    CENTRAL PARK CONCEPT DEVELOPMENTSteering Committee Update June 27 th 2011

    Co-Chairs Brian Saunderson & Claire Tucker-Reid

  • 8/6/2019 06 June 27 2011_CP Steering Committee Council Update

    2/8

  • 8/6/2019 06 June 27 2011_CP Steering Committee Council Update

    3/8

    To develop a design concept for a recreation facility that will serve in partnership as a central hub of

    activity to attractall

    residents, keep our citizens fit, and further build community pride and cohesion.

    Draft Vision for Central Park

  • 8/6/2019 06 June 27 2011_CP Steering Committee Council Update

    4/8

    Scope of Work

    Determine feasibility of facility componentsEnsure that there is public input and reviewDevelop a concept for the site

    Address other amenities on site (parking, slow pitchdiamonds etc.)Develop a capital cost of the projectDevelop a 5 year operating budget pro-forma

    Develop a report that summarizes the findings andmakes go-forward recommendations to Council

  • 8/6/2019 06 June 27 2011_CP Steering Committee Council Update

    5/8

  • 8/6/2019 06 June 27 2011_CP Steering Committee Council Update

    6/8

  • 8/6/2019 06 June 27 2011_CP Steering Committee Council Update

    7/8

    Draft Minimum / Maximum ConceptDesign Scenarios

    OPTIONS ICE POOL

    Option One No additional facilities Refurbish existing pool

    Option Two One new or upgraded

    surface

    Refurbish existing pool into

    a warm water leisure tank &build new 25m 6 lane tank

    Option Three Two surfaces Refurbish existing pool intoa warm water leisure tank &build new 25m 6 lane tankw/ expanded deck

    Note:There may be other options as the work progresses.Investigation will continue for the advantages and disadvantages of each

    option; impacts to other amenities on site or off site will also be determined.Services of a professional Architectural Design Firm will be essential to

    determining accurate design options.

  • 8/6/2019 06 June 27 2011_CP Steering Committee Council Update

    8/8

    Project Considerations &Recommendations

    1 . Memorandum of Understanding with the Simcoe/Muskoka YMCA

    2. Procurement of a Design Firm

    3 . Possible Assistance with Communications

    4 . Extension of the Advisory Committees Timeframe