OPERABLE UNIT 3-13 09122199
p FILE NUMBER
AR3.1 SAMPLING AND ANALYSIS PLAN Icontinued)
A
A
A
A
A
A
Document #: 93MSE/lD-225 Title: Transmittal of WAG 3/WAG 10 Sampling and Analysis Plan Author: Barry, G.A. Recipient: Burns, S.M. Date: 08/02/93
Document #: 6744 Title: Sampling and Analysis Plan for WAG 3/WAG 10 Radionuclide-
Contaminated Soils Treatability Study Author: Barry, G.A.; Doornbos, M.H. Recipient: Not specified Date: 08/01193
Document #: AMIERWM-RPO-173-92 Title: Transmittal of the Closure Addendum for the Draft Sampling and Analysis
Plans (SAP) for Operable Units (OU) 3-07 and -98 (Tank Farm I & II, respectively), and WAG 3 Quality Assurance Project Plan (QAPjP)
Author: Lyle, J.L. Recipient: Pierre, W.; Nygard, D. Date: 07131192
Document #: AMIERWM-RPO-154-92 Title: Transmittal of the Modifications to Operable Unit (OU) 3-07, the Tank
Farm Sampling and Analysis Plan (SAP) at the Idaho Chemical Process Plant (ICPPI Waste Area Group 3 (WAG 3)
Author: Lyle, J.L. Recipient: Pierre, W.; Nygard, D. Date: 07/10192
Document #: 893-l 195.320 Title: Report for the Idaho Chemical Processing Plant (ICPP) Drilling and
Sampling Program at Land Disposal Unit CPP-59 Author: Golder Associates, Inc. Recipient: Not specified Date: 01101/91
Document #: 893-l 195.330 Title: Report for the Idaho Chemical Processing Plant (ICPP) Drilling and
Sampling Program at Land Disposal Unit CPP-64 Author: Golder Associates, Inc. Recipient: Not specified Date: 01101/91
B-21
FILE NUMBER
AR3.1
09122199 OPERABLE UNIT 3-l 3
SAMPLING AND ANALYSIS PLAN (continued)
A.
A
A
A
1.
h
Document #: 893-l 195.360 Title: Report for the Idaho Chemical Processing Plant (ICPP) Drilling and
Sampling Program at Land Disposal Unit CPP-54 Author: Golder Associates, Inc. Recipient: Not specified Date: 01/01/91
Document #: INEL-9510064 Title: Report of 1993194 Tank Farm Drilling and Sampling Investigation at the
Idaho Chemical Processing Plant Author: Not specified Recipient: Not specified Date: 02101 I95
Document #: 893-l 195.530 Title: Report of the Idaho Chemical Processing Plant Drilling and Sampling
Program at the HLLW Tank Farm and LDU CPP-33 Author: Golder Associates, Inc. Recipient: Not specified Date: 12/l 9191
Document #: 903-l 171 Title: Report for the Idaho Chemical Processing Plant Sampling and Analysis
Program at Service Waste Percolation Pond No. 2 Author: Golder Associates, Inc. Recipient: Not specified Date: 04/l 5192
Document #: ERDl-098-92 Title: Transmittal of the Sampling and Analysis Plan (SAP) for Operable Unit
(OU) 3-08 at the Idaho Chemical Processing Plant (ICPP) Waste Area Group 3 (WAG 3)
Author: Lyle, J.L. Recipient: Pierre, W.; Nygard, D. Date: 04/07/92
Document #: INEEL/EXT-97-00677, Rev. 0 Title: Limited Scope and Hazard Characterization Plan for Soil Disturbance
CERCLA Radiological Characterization at ICPP - CPP-701 Petroleum Contaminated Soil
Author: Jones, R.K.; Willis, B.J. Recipient: Not specified Date: 06101 I97
B-22
OPERABLE UNIT 3-13
,p FILE NUMBER
09122199
AR3.1 SAMPLING AND ANALYSIS PLAN (continued)
A Document #: INEL-9510137, Rev. 0 Title: Sampling and Analysis Plan for the Waste Area Group 3 Remedial
InvestigationlFeasibility Study Work Plan (FINAL) Author: Meyer, T.J. Recipient: Not specified Date: 08lOl I95
AR3.2 SAMPLING AND ANALYSIS DATAICHAIN OF CUSTODY FORMS (COCI
A Document #: RM-06-93-A Title: Validation of Organochlorine Herbicide Data from the Fourth Quarter
1992 Groundwater Sampling Effort at the Westinghouse Idaho Chemical Processing Plant: Sample Delivery Groups
Author: Marty, R.C. Recipient: Williams, J.L. Date: 02124193
A Document #: RPW-44-94 Title: Transmittal of Limitations and Validation Report (L&V) Idaho Chemical
Processing Plant (ICPP), Operable Unit 3-07, Radiochemical Analysis, Sample Delivery Group #3PG10301 BG
Author: Wells, R.P. Recipient: Holder, K.D. Date: 04112194
A Document #: 6629 Title: Final Report for 2”’ PECR Author: Hunter, B.R. Recipient: Stalke, A.K. Date: 07127187
1,. Document #: OPE-ER-052-95 Title: Transmittal of the Validated Data for Perched Water Sampling December
1994 and January 1995 Author: Green, L.A. Recipient: Pierre, W.; Nygard, D. Date: 03123195
B-23
09122199 OPERABLE UNIT 3-13
FILE NUMBER
AR3.2 SAMPLING AND ANALYSIS DATAICHAIN OF CUSTODY FORMS (COC)
A
A
I.
A.
A
Document #: Title:
Author: Recipient: Date:
Document #: Title: Author: Recipient: Date:
Document #: Title:
Author: Recipient: Date:
Document #: Title:
Author: Recipient: Date:
Document #: Title:
Author: Recipient: Date:
INELIEXT-97-00341, Rev. 0 Limited Scope and Hazard Characterization Plan for Soil Disturbance CERCLA Radiological Characterization at ICPP Jones, R.K. Not specified 03/01/97
DLF-01-89 Review of Documents (QA/QC Samples) Forsberg, D.L. Minkin, S.C. 09127189
OPE-ER-254-97 Transmittal of the Validated Analytical Sampling Data for Idaho Chemical Processing Plant (ICPPI Radionuclide-Contaminated Soils Non-Time Critical Removal Action at the Idaho Chemical Processing Plant Jenkins, T.W. Pierre, W.; Nygard, D. 11125197
ERD-01 l-91 Submittal of Summary Analytical Data for Investigations at the ICPP (CPP-51, CPP-54, CPP-59, and CPP-64) Solecki, J.E. Humphrey, D.L. 0111 l/91
ERD-036-91 Submittal of Summary Analytical Data for Investigations at the ICPP (CPP-39, CPP-34, and CPP-55) Solecki, J.E. Humphrey, D.L. 02127191
B-24
OPERABLE UNIT 3-13 09122199
r‘ FILE NUMBER
AR3.3 WORK PLAN
A
A
A
A
A
A
Document #: INEL-9510056, Rev. 0 Title: Waste Area Group 3 Comprehensive Remedial Investigation/Feasibility
Study Work Plan (FINAL), Vol. I, through 8. References Author: N/A Recipient: N/A Date: 08/01/95
Document #: INEL-95/0056, Rev. 0 Title: Waste Area Group 3 Comprehensive Remedial Investigation/Feasibility
Study Work Plan (FINAL), Vol. I, Appendices Author: Recipient: Date:
N/A NIA 08/01/95
Document #: INEL-9510056, Rev. 0 Title: Waste Area Group 3 Comprehensive Remedial Investigation/Feasibility
Study Work Plan (FINAL), Vol. II, through Attachment 5 Author: N/A Recipient: N/A Date: 08lOl I95
Document #: INEL-9510056, Rev. 0 Title: Waste Area Group 3 Comprehensive Remedial InvestigationlFeasibility
Study Work Plan (FINAL), Vol. II, Attachment 6 Author: N/A Recipient: N/A Date: 08/01/95
Document #: 6656 Title: Technical Work Plan for the Idaho Chemical Processing Plant, Sampling
and Analysis Program at Solid Waste Management Unit CPP-14, Vol. I, Rev. 1
Author: Golder Associates, Inc. Recipient: N/A Date: 0111 l/91
Document #: 6659 Title: Technical Work Plan for the Idaho Chemical Processing Plant, Quality
Assurance Project Plan for Drilling and Sampling Activities at Solid Waste Management Unit CPP-14, Vol. II, Rev. 1
Author: Golder Associates, Inc. Recipient: Not specified Date: 01111191
B-25
OPERABLE UNIT 3-13
FILE NUMBER
AR3.3 WORK PLAN (continued)
09122199
A
/.
/\
A
A
A
Document #: 6636 Title: Technical Work Plan for the Idaho Chemical Processing Plant, Sampling
and Analysis Program at Solid Waste Management Unit CPP-14, Vol. I, Rev. 2
Author: Golder Associates, Inc. Recipient: NIA Date: 12116/91
Document #: 893-l 195.310 Title: Report for the Idaho Chemical Processing Plant, Drilling and Sampling
Program at Land Disposal Unit CPP-39 Author: Golder Associates, Inc. Recipient: Ledger, J.D. Date: 01/01/91
Document #: OPE-ER-099-94 Title: Transmittal of the Draft Final Technical Work Plan for the WAG 3 and
WAG 10 Radionuclide-Contaminated Soils Treatability Study Author: Lyle, J.L. Recipient: Pierre, W.; Nygard. D. Date: 04126194
Document #: OPE-ER-127-95 Title: Transmittal of the Draft Final Waste Area Group 3 Remedial
Investigation/Feasibility Study Work Plan Author: Green, L.A. Recipient: Pierre, W.: Nygard, D. Date: 07/05/95
Document #: 893-l 195.450, Vol. I Title: Technical Work Plan for the Idaho Chemical Processing Plant Drilling and
Sampling Program at the ICPP Tank Farm (CPP-33) Author: Golder Associates, Inc. Recipient: Not specified Date: 07125190
Document #: 893-l 195.450, Vol. II Title: Quality Assurance Project Plan for Drilling and Sampling Activities at the
ICPP Tank Farm (CPP-331 Author: Golder Associates, Inc. Recipient: Not specified Date: 07125190
B-26
OPERABLE UNIT 3-13
r”
FILE NUMBER
AR3.3 WORK PLAN (continued)
09122199
A Document #: INEELIEXT-98-01097, Rev. 0 Title: Treatability Study Work Plan for the Segmented Gate System Technology
Deployment Author: Wells, R.P. Recipient: Not specified Date: 04/O 1199
AR3.4 RI REPORTS
A Document #: OPE-ER-122-96 Title: Transmittal of the Comprehensive RIIFS for the Idaho Chemical
Processing Plant OU 3-13 at the INEL--Part A, RI/BRA Report (Draft) Author: Jensen, N.R. Recipient: Pierre, W.; Nygard, D. Date: 08105196
AR3.8 RISK ASSESSMENT
A Document #: OPE-ER-117-95 Title: Transmittal of the Draft WAG 3 Screening Level Ecological Risk
Assessment Author: Green, L.A. Recipient: Pierre, W.; Nygard, D. Date: 06/l 9195
AR3.9 QUALITY ASSURANCE PROJECT PLAN
A Document #: QAPjP-E-035, Revision 0 Title: Quality Assurance Project Plan for Characterization Activities at WAG 3 Author: WINCO Recipient: Not specified Date: 07121 I92
h Document #: INEL-9510086, Rev. 4 (formerly EGG-WM-10076) Title: Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6,
7. and 10 Author: Baumer, A.R.; Flynn, S.C.; Watkins, C.S. Recipient: Not specified Date: 03101 I95
B-27
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR3.9 QUALITY ASSURANCE PROJECT PLAN (continued)
k Document #: DOE/ID-10587, Rev. 5 (formerly INEL-95/0086) Title: Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6,
7, 10 and Inactive Sites Author: Baumer, A.R.; Flynn, S.C.; Thompson, R.G.; Watkins, C.S. Recipient: Not specified Date: 12101 I97
AR3.10 SCOPE OF WORK
A
1.
A
h
A
Document #: 5791 Title: Final Scope of Work for the Waste Area Group 3 Comprehensive
Remedial Investigation Feasibility Study Author: WINCO Recipient: N/A Date: 1 O/l 4194
Document #: OPE-ER-283-94 Title: Transmittal of the Final Scope of Work for the Waste Area Group 3
Comprehensive Remedial Investigation Feasibility Study T
Author: Green, L. Recipient: Pierre, W.: Nygard, D. Date: 1 o/21 I94
Document #: RPO-001-92 Title: Transmittal of Scope of Work (SOW) for Track 2 Preliminary Scoping
Study at Operable Unit IOU) 3-08 Author: Lyle, J.L. Recipient: Pierre, W.; Nygard, D. Date: 01/10/92
Document #: OPE-ER-035-93 Title: Transmittal of the Draft Scope of Work (SOW) for Operable Unit 3-08A
(ICPP North Area RI/FS) Author: Lyle, J.L. Recipient: Pierre, W.: Nygard, D. Date: 11115193
Document #: 6590 Title: Review of Draft Scope of Work for Operable Unit-7, Tank Farm Author: Mejia, C. Recipient: Williamson, D.; Fourr, 8.; Williams, J.; Gombert, D. Date: 10118/91 r7
B-28
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR3.10 SCOPE OF WORK (continued)
Iv Document #: 6591 Title: Review of Draft Scope of Work for Operable Unit-7, Tank Farm Author: Mejia, C. Recipient: Williamson, D.; Fourr, B.: Williams, J.; Gombert, D. Date: 10118/91
A Document #: 6592 Title: Review of Draft Scope of Work for Operable Unit-7, Tank Farm Author: Mejia, C. Recipient: Williamson, D.; Fourr, B.; Williams, J.: Gombert, D. Date: 10118/91
A Document #: OPE-ER-047-94 Title: Transmittal of the Draft Final Scope of Work for Operable Unit 3-08A
(ICPP North Area RIIFS) Author: Lyle, J.L. Recipient: Pierre, W.; Nygard, D. Date: 02/l 8194
AR3.11 FIELD SAMPLING
A Document #: DOE/ID-10579, Rev. 0 Title: Field Sampling Plan for the Idaho Chemical Processing Plant Radionuclide-
Contaminated Soils Removal Action Author: Wells, R.P. Recipient: Not specified Date: 05/01197
A Document #: OPE-ER-91-97 Title: Transmittal of the Field Sampling Plan for the Idaho Chemical Processing
Plant Radionuclide-Contaminated Soils Removal Action and the Removal Action Plan for the ICPP Radionuclide-Contaminated Soils Removal Action
Author: Jensen, N.R. Recipient: Pierre, W.; Nygard, D. Date: 06/l 2197
09122199
FILE NUMBER
AR3.11 FIELD SAMPLING (continued)
A Document #: INEELIEXT-97-00805 Title: Field Sampling Plan for the D&D of the CPP-631 RaLa Building, and CPP-
709 and CPP-734 Monitoring Stations at the Idaho Chemical Processing Plant
Author: Jones, R.W. Recipient: Not specified Date: 08lOll97
AR3.12 RIIFS REPORTS
A
1.
A
1.
Document ii’: OPE-ER-106-97 Title: Transmittal of the Draft Comprehensive RIIFS for the Idaho Chemical
Processing Plant OU 3-13 at the INEEL Author: Jines, A.T. Recipient: Pierre, W.; Nygard, D. Date: 06127197
Document #: OPE-ER-127-97 - Title: Transmittal of the Draft Comprehensive RIIFS for the Idaho Chemical
Processing Plant OU 3-13 at the INEEL Author: Hain, K.E. Recipient: Pierre, W.; Nygard, D. Date: 08/l 4197
Document #: DOE/ID-10534 Title: Comprehensive RllFS for the Idaho Chemical Processing Plant OU 3-l 3
at the INEEL--Part A, RI/BRA Report (Final), Binder 1 Author: Rodriguez, R.R.; Schafer, A.L.; McCarthy, J.; Martian, P.; Burns, D.E.;
Raunig, D.E.; Burch, N.A.; VanHorn, R.L. Recipient: Not specified Date: 1 l/01/97
Document #: DOEIID-10534 Title: Comprehensive RIIFS for the Idaho Chemical Processing Plant OU 3-l 3
at the INEEL--Part A, RIIBRA Report (Final), Binder 2 Author: Rodriguez, R.R.; Schafer, A.L.; McCarthy, J.; Martian, P.; Burns, D.E.;
Raunig, D.E.; Burch, N.A.; VanHorn, R.L. Recipient: Not specified Date: 11/01/97
B-30
OPERABLE UNIT 3-13
P
FILE NUMBER
AR3.12 RIIFS REPORTS (continued)
09122199
A
A
j.
p
k.
A
Document #: DOE/ID-l 0534 Title: Comprehensive RIIFS for the Idaho Chemical Processing Plant OU 3-13
at the INEEL--Part A, RI/BRA Report (Final), Binder 3 Author: Rodriguez, R.R.; Schafer, A.L.; McCarthy, J.; Martian, P.; Burns, D.E.;
Raunig, D.E.; Burch, N.A.; VanHorn, R.L. Recipient: Not specified Date: 1 l/01/97
Document #: DOE/ID-10572 Title: Comprehensive RIIFS for the Idaho Chemical Processing Plant OU 3-13
at the INEEL--Part 8, FS Report (Final), Binder 1 Author: Rodriguez, R.R.: Schafer, A.L.; McCarthy, J.; Martian, P.; Burns, D.E.:
Raunig, D.E.; Burch, N.A.; VanHorn, R.L. Recipient: Not specified Date: 11101197
Document #: DOE/ID-10572 Title: Comprehensive RIIFS for the Idaho Chemical Processing Plant OU 3-13
at the INEEL--Part B, FS Report (Final), Binder 2 Author: Rodriguez, R.R.; Schafer, A.L.; McCarthy, J.; Martian, P.; Burns, D.E.;
Raunig, D.E.; Burch, N.A.; VanHorn, R.L. Recipient: Not specified Date: 1 l/01/97
Document #: DOE/ID-10619, Rev. 2 Title: Comprehensive RIIFS for the Idaho Chemical Processing Plant OU 3-l 3
at the INEEL - Part 8, FS Supplement Report, Vol. 1 and 2 Author: Recipient: Date:
Greenwell, R.D.; Evans, C.S. Not specified 1 O/O 1 I98
Document #: OPE-ER-160-98 Title: Transmittal of the Final Comprehensive RIIFS for the Idaho Chemical
Processing Plant OU 3-13 at the INEEL--Part B, FS Supplement Report (Revision 2)
Author: Hein, K.E. Recipient: Pierre, W.; Nygard, D. Date: 1 O/l 4198
B-31
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR3.12 RIIFS REPORTS (continued)
Document #: OPE-EP&SA-98-002 Title: Transmittal of Final Comprehensive Remedial Investigation/Feasibility
Study for the Idaho Chemical Processing Plan Operable Unit 3-l 3 at the Idaho National Engineering and Environmental Laboratory and Draft Proposed Plan for Waste Area Group 3
Author: Depperschmidt, J. Recipient: Distribution Date: 01/05/98
Document #: OPE-ER-95-222 Title: Transmittal of Validated Analytical Sampling Data for Idaho Chemical
Processing Plant (ICPP) Perched Water Wells, Snake River Plain Aquifer ISRPA) Wells, Well USGS-47 Vertical Contaminant Profiling, and ICPP Soil Samples Conducted for the Waste Area Group (WAG) 3 Comprehensive Remedial InvestigationlFeasibility Study (RIIFS)
Author: Green, L.A. Recipient: Pierre, W.; Nygard, D. Date: 12105195
Document #: DEB-20-97 Title: Summary of Assumptions Used During Development of Waste Area
Group (WAG) 3 Remedial Investigation and Feasibility Study (RI/FS) Microshield Modeling Results
Author: Burns, D.E. Recipient: Henry, R.L. Date: 10/13/97
Document #: OPE-ER-253-97 Title: Transmittal of the Final Comprehensive RI/IFS for the Idaho Chemical
Processing Plant OU 3-l 3 at the INEEL Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 11125197
Document #: OPE-ER-174-97 Title: Transmittal of the Draft Final Comprehensive RI/IFS for the Idaho
Chemical Processing Plant OU 3-13 at the INEEL ,., Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 10130/97
B-32
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR3.14 TRACK 2 SUMMARY REPORT
A Document #: OPE-ER-308-94 Title: Transmittal of the Revised Track 2 Summary Report for Operable Unit 3-
09 Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 1 1 I22194
AR3.15 HEALTH AN0 SAFETY PLAN
A
p /‘-
A
A
A
P
Document #: 6621 Title: Site Specific Health and Safety Plan -FY-1992 Drilling and Sampling
Program -Track 2 Investigation of OU 3-07 Tank Farm and OU 3-08 Tank Farm II
Author: Mascarenas, C.S. Recipient: Not specified Date: 08/l O/92
Document #: 6651 Title: Site Specific Health and Safety Plan -Solid Waste Management Unit
(SWMU) CPP-14 Author: Alcalde, A. Recipient: Not specified Date: 1 O/l 6190
Document #: 6652 Title: Site Specific Health and Safety Plan -Solid Waste Management Unit
(SWMU) CPP-36 INEL Author: Alcalde, A. Recipient: Not specified Date: 1 O/l 6190
Document #: 6656 Title: Site Specific Health and Safety Plan -Land Disposal Unit (LDU) CPP-63 Author: Alcalde, A. Recipient: Not specified Date: 10/16/90
Document #: 6655 Title: Site Specific Health and Safety Plan -ICPP Land Disposal Unit (LDUI CPP-
48 Author: Alcalde, A. Recipient: Not specified Date: 1 O/l 6190
B-33
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR3.15 HEALTH AND SAFETY PLAN (continued)
Document #: Title:
Author: Recipient: Date:
Document #: Title:
Author: Recipient: Date:
Document #: Title:
Author: Recipient: Date:
Document #: Title:
Author: Recipient: Date:
Document #: Title:
Author: Recipient: Date:
Document #: Title: Author: Recipient: Date:
6653 Site Specific Health and Safety Plan -ICPP Land Disposal Unit (LDU) CPP- 37 Alcalde, A. Not specified 10116/90
6654 Site Specific Health and Safety Plan -Land Disposal Unit (LDU) CPP-40; LDU CPP-47 Alcalde, A. Not specified 1 O/l 6190
EGG-ER-10922, Rev. 0 Health and Safety Plan for the WAG 3/WAG 10 Radionuclide- Contaminated Soils Treatability Study Barry, G.A.; Nuthak, S.A.: Pickett, S.L. -?
Not specified 08lOl I93
INEL-95/0136, Rev. 0 Health and Safety Plan for the Waste Area Group 3 Comprehensive Remedial Investigation/Feasibility Study (Final) Meyer, T.J. Not specified 08/01195
INEL-95/0136, Rev. 2 Health and Safety Plan for the Waste Area Group 3 Comprehensive Remedial Investigation/Feasibility Study Meyer, T.J. Not specified 07/01195
INEL-95/0292, Rev. 0 Health and Safety Plan for D&D of CPP-631, -709, -734 LaBuy, S.A.; Peterson, D.A. Not specified 06/01/95
B-34
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR3.15 HEALTH AND SAFETY PLAN (continued)
A Document #: INEL-95/0292, Rev. 1 Title: Health and Safety Plan for D&D of CPP-631, -709, -734 Author: LaBuy, S.A.; Peterson, D.A. Recipient: Not specified Date: 06lOll97
AR3.17 REMEDIAL INVESTIGATION AND BASELINE RISK ASSESSMENT REPORT
A Document #: KLF-21 O-95 Title: Modification to the WAG 3 Baseline Risk Assessment Approach Author: Rodriguez, R.R. Recipient: Green, L.A. Date: 06121195
AR3.20 TREATABILITY STUDY
1. Document #: PTL-02-94 .- Title: Comments on the Draft Technical Work Plan for the WAG 3 and WAG
10 Radionuclide Contaminated Soils Treatability Study Author: Laney, P.T. Recipient: Honeycutt, T.K. Date: 03122194
A Document #: GMH-01-93 Title: Comments concerning the treatability study of INEL soils, ihcluding ICPP
soils Author: Huestis, G.M. Recipient: Daum, K.A. Date: 08/04/93
AR3.21 SCHEDULE
A Document #: OPE-ER-131-96 Title: Transmittal of the Revised WAG 3 Operable Unit 3-13 Comprehensive
RI/FS Schedule Author: Jensen, N.R. Recipient: Pierre, W.; Nygard, D. Date: 08127196
B-35
OPERABLE UNIT 3-l 3 09122199
FILE NUMBER
AR3.21 SCHEDULE (continued)
Document #: OPE-ER-33-97 Title: Transmittal of the Revised WAG 3 Operable Unit 3-13 Comprehensive
RllFS Schedule Author: Jines, A.T. Recipient: Pierre, W.; Nygard, D. Date: 03/05/97
Document #: 10110 Title: Revised Closure Plan Schedule Author: Solecki, J.E. Recipient: Monson, S. Date: 09/29/89
Document #: 6206 Title: Detailed Schedules for Preparation of Closure Plans Author: Solecki, J.E. Recipient: Gearheard, M.F. Date: 01/l 1190
Document #: KHK-147-69 Title: Detailed Schedules for Preparation of Closure Plans Author: Blumberg, D.J. Recipient: Sato, W.N. Date: I 2122189
AR4.2 FS REPORTS
Document #: OPE-ER-18-96 Title: Transmittal of the Draft OU 3-13 Feasibility Study Supplement to the
Final OU 3-13 Comprehensive RI/IFS for the Idaho Chemical Processing Plant OU 3-13 at the INEEL
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 01 I29198
I. Document #: OPE-ER-126-96 Title: Transmittal of the Revised Draft Comprehensive RI/IFS for the Idaho
Chemical Processing Plant OU 3-l 3 at the INEEL -Part B, FS Supplement Report (Revision 1)
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 08/06/98
B-36
09122199
FILE NUMBER
AR4.2 FS REPORTS (continued)
A Document #: OPE-ER-40-98 Title: Transmittal of Documents for Review of WAG 3 Cost Estimates Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 03112/98
A Document #: FL-92-0234 Title: Feasibility of Performing Gamma Isotopic Profiles in the Idaho Chemical
Processing Plant Waste Tank Farm Observations Wells Author: Battaglia, P.J. Recipient: Alexander, D. Date: 09/29/92
AR4.3 PROPOSED PLAN
A Document #: 10542 Title: Proposed Plan for Waste Area Group 3 at the Idaho Chemical Processing
Plant Idaho National Engineering and Environmental Laboratory Author: INEEL Community Relations Recipient: Not specified Date: 10101/98
A Document #: OPE-ER-159-98 Title: Transmittal of the Final Proposed Plan (Rev 6) for Waste Area Group 3--
Idaho Chemical Processing Plant, Idaho National Engineering and Environmental Laboratory
Author: Hain, K.E. Recipient: Pierre, W.; Nygard, D. Date: i o/14/98
1.. Document #: 15054 Title: DOE-HQ Approval and Comments on the Draft Proposed Plan for
Remediation of the Idaho National Engineering and Environmental Laboratory, Waste Area Group 3, Operable Unit 3-l 3, Idaho Chemical Processing Plant, Comprehensive Remedial Investigation/Feasibility Study
Author: Robison, S.A. Recipient: Hain, K.E. Date: 11114197
B-37
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR4.3 PROPOSED PLAN (continued)
A Document #: OPE-ER-66-96 Title: Transmittal of the Revised Draft Proposed Plan, (Rev. 1) for Waste Area
Group 3, Idaho Chemical Processing Plant, Idaho National Engineering and Environmental Laboratory
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 04117/98
A Document #: OPE-ER-76-96 Title: Transmittal of the Revised Draft Proposed Plan, (Rev. 2) for Waste Area
Group 3, Idaho Chemical Processing Plant, Idaho National Engineering and Environmental Laboratory
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 05114/9a
1.. Document #: OPE-ER-104-96 Title: Transmittal of the Revised Draft Proposed Plan, (Rev. 3) for Waste Area
Group 3, Idaho Chemical Processing Plant, Idaho National Engineering -, and Environmental Laboratory
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 06122198
A Document #: OPE-ER-261-97 Title: Transmittal of the Draft Proposed Plan for Waste Area Group 3, Idaho
Chemical Processing Plant, Idaho National Engineering and Environmental Laboratory
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 12104197
I. Document #: OPE-ER-133-96 Title: Transmittal of the Revised Draft Proposed Plan (Rev 4) for Waste Area
Group 3, Idaho Chemical Processing Plant, Idaho National Engineering and Environmental Laboratory
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 08/17/98
B-38
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR4.3 PROPOSED PLAN (continued)
A Document #: OPE-ER-148-98 Title: Transmittal of the Revised Draft Proposed Plan (Rev 5) for Waste Area
Group 3, Idaho Chemical Processing Plant, Idaho National Engineering and Environmental Laboratory
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 09/i 5198
1. Document #: OPE-ER-29-98 Title: Transmittal of the Revised Draft Proposed Plan for Waste Area Group 3,
Idaho Chemical Processing Plant, Idaho National Engineering and Environmental Laboratory
Author: Jenkins, T.W. Recipient: Pierre, W.; Nygard, D. Date: 02113i98
AR5.1 RECORD OF DECISION
fl A Document #: OPE-ER-44-99 Title: Transmittal of the Draft Record of Decision -Idaho Nuclear Technology
and Engineering Center, Idaho National Engineering and Environmental Laboratory
Author: Hain, K.E. Recipient: Pierre, W.; Nygard, D. Date: 03129199
A Document #: OPE-ER-119-99 Title: Transmittal of the Final Record of Decision -Idaho Nuclear Technology
and Engineering Center, Idaho National Engineering and Environmental Laboratory
Author: Hain, K.E. Recipient: Pierre, W.; Nygard, D. Date: oa/30/99
A Document #: OPE-ER-99-99 Title: Transmittal of the Draft Final Record of Decision -Idaho Nuclear
Technology and Engineering Center, Idaho National Engineering and Environmental Laboratory
Author: Hain, K.E. Recipient: Pierre, W.; Nygard, D. Date: 07/20/99
B-39
OPERABLE UNIT 3-13 09122199
FILE NUMBER
AR5.1 RECORD OF DECISION (continued)
A. Document #: OPE-ER-26-99 Title: Transmittal of the Draft Record of Decision -Idaho Nuclear Technology
and Engineering Center, Idaho National Engineering and Environmental Laboratory
Author: Hain, K.E. Recipient: Kluk, A. Date: 02117199
AR5.4 RECORD OF DECISION REVIEW COMMENTS
A Document #: 10679 Title: IDHWIDEQ Comments on Draft Record of Decision -Idaho Nuclear
Technology and Engineering Center Author: Not specified Recipient: Jenkins, T.W. Date: 03/01/99
A Document #: 10681 Title: IDHWlDEQ Comments on Draft Record of Decision -Idaho Nuclear T
Technology and Engineering Center (DOE/ID-10660) Author: Reno, S.L. Recipient: Hain, K.E. Date: 05114199
A Document #: 10662 Title: IDHWIDEQ Comments on Draft Final Record of Decision, Idaho Nuclear
Technology and Engineering Center (DOE/ID-10660) Author: Reno, S.L. Recipient: Hain, K.E. Date: oaio4i99
A Document #: 10663 Title: EPA Review of Draft Final Record of Decision (ROD) for O.U. 3-13, Idaho
Chemical Processing Plant Author: Pierre, W. Recipient: Hain, K.E. Date: oaio4i99