In Station Quality and 6 Tools Review
Supplier NOS Training
June 2009
3In Station Quality Review
In-Station Quality (ISQ)• ISQ in essence means never letting a defect pass into
the next station. There is quality at the source
• For ISQ to work, problems must be made visible
• ISQ can be summarized as GET IT RIGHT THE FIRST TIME
• Three only’s Only accept good quality Only make good quality Only pass on good quality
“Defects do not leave my workstation”
4In Station Quality Review
Pre-requisites of ISQ
• 5S /Visual factory• Line Balancing /
Standardized Work• Andon system
• PDCA/ Kaizen
5In Station Quality Review
Inspect Inspect InspectProcess 1Process 1 Process 2Process 2 Process 3Process 3
Process 1Process 1 Process 2Process 2 Process 3Process 3Inspect Inspect
Types of Inspections
Successive Inspection
Self Inspection
6In Station Quality Review
Discovery of mistakes before processing
Feedback and corrective action
A Process with Zero Defects
Source Inspection
7In Station Quality Review
InspectionType
InspectionImpact
Situation
Factory
Customer
Level 1
Defects
DefectsLeave
factory
Does notidentify defects
None
Operations
Errors
Defects
JudgmentInspected
Level 2
Non-defective
items
Most DefectsDo not Leave
factory
Identifiesdefects, but
does notremove
Operations
Errors
Defects
Inspections
InformativeInspection
Level 3
Non-defective
items
Defectsdecrease
LowerDefects by
givingfeedback
Operations
Errors
Defects
Inspections
Improve
Self-Checkswithin process
Level 4
Non-defective
items
Defectsdon’t leavethe process
Defectsdiscovered
Beforeproduct leaves
process
Operations
Errors
Defects
Inspections
Improve
SourceInspection
Level 5
Non-defective
items
ZERODEFECTS
Skips feedback
and catcheserrors at source
Operations
Errors
Inspections
Improve
8In Station Quality Review
With ISQ Tools
1. Incoming Material O,S & D Control (Overage,
Shortage, and Defectives)
2. Self Inspection
3. 1st Product Check
4. Key Process Management
5. Quality Audit
6. Quality Review Meeting
Application of these tools will vary depending on Material Type and Construction
How Do We Improve ISQ?
9In Station Quality Review
ISQ Tools
5. Q-Audit1. O,S & D 2. Self Inspection
“Zero” defective in Component Q-AuditProcess Q-AuditProduct Q-Audit
6. Quality Review Meeting
Input Quality(Vendor, Components)Input Quality
(Vendor, Components)Line Quality
(Process)Line Quality
(Process) Output Quality
(Product) Output Quality
(Product)
No defectivesto next process
4. Key ProcessManagement
Critical to Quality, Critical to Process
3. 1st Product Check
Check the product/component with CFM shoe, PFC & Checklist
Regular quality meeting for continuous improvement & habituation
10In Station Quality Review
1
• 100% components inspection before put into production
• Set up quick information flow process - Feedback quality issue with physical
defective - Replenish defectives within 2hrs for
existing SKU’s or 24hrs for new SKU’s. - Prevent recurrence by PDCA
• Vendor evaluation system - QA contract by Policy Deployment - QA Certification Program
Working Station
Supplier / PreviousWork station
Feedback with defective
ImprovementThru PDCA
Immediate communication with vendor/ previous workstation on Over, Shortage & Defective with physical component
O, S & D (Overrun, Shortage, Defective)
11In Station Quality Review
• Set up and post quality check points on
Standardized worksheet in each process
• Check components before processing and
give feedback to previous workstation to
correct if any quality problem
• Make sure to check quality for
components before sending to next process
• Encourage operators to use Andon and
stop the line if same defective occurs twice
in a row
Inspect
Reject
My ProcessSelf
-correction
To enhance quality mind and to prevent defectives from passing down the line, the operators check quality by themselves when receiving and before sending components
2
Reject
Next Process
Previous Process
Inspect
Self Inspection
12In Station Quality Review
• Whenever there are changes in (4M) Men/ Machine/ Material/ Method, check the 1st product with sample, process flow chart and checklist
•1st product in the morning, after lunch, finish work, and shift change.
• If any problem is found, share the information with T/L, G/L and give a feedback to related process to solve problem with education and training
• Line Stop if needed
• Problems are called out during quality review meeting
Line Stop
100% re-inspection
Solve problem with training
No good
Good
List up check points
Check sample
Keep monitoring
Check 1st product with CFM Shoe, PFC and Checklist
31st Product Check
13In Station Quality Review
• Supplement PFC (Nike
Standard) with CTQ, CTP
• Critical To Quality
• Critical To Process
• Manage to execute customer’s expectation for premium product with craftsmanship
• Tracking the trend of problems on display board to prevent recurrence
Checking key features for Quality & Process through visual management
Check CTP process
4Key Process Management
14In Station Quality Review
• Component Q-Audit - Audit of components from vendor to improve quality level in advance
• Process Q-Audit - Audit for line management mainly focused on 6 tools
• Product Q-Audit - Audit of finished goods from the customer point of view
• Reflection and continuous improvement through Quality meeting
Supplier
Line Process Q-Audit
Component Q-Audit
Self and team evaluation activities to improve quality level of component, process and finished product from Development to Manufacturing
Final product Product Q-Audit
5Quality Audits
15In Station Quality Review
Problem Solving System
• Daily review meeting – T/L, G/L• Weekly improvement meeting -
Manager• Monthly strategic meeting - GM• Quarterly GM meeting -
President
• Biannual QA and Craftsmanship contests
• Policy deployment for quality
Quality Review Meetings
Regular quality meeting to solve any quality problem and to share the information for continuous improvement from management to line workers
Daily Review Meeting
Weekly Improvement
Meeting
Quarterly GM
Meeting
-GM~MgrsReview Policy Deployment
6
Monthly Strategic Meeting