10
LOGO On-Going and Recently Completed Projects Bauer International Philippines Regalia Park Tower Cubao, Q.C. Philippines 1109 P.O. Box 10154 Q.C. Reference List

06_recently completed and on-going projects.ppt

Embed Size (px)

Citation preview

Page 1: 06_recently completed and on-going projects.ppt

LOGO

On-Going and RecentlyCompleted Projects

Bauer International PhilippinesRegalia Park Tower Cubao, Q.C.

Philippines 1109P.O. Box 10154 Q.C.

Reference List

Page 2: 06_recently completed and on-going projects.ppt

wps.cn/moban

On-Going Project

1. Introduction

CLARK WATER DEEP WELL 39

Clark Freeport Zone, PampangaWater Concessionaire

Design and Build of Deepwell 39

Water Treatment Plant For Iron and Manganese

Ultimate Capacity: 2160 m3/day

Page 3: 06_recently completed and on-going projects.ppt

wps.cn/moban

On-Going Project

1. Introduction

LAGUNA WATER MARKET AREASta. Rosa, LagunaWater ConcessionaireUltimate Capacity: 4 MLD

Supply of Labor and MaterialsFor Fabrication, Supply and

Installation of Iron and ManganeseUsing DMI-65

Page 4: 06_recently completed and on-going projects.ppt

wps.cn/moban

On-Going Project

1. Introduction

LAGUNA WATER- PULONG

Sta. Rosa, LagunaWater Concessionaire

Supply of Labor and MaterialsFor Fabrication, Supply and

Installation of Iron and ManganeseUsing DMI-65

Ultimate Capacity: 4 MLD

Page 5: 06_recently completed and on-going projects.ppt

wps.cn/moban

1. Introduction

RC COLA ISABELA

Cauyan, IsabelaBeverage Plant

Supply and Installation ofWastewater Treatment

PlantUsing Dynamic SBR System

Ultimate Capacity: 912m3/day

Recently Completed Project

Page 6: 06_recently completed and on-going projects.ppt

wps.cn/moban

1. Introduction

RC COLA CANLUBANG

Canlubang, LagunaBeverage Plant

Design, Supply and Installation

Of Reverse OsmosisSystem

Ultimate Capacity: 490 m3/day

Recently Completed Project

Page 7: 06_recently completed and on-going projects.ppt

wps.cn/moban

1. Introduction

MAYNILAD PALTOK PROJECTBrgy. Paltok, Quezon City

Water and Wastewater Concessionaire

Design, Supply and Installation

And Construction ofSewage Treatment Plant

Using MBRR

Ultimate Capacity: 4900 m3/day

Recently Completed Project

Page 8: 06_recently completed and on-going projects.ppt

wps.cn/moban

Recently Completed Project

1. Introduction

MAYNILAD LEGAL PROJECT

Legal St., Brgy. Sangandaan Quezon City

Water and Wastewater Concessionaire

Design, Supply, Installation, Testing, and Comissioning

of the SBR Electro Mechanical Works System for the Upgrading of Legal

Communal Septic Tank

Ultimate Capacity: 409 m3/day

Page 9: 06_recently completed and on-going projects.ppt

wps.cn/moban

Recently Completed Project

1. Introduction

MAYNILAD GRANT PROJECTGrant St., Brgy. Sangandaan Quezon City

Water and Wastewater Concessionaire

Design, Supply, Installation, Testing, and Comissioning of the

SBR Electro Mechanical Works System for the Upgrading of

Grant Communal Septic Tank

Ultimate Capacity: 621 m3/day

Page 10: 06_recently completed and on-going projects.ppt

wps.cn/moban

Recently Completed Project

PHILIP MORRIS PHILS., INC.

Fortune Ave, Brgy. Fortune, Marikina, Philippines

Cigarette Manufacturing Plant

Domestic and Industrial Interconnection to Centralized WWTP

Ultimate Capacity: 40 m3/day