DOCUMENT TITLE :
3/10/2012 0
DOCUMENT NUMBER : SHT. 1 OF 6 REV.
ORIGINATOR:
Descon PROJECT :
Descon Engineering FZE
DATE REV.NO. DESCRIPTION
PROJECT :
INSPECTION AND TEST PLAN
RM
Des-XXXX-QA&QC-01
Issued for Client Review / Comments
0
SK SK
PREPARED BY CHECKED BY APPROVED BY
PO No.:
1
1.1 PIM Agenda H
1.2 ITP & Applicable Code H
1.3 ASME Sec.1 H
1.4 ASME IX, B31.1 , H
1.5 ASME IX H
1.6 ASME Sec.V H
1.7 ASME Sec.VIII Div.1 & Sec.I H
1.8 ASME Sec.VIII Div.1 & Sec.I H
1.9 ASTM / SSPC / Swedish H
1.10 Certificates / SNT-TC-1A H
2
2.1 Drawings/ P.O/ ASME Sec.II Part A H
2.2 Drawings/ P.O/ ASME Sec.II Part A H
3
3.1 ASME Sec.VIII Div.1+ DWG H
Material Inspection / Verification / Certificate review QC Material Inspector
Inspection of Dish End QC Material Inspector
Material inspection report / MTC'S
Controlling of Heat Number and stamp transfer for pressure parts and those which are directly weld with pressure parts / Traceability check
QC Material Inspector Material traceability report / MTC'S
End User
DESCON DOC No.:
Coating Inspector
DOCUMENTATION
INSPECTION BY
DES-PROP-QA&QC-01
DES-QA&QC/FRM-40
QC Engineer
QC Engineer
Welding Engineer
MATERIAL CONTROL
STATUS SIGN SIGN
QC ACTIVITY
STATUS
JZNOBO (CE Marking)
STATUS
Weld Repair Proceudre
SIGNATURE
DESCON PROJECT No.:
SIGN
Hydrostatic and Pneumatic test procedure
PROJECT
COMPANY DOC No:
ASME Authorized Inspector
COMPANY
DES-PROP-QA&QC-01
ITEM TAG
REFERENCE DOCUMENTS / ACCEPTANCE CRITERIA
PREPARED BY
SAKET KUMAR
VERIFYING DOCUMENT
STATUSSIGNSTATUS SIGN
Welding Book
DESCON ENGINEERING FZE
CLIENT
MANUFACTURER
INSPECTION AND TEST PLAN (ITP)
RASHID MAHMOOD
DESCON QA/QC
REVIEWED BY
I/C Product Engineering
PRIME RESPONSIBILTY
-
APPROVED BY
LEGEND: H - HOLD, W - WITNESS, SW - SPOT WITNESS, R - REVIEW OF RECORD, RW-RANDOM WITNESS, A - APPROVAL , M - MONITORING
I/C QA&QC Minutes of meeting
Qualification Certificates
DISH END FORMING
NDE Operator Qualification
Surface Preparation & Painting Procedure
ITEM
SAKET KUMAR
Inspection and Test Plan
Welding Book Welding Engineer
S.P & Painting Procedure
Weld Repair Prcoedure
Pre- Inspection Meeting
Drawings and Design Calculations
Welders Qualification Record
NDE Procedures
Approved drawings
QC Engineer
Hydro static and Pneumatic test procedure
RT,MT,UT DPT Procedures
NDE Engineer
QC Engineer
Inspection Report
Doc. No. : DES-QA&QC/FRM-05ARev.: 01Date: April 22, 2010
Do not duplicate. controlled copy if stamped in red.Descon Engineering FZE
2 of 6
End User
INSPECTION BY
STATUS SIGN SIGN
QC ACTIVITY
STATUS
JZNOBO (CE Marking)
STATUS SIGN
ASME Authorized Inspector
REFERENCE DOCUMENTS / ACCEPTANCE CRITERIA VERIFYING DOCUMENT
STATUSSIGNSTATUS SIGN
DESCON QA/QCPRIME RESPONSIBILTYITEM
3.2 ASME Sec.VIII Div.1 + DWG H
3.3 ASME Sec.VIII Div.1 + DWG H
4
4.1
4.2 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.3
4.4 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.5 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.6 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.7 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.8 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.9 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.10 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.11 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.12 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.13 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.14
4.15
4.16 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.17
MUD DRUM
Rolling Inspection
Rolling / Re Rolling of Shell Course
QC Inspector
Marking of tube holes on the shell of Mud Drum
Marking of tube holes on the shell of Steam Drum QC Inspector
Physical verification / Signed ITP for recordQC Inspector
QC Inspector Physical verification / Signed ITP for record
Physical verification / Signed ITP for record
QC Inspector
Physical verification / Signed ITP for record
Fit up of Tubes with Steam Drum Shell
Fit up Inspection
Rolling / Re Rolling of Shell Course
Nozzles and Stubs Fit-up
Physical verification / Signed ITP for record
Tubes Expansion report
LS and CS Fit-up of shell course. QC Inspector
QC Inspector Physical verification / Signed ITP for record
Physical verification / Signed ITP for record
QC Inspector
Rolling Inspection
FABRICATION
Thickness Check of Head QC Material Inspector Thickness Report
QC Material Inspector MT ReportMT on Knuckle radius
Holes drilling in Steam Drum and Mud Drum
Insertion of Tubes in Tube Holes in the Shell of Steam Drum and Mud Drum
QC Inspector Physical verification / Signed ITP for record
QC Inspector
STEAM DRUM
Physical verification / Signed ITP for record
Fit up of Tubes with Mud Drum Shell QC Inspector Physical verification / Signed ITP for record
Expansion of tubes
QC Inspector Physical verification / Signed ITP for record
Fit up Inspection
Fit up of Saddles
Do not duplicate. controlled copy if stamped in red.Descon Engineering FZE
3 of 6
End User
INSPECTION BY
STATUS SIGN SIGN
QC ACTIVITY
STATUS
JZNOBO (CE Marking)
STATUS SIGN
ASME Authorized Inspector
REFERENCE DOCUMENTS / ACCEPTANCE CRITERIA VERIFYING DOCUMENT
STATUSSIGNSTATUS SIGN
DESCON QA/QCPRIME RESPONSIBILTYITEM
4.18 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.19 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.20 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.21
4.22
4.23 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.24
4.25 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.26 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.27 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.28
4.29 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.30 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.31 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
4.32 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.33
4.34 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.35 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
4.36
4.37 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
4.38
SUPER HEATER HEADER
Hydrostatic test of Header as per approved drawing QC Inspector Physical verification / Signed ITP for record
Final Visual and Dimensional inspection of Coil QC Inspector Physical verification / Signed ITP for record
NDE as per apporved drawing QC Inspector Physical verification / Signed ITP for record
Final Visual and Dimensional inspection of Header QC Inspector Physical verification / Signed ITP for record
PIPING SPOOLS
Fit Up Inspection of Piping Spools QC Inspector Physical verification / Signed ITP for record
NDE as per approved Drawings QC Inspector Physical verification / Signed ITP for record
QC Inspector Physical verification / Signed ITP for record
QC Inspector
Final visual and dimensional Inspection of Ladders and Platforms QC Inspector
Physical verification / Signed ITP for record
Nozzles and Stubs Fit-up
FLASH VESSEL
Rolling Inspection
QC Inspector Physical verification / Signed ITP for record
Fit up Inspection
Nozzles and Stubs Fit-up QC Inspector Physical verification / Signed ITP for record
Physical verification / Signed ITP for record
Rolling / Re Rolling of Shell Course
LS and CS Fit-up of shell course.
Physical verification / Signed ITP for record
QC Inspector
Marking of Tube holes on the shell of Steam Drum
QC Inspector
Marking of Tube holes on the shell of Steam Drum QC Inspector Physical verification / Signed ITP for record
Physical verification / Signed ITP for record
LADDERS AND PLATFORMS
LS and CS Fit-up of shell course.
Trial Assembly of Ladders and Platforms
Do not duplicate. controlled copy if stamped in red.Descon Engineering FZE
4 of 6
End User
INSPECTION BY
STATUS SIGN SIGN
QC ACTIVITY
STATUS
JZNOBO (CE Marking)
STATUS SIGN
ASME Authorized Inspector
REFERENCE DOCUMENTS / ACCEPTANCE CRITERIA VERIFYING DOCUMENT
STATUSSIGNSTATUS SIGN
DESCON QA/QCPRIME RESPONSIBILTYITEM
4.39 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
5
6.4 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
6.6 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications W
6.7 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications W
6
6.1 PWHT Specification ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
6.2 PWHT Report and Graph (Chart) ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
6.3 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
7
7.1
7.2 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
7.3 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
7.4 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications , ASME Sec.V H
7.5 10 % MT of LS & CS weld joints ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
7.6 10 % MT on Fillet Welds ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
7.7 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
7.8
7.9 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
7.10 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
7.11 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
7.12 10 % MT of LS & CS weld joints ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
7.13 10 % MT on Fillet Welds ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
WELDING INSPECTION
DES-QA&QC/FRM- 62
NDE Inspector DES-QA&QC/FRM-63 + 62
Complete compliance of approved WPS
PWHT
DES-QA&QC/FRM-74
DES-QA&QC/FRM-56
BEFORE PWHT
DES-QA&QC/FRM-63 + 62
DES-QA&QC/FRM-61 + 62
Final weld visual Inspection
Welding Inspector
UT of Nozzle to Shell welds NDE Inspector
RT as per approved Drawings
NDE Inspector DES-QA&QC/FRM- 62
NDE Inspector
DES-QA&QC/FRM-60 + 62
AFTER PWHT
10 % MT or PT on all nozzle welds and welded accessories NDE Inspector
NDE Inspector
DES-QA&QC/FRM-63 + 62
DES-QA&QC/FRM-62
RT as per approved Drawings NDE Inspector DES-QA&QC/FRM-60
100 % MT on Lifting Lugs100% UT on Lifting Lugs (Full Penetration Joints) NDE Inspector
NDE Inspector
UT of Nozzle to Shell welds
DES-QA&QC/FRM-63 + 62
Welding Engineer
Hardness test of welds after PWHT
Welders Qualification Welding Inspector
NDE Inspector DES-QA&QC/FRM-61 + 62
Welding Inspector
Physical verification / Signed ITP for record
Weld visual Inspection report
Physical verification / Signed ITP for record
NDE
MPT / DPT after grinding smooth temporary welds
Welding Engineer
Welding Engineer
Hardness test report
NDE Inspector
NDE as per approved Drawings QC Inspector Physical verification / Signed ITP for record
Do not duplicate. controlled copy if stamped in red.Descon Engineering FZE
5 of 6
End User
INSPECTION BY
STATUS SIGN SIGN
QC ACTIVITY
STATUS
JZNOBO (CE Marking)
STATUS SIGN
ASME Authorized Inspector
REFERENCE DOCUMENTS / ACCEPTANCE CRITERIA VERIFYING DOCUMENT
STATUSSIGNSTATUS SIGN
DESCON QA/QCPRIME RESPONSIBILTYITEM
7.14 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications, ASME Sec.V H
8
8.1 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
8.2 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
8.3 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
8.4 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
8.5 Verification of Close out of NCR's (if any) ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
8.6 ASME Sec.VIII Div.1 / Sec.I H
8.7 ASME Sec.VIII Div.1 / Sec.I H
8.8 ASME Sec.VIII Div.1+Sec.I + DWG + Project Specifications H
9
9.1 ASME Sec.VIII Div.1 / Sec.I H
9.2 ASME Sec.VIII Div.1 / Sec.I H
10
10.1 SSPC / Swedish H
11
11.1 Packing and Shipping Instructions H
11.2 Packing and Shipping Instructions H
11.3 Release Note H
11.4 Final Data Book H
QC Inspector / QA Engineer NDE Summary sheet
DES-QA&QC/FRM-62
Visual Inspection after PWHT QC Inspector Dimensional inspection report
Dimensional inspection reportQC Inspector
Physical verification / Signed ITP for record
100 % MT on Lifting Lugs100% UT on Lifting Lugs (Full Penetration Joints) NDE Inspector
Draining & Drying after Hydrostatic test
NDT Verifications
FINAL INSPECTION
NDE Summary sheet
SURFACE PREPARATION AND PAINTING
Flange Protection inspection Physical verification / Signed ITP for record
MDR
QC Inspector Physical verification / Signed ITP for record
PRE-SHIPMENT INSPECTION AND DOCUMENTATION
Final Coat DFT and Final Colour Check
QC Inspector
Manufacturer data record book
QC Inspector
QC Inspector
Inspection of packing of shipment QC Inspector
Final Data Book
Stamping & Attachment of name plate QC Inspector Name plate copy
Signing of Manufacturer Data Report
IRCIssuance of inspection release note QC Inspector
Packing List
Coating Inspector
Leak test on RF Pads QC Inspector
Final visual and dimensional Inspection
DES-QA&QC/FRM-52Hydrostatic testing QC Inspector
NAME PLATE
QC Inspector
Internal Inspection before Hydrostatic test
Painting inspection report
DES-QA&QC/FRM-52
QC Inspector
Do not duplicate. controlled copy if stamped in red.Descon Engineering FZE
6 of 6