13

042-new drying rack.pdfISMC 150 over the concrete floor beam are also to be supplied by the contractor at his own cost. . ISMC 150 shall be widened by welding ISA 65X65X6 at both ends

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview