Upload
berenice-powell
View
214
Download
1
Embed Size (px)
Citation preview
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 1
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion
Competition aim:
To run a fair and attractive competition according to the
WorldSkills rules, in order to find the best
Mechatronics Team worldwide.
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 2
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion Thursday:
Idea:
Competitors should get familiar with the competition, their tools and with the robot
Morning:
Project 1.
(preparation: Introduction to Robot station, time ½ h)
Build a system ‘Distribution station – Robot station’.
Commissioning, Teaching positions of robot and programming Distribution station
(program for robot is given and can’t be modified from the participants)
The Distribution station is already assembled, so every team has enough time to learn and work with the unknown robot.
Time: 2 ½ h
- (evaluation 1 h)
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 3
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion Thursday:
Idea:
Competitors should get familiar with the competition, their tools and with the robot
Afternoon:
Project 2
(preparation: not necessary)
Troubleshooting / Optimizing on system ‘Distribution robot’.
max. Time 1 ½ h
- (evaluation 1 ½ h)
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 4
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion Friday:
Idea:
Unknown exercises covering the topics assembly, programming, commissioning of mechatronic systems, integration of different systems.
Morning:
Project3
Build a Pick and place station (complete new MPS station). Assembly, programming and
commissioning
Time: 2 ½ h
- (evaluation 1 h)
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 5
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion Friday:
Afternoon:
Project4
Build a system ‘Distribution station – Pick and place station – robot station’.
Assembly, programming and commissioning
Time: 2 ½ h
- (evaluation 1 h)
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 6
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion Saturday:
Idea:
Unknown exercises covering the topics assembly, programming, commissioning of mechatronic systems, integration of different systems.
Morning:
Project5
Build a FluidicMuscle Press station (complete new MPS station).
Assembly, programming and commissioning
Time: 3 ½ h
- (evaluation 1 h)
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 7
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion Saturday:
Afternoon:
Project6
Build a system ‘Distribution station – Pick and place station – FluidicMuscle press station – robot station’.
Assembly, programming and commissioning
Time: 2 ½ h
- (evaluation 1 h)
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 8
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion Sunday:
Idea:
Unknown exercises covering the topics optimizing, troubleshooting, increasing productivity –
Mechatronics excellence!
Morning:
Project7
Troubleshooting on system ‘Distribution station – Pick and place station – FluidicMuscle Press
station – robot station’.
Assembly, programming and commissioning
Time: 2 ½ h
- (evaluation 1 h)
Eckhard von Terzi, Benoit Maisonneuve
21/04/23 Folie 9
Wo
rld
Ski
lls
Mec
hat
ron
ics
Co
mp
etit
ion Sunday:
Afternoon:
Project8
Optimizing ‘Distribution station – Pick and place station – FluidicMuscle press station – robot
station’.
Assembly, programming and commissioning
Time: 2 h
- (evaluation 1 ½ h)