TEXTILE SECTORE RESENTATION TO Workshop for Textile Sector ON 18/7/2009 ASHU SHARMA MANAGER (TECHNICAL) LLOYD INSULATIONS (I) LTD.

06-LLOYDInsulation

Embed Size (px)

DESCRIPTION

insulation works

Citation preview

Page 1: 06-LLOYDInsulation

TEXTILE SECTORE

RESENTATION TO Workshop for Textile Sector

ON 18/7/2009 ASHU SHARMA – MANAGER (TECHNICAL)

LLOYD INSULATIONS (I) LTD.

Page 2: 06-LLOYDInsulation

Firm Overview, Capabilities

& Relevant Experience

Lloyd Insulations (India) Limited

Page 3: 06-LLOYDInsulation

Profile

Lloyd Insulations have been providing turn-key contracting

services, to Indian industry for more than 50 years.

As a pioneer & market leader for specialised construction

solutions to more than 15000 major projects, LII has continuously

made available relevant technologies and required infrastructure to

provide total service demanded by such projects.

Our Leadership status and Industry Expertise has made us

Market Leaders with over 70% market share.

Page 4: 06-LLOYDInsulation

4

Services Rendered

• Thermal Insulation for Industrial / Commercial Applications

• Refractory & Ceramic Fibre Lining

• Acoustic Insulation / Enclosures

• Pre-Engineered Buildings / Structures

• Turnkey Cold Storage Construction with PUF Sandwich Panels

• Specialised Cold Storages Construction (CA / Ripening)

• Metal Roofing (with & without Insulation)

• Specialised Aluminium Roofing Systems

• Over deck Insulation with Spray applied PUF

• Waterproofing (Elastomeric / APP / TPO membranes)

• Coal Tar Enamel Coating & Wrapping for Cross-country Pipelines

• Passive Fire Protection (Cementaceous / Vermicullate / Intumescent Paint)

• Fire Protection Systems for Electrical Cable Trays / Cable / Duct penetrations

• Thermal Insulation Audit (Hot & Cold)

• ESCO Company (Detailed Energy Audit of Buildings)

Page 5: 06-LLOYDInsulation

ISO Certification

Page 6: 06-LLOYDInsulation

MAJOR CLIENTELE :

Bechtel, Kellog Brown & Root, Lurgi, Fluor Daniel, Mcdermot,

Alstom, Stone and Webster, Toyo Engineering, Mitsubishi

Heavy Industries, Kvaerner Corpn., Chemtech, Techno Promo

Export, Samsung, Daelim, Haldar Topsoe, Snam Progetti,

Linde, L’Air Liquide, KT-Technip, Technimont, BF Goodrich,

UOP, ICI, UHDE, Ansaldo, SPA, FL Schmidt, Holtech,

Humphrey’s & Glasgow, Siemens, Babcock, SEPCO,

Dongfang, Sichuan, SEC / Hubei, CMEC, Saudi Armco, SWCC,

NCC, NPCC, Gasco, Adgas, CCIC including Indian engineering

consultants and public sector undertakings like EIL,

PETRONET LNG, ONGC, SHELL, GAIL, IOCL, HPCL, BPCL,

Reliance, NTPC, BHEL, JSPL, TCE, L&T, Private Architects and

many more.

Industries Served

Page 7: 06-LLOYDInsulation

POWER SECTOR

Proofing, Fire Proofing.

Thermal Insulation of Turbine, Boiler, ESP, Ducts, Pipelines etc.

HRSG, Duct & Chimney stack lining.

Insulated Wall Cladding, False Ceiling,Water Proofing, Pre-engineeredBuilding.

Industries Served

Page 8: 06-LLOYDInsulation

REFINERY & PETROCHEMICAL

Thermal Insulation of Equipments, Columns,Tanks, Pipelines etc.

Ceramic Fibre Lining of Reformers, Furnaces,Heaters, HRSG, Ducts etc.

Fire Proofing of Spheres, Cable ducts, cablesetc.

Insulated Wall Cladding, False Ceiling, WaterProofing, Fire Proofing.

Pre-engineered Building.

Industries Served

Page 9: 06-LLOYDInsulation

LNG TERMINALS

Thermal Insulation of Tanks &Pipelines operating at extreme lowtemperatures (-180 deg.C) including allancillaries & cladding.

COMPLETED IN 2005

OPERATING COMFORTABLY

Industries Served

Page 10: 06-LLOYDInsulation

SUGAR PLANTS Thermal Insulation of Equipments,

Columns, Tanks, Pipelines, Ductetc.

Industries Served

Page 11: 06-LLOYDInsulation

FERTILIZER PLANTS

Thermal Insulation of Equipments,Columns, Tanks, Pipelines etc.

Ceramic Fibre Lining of Reformers,Furnaces, Heaters, HRSG, Ducts etc..

Industries Served

Page 12: 06-LLOYDInsulation

CEMENT PLANTS

Thermal Insulation of Equipments &Pipelines etc.

Industries Served

Page 13: 06-LLOYDInsulation

AIRPORTS

Double skin insulated Roofing &Wall Cladding, False Ceiling &Pipeline Insulation, hangars.

Industries Served

Page 14: 06-LLOYDInsulation

WARE HOUSE, MANUFACTURING SHEDS, HANGARS, ASSEMBLY LINES

PEB, Double skin Roofing & WallCladding with Insulated & non-insulated panels.

Industries Served

Page 15: 06-LLOYDInsulation

TELECOM SHELTERS

Pre-fabricated shelters constructed with Polyurethane Sandwich panels

Industries Served

Page 16: 06-LLOYDInsulation

COLD STORAGE & CA ROOMS

Pre-fabricated, pre-insulated Polyurethane Foam sandwich panels

Industries Served

Page 17: 06-LLOYDInsulation

ALUMINIUM PLANTS

Thermal Insulation of Equipments &Pipelines.

Refractory & Ceramic Fibre lining ofAnode Baking Furnace.

Industries Served

Page 18: 06-LLOYDInsulation

NUCLEAR POWER PLANTS

Thermal Insulation of Equipments, Tanks, Pipelines & Domes.

Industries Served

Page 19: 06-LLOYDInsulation

LI’s insulation audit is the only scientific methodology available

indigenously for quantified analysis of performance of existing

insulation systems in a plant. Observations and recordings assist

in developing a database for existing performance levels and for

determining techno-economic feasibility

for upgradation of insulation.

Insulation Audit Services

Page 20: 06-LLOYDInsulation

THERMAL INSULATION

Thermal Insulation is the system which is

provided to retard flow of heat and is used

as a barrier between two bodies of different

temperatures to Either a) reduce the heat

loss from a hot body or b) reduce the heat

ingress into a cold body.

Page 21: 06-LLOYDInsulation

Energy Conservation

Energy efficiency technologies and practices can therefore

play a significant role in reducing the threat of global

climate change.

Energy conservation is defined largely as cost-effective

ways to reduce energy consumption through existing and

improved technologies as well as through sound energy use

practices.

“The judicious and effective use of energy to

maximize profits (minimize costs) and enhance

competitive positions”

SUSTAINABILITY

Page 22: 06-LLOYDInsulation

SUSTAINABILITY

One of the easiest and most effective energy efficient technologies

available today is Thermal Insulation. Overall benefits from

insulation are numerous, including thermal performance, personal

comfort, sound control, condensation control, fire protection,

provided to retard flow of heat or cold from environment to inside of

building and vice-versa and personnel protection.

„COOLING OF INSIDE AIR IN BUILDINGS‟

Page 23: 06-LLOYDInsulation

Energy Conservation, Sustainability

&

Role Of Thermal Insulation

Page 24: 06-LLOYDInsulation

SUSTAINABILITY

Page 25: 06-LLOYDInsulation

SUSTAINABILITY

EXSISTING

ENERGY

CONSUMPTION

$ $

INVESTMENT

I

N

S

U

L

A

T

I

O

N

CO2

REDUCTION

REDUCED

ENERGY

CONSUMPTION

$$

SAVINGS

ECONOMIC IMPACT

JOB

CREATION

REDUCED

ILLNESS

Insulation is a product or service, which stands up very well on its own -

offering clear and straightforward energy efficiency and economic

advantages and can go much further!

Page 26: 06-LLOYDInsulation

THERMAL INSULATIONS

THERMAL INSULATION DELIVERS THE FOLLOWING BENEFITS

Reduce heat loss or heat gain to achieve energy conservation.

Offer better process control by maintaining process temperature.

Protect the environment through the reduction of Co2, NOx, & Greenhouse gases.

Increase operating efficiency of heating / ventilation / cooling, steam, process & Power system.

Control system temp. for personnel & equipment protection.

Prevent corrosion by keeping the exposed surface of a refrigerated system above dew point.

Provides fire protection to equipment. Absorbs vibration.

Page 27: 06-LLOYDInsulation

Potential for energy loss from a hot surface

Difference between

ambient and surface

temperature°C

Heat loss kcal

/m2.hr

25

40

100

150

225

340

600

1910

3225

5330

Page 28: 06-LLOYDInsulation

Heat-in-leak into cold surfacesDifference in Temperature between

ambient & Surface °C

Heat in-leak Kcal/m2h

5

10

15

20

38

76

125

165

Ambient considered : 38 C Shape of Surface : Spherical

Properly designed insulation can restrict the above valuesdown to 10 - 15 kcal / M

Page 29: 06-LLOYDInsulation

SUSTAINABILITY

Insulation

Wind Speed =VSurface1 Emissivity = e

Conducted heat through insulation

Surface Heat Transfer or film Coefficient

fConv.=1.683 x (Ts - Ta )0.25 x (2.857 x V + 1)0.5

Heat

Ambient Temp (Ta)

Surface Temp. (Ts)

fRad= 4.876 x 10-8 x e x ( Ts4 - Ta

4 )

( Ts - Ta )

Page 30: 06-LLOYDInsulation

ROCKLOYD ROCKWOOL MATTRESSSPECIFICATION CONFORMANCE

IS : 8183 – 1993

BS : 3958 Part-3

ASTM : C 592-80

APPROVED FOR A-60 CLASS INSULATION .*

*The only product in India.

UPGRADED THERMAL INSULATION SYSTEM

Page 31: 06-LLOYDInsulation

TECHNICAL SPECIFICATIONS

1 Standard Densities 100, 120, 150 Kg/m3

2 Application Temperatures

-1000C to +8000C

3 Standard Thickness* 25, 40, 50, 65, 75mm

4 Standard Size 1520 x 1220mm

* Other thickness from 20 to 100mm insteps of 5mm can also be made available.

UPGRADED THERMAL INSULATION SYSTEM

Page 32: 06-LLOYDInsulation
Page 33: 06-LLOYDInsulation
Page 34: 06-LLOYDInsulation

ROCKLOYD PIPE SECTIONS - pre-formed pipe section of pipe dia upto 350mm NB

UPGRADED THERMAL INSULATION SYSTEM

Page 35: 06-LLOYDInsulation

ROCKLOYD ROCKWOOL PIPESECTIONSPECIFICATION CONFORMANCE

IS : 9842

BS : 3958 Part-4

ASTM : C 547-95

UPGRADED THERMAL INSULATION SYSTEM

Page 36: 06-LLOYDInsulation

TECHNICAL SPECIFICATIONS

1 Standard Densities 144, 150 & 160 Kg/m3

2 Application Temperatures -1000C to +8000C

3 Standard Thickness* 25, 40, 50, 65, 75mm

4 Diameter Range** 12.5mm to 350mm

Nominal Bore

5 Standard Length 0.5, 0.75, 1.0 mtrs.

6 Facings (if specified) Kraft Paper, Scrim Cloth, Canvas or Aluminium Foil

*Other thickness from 20 to 100mm insteps of 5mm can also be made available.

** Outer diameter of pipe to be specified.

UPGRADED THERMAL INSULATION SYSTEM

Page 37: 06-LLOYDInsulation

ROCKLOYD ROCKWOOL SLAB / ROLL

UPGRADED THERMAL INSULATION SYSTEM

Page 38: 06-LLOYDInsulation

SPECIFICATION CONFORMANCE

IS : 8183 – 1993

BS : 3958 Part-5

ASTM : C 612

IMO for A-15, A-30 & A-60 Class Fire Barrier Insulation.**

*The only product to carry this certification in India.

ROCKLOYD SLAB

UPGRADED THERMAL INSULATION SYSTEM

Page 39: 06-LLOYDInsulation

TECHNICAL SPECIFICATIONS

1 Standard Densities 48, 64, 96,144 Kg/m3

2 Application Temperatures

-1000C to +8000C

3 Standard Thickness* 25, 40, 50, 60, 65, 75mm

4 Standard Size 1.0 x 0.50, 1.0 x 0.60 or

1.2 x 0.75 mtr.

*Can be made available with increments in thickness of 5mm against special orders.

ROCKLOYD SLAB

UPGRADED THERMAL INSULATION SYSTEM

Page 40: 06-LLOYDInsulation

Rockwool – Water Repellant Grade

Rock Fibres treated with SILANE

THERMAL INSULATION OF STEAM LINES

Page 41: 06-LLOYDInsulation

WATER REPELLENT GRADE ROCKWOOL

Page 42: 06-LLOYDInsulation

WATER REPELLENT GRADE ROCKWOOL

Page 43: 06-LLOYDInsulation

WATER REPELLENT GRADE ROCKWOOL

Page 44: 06-LLOYDInsulation
Page 45: 06-LLOYDInsulation
Page 46: 06-LLOYDInsulation

SUPERCERA BRAIDED & TWISTED ROPE

UPGRADED THERMAL INSULATION SYSTEM

Page 47: 06-LLOYDInsulation

SUPERCERA ROPE

UPGRADED THERMAL INSULATION SYSTEM

Page 48: 06-LLOYDInsulation

TWISTED / BRAIDED ROPE, CLOTH

Insulation material for small dia / embeddedpipes, DG Set exhaust pipeline, Packing materialbetween expansion and contraction joints,Furnace curtains, Replacement of asbestos clothand tape, Pipe hanger insulation, Cable & wireinsulation, Fuel line insulation, Impulse LineInsulation.

UPGRADED THERMAL INSULATION SYSTEM

Page 49: 06-LLOYDInsulation

SUPERCERA ROPE, CLOTH, TAPE

UPGRADED THERMAL INSULATION SYSTEM

Page 50: 06-LLOYDInsulation

SUPERCERA ROPE

Supercera Twisted Rope is a 3 ply ropemanufactured from supercera long fibres having15-20% organic binder.

Supercera Braided Rope in addition is braidedwith SS 304/310 wire netting.

Size – 6 to 40mm dia, 10/25M coils

Density – 300 kg/m3

UPGRADED THERMAL INSULATION SYSTEM

Page 51: 06-LLOYDInsulation

SUPERCERA CLOTH / TAPE

Supercera made from 15-20% organic coatedsupercera long fibres :

Cloth size : 3 x 300 / 1000mm x 10M

Tape size : 3 x 50 / 25mm x 10M

UPGRADED THERMAL INSULATION SYSTEM

Page 52: 06-LLOYDInsulation

SUPERCERA PADS

Supercera blankets of density 128 kg/m3 andthickness 50 & 75mm encased in SuperceraCloth and stitched with SS Wire to form pads.Special hooks are stitched to the surface andcorners for the purpose of positioning & tieing.

USES : Steam Turbine Insulation, Fire Walls

for Isolation

AVAILABILITY : Width : 610mm;

Length Max. : 7 mtr.

UPGRADED THERMAL INSULATION SYSTEM

Page 53: 06-LLOYDInsulation

SUSTAINABILITY

Thickness Calculation based on ASTM C – 680

Upgraded & latest method to calculate thickness of

insulation

Calculates effect of windage & emissivity for each

pipeline

Slightly more thickness

Reduced heat loss

Page 54: 06-LLOYDInsulation

SUSTAINABILITY

ILLUSTRATION

OT : 450 deg.C

AT : 40 deg.C

ST : 60 deg.C

Cladding : Aluminium ( 0.2 Emissivity)

Wind Velocity : 0, 0.5, 1

Pipe OD : 8”,10”, 12”

Insulation : ROCKWOOL MATTRESSES

150 KG/M3 DENSITY

Calculation : ASTMC-680 & IS-14164

Procedure

Page 55: 06-LLOYDInsulation

As per IS-14164 As per ASTMC-680

Dia (mm)

Thickness(mm)

Heat Loss(Kcal/m2hr.)

Thickness(mm)

Heat Loss(Kcal/m2hr.)

8” 175 105 210 85

10” 185 105 220 85

12” 190 105 230 85

WINDAGE = 0

SUSTAINABILITY

COMPARATIVE OF THICKNESS

Page 56: 06-LLOYDInsulation

` As per IS-14164 As per ASTMC-680

Dia (mm)

Thickness(mm)

Heat Loss(Kcal/m2hr.)

Thickness(mm)

Heat Loss(Kcal/m2hr.)

8” 135 143 165 119

10” 140 143 175 119

12” 145 143 180 119

SUSTAINABILITY

WINDAGE = 0.5

COMPARATIVE OF THICKNESS

Page 57: 06-LLOYDInsulation

As per IS-14164 As per ASTMC-680

Dia (mm)

Thickness(mm)

Heat Loss(Kcal/m2hr.)

Thickness(mm)

Heat Loss(Kcal/m2hr.)

8” 115 174 140 143

10” 120 174 150 143

12” 125 174 155 143

SUSTAINABILITY

WINDAGE = 1

COMPARATIVE OF THICKNESS

Page 58: 06-LLOYDInsulation

SUSTAINABILITY

WindageThickness reduces with wind impact.

EmissivityThickness reduces with dull surface.

Page 59: 06-LLOYDInsulation

Thermal Insulation

From this, we can see that

insulation is a major tool in

improving “energy

availability”

Page 60: 06-LLOYDInsulation

Economic reasons for Thermal insulation in industry

Reduces fuel consumption, and hence overall cost of operation

Reduces capacity requirements for heating/cooling systems (e.g., boilers/ refrigeration units, etc)

Benefits of higher profits to owner

Savings in Project Capital costs

Page 61: 06-LLOYDInsulation

Calculation of Insulation thickness

Ambient Temp.

Operating Temp.

Surface Temp.

Pipe OD

Wind Velocity

Cladding Emissivity

Insulation material K value

Thermal Insulation of Steam Lines

Page 62: 06-LLOYDInsulation

Calculation of Insulation thickness

Surface Temp. - 60 deg.C (max.)

Wind Velocity - 0, 0.5, 1 m/sec.

Emissivity – 0.2, 0.3, 0.6

K Value (Mean Temp.) – 0.T + S.T

2

OUTPUT : Thickness, Heat Loss, Surface Temp.

Thermal Insulation of Steam Lines

Page 63: 06-LLOYDInsulation

LATEST INSULATION DESIGN METHOD

Combination Insulation System for Super Heated Steam Lines : OT = 450 deg.C & above

K value varies as per mean temperatures

eg. OT= 450 C, ST=60 C , MT=255 C = (450+60)

2

Rockwool - 0.068 Kcal/mhr.deg.C

Calcium Silicate - 0.0757 Kcal/mhr.deg.C

Ceramic Fibre - 0.066 Kcal/mhr.deg.C

Perlite - 0.091 Kcal/mhr.deg.C

Thermal Insulation of Steam Lines

Page 64: 06-LLOYDInsulation

Ceramic Fibre has a lower K value at elevated temps. as compared to Rockwool, Calcium Silicate & Perlite.

Ceramic Fibre will reduce heat losses maximum

An initial layer will bring down Interface temp.

Subsequent layers with Rockwool

Overall reduction in heat loss & ST

Thermal Insulation of Steam Lines

Page 65: 06-LLOYDInsulation

Thermal Insulation of Steam Lines

ILLUSTRATION

OT : 450 deg.C

AT : 40 deg.C

ST : 60 deg.C

Cladding : Aluminium

Wind Velocity : 0

Pipe OD : 10, 12, 14

Pipe Length : 5 mtr.

Insulation : RW, Cal. Sil., CF+RW, Perlite

Page 66: 06-LLOYDInsulation

mm Kcal/m2hr. STDeg.C

RW 185 95 60

Cal. Sil. 200 95 60

CF+RW 160 56 53

Perlite 215 96 60

1. 10” Line

Thermal Insulation of Steam Lines

Page 67: 06-LLOYDInsulation

mm Kcal/m2hr. STDeg.C

RW 190 96 60

Cal. Sil. 205 96 60

CF+RW 165 62 54

Perlite 220 96 60

2. 12” Line

Thermal Insulation of Steam Lines

Page 68: 06-LLOYDInsulation

mm Kcal/m2hr. STDeg.C

RW 195 97 60

Cal. Sil. 210 97 60

CF+RW 170 65 54

Perlite 225 96 60

3. 14” Line

Thermal Insulation of Steam Lines

Page 69: 06-LLOYDInsulation

mm Kcal/m2hr. ST

Deg.C

RW 240 94 55

Cal. Sil. 250 95 55

CF+RW 235 62 49

Perlite 225 96 60

4. 12” Line, OT = 500 deg.C, AT = 35 deg.C

Thermal Insulation of Steam Lines

Page 70: 06-LLOYDInsulation

Mm Kcal/m2hr. ST

Deg.C

RW 275 95 55

Cal. Sil. 290 96 55

CF+RW 250 61 49

Perlite 295 96 60

5. 12” Line, OT = 550 deg.C, AT = 35 deg.C

Thermal Insulation of Steam Lines

Page 71: 06-LLOYDInsulation

Rockwool is Techno-Economic and available as Water Repellent Grade.

Calcium Silicate is expensive and hygroscopic.

Ceramic Fibre is Soft Refractory Fibre and thermally most stable.

Expanded Perlite is Water Repellent, higher „K‟ value & costly.

Thermal Insulation of Steam Lines

Page 72: 06-LLOYDInsulation

Effect of Wind Velocity

Presence of Wind in surrounding takes away heat generated from cladding surface.

A strong wind will carry away heat and ensure a lower surface temperature.

Windage has effect on insulation thickness – reduces with increase in windage.

For energy conservation, windage is taken as ‘Zero’.

Thermal Insulation of Steam Lines

Page 73: 06-LLOYDInsulation

Effect of Emissivity

Heat coming on top of insulation is emitted out.

Polished surface will emit maximum heat (Aluminium)

Aluminium calls for higher thickness & GI, Plaster lower thickness

Old aluminium will emit lower heat as compared to new sheet.

Thermal Insulation of Steam Lines

Page 74: 06-LLOYDInsulation

Cladding

Cladding corrosion due to condensation on inner side

Moisture present on inner side condenses & lower corrosion to cladding sheet.

Polysurlyn coated aluminium sheet is now available(earlier bitumen coating underneath).

Thermal Insulation of Steam Lines

Page 75: 06-LLOYDInsulation

Supercera Ceramic fibre Removable Pads for Turbine Insulation

Page 76: 06-LLOYDInsulation

Supercera PadsSupercera blankets of density 128 kg/m3 andthickness 50 & 75mm encased in Supercera Cloth andstitched with SS Wire to form pads. Special hooks arestitched to the surface and corners for the purpose ofpositioning & tieing.

USES : Steam Turbine Insulation, Fire Walls for

Isolation, Valves & Flange Insulation

AVAILABILITY : Width : 610mm;

Length Max. : 7 mtr.

Page 77: 06-LLOYDInsulation

Supercera Pads for Valves & Flanges Insulation

Page 78: 06-LLOYDInsulation

Supercera Pads for Equipment Insulation

Page 79: 06-LLOYDInsulation

Supercera Pads for Equipment Insulation

Page 80: 06-LLOYDInsulation

WITH CERAMIC PADS

Page 81: 06-LLOYDInsulation
Page 82: 06-LLOYDInsulation

APPLICATION SPECIFICATION FOR IMPULSE LINE INSULATIONvery small dia ¾”, ½”, 1”, 1 ½”, 2”

1. Providing and wrapping Supercera ceramic fibre rope in required thickness over the pipeline so as to cover the piping completely without leaving any gap.

2. Providing and applying one coat of insulkote over the rope.

3. Providing and applying glass fibre cloth 10 x 10 sq. inch apperture over the insulkote and tying with synthetic thread.

4. Providing and applying second coat of insulkote over the glass cloth.

5. Providing and applying a coat of bitumenous based aluminium paint over insulkote.

Insulation of Hot Services

Page 83: 06-LLOYDInsulation

MONSOON SPECIFICATION FOR

HOT PIPELINE INSULATION

1. Cleaning the surface thoroughly to ensure that the surface is free ofall dust, rust and grease.

2. Providing and fixing MS flat ring of size 25x3mm over pipes havingdiameter more than 150mm NB at every 1150mm distance having Lshaped lugs with a packing of ceramic paper duly riveted andtightening it over the surface with nut and bolt.

3. Providing and fixing the recommended insulation thickness ofRockloyd Resin Bonded Rockwool mattress of suitable density stitchedwith one side GI wire netting of size 20mm X 24G.

Insulation of Hot Services

Page 84: 06-LLOYDInsulation

4. Butting the joints and stitching the mattress properly with GI wire of20G to secure it firmly to the surface.

5. Providing and applying 4mm thickness APP modified membranehelically over the insulation with AL. paint coating.

6. Providing and applying Aluminum sheet as cladding over the MS flatring already provided at 1150 distance duly screwed with self tappingscrew at 150mm distance at the sheet joints making an overlap ofminimum 30mm. Sealing all the joints with mastic MAS-94.

7. Providing and applying 22G AL band at every 450mm c/c over thecladding to secure it firmly to its place.

Insulation of Hot Services

Page 85: 06-LLOYDInsulation

Insulation of Hot Services

Page 86: 06-LLOYDInsulation

Insulation of Hot Services

Page 87: 06-LLOYDInsulation

FOOT TRAFFIC SPECIFICATION FOR HOT PIPE LINE INSULATION

1. Cleaning the surface thoroughly to ensure that the surfaceis free of all dust, rust and grease.

2. Providing and fixing MS flat ring of size 25x3mm, over pipehaving diameter more than 100mm, at every 1150 mm distancehaving L shaped lugs with a packing of ceramic paper, dulyriveted and tightening it over the surface with nut and bolt.

3. Providing and fixing the recommended insulation thickness ofRockloyd Resin Bonded Rockwool mattress of suitable densitystitched with one side GI wire netting of size 20mm X 24G .

Insulation of Hot Services

Page 88: 06-LLOYDInsulation

4. Butting the joints and stitching the mattress properly with GIwire of 20G to secure it firmly to the surface

5. Providing and applying 25mm thick cement sand plaster overthe insulation material .

6. Providing and applying bitumen primer over the cement sandplaster.

7. Providing and applying 4mm thickness APP modifiedmembrane helically over the insulation with AL. paint coating.

Insulation of Hot Services

Page 89: 06-LLOYDInsulation

8. Providing and fixing 22 gauge AL sheet cladding over the MSflat ring already provided at 1150mm distance duly screwedwith self tapping screw at 150mm distance at the sheetjoints making an overlap of minimum 30mm. Sealing all thejoints with mastic MAS-94.

9. Providing and applying 22G AL band at every 450mm c/c overthe cladding to secure it firmly to its place.

Insulation of Hot Services

Page 90: 06-LLOYDInsulation

Insulation of Hot Services

Page 91: 06-LLOYDInsulation

Insulation of Hot Services

Page 92: 06-LLOYDInsulation

APPLICATION SPECIFICATION FOR EQUIPMENTS

1. Cleaning the surface thoroughly to ensure that the surface is

free of all dust, rust and grease.

2. Providing and fixing MS flat ring of size 25x3mm at every

1150mm distance c/c having L shaped lugs with a packing of

ceramic paper, duly riveted and tightening it over the surface

with nut and bolt.

3. Providing and welding GI wire pins of 8 to 10G diameter

having length 20mm more than the thickness of insulation at

every 300mmc/c(incase of equipments having diameter more

than 1000 mm).

Insulation of Hot Services

Page 93: 06-LLOYDInsulation

4. Providing and fixing the recommended insulation thickness

of Rockloyd Rockwool mattress of suitable density stitched

with one side GI wire netting of size 20mm x 24G and

piercing it through the GI wire pins.

5. Butting the joints and stitching the mattress properly with GI

wire of 20G to secure it firmly to the surface.

6. Bending the pins over the insulation surface.

7. Providing and fixing aluminium sheet cladding over the

insulation surface.

Insulation of Hot Services

Page 94: 06-LLOYDInsulation

ELECTROSTATIC PRECIPITATOR (ESP)

Following main materials are used for ESP Insulation :-

Rockloyd LRB Matts. 100-120 kg/m3 in appropriate thickness conforming to IS : 8183-1993.

Aluminium sheet of 20G.

GI Wire Netting of 50mm x 65mm x 16 SWG.

Insulation of Hot Services

Page 95: 06-LLOYDInsulation

ESP INSULATION - THE CASINGS ARE INSULATED WITH ROCKWOOL

Insulation of Hot Services

Page 96: 06-LLOYDInsulation

Insulation of Hot Services

Page 97: 06-LLOYDInsulation

CHIMNEY INSULATION

Main insulation material used for Chimney Insulation is Rockloyd ResinBonded Rockwool Slab – 100 kg/m3 in thickness of 50mm having K-valueof 0.052 W/mK at 100 deg.C mean temperature conforming to IS : 8183-1993. Following ancilliary materials are also used for Chimney Insulation:-

Pins & Studs of 10G in 75mm length.

Metal Speed washers 63mm dia or square.

GI Wire Netting of 20G x 25mm.

GI Wire of 16 SWG.

Insulation of Hot Services

Page 98: 06-LLOYDInsulation
Page 99: 06-LLOYDInsulation
Page 100: 06-LLOYDInsulation
Page 101: 06-LLOYDInsulation
Page 102: 06-LLOYDInsulation
Page 103: 06-LLOYDInsulation
Page 104: 06-LLOYDInsulation
Page 105: 06-LLOYDInsulation

INSULATION OF FLANGES

Page 106: 06-LLOYDInsulation

APPLICATION SPECIFICATION OF STEAM TURBINE SPRAY

INSULATION

1. Cleaning of the turbine / valve casing surface with wire brush to

remove dust, dirt and such residues. Any contamination due to

oil / grease shall be removed with suitable solvent.

2. MS Rod of 10mm dia having length equivalent to insulation

thickness should be welded on the MS Pad provided by the

turbine manufacturer at a pitch of 250mm (Max.).

3. Providing casing flange joint (parting plate) with a separation

made out of Aluminium sheet (2mm thick) as distance line

between top and bottom half of the insulation.

4. Casing flange joint shall be provided with a box made out of

Aluminium Sheet will be filled in with loose Rockwool for the

ease of maintenance.

Insulation of Hot Services

Page 107: 06-LLOYDInsulation

5. Mask all thermo couples with sleeves made out of aluminium

sheet for proper access during maintenance and replacement

when and where necessary.

6. Rockloyd fibres (HT) shall be sprayed using specially designed

spraying equipments and accessories. The fibres shall be

processed to a desired pattern and finally taken through a hose

to the spray gun center nozzle. Lloyd binder is taken to three

nozzles around the main hose. The spray gun sprays Rockwool

along with binder which gets mixed in the air and forms a finely

distributed concentric spray. The sprayed fibres strike the

surface to be insulated forming a continuous monolithic layer.

Insulation of Hot Services

Page 108: 06-LLOYDInsulation

The required bulk density shall be achieved by controlling the

fibre output. It shall be necessary to use wooden logs / probe

for compacting the sprayed mass in congested and other

locations in order to provide required density and thickness.

The first layer of the insulation shall be supported with SS wire

netting ¾” x 22G whereas the subsequent layers shall be

supported with GI wire netting ¾” x 22G and MS Retainers.

7. CAT-9 hard setting special finishing cement plaster shall be

trowel applied all over the insulated surface to a thickness of 6-

10mm applied in two layers. The final coat of CAT-9 shall be

applied after reinforcing Lloyd fabric all around the plastered

surface.

8. The surface shall finally be finished with a coat of Lloyd FR

Paint 80/100 microns of special duty oil resistant and heat

resistant coating.

Insulation of Hot Services

Page 109: 06-LLOYDInsulation

9. Design Criteria

Ambient Temp. : 40 0C

Surface Temp. : 60 0C

10. Material Details

Sprayed Lloydwool fibre : Non corrosive, non combustible, non

toxic & asbestos free fibres.

Fibre Dia : 4-5 mirocns

Sulphur Content : Less than 0.6%

Max. Service Temp. : 750 ºC

Density : 200 – 250 kg/m3

Thickness : 260-310 mm

K-Value : 0.039 Kcal/m. hr.0C at 50 ºC (Mean Temp.)

Insulation of Hot Services

Page 110: 06-LLOYDInsulation

STEAM TURBINE INSULATION

Insulation of Hot Services

Page 111: 06-LLOYDInsulation

APPLICATION SPECIFICATION OF STEAM TURBINE WITH

CERAMIC FIBRE PAD INSULATION

1. Cleaning the surface thoroughly with wire brush to ensure that

the surface is free of all dust, rust and grease.

2. Any contamination due to oil, grease shall be removed with a

suitable solvent.

3. Providing and fixing MS flat ring of size 25x3mm on casing

surface which is secured with either nuts and bolts or welded

on the pads already provided on the casing plate.

Insulation of Hot Services

Page 112: 06-LLOYDInsulation

4. Additional frame work of M.S. strip is provided to impart adequate

stand to the holding structure.

3&4 are optional if pads are not adequately available.

5. The M.S. studs of thickness 6mm and height equivalent to the

thickness of insulation (175mm) is fixed on the MS flat ring

holding structure.

6. Providing and fixing the recommended insulation thickness of hot

face insulation quilt/pad of min. 75mm thickness and cold face

insulation quilt/pad of min. 100mm thickness (double layer of

50mm).

Insulation of Hot Services

Page 113: 06-LLOYDInsulation

a) The hot face insulation pad is made out of three layer of

ceramic fibre blanket of thickness 25mm and density 128kg/m3

having 0.1mm aluminium foil inserted between 2 layers of

ceramic blankets, covered with ceramic cloth on all sides and

joints stitched with 20SWG SS wire. Ceramic fibre tape 75mm

wide is applied on the edges of the pad so as to cover the cloth

overlapping/stitching joints on all the sides. SS washer are fixed

on the corner and over the insulation pad Surface.

b) The cold face insulation pad is made out of double layer of

50mm each . Each 50mm pad is made out of two layers of

ceramic fibre blanket of thickness 25mm and density 128kg/m3

having 0.1mm aluminium foil inserted between 2 layer of

ceramic blankets, covered with MFMB glass cloth on all sides

and joints stitched with 20SWG SS wire. Glass fibre tape 50mm

wide is applied on the edges of the pad so as to cover the cloth

overlapping/stitching joints on all the sides. SS washer are fixed

on the corners and over the insulation pad Surface.

Insulation of Hot Services

Page 114: 06-LLOYDInsulation

7. The insulation pads are held in position with the help of SS clip

washers provided after piercing of these pads to the supporting

cage work( already fabricated and fixed). SS wires are used to

tie the pads. The pads placing to have staggered joints.

8. Providing and applying 75mm ceramic tape at the pad

overlapping joints.

9. The casing flange joints are provided with 18 SWG aluminium

sheet fixed with MS cleats and filled with insulation pads of

same thickness.

Insulation of Hot Services

Page 115: 06-LLOYDInsulation

10. DESIGN DATA FOR TURBINE INSULATION

Size of the insulation Pad = 1M X 0.61 M

Total insulation thickness=175 to 250mm

Ambient Temperature = 400C

Operating Temperature = 330 to 5500C

Surface Temperature = 58-600C

Wind Velocity = Still condition (0m/sec)

Insulation of Hot Services

Page 116: 06-LLOYDInsulation

TURBINE INSULATION USING CERAMIC PADS

Insulation of Hot Services

Page 117: 06-LLOYDInsulation

TURBINE INSULATION USING CERAMIC PADS

Insulation of Hot Services

Page 118: 06-LLOYDInsulation

TURBINE INSULATION USING CERAMIC PADS

Insulation of Hot Services

Page 119: 06-LLOYDInsulation

Insulation of Hot Services

Page 120: 06-LLOYDInsulation

SUSTAINABILITY

Thermal Insulation Survey

Thermal insulation survey is a service oriented

towards bringing existing shortcomings and unrealised

opportunities of saving energy through extensive field

data collection and possible up gradation of insulation

materials for achieving higher plant efficiency.

Page 121: 06-LLOYDInsulation

SUSTAINABILITY

Thermal Insulation Survey : Concept

It is essential to know precisely the heat loss for the

insulated surfaces in operation.

Annual heat loss in terms of money are then worked out.

A new upgraded insulation system is then designed

An economic analysis is then carried out to study the

viability of the proposed system.

The investment on proposed system and simple payback

are then worked out.

Page 122: 06-LLOYDInsulation

SUSTAINABILITY

Thermal Insulation Survey : Methodology

Following operational parameters and design data are collected

from the plant authorities :

Cost of Fuel

Calorific value of fuel

Boiler / Equipment design efficiency

No. of plant operating hours

Pipe OD, Length and Dimension of Equipments

Operating Temperature of Process fluids / Steam

Page 123: 06-LLOYDInsulation

SUSTAINABILITY

Thermal Insulation Survey : Methodology

Following field data are collected :

Average Insulation cladding surface temperature

Corresponding ambient temperature

Corresponding air velocity

Emissivity of Insulation cladding surface

Page 124: 06-LLOYDInsulation

SUSTAINABILITY

Thermal Insulation Survey : Analysis

The data collected during plant survey are

then analysed systematically and calculations

are performed on present value to arrive at

the quantity of energy and financial losses.

Page 125: 06-LLOYDInsulation

SUSTAINABILITY

Thermal Insulation Survey : Economics

The economic benefits of insulation shall vary according to

application and method of financial appraisal. One of the simplest

methods of financial appraisal is the “Pay Back” analysis, where

costs are compared with savings and the result is expressed in terms

of “Pay Back Period”.

There is a definite limiting thickness of insulation which is known

as “Economic Thickness”

Page 126: 06-LLOYDInsulation

SUSTAINABILITY

Thermal Insulation Survey : Economic Thickness

The Economic Thickness of insulation is that thickness at

which the costs of heat loss, plus the installed cost is at

minimum.

Where :

I = Cost of Insulation

H = Cost Of Heat Loss

I+H= Total Cost

M = Economic Thickness

MC= Minimum Cost

H+I

I

H

MCM

Insulation Thickness

Page 127: 06-LLOYDInsulation

SUSTAINABILITY

SELECTION OF INSULATION MATERIAL:

THE MATERIALS USED FOR INSULATION SHALL CONFORMTO THE RELEVANT INDIAN STANDARDS WHEREEVER THEYEXSIST.

INSULATION MATERIAL USED SHOULD BE SUITABLE FORUSE AT THE OPERATING TEMPERATURE AS STATED BY THEPURCHASER.

HAND MADE MATERIALS FROM LOOSE WOOL ARE NOTPERMITTED DUE TO POOR CONSISTENCY.

ALL INSULATION MATERIAL SHALL HAVE A PROVENSERVICE RECORD OF SATISFACTORY PERFORMANCE

UNDER INDIAN CONDITIONS IN SIMILAR PROCESS PLANT

Page 128: 06-LLOYDInsulation

SUSTAINABILITY

Corrosion resistant

Water repellents

Fire Proof / non combustible

Durability

Green insulation materials

OTHER IMPORTANT ASPECTS

Page 129: 06-LLOYDInsulation

CASE STUDYSupercera Pads for Valves & Flanges Insulation

IOCL, PANIPAT REFINERY

We had carried out Thermal Insulation audit of IOCL PanipatRefinery. The data recorded for open valve are as follows:

1. Average Ambient Temp. - 40 C

2. Average Surface Temp. - 450 C

3. Average Operating Temp. - 450 C

4. Total area insulated - 1 m2

5. Heat Loss - 7922.01 Kcal/m2 hr.

6. Total Heat Loss - 7922.01 Kcal/hr.

7. Cost of Heat Loss - Rs. 500 Rs. /million Kcal.

8. Running Hr. - 8040 / Yr.

9. Average cost of Heat Loss - Rs.31454 /year

Page 130: 06-LLOYDInsulation

we recommended to insulate the un-insulate valve with 150 mm cf padinsulation of 128 kg/m3 density. application procedure was alsorecommended to enhance the life of insulation

After re-insulation the following were the findings :-

1. Average Ambient Temp. - 40 C 2. Average Surface Temp. - 60 C

3. Total area insulated - 1 m24. Designed Heat Loss - 98 Kcal/m2 hr.5. Cost of Energy - Rs.500 /million Kcal 6. Total Savings - Rs. 31064 /year7. Insulation Thickness - 150 mm CF Pad 128 kg/m3 density.8. Total cost of insulation - Approx. Rs. 20,000 /-9. Average pay back period - 8 Months

So proper insulation with a little bit investment accrues lot of savings with a defined shorter pay back period.

Page 131: 06-LLOYDInsulation

OPTIMAL INSULATION

Heat loss, 89 mm pipe, 100 C temp.

Uninsulated Pipe 50mm Insulated Pipe

Heat loss = 255 Kcal/hr.m2 Heat loss = 80 Kcal/hr.m2

50mm insulation compared with an un-insulated pipe = 255 – 80

(Consider 1 m length ) = 175 Kcal/hr.

No of operating hr. in year = 8760 Hr.

Total Heat loss = 8760 x 175 = 1533000 Kcal/hr.

Consider Boiler Efficiency = 80 %

Cost of fuel (Coal) = Rs. 3500 / Ton

Calorific of Coal = 3200 Kcal / Kg

Yearly fuel saving = 1533000 / ( 3200 x 0.80 )

Yearly fuel saving = 598 Kg/ Year

Upgraded Energy Efficient Thermal Insulation

Page 132: 06-LLOYDInsulation

ROCKWOOL INSULATION

HINDALCO INDUSTRIES LTD., RENUSAGAR POWER DIVISION

We had carried out Thermal Insulation audit of HindalcoIndustries Ltd., Renusagar Power Division for the Boilers. Thedata recorded are as follows:

1. Average Ambient Temp. - 31 °C

2. Average Surface Temp. - 80 °C

3. Average Operating Temp. - 525 °C

4. Total area insulated - 400 m2

5. Heat Loss - 530.704 Kcal/m2 hr.

6. Total Heat Loss - 212282 Kcal/hr.

7. Cost of Heat Loss - Rs. 500 /million Kcal.

8. Running Hr. - 8040 / Yr.

9. Average cost of Heat Loss - Rs.853373/year

Upgraded Energy Efficient Thermal Insulation

Page 133: 06-LLOYDInsulation

We recommended to re-insulate the complete plant piping &equipments with 255 mm Rockloyd, Resin Bonded RockwoolMattress of 150 kg/m3 density. Application procedure was alsorecommended to enhance the life of insulation.

After re-insulation the following were the findings:

1. Average Ambient Temp. - 40 °C

2. Average Surface Temp. - 60 °C

3. Total area insulated - 400 m2

4. Designed Heat Loss - 98 Kcal/m2 hr.

5. Cost of Energy - Rs.500 /million Kcal

6. Total Savings - Rs. 695789 /year

7. Insulation Thickness - 255 mm RW

8. Total cost of insulation - Rs. 786840/-

9. Average pay back period - 14 Months

So proper insulation with a little bit investment accrues lot of savings with a defined shorter pay back period.

Upgraded Energy Efficient Thermal Insulation

Page 134: 06-LLOYDInsulation

Industries benefits from Energy Audit recommendations made by Lloyd Insulations (I) Ltd.

Combination of Ceramic Fibre & Rockwool Insulation

KRIBHCO SHYAM FERTILIZERS LTD., SHAHJAHANPUR (UP)

We had carried out Thermal Insulation audit of pipe lines. Thedata recorded are as follows:

1. Average Ambient Temp. - 37 °C

2. Average Surface Temp. - 77 °C

3. Average Operating Temp. - 507 °C

4. Total area insulated - 10 m2

5. Heat Loss - 388 Kcal/m2 hr.

6. Total Heat Loss - 7080 Kcal/hr.

7. Cost of Heat Loss - Rs. 664 /million Kcal.

8. Running Hr. - 8760 / Yr.

9. Average cost of Heat Loss - Rs.41183 / year

Upgraded Energy Efficient Thermal Insulation

Page 135: 06-LLOYDInsulation

We recommended to re-insulate the complete pipingequipments with combination of insulation 25 mm CF OF 128Kg/m3 density + 170 mm Rockloyd Resin Bonded RockwoolMattress of 150 kg/m3 density. Application procedure was alsorecommended to enhance the life of insulation.

After re-insulation the following were the findings:

1. Average Ambient Temp. - 40 °C

2. Average Surface Temp. - 60 °C

3. Total area insulated - 10 m2

4. Designed Heat Loss - 70 Kcal/m2 hr.

5. Cost of Energy - Rs.664 /million Kcal

6. Total Savings - Rs. 33622 /year

7. Insulation Thickness - 25 mm CF +170 mm RW

8. Total cost of insulation - Rs. 40282/-

9. Average pay back period - 14 Months

So proper insulation with a little bit investment accrues

lot of savings with a defined shorter pay back period.

Upgraded Energy Efficient Thermal Insulation

Page 136: 06-LLOYDInsulation

For pipelines operating above 5000C – combination of

Ceramic Fibre & Rockwool can be used for reducing

heat loss, taking advantage of lower K-value of Ceramic

Fibre at higher temperature.

IS : 14164 - 2008

Page 137: 06-LLOYDInsulation

Colour coated GI Sheet for pipeline insulation

cladding.

Cladding Material & Accessories

0.5mm TCT & 240 MPa as per IS : 277 & 513

Page 138: 06-LLOYDInsulation

Upgraded Energy Efficient Thermal Insulation

PIPELINE INSULATION WITH FIRST LAYER CERAMIC FIBRE &

SUBSEQUENTLY ROCKWOOL MATTRESS & COLOUR COATED

GI SHEET CLADDING

Page 139: 06-LLOYDInsulation

Increasing the supply of energy is in one way

of dealing with energy shortage in our

country.

A second way is to improve energy efficiency

by using Firesafe Fire Barrier Thermal

Insulation Products –

Page 140: 06-LLOYDInsulation

BUILDING INDUSTRY

TODAY‟S

SCENARIO

`

Page 141: 06-LLOYDInsulation

INDUSTRIAL BUILDING SCENARIO

Today’s Buildings are large, complicated and require

to be completed in a short period of time.

Today’s Industrial and Public buildings are viewed as

special “facilities”

`

Page 142: 06-LLOYDInsulation

INDUSTRIAL BUILDING SCENARIO

We are called upon to provide enclosures which meetevery need of the occupier.

Least amount of impediments in use, operation,maintenance, expansion / modification should befaced by users.

`

Page 143: 06-LLOYDInsulation

LLOYD PUF/PIR PANELSFOR INSULATED ROOFING AND CLADDING

`

Page 144: 06-LLOYDInsulation

`

LLOYD PUF / PIR PANEL INSULATED ROOFING & CLADDING SYSTEM

Page 145: 06-LLOYDInsulation

`

Page 146: 06-LLOYDInsulation

LLOYD PANEL is the answer for providing high

insulation value to the roofing and wall cladding of

insulated industrial / commercial buildings.

LLOYD PUF / PIR PANEL INSULATED ROOFING & CLADDING SYSTEM

`

Page 147: 06-LLOYDInsulation

LLOYD PANEL provides one

step solution in the form of a

pre-fabricated sandwiched

Polyurethane Foam panel system

which ensure exceptional panel

strength

LLOYD PUF / PIR PANEL INSULATED ROOFING & CLADDING SYSTEM

`

Page 148: 06-LLOYDInsulation

PRODUCT: LLOYD TR PANEL

LLOYD PANEL is a composite

panel comprising of LLOYD TR

profiled Colour coated sheet

on the top face, Plain sheet with slight ribs on the inner face and injected CFC free closed cell Polyurethane Foam in between.

LLOYD PUF / PIR PANEL INSULATED ROOFING & CLADDING SYSTEM

`

Page 149: 06-LLOYDInsulation

PHYSICAL DATA

SHEETING MATERIAL:

Weathering Side : LLOYD TR Profiled Colour Coated Sheet

Inner Side : Plain sheet with slight ribs Colour Coated Sheet

CORE : 30mm thick high efficiency Polyurethane Foam of 40 Kg/m3 Density.

K VALUE OF PUF : 0.023 W/m K

THERMAL TRANSMITTANCE : 0.67 W/m2 K

PANEL SIZE : 1 m width X Any length up to 12 m.

LLOYD PUF / PIR PANEL - 30 INSULATED ROOFING & CLADDING SYSTEM

`

Page 150: 06-LLOYDInsulation

FIXING:

LLOYD PANEL is fixed on to

the purlins / subgirts with joints

overlapped and fastened using

hot dip zinc coated self drilling

hexagonal washer head

fasteners.

LLOYD PUF / PIR PANEL INSULATED ROOFING & CLADDING SYSTEM

`

Page 151: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

Page 152: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

WALL PANELLING -MOCKUP

Page 153: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

WALL PANELLING -MOCKUP

Page 154: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

WALL PANELLING -MOCKUP

Page 155: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

WALL PANELLING -MOCKUP

Page 156: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

WALL PANELLING -MOCKUP

Page 157: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

WALL PANELLING -MOCKUP

Page 158: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

WALL PANELLING -MOCKUP

Page 159: 06-LLOYDInsulation

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

`

WALL PANELLING -MOCKUP

Page 160: 06-LLOYDInsulation

IMPORTANCE OF

THERMAL INSULATION

IN BUILDINGS

`

Page 161: 06-LLOYDInsulation

Thermal Insulation is an essential part of all Buildings andperforms many functions.

Energy Conservation – Reduces the heating / cooling load

Human Comfort – improves the efficiency of the workmen

`

THERMAL INSULATION

Page 162: 06-LLOYDInsulation

Human Comfort in buildings depends, of course upon the

proper design of Heating / Cooling equipment.

Efficient operation of these equipment however depends on

the effectiveness of the Thermal Insulation.

`

THERMAL INSULATION

Page 163: 06-LLOYDInsulation

In any building the Maximum Heat Ingress takes placethro‟ the roof fabric.

Heat gain thro‟ the roof may be reduced by providingappropriate Thermal insulation

`

THERMAL INSULATION

Page 164: 06-LLOYDInsulation

The Design of Insulation requirements for buildings is notstraight forward as the calculation of economic thickness forpipeline / equipment

Almost all Building material provide some resistance toheat flow and thermal insulation is a part of the system

`

THERMAL INSULATION

Page 165: 06-LLOYDInsulation

Hence the design solution for

the thermal insulation of

buildings must be based on

comparison of the system

`

THERMAL INSULATION

Page 166: 06-LLOYDInsulation

Factors influencing the design of insulation of building

Location and Weather conditions

Orientation of the building

Wind / breeze

Height of Ceiling

`

THERMAL INSULATION

Page 167: 06-LLOYDInsulation

Factors influencing the design of insulation of building

Proportion of Glassed Areas, Door / Window / Ventilator openings

Shading

Whether the building is only heated or heated or cooled

`

THERMAL INSULATION

Page 168: 06-LLOYDInsulation

Because of the above factors, The

Thermal Conductance given by “U”

value forms the basis for design and

becomes the only governing factor for

selection of insulating material

`

THERMAL INSULATION

Page 169: 06-LLOYDInsulation

Thermal Conductance “U” is

defined as the reciprocal of the

total thermal resistance

U = 1/R

`

THERMAL INSULATION

Page 170: 06-LLOYDInsulation

Thermal resistance R is given by

R = 1/fo + 1/fi + l/k

Where

fo – Outside surface conductance

fi – Inside surface conductance

l – Thickness of material

K – thermal Conductivity of the material

`

THERMAL INSULATION

Page 171: 06-LLOYDInsulation

Based on the above formulae, the

U value for

Asbestos = 5.513 W/m2 K

and

Lloyd TR Panel = 0.603W/m2 K

Thus the heat ingress into the building thro Lloyd TRpanel Roofing is almost 9 times lesser than that ofAsbestos Roofing.

`

THERMAL INSULATION

Page 172: 06-LLOYDInsulation

GENERAL PROBLEMS FACED WITH ASBESTOS ROOFING SHEETS

Aesthetics & Maintenance

Asbestos becomes

black and dirty

because of its porosity

& brittleness, imposes

heavy maintenance

work

`

THERMAL INSULATION

Page 173: 06-LLOYDInsulation

GENERAL PROBLEMS FACED WITH ASBESTOS ROOFING SHEETS

Reflection of Heat:

Asbestos becomes

Dull and Dark in

due course of time

has got higher

emissivity which in

turn observes

more incident

solar radiation.

`

THERMAL INSULATION

Page 174: 06-LLOYDInsulation

GENERAL PROBLEMS FACED WITH ASBESTOS ROOFING SHEETS

Installation :

Asbestos sheets shall

be fixed only by means

of „J‟ bolts, by drilling

holes through the roofing

which always pose major

Maintenance and water

proofing problems.

`

THERMAL INSULATION

Page 175: 06-LLOYDInsulation

GENERAL PROBLEMS FACED WITH ASBESTOS ROOFING SHEETS

Air Tightness:

Asbestos sheets

shall not provide

any air tightness to

the building and are

totally inadequate.

`

THERMAL INSULATION

Page 176: 06-LLOYDInsulation

GENERAL PROBLEMS FACED WITH ASBESTOS ROOFING SHEETS

Environmental Issues:

Asbestos Fibres are

Carcinogenic in

nature and are being

slowly banned

in developing Countries.

`

THERMAL INSULATION

Page 177: 06-LLOYDInsulation

ADVANTAGES OF LLOYD PANEL WHEN COMPARED WITH ASBESTOS ROOFING

Aesthetics & Maintenance

Asbestos becomes black and dirty because of its porosity and imposes heavy maintenance work

Lloyd Panel comprises of Colour

Coated sheets of outer and inner

sides and gives a clean and aesthetic

look to your building. Lloyd Panel

is absolutely maintenance free and

provides Long, Trouble Free Life.

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 178: 06-LLOYDInsulation

ADVANTAGES OF LLOYD PANEL WHEN COMPARED WITH ASBESTOS ROOFING

Reflection of Heat:

Lloyd Panel has a Bright Reflective surface (low emissivity) when compared with

Asbestos which becomes

Dull and Dark in due course

of time has got higher

emissivity which in turn

observes more incident

solar radiation.

Lloyd Panel 30 reflects

back most of the

incident Solar Radiation.

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 179: 06-LLOYDInsulation

ADVANTAGES OF LLOYD PANEL WHEN COMPARED WITH ASBESTOS ROOFING

Air Tightness:

For air conditioned buildings

/ Building with Pressurized

ventilation system, Lloyd

Panel provides higher

level of Air tightness in

the building.

Asbestos are totally

inadequate.

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 180: 06-LLOYDInsulation

ADVANTAGES OF LLOYD PANEL WHEN COMPARED WITH ASBESTOS ROOFING

Installation :

Lloyd Panel is easy to install.

Lloyd Panel is available upto

length of 12 m resulting is

less joints / jointless roof.

The length of Asbestos

sheet is normally 3 mtr.

which results in more joints.

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 181: 06-LLOYDInsulation

ADVANTAGES OF LLOYD PANEL WHEN COMPARED WITH ASBESTOS ROOFING

Fixing:

Lloyd Panel are fixed with

Self Drilling Self Tapping

fasteners with EPDM Washers.

One Stroke application which

does not require Master drilled

Holes & hence no Leakage

Problems.

In case of Asbestos, the only

feasible fixing system is by

means of „J‟ bolts fixed by

drilling holes through the

roofing which had always posed major

Maintenance and water proofing problems.

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 182: 06-LLOYDInsulation

ADVANTAGES OF LLOYD PANEL WHEN COMPARED WITH ASBESTOS ROOFING

Environmental Issues:

Lloyd Panel is made

out of environmently,

friendly, CFC free, PUF

material.

But, Asbestos Fibres are

Carcinogenic in nature and

are being slowly banned in

developing Countries.

Lloyd panel also meets

the ISO 14000 norms

for Insulated roofing

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 183: 06-LLOYDInsulation

To sum up……………

THE ADVANTAGES OF

LLOYD PANEL are…..

Very Low Thermal Conductance

(U Value)

Less radiation and less heating

of other parts

`

LLOYD PANEL INSULATED ROOFING & CLADDING SYSTEM

Page 184: 06-LLOYDInsulation

THE ADVANTAGES OF

LLOYD PANEL

• Lower emissivity and hence heat is reflected back

• Non absorbent, Vapour resistant insulation sandwiched between colour coated sheets

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 185: 06-LLOYDInsulation

THE ADVANTAGES OF

LLOYD PANEL

Good Mechanical strength

Aesthetic and absolutely maintenance free

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 186: 06-LLOYDInsulation

THE ADVANTAGES OF

LLOYD PANEL

Lloyd Panel is available in lengths upto 12 m and hence

jointless roof.

Lloyd Panel are fixed on to the support system with leak

proof method using SDST Fasterners.

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 187: 06-LLOYDInsulation

THE ADVANTAGES OF

LLOYD PANEL

Lloyd Panel are made

out of environment

friendly, CFC. Free

Polyurethane Foam.

`LLOYD PANEL

INSULATED ROOFING & CLADDING SYSTEM

Page 188: 06-LLOYDInsulation

LLOYD PANEL

IS THE ULTIMATE ONE STEP SOLUTION FOR

INSULATING THE ROOF OF INDUSTRIAL AND

COMMERCIAL BUILDINGS.

`

Page 189: 06-LLOYDInsulation

PARTIAL LIST OF LLOYD PANEL

JOBS CARRIED OUT / ORDERS RECEIVED

BY US RECENTLY

`

S.No Client Area in Sqm

1 Win Wind Energy Pvt. Ltd., Chennai 65000

2 ETA Engineering, Kolkata 10000

3 Takata India Pvt. Ltd., Chengalpet 10000

4 Aveagen Poultry, Udamalpet 5000

5 Ames Foods Ltd., Cochin 2500

6 Naser Tanning Industries Ltd, Vanniyambadi 1500

LIST OF JOBS / ORDERS

Page 190: 06-LLOYDInsulation

PARTIAL LIST OF LLOYD PANEL

JOBS CARRIED OUT BY US

`

S.No Client Area in Sqm

1 MICO, Bangalore 20000

2 Reliance Filaments, Silvassa 17000

3 NTPC, Kathalguri 5000

4 CESE Power Project, Calcutta 5000

5 Indian school of Business, Hyderabad 1300

6 PES College, Bangalore 1200

LIST OF JOBS / ORDERS

Page 191: 06-LLOYDInsulation

PARTIAL LIST OF LLOYD PANEL

JOBS CARRIED OUT BY US

`

S.No Client Area in Sqm

7 Elnet Technologies, Chennai 400

8 Diamond Tools, Bangalore 1200

9 Sapna Book House , Bangalore 200

10 IBC, Bangalore 1000

11 Indiana India, Dodabellapur 1300

12 NGMA Art Gallery, Bangalore 600

13 Sonata Software, Hyderabad 1000

LIST OF JOBS / ORDERS

Page 192: 06-LLOYDInsulation

LLOYD PANEL 30 AT MICO, BANGALORE

`

Page 193: 06-LLOYDInsulation

LLOYD PANEL 30 AT MICO, BANGALORE

`

Page 194: 06-LLOYDInsulation

LLOYD PANEL 30 AT MICO, BANGALORE

`

Page 195: 06-LLOYDInsulation

LLOYD PANEL 50 AT METRO CASH AND CARRY, BANGALORE

`

Page 196: 06-LLOYDInsulation

LLOYD PANEL 50 AT METRO CASH AND CARRY, BANGALORE

`

Page 197: 06-LLOYDInsulation

LLOYD PANEL 50 AT METRO CASH AND CARRY, BANGALORE

`

Page 198: 06-LLOYDInsulation

Products

for

Building Industry

`

Page 199: 06-LLOYDInsulation

METAL ROOFING &

WALL CLADDING

Page 200: 06-LLOYDInsulation

PRODUCTS FOR BUILDING INDUSTRY

LLOYDECK, LLOYD TILE, LLOYD SUPERDECK LLOYDKLIPLOCK, LLOYD STANDING SEAM, LLOYD ARCH, LLOYDPANEL – 30, - The modern roofing concept for Scientific Roofing /Siding for industrial and commercial buildings.

LLOYD FOAM – Spray Applied Polyurethane Foam (PUF) formonolithic over-deck insulation application.

ISOTHANE EM – A Single component liquid applied Urethanebased Elastomeric Membrane Water Proofing system suitable forall kinds of roof substrates.

`

Page 201: 06-LLOYDInsulation

PRODUCTS FOR BUILDING

INDUSTRY

LLOYD PANEL SYSTEM – State of art system with Sandwich Polyurethane Foam Panel with all accessories for complete Modern Cold Storage.

LLOYDROC PANEL SYSTEM – Pre-fabricated system with high density lamellar type rockwool sandwiched between colour coated sheets for turbine halls, D.G. Buildings, Industrial Buildings, etc.,

PRE-ENGINEERED BUILDINGS, CIVIL AND STRUCTURAL WORKS

SPANTECH – Frameless Roofing system for Grain Storage Facility.

`

Page 202: 06-LLOYDInsulation

OTHER PRODUCTS FOR BUILDING INDUSTRY

BUILDING INSULATION SYSTEM – BOTH UNDER DECK AND OVER DECK.

BUILDING ACOUSTICS & NOISE CONTROL SYSTEM

BUILDING FIRE PROTECTION AND PASSIVE FIRE PROTECTION SYSTEM FOR CABLES.

BUILDING FALSE CEILING SYSTEMS

BUILDING WATER PROOFING SYSTEMS

`

Page 203: 06-LLOYDInsulation

203

LLOYD INSULATIONS (INDIA) LIMITED

SAVE ENERGY…

PROTECT ENVIORNMENT…

THINK INSULATION…

Page 204: 06-LLOYDInsulation

204

for a better future

Page 205: 06-LLOYDInsulation

205

THANK YOU !!