national rules.

• NRAs appreciates the TSO efforts and recognize the proposal as a good starting point to implement OSBB in a coordinated way.

• NRAs ask TSOs when it would be possible to implement the Proposal. The implementation date should be adapted to the application of daily auctions: November 2015.

• SGRI will send the Proposal to SGRI Stakeholders Group for public consultation.

• NRAs and TSOs must set up deadlines for completing the process asap

Page 10: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

10

(for information by NRAs)

IV. Balancing NC implementation in the three countries

Page 11: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

11

IV. Balancing NC implementation in the three countries

FRANCE

• The “Trading region South”, a single market zone including GRTgaz South zone and TIGF, was implemented from 1 April 2015.

• The balancing network code will be fully implemented in France in October 2015, consistently with CRE deliberation of 15 January 2015: http://www.cre.fr/en/documents/deliberations/approval/balancing-rules-grtgaz-tigf

Page 12: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

12

IV. Balancing NC implementation in the three countries

SPAIN

• In September 2014, GTS (the Technical System Manager, the agent in charge of the balancing) and Enagas –following article 52 - sent a justified request to the CNMC asking for an extension of the period to implement the code – by 1 October 2016.

• In October 2014, CNMC accepted the request. The answer was also sent to European Commission and ACER.

• The CNMC proposal of “Circular” to regulate the gas balancing was submitted to Public Consultation until 23 March 2015.

http://www.cnmc.es/es-es/energ%C3%ADa/consultasp%C3%BAblicas.aspx

• The Circular has been reviewed taking into account the responses received. It is expected to be approved by the CNMC Plenary by the end of July.

Page 13: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

13

IV. Balancing NC implementation in the three countries

PORTUGAL

• In February 2015, ERSE received from REN Gasodutos (TSO) – following article 52 – a justified request asking for an extension of the period to implement the code – by 1 October 2016.

• In April 2015, ERSE accepted the request. The answer was also sent to European Commission and ACER.

http://www.erse.pt/pt/gasnatural/regulamentos/operacaodasinfra-estruturas/Documents/BAL%20Decis%C3%A3o%20ERSE%20Prorroga%C3%A7%C3%A3o%20Prazo.pdf

• Since April 2015 ERSE has promoting working meetings with TSO, DSO and suppliers to discuss the framework to implement balancing NC.

• The public consultations to approve the new framework regarding Balancing NC, are foreseen for the 2nd semester 2015.

Page 14: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

14

(for information by NRAs)

V. Interoperability NC. Latest developments and next steps in the Region

Page 15: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

15

Interoperability NC. Latest developments and next steps in the Region

Regulation (EU) 2015/703 of 30 April 2015 establishes a network code on interoperability and data exchange rules.

According to article 5 ENTSOG published a template to evaluate the draft interconnection agreement covering the default terms and conditions set out in articles 6 to 10.

ENTSOG has published the draft template. The objective of the ENTSOG template is to set out the default terms and conditions that TSOs must conclude when they fail to agree on one or more rules established in the code.

By 31st August, NRAs can provide an opinion to ACER on the compliance of the template with national laws.

Page 16: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

16

Interoperability NC. Latest developments and next steps in the Region

Next steps

NRAs to guarantee the compliance of the template with national laws.

NRAs and TSOs in cooperation will supervise the transparency of the current interconnection agreements at the IPs in the Region. In particular:• Rules for flow control• Measurement principles for gas quality and quantity• Rules for the matching process• Rules for the allocation of gas quantities• Communication procedures in case of exceptional events.

By 1st November 2015, according to the SGRI WP 2015-2016 it need to be done:

Definition of specific actions and measures to be taken in coordination with NRAs, TSOs and stakeholders, on the harmonisation of Gas year / Gas day / Nomination and renomination procedures / Data exchange

Page 17: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

17

(for information by TSOs)

VI. Infrastructures

VI.1. Candidate projects of common interests in the Region

Page 18: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

18

(for information by NRAs)

VI. Infrastructures

VI.2. Preliminary assessment of the candidate PCIs

1. GR_25_WEST: ES-PT

2. GR_21_a_WEST: Midcat Enagas+Midcat TIGF+Midcat GRTGaz+Eridan+Arc Lyonnais

3. GR_21_c_WEST: Midcat Enagas+Midcat TIGF+Midcat GRTGaz+Eridan+Arc Lyonnais+Obergailbach

4. GR_21_e_WEST: Midcat Enagas+Midcat TIGF+Midcat GRTGaz+Eridan+Arc Lyonnais+Obergailbach+Fos

5. GR_21_b_WEST – Spain non-hosting country - Fos+Eridan+Arc Lyonnais

6. GR_21_d_WEST – Spain non-hosting country - Obergailbach+Fos+Eridan+Arc Lyonnais

7. GR_22_WEST – Spain non-hosting country - Artere Gascogne-Midi+Val de Saone+Gascogne-Midi

PCIs candidates in the SGRI

Page 19: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

19

VI. InfrastructuresVI.2. Preliminary assessment of the candidate PCIs

• Project promoters/TSOs sent to NRAs the Project Specific - CBA results following the ENTSOG methodology.

• Every NRA gave the preliminary assessment to ACER as “hosting” or “non hosting country”, stating if any objection existed for a project candidate to be included in the PCI list.

• EC required TSOs to send CBA results to NRAs interested in receiving the information (non hosting country).

• NRAs have given the assessment to ACER, on 18 June 2015, on the online survey.

One coordinated answer for a candidate PCI or PCI group was submitted.• Next Regional Group meeting is still not scheduled.

Page 20: 1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative

20

Next meetings:

Sep IG?

VII. AOB and next meetings

JULY AUGUST SEPTEMBERL M X J V S D L M X J V S D L M X J V S D

1 2 3 4 5 1 2 1 2 3 4 5 66 7 8 9 10 11 12 3 4 5 6 7 8 9 7 8 9 10 11 12 13

13 14 15 16 17 18 19 10 11 12 13 14 15 16 14 15 16 17 18 19 2020 21 22 23 24 25 26 17 18 19 20 21 22 23 21 22 23 24 25 26 2727 28 29 30 31 24 25 26 27 28 29 30 28 29 30

31

OCTOBER NOVEMBER DECEMBERL M X J V S D L M X J V S D L M X J V S D

1 2 3 4 1 1 2 3 4 5 65 6 7 8 9 10 11 2 3 4 5 6 7 8 7 8 9 10 11 12 13

12 13 14 15 16 17 18 9 10 11 12 13 14 15 14 15 16 17 18 19 2019 20 21 22 23 24 25 16 17 18 19 20 21 22 21 22 23 24 25 26 2726 27 28 29 30 31 23 24 25 26 27 28 29 28 29 30 31

30