8/12/2019 0416 - Steam Drum
1/2
S: 0..../N9-10/T
1. Khng c trch sao mt phn phiu kt quny nu khng c sng ca Trung Tm K Thut 3 / This Report shall not be reproduced except in full, without the written approval of Quatest 32. Tn mu , tn khch hng c ghi theo yu cu ca ni gi mu./Name of sample and client are reported as clients request.
Ngy: ..........
Trang s: 01/02
1. n vyu cu :Customer
2. a ch :Address
My Xuan B1 Industrial Zone, Tan Thanh Dist, Ba ria VungTau province
3. i tng thm nh :Inspection items
STEAM DRUM 10699 x 1525 x 75 mm (L x ID x T),Serial No:KAWASAKY FB75U TYPE ICFB, IKSAN # 2
4. Slng :Quantity
01
5. Ni dung thm nh :Inspection content
Thm nh cht lng ca Steam DrumQuality inspection of Steam Drum
6. Ngy nhn thm nh :Date of receiving
7.Ngy thm nh :Date of inspection
8. Ni thc hin :Location My Xuan B1 Industrial Zone, Tan Thanh Dist, Ba ria
Vung Tau province
9. Phng php thm nhv mc cht lng :
Method & Acceptance criteria
Inspection & Test Procedure for Steam Drum No: IKQA-01
(20/10/2010) & ASME BPV code, section I, 2010 edition
10.Kt quthm nh/Inspection results:Steam Drum c ch to, kim tra v thnghim ph hp vi quy trnh ch to,
kim tra v thnghim sIKQA-01 (20/10/2010) v ASME BPV code, section I (2010)/Steam Drum were fabricated, inspected and tested conform to Inspection & Test Procedurefor Steam Drum N
o: IKQA-01 (20/10/2010) andASME BPV code, section I (2010).
Ni nhn/Receiver:
- Khch hng / Client;- Lu / File:N4.
KT. GIM CPH GIM C
Hong Lm
THNG BO KT QUTHM NHINSPECTION REPORT
8/12/2019 0416 - Steam Drum
2/2