Page 1: 06 August 2013

Office Space-Relocation of Johannesburg RAF Office:

RAF/2013/00024

Non -Compulsory Briefing Session

06 August 2013

The Road Accident Fund

Page 2: 06 August 2013

AGENDA

1. Welcome

2. Introduction of the RAF members

3. Circulation of Attendance Register

4. Presentation By RAF :

a) Procurement – Process and Complianceb) Facilities-Scope/specification

5. Q & A

6. Closing

Page 3: 06 August 2013

Details of the BidREQUEST FOR PROPOSALS : OFFICE SPACE FOR THE RELOCATION OF THE RAF JOHANNESBURG OFFICE

• Non-Compulsory briefing session

• 06 August July 2013

• Published 26 July 2013

• Closing date 20 August 2013 • All questions / enquiries outside this forum will be via email to:

[email protected] not later than 11:00 on 12th August 2013

• Questions/ Answers will be published on the RAF Website on 13th August 2013

Page 4: 06 August 2013

BACKGROUND

Background

To request proposals from suitably qualified and experienced Bidders whohas presence in Gauteng to assist the RAF in identifying office space for the Road Accident Fund.

The intention is to appoint Bidders who manages commercial properties or owncommercial properties for leasing. Bidders must propose buildings that will suit the RAF requirements.

Parameters

Lease: Office space.

Page 5: 06 August 2013

Compliance

• Compulsory Documents (Valid & Original Tax Clearance Certificate)

• Page 5-Checklist of documents to be submitted

• Please ensure that the bid document is signed where required

• Completed bid and response to evaluation must be submitted

Page 6: 06 August 2013

Evaluation CriteriaMandatory Requirements

The following specific requirements must be met by the bidders and it will be expected of bidders to supply proof or confirm their commitment where applicable.

• The bidder must confirm that they have read and understood the terms and conditions set out in the attached Special Conditions of Contract and mandatory clauses to be incorporated into the lease agreement (Annexure J) which terms and conditions the bidder accepts, in the event that the RAF awards the contract to the bidder pursuant to this bid. The bidder must submit with the bid:

A. A proposed Lease Agreement; andB. A proposed Pricing ScheduleC. Special Conditions of Contract

• The Bidder must provide proof of mandate if acting on behalf of the owner/landlord or company. Please provide for each company identified. The RAF does not pay commission agent fees.

• The Bidder’s must have been established, experienced, and operational for a period of three (3) years or more. Provide Company Profile.

• The Bidder confirms that they have read the attached Special Conditions of Contract attached hereto as Annexure J and the bidder confirms that they understand that they shall form part of the agreement to be concluded between the Parties.

NB:FAILURE TO COMPLY WITH ALL OF THE MANDATORY EQUIREMENTS WILL LEAD TO DISQUALIFICATION

 

Page 7: 06 August 2013

Technical / Functional Requirements

The technical criterion that will be utilized to test the capability ofThe service providers

please see circulated copy for details.

Technical criterion will be evaluated against the following detailed requirements:

The bidder will be evaluated and scored on seven elements with a total of 100 points,

Threshold: all bidders who score 56 or more out of 75 points will be considered for site visits

Site visit: is out of 25 points

Threshold: All bidders who score 70 or more out of 100 points will be shortlisted for Price and BEE.

Page 8: 06 August 2013

Evaluation

90/10 principle will be used.

Price and BEE

Page 9: 06 August 2013

Bid response format to be strictly adhered to for easy reference

Please see circulated document

Page 10: 06 August 2013

SPECIFICATION

Please see circulated copies

Page 11: 06 August 2013

QUESTIONS

?

Page 12: 06 August 2013

THANK YOU