05 Well Testing - Trisakti 25 Nov 2006

  • Upload
    saiwawa

  • View
    33

  • Download
    0

Embed Size (px)

DESCRIPTION

Menjelaskan tatacara pengujian sumur minyak

Citation preview

  • By

    R. Harry EddyarsoPT. SARIPARI PERTIWI ABADI

    KMI Goes to Campus ProgramKomunitas Migas Indonesia Universitas Trisakti

    25 November 2006

  • WE DO APPRECIATE HALLIBURTON AND POWER WELL SERVICE GROUPS FOR PROVIDING THE WELL TESTING PRESENTATION MATERIALS FOR LESSON LEARNED SHARING AND EDUCATIONAL PURPOSES .

    STATEMENT of APPRECIATION

  • Finding The Reservoir : Seismic Survey

    Making Access to The Reservoir : Drilling

    Optimizing The Reservoir : Testing

    Evaluating The Reservoir : Logging

    Producing The Reservoir : Completion

  • SEISMIC ALONG WELL PATH3D DATA

  • Depth Structure Map

    Top B-29A2 Base B-29A2

    c.i =25

  • Types Of Well Testing Equipment

    DST(Drill Stem Testing)

    DST

    Open Hole Cased Hole Barefoot

    STE (Surface Testing Eqpt.)

    STE

    Exploration Clean Ups Production

  • Guide to Better Service and Correct Sizing of Equipment

    Guide to Better Service and Correct Sizing of Equipment

    1. What is the estimated highest pressure atthe wellhead ?.

    2. What is the lowest pressure at wellhead ?.3. What are the expected maximum and

    minimum effluent rates ?. Gas/Oil/Water ?.4. Is the effluent sweet or does it contain

    corrosives ?. If it does contain corrosives,what are the expected highest concentrations of H2S (This will also include CO2 amounts).

  • Guide to Better Service and Correct Sizing of Equipment (Continued)

    Guide to Better Service and Correct Sizing of Equipment (Continued)

    5. What is the expected A.P.I. of liquid hydrocarbon and the specific gravity of gas ?.

    6. What is the customers requirement for disposal or storing of liquid hydrocarbon and H2O ?.

    7. Are there any special requirements such as governing bodies special rules or regulations, i.e., maximum weight restrictions, etc. ?.

  • DRILL STEM TESTING

    Definition

    Temporary completion of a well to gather reservoir data and information for evaluation.

    Measurement of formation parameters and characteristics are under dynamic conditions. Disturbance (flow) of the formation is measured (Pressure transient).

  • Objectives Identify the formation

    fluid Determine the rate at

    which fluids can be produced

    Determine reservoir parameters(Productivity, Permeability, Well Bore Damage, etc )

    Calculating the Economic Feasibility of the Well

    DRILL STEM TESTING

  • SECONDARY CIRCULATING VLV.

    DRILL COLLARS

    PRIMARY CIRCULATING VLV.

    TESTER VLV.

    WORK STRING

    PRESSURE / TEMPERATURE RECORDERSPACKER BYPASS

    PACKER

    DRILL COLLARS

    DRILL STEM TESTING

    PACKER

    Will safely separate well in two sections.

    Will protect formation

    Allow flowing the well inside Tubing while Isolating the Annulus

    PACKER

    Will safely separate well in two sections.

    Will protect formation

    Allow flowing the well inside Tubing while Isolating the Annulus

    PACKER By Pass

    Will divert mud while tripping in and out of the hole.

    Will protect Packer elements during circulation.

    Allow equalization of differential pressure when unsetting packer

    PACKER By Pass

    Will divert mud while tripping in and out of the hole.

    Will protect Packer elements during circulation.

    Allow equalization of differential pressure when unsetting packer

    Pressure Temperature Recorders

    Will record pressure transient

    Must be carried safely and must be protected.

    Location in the string can vary.

    Multiple options exists

    Pressure Temperature Recorders

    Will record pressure transient

    Must be carried safely and must be protected.

    Location in the string can vary.

    Multiple options exists

  • SECONDARY CIRCULATING VALVE

    DRILL COLLARS

    PRIMARY CIRCULATING VALVE

    TESTER VALVE

    WORK STRING

    Pressure / Temperature Recorders and Carriers

    Packer Bypass

    Packer

    DRILL COLLARS

    DRILL STEM TESTING

    Tester Valve

    Will provide DOWN HOLE closure.

    Will add a safety barrier. Allow pressure control inside the string.

    Various types, some allow to Lock Open and can be reversed to Normal Mode.

    Tester Valve

    Will provide DOWN HOLE closure.

    Will add a safety barrier. Allow pressure control inside the string.

    Various types, some allow to Lock Open and can be reversed to Normal Mode.

    Drill Collars

    Will provide a SAFE separation between Ball Valves.

    Will add weight to packer protecting the Tubing.

    Drill Collars

    Will provide a SAFE separation between Ball Valves.

    Will add weight to packer protecting the Tubing.

    Primary Circulating Valve

    Will provide a mean to circulate without unsetting the packer. (Before and/or after the DST, and with NO manipulation of the Tubing)

    Will be re-closable.

    Can isolate formation during circulation, adding safety to the operation.

    Primary Circulating Valve

    Will provide a mean to circulate without unsetting the packer. (Before and/or after the DST, and with NO manipulation of the Tubing)

    Will be re-closable.

    Can isolate formation during circulation, adding safety to the operation.

  • SECONDARY CIRCULATING VALVE

    Drill Collars

    Primary Circulating Valve

    Tester Valve

    WORK STRING

    Pressure / Temperature Recorders and Carriers

    Packer Bypass

    Packer

    Drill Collars

    DRILL STEM TESTING

    Secondary Circulating Valve

    To provide a mean to circulate if the primary circulating valve fails. (Before or after the DST, and with NO manipulation of the Tubing)

    Could be re-closable, or a one shot.

    Can isolate formation during circulation, adding safety to the operation.

    Secondary Circulating Valve

    To provide a mean to circulate if the primary circulating valve fails. (Before or after the DST, and with NO manipulation of the Tubing)

    Could be re-closable, or a one shot.

    Can isolate formation during circulation, adding safety to the operation.

    Work String

    To provide a conduct for the hydrocarbons to surface.

    To have a mean to operate mechanical tools, such as Packers or other valves.

    Typically in Cased Hole DST Tubing will be used. In Open Hole DST Drill Pipe will be used.

    Work String

    To provide a conduct for the hydrocarbons to surface.

    To have a mean to operate mechanical tools, such as Packers or other valves.

    Typically in Cased Hole DST Tubing will be used. In Open Hole DST Drill Pipe will be used.

  • TOOL SYSTEM APPLICATIONS OPEN HOLE CASED HOLE

    DRILL STEM TESTING

  • TYPICAL OPEN HOLE DRILL STEM

    TESTING SYSTEM

    IMPACT SUB REV. CIRC. VLV.

    DRILL PIPE

    DRILL COLLARS

    DUAL CIP VALVE

    HYDROSPRING TESTER VLV.

    PRESSURE RECORDER

    VR SAFETY JOINT

    ANCHOR PIPE SAFETY JT.

    TEMPERATURE RECORDER

    NR PACKER

    BIG JOHN JAR

    FLUSH JOINT ANCHOR

    PRESSURE RECORDER

  • TYPICAL CASED HOLE DRILL STEM

    TESTING SYSTEM

    RD SAFETY CIRCULATING VLV.

    PREMIUM THREADED TUBING

    DRILL COLLARSEXPRESS CIRCULATING VLV.

    SURFACE READOUT SYSTEMSELECT TESTER VLV.MPV VALVE

    PRESSURE / TEMPERATURE REC.

    CHAMP IV PACKER

    VERTICAL SHOCK ABSORBERTIME DELAY FIRING HEAD

    R/A TAG SUB

    BIG JOHN JARRTTS SAFETY JOINT

    WORK STRING

    RADIAL SHOCK ABSORBER

    VANN GUNS

    BELOW PKR. HYD. SAFETY JOINT

  • Surface Well Test Package

  • Surface Test Tree

  • Data Header

  • Choke Manifold

  • Steam Heat Exchanger

  • Indirect Fired Heater

  • Separator

  • Test Tank

  • Transfer Pump

  • Burner Boom

  • Burner Head

    Air Inlet

    Oil Inlet

    Igniter Connections

    Nozzle

    GasJets

    Pilot

  • Chemical Injection Pump

  • Well Test Lab

  • Air Compressor

  • SCAN (Surface Computerized Acquisition Network)

    PowerWell Services SCAN combines the most up-to date electronic hardwareand data gathering software for unbeatable performance during well testoperations.

    Present equipment consists of Computer and peripherals connected totransducers and transmitters measuring pressure, temperature, and flow rates.

  • Data Acquisition

  • 01000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    11000

    12000

    13000

    14000

    15000

    16000

    1

    0

    /

    2

    7

    1

    2

    :

    0

    0

    :

    0

    0

    1

    0

    /

    2

    8

    0

    0

    :

    0

    0

    :

    0

    0

    1

    0

    /

    2

    8

    1

    2

    :

    0

    0

    :

    0

    0

    1

    0

    /

    2

    9

    0

    0

    :

    0

    0

    :

    0

    0

    1

    0

    /

    2

    9

    1

    2

    :

    0

    0

    :

    0

    0

    1

    0

    /

    3

    0

    0

    0

    :

    0

    0

    :

    0

    0

    1

    0

    /

    3

    0

    1

    2

    :

    0

    0

    :

    0

    0

    1

    0

    /

    3

    1

    0

    0

    :

    0

    0

    :

    0

    0

    1

    0

    /

    3

    1

    1

    2

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    1

    0

    0

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    1

    1

    2

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    2

    0

    0

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    2

    1

    2

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    3

    0

    0

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    3

    1

    2

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    4

    0

    0

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    4

    1

    2

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    5

    0

    0

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    5

    1

    2

    :

    0

    0

    :

    0

    0

    1

    1

    /

    0

    6

    0

    0

    :

    0

    0

    :

    0

    0

    P

    r

    e

    s

    s

    u

    r

    e

    (

    p

    s

    i

    )

    Time (mm/dd hh:mm:ss)

    60

    80

    100

    120

    140

    160

    180

    200

    220

    240

    260

    Temperature (F)

    Pressure Inflection Point Temperature

    Pressure up tubing to fire the guns

    Shut in at the choke manifold and cycle the OMNI to spot diesel to lower the hydrostatic head

    Pre-stimulation flow period for formation cleanup.

    Acidising the formation by bullheading from surface

    Post-Stimulation flowback and cleanup

    Steady flow on a small choke

    Pressure buildup

    Second flow period for sample catching

    Pressure & Temperature History Plot for Marrat Object II

  • Reporting FormatsThe Software Gives The Operator The Ability To Create Custom Report Formats

    And Save Them For Later Use

  • Emergency Shutdown System The Emergency Shutdown (ESD) system consists of a panel which maintains 1500 psig hydraulic pressure via

    a flexible high pressure hose to the Surface Safety Valve or Surface Test Tree flow wing valve. The hydraulic pressure holds the valve open. In the ESD mode this hydraulic pressure can only be maintained provided the control valve inside the panel is held closed by a pilot air supply of approximately 40 psig.

    This 40 psig pilot air line is fed via " plastic hose to Hi/Lo pressure pilots and ESD push button stations situated around the installation:

    Upstream of the choke manifold providing overpressure and line rupture protection for the high pressure pipework.

    Downstream of the choke manifold providing overpressure and line rupture protection for the low pressure pipework.

    On the holding tank providing overpressure protection of the vessel. On the Heat Exchanger shell providing overpressure protection of the shell if the coils rupture. On the low pressure coils of the heat exchanger, providing overpressure protection in the event of a blockage

    downstream. On the high pressure coils of the heat exchanger, providing overpressure protection in the event of a blockage

    upstream. Push buttons situated : a) In driller dog house, b) Outside Company office, c) At escape lifeboats, d) In the

    welltest area, e) On the ESD panel

    Should any of the Hi/Lo pilots detect over/under pressure during the flow period the pilot air pressure would be vented, causing the panel control valve to dump the hydraulic pressure that holds the actuator valve open. The spring inside the actuator closes the actuator valve.

    Should any of the ESD buttons be activated, again the pilot air supply would be dumped and the same sequence of events would occur.

    A manual override is incorporated in the panel and isolation valves are installed at the Hi/Lo pilots to allow for pressure testing of the system.

  • Emergency Shutdown System

    Fusible Plug

    S.T.T. Manifold Optional Remote

    E.S.D. Station

    Pneumatic

    Hydraulic

    Hydraulic Return

    Hydraulic Quick Exhaust

    Fusible Plug

    DS Pilot DS Pilot DS Pilot DS Pilot

    HydraulicActuator

    Choke Manifold

    Heat Exchanger Separator Test Tank Pump Burner

  • SEISMIC ALONG WELL PATHTypes Of Well Testing EquipmentGuide to Better Service and Correct Sizing of EquipmentGuide to Better Service and Correct Sizing of Equipment (Continued)DRILL STEM TESTINGDRILL STEM TESTINGTYPICAL OPEN HOLE DRILL STEM TESTING SYSTEMTYPICAL CASED HOLE DRILL STEM TESTING SYSTEMSurface Well Test PackageSurface Test TreeData HeaderChoke ManifoldSteam Heat ExchangerIndirect Fired HeaterSeparatorTest TankTransfer PumpBurner BoomBurner HeadChemical Injection PumpWell Test LabAir CompressorData AcquisitionReporting Formats The Software Gives The Operator The Ability To Create Custom Report Formats And Save Them For Later UseEmergency Shutdown SystemEmergency Shutdown System