Oracle Gridon DELL Enterprise
Dell International Inc., Korea Dell International Inc., Korea 컨설팅컨설팅 사업부사업부
정진일정진일 차장차장
Fastest growing tier-1 hardware vendor in the Oracle database market #1 Oracle Reseller in 2003Up to 250,000 transactions per hour* within Dell IT on mission critical system
Oracle Global IT operations using >2,000 Dell|Linux serversUsing Dell servers in the Austin Data Center for OutsourcingDevelops Linux-based software on Dell servers
*Dell’s Sales ODS database is processing over 250,000 transactions per hour in peak hours. It is also responding to 100,000+ queries/requests per hour at the same time. (as of April 2003)
Dell | | Oracle PartnershipPartnership
1997. Dell|Oracle Partnership Formed
Dell | | Oracle | | Linux alliancealliance
Oracle은 Dell Power Edge Server를 사용하여Red-Hat Linux상에서 Core Product를 개발합니다.
Oracle은 Dell Power Edge Server를 사용하여Red-Hat Linux상에서 Core Product를 개발합니다.
Intel
OracleRed Hat
Dell
IDOL Program
IDOL프로그램은 Intel, Dell, Oracle, Red Hat Linux를 통한Unix Migration Solution입니다.
IDOL프로그램은 Intel, Dell, Oracle, Red Hat Linux를 통한Unix Migration Solution입니다.
The The DellDell | | Oracle Value PropositionValue Proposition
“We can take four inexpensive Dell machines and group them together and run them faster than a Unix machine at a tiny fraction of the cost. And it’s much more reliable, because if one of the Dell computers fails, three are left to keep the system running.”
- Larry Ellison, Chairman and CEO, Oracle Corporation
Oracle Chief Executive Larry Ellison said his company had "no more important partner than Dell" when it comes to expanding the reach of its technology and lowering customers costs.
- Rex Crum, CBS.MarketWatch.com
Oracle & Dell Joint DevelopmentOracle & Dell Joint Development
• All Oracle applications run on Dell servers
• Two operating systems– Microsoft® Windows®– Red Hat® Linux® Advanced
Server
• Best Practices Program– White papers– Installation guides, tools– Benchmarks– Joint Support ServicesYYDeveloper tools
YYSmall Business Suite
YYCollaboration Suite
YYE-Business Suite
YYApplication Server
YYRAC (parallel cluster)
YYDatabase
LinuxWindowsORACLE Product
Real Business BenefitsReal Business Benefits
Reduce Cost:• Pre-defined되고, pre-tested 된 technology combination은 Downtime최소화 및
Grid 인프라를 통한 Deployment & Management의 단순화를 통해 비용절감을돕는다.
Improve Quality of Service: • End-to-end testing, validation, and documentation등으로 신뢰성있는 Service
Level을 제공, 빠른 응답시간을 요하는 Business를 위한 IT를 가능하게 합니다.
Reduce Risk: • 입증된 solution들과 cooperative engineering을 통한 Downtime의 최소화와 신
속한 유지보수 및 그에 대한 프로세스를 제공합니다.
Manage Growth: • Dell|Oracle solution은 확장성 및 집중된 관리를 통하여 낮은 비용으로 H/W 및
사용자의 성장을 도모하도록 디자인됩니다.
Accelerate Time to Value:• Pre-tested되고 입증된 최고의 성능은 고객의 Deployment Time을 빠르게 한다.
Dell and Oracle Dell and Oracle –– Beyond the BoxBeyond the Box
• Dell is an authorized reseller of Oracle products• Database 9i and 10g
• Application Server 9i and 10g
• Real Application Clusters (RAC) 9i and 10g
• Collaboration Suite
• Standard Edition One – database for small business
• Oracle Product Support
• Comprehensive Professional Services• Sizing, Installation, Deployment, Tuning
The Momentum and Value of StandardsThe Momentum and Value of Standards
Dell drives standards in the industry…
Desktops Desktops -- 98% standardized:98% standardized:Dell #1 worldwideDell #1 worldwide11
x86 Servers x86 Servers -- 90% standardized90% standardized33::Dell #1 US, China (PRC)Dell #1 US, China (PRC)11
Workstations Workstations -- 87% standardized:87% standardized:Dell #1 worldwideDell #1 worldwide22
The datacenter is moving to standards
Disk Storage Disk Storage -- standardizing:standardizing:Dell #4 WorldwideDell #4 Worldwide44
Sources: Sources: 1 1 IDC Worldwide Quarterly PC Tracker, Nov 15, 2004 IDC Worldwide Quarterly PC Tracker, Nov 15, 2004 2 2 IDC Worldwide Workstation IDC Worldwide Workstation QViewQView Q3 2004 Q3 2004 33IDC Worldwide Quarterly Server Tracker, Q3 2004 IDC Worldwide Quarterly Server Tracker, Q3 2004 4 4 IDC IDC Worldwide Quarterly Disk Storage Systems Tracker Q3 2004. StandaWorldwide Quarterly Disk Storage Systems Tracker Q3 2004. Standardization is defined as open, nonrdization is defined as open, non--proprietary architectureproprietary architecture
X86-32 X86-64 RISC
1.8M
1.6M
1.4M
1.2M
1M
800K
600K
400K
200K
US Unit Shipments
x86 architecture share continued to grow and reached 91% of overall server units.
Customers Are Voting With Their $$$Customers Are Voting With Their $$$x86 vs. RISCx86 vs. RISC
Source: IDC reports
96 97 98 99 00 01 02 03 04 05
LAN
Storage Area Network (SAN)Storage Area Network (SAN)
Network Attached Storage (NAS)Network Attached Storage (NAS)Direct Attached Storage (DAS)Direct Attached Storage (DAS)
Dell | EMCFC Switch
Dell | EMCStorage Enclosure
PowerVault136T DLT Library
PowerEdge 6850Servers
PowerEdge 6850 Servers w/ Dell | EMC Storage Enclosure
& DLT Drive/Autoloader
PowerEdge 6850Servers w/PowerVault 220S
Disk Subsystem
PowerVault 745N
Dell | EMC NS500GNAS on SAN
Enterprise Total Solution providerEnterprise Total Solution provider
Enterprise Total Solution providerEnterprise Total Solution provider
• Client (Desktop, Notebook, Workstation, Monitor, Print, etc)• Server (Tower, Rack, 1way,2way,4way & Blade)• Storage (DAS, NAS, SAN)• Switch (Gigabit, Managed, Unmanaged)• SAN solutions (FC Switch, HBA)• Tape solutions (Tape Drive, Tape Autoloader, Tape library)• OS (MS, Red Hat, Suse)• Application (Altiris, MS SMS, VMware)• DB application• Back-up S/W • DPS (Dell Professional Service), 3rd party service
PowerEdgePowerEdge Server Roadmap Server Roadmap -- OverviewOverview
PowerEdge 8301 SOCKET
4 SOCKET PowerEdge 6800
PowerEdge 6850
PowerEdge 850
2 SOCKET
PowerEdge 2800
PowerEdge 2850
PowerEdge 1800
PowerEdge 1850
PowerEdge 1855
PowerEdge SC 430
PowerEdge SC 1425
PowerEdge SC 1420
End of LifeUpdateNew Product Introduction
PE 1955
PE 2900
PE 2950
PE 1900
PE 1950
SC 1435
SC 1430
MP Paxville
PE 840
PE 860
SC 440
800FSB, SAS Option External
SAS Option Internal
Woodcrest
SAS External
Q4 CY05 Q1 CY07Q4 CY06Q1 CY06 Q2 CY06 Q3 CY06Tulsa
Processor RoadmapProcessor RoadmapSi
ngle
Cor
eD
ual C
ore
Q4 CY05 Q1 CY07Q4 CY06Q1 CY06 Q2 CY06 Q3 CY06
EOLNew platform/chipsetNew processor introduction
4S
Blades
Low Voltage* 2S (Rack and Blades)
2S (SC and PE)
1S (SC and PE)Xeon 2MB (Irwindale) / 7520
Xeon LV 1MB 2.8Ghz (Nocona LV) / 7520
Xeon 1MB (Cranford), Xeon 8MB (Potomac) / 8500
Dual core Xeon (Paxville MP) / 8501
P4 600 sequence (Cedar Mill) / 7230
New Cedar Mill/Prescott sequence / Mukilteo-2
Xeon 2MB (Irwindale) / 7520
Mid /Low Voltage 2S PE and Blades
2S (SC1430)
1S (SC and PE)
Dual core (Dempsey) / 5000P (Blackford)
Dual core (Woodcrest) / 5000P (Blackford)
Conroe Family / Mukilteo-2
Dual core Xeon 16MB L3 (Tulsa) / 8501
Dual core (Woodcrest) / 5000V (Blackford-VS)
Dual core (Dempsey) / 5000X (Greencreek)
Dual core (Woodcrest) / 5000X (Greencreek)
** SC1435, SC1430 and PE1900 will launch with Woodcrest only (no Dempsey)
*** For PE only
PD 900 sequence (Presler) / 7230
Xeon LV 2MB 3.0Ghz (Irwindale LV) / 7520
4S
2S (Triathlon)
SC1435, PE1900 and Blades
MV Dempsey 3.2Ghz 1066 FSB Dual core (LV Woodcrest)
Dual core Xeon 2.8GHz** / 7230
PD 800 sequence (Smithfield) / 7230
Dual core Xeon 2.8GHz / 7230
P4 1MB, P4 2MB (Prescott) / 7230
PowerEdgePowerEdge 99thth GenerationGenerationFor Better Control of Your BusinessFor Better Control of Your Business
Continuing the success of Dell’s 8th Generation of PowerEdge Servers
신뢰성정밀한설계및제조, 테스트과정에충실한 Dell
관리기능- 강화된 공통기능
- Dell OpenManage™
- DRAC 5- IPMI 2.0- Program 가능한 LCD
성능- Intel® Xeon® Dual-Core - Fully Buffered DIMMs- PCI-Express I/O- Serial-Attached-SCSI- TCP/IP Offload Engine
완벽한 솔루션완벽한 기업용 제품을 위한
테스트 및 입증자료 제공
PowerEdge 9th Generation
BerlinPE1950
LondonPE2950
MontrealPE2900
PowerEdgePowerEdge 99thth GenerationGenerationFor Better Control of Your BusinessFor Better Control of Your Business
Consistent rack ID; Metal bezels; LCD visible; focus on fit/finish/refinement
PowerEdge 9th Generation
PowerEdgePowerEdge 99thth GenerationGenerationFor Better Control of Your BusinessFor Better Control of Your Business
London 3.5w/6 backplane
Berlin 3.5
Berlin 2.5
London 2.5
London 3.5w/4 backplane
Supported on the 2P rack servers
PowerEdge 9th Generation
PowerEdgePowerEdge 99thth G vs. G vs. PowerEdgePowerEdge 88thth
8 DIMMs on 9G (12 on PE2900); 고용량 DIMMs6 DIMMs –큰구성을위한고비용
DRAC은고정또는분리포트를지원할수있음; 더나은가상화실행
DRAC을위한옵션없이고정포트또는분리포트를가짐; 제한된가상화
Only PCI-X and PCIe5v PCI (몇몇타워형모델)
Broadcom Gb NICs w/ optional TOEIntel Gb NICs
듀얼 Core Processors단일 Core Processors
TBU w/ add-in controller; ROMB int. onlyInternal SCSI for TBU; ext SCSI on 2U/5U
ROMB on daughter cardROMB on riser
Fully Buffered DIMMs (FBD)DDR II
4 Port SAS std.; ROMB required for >4 HDsDual channel SCSI
프로세서 / 메모리
I/O Connectivity
저장변환
No PS/2 – USB only; No parallel portPS/2, 병렬 port (몇몇타워형모델)
SATA, hot-plug SATA 포함 (3.5”만가능)SATA 안됨
3.5” (블레이드를제회한전모델) 및 2.5” (1U/2U/블레이드)
3.5” HDs만가능
SAS (split backplane N/A)U320 SCSI (병렬); split backplane
9세대8세대
PowerEdge “9th Generation” vs “8th Generation”
Standard Edition One: Standard Edition One: TheThe Solution For SMBSolution For SMB
““현재현재 비지니스의비지니스의 요구요구””
• Oracle 가격: $745 for a 5 user license1
• Oracle 패키지구입 including server, software and support (storage sold separately)
• 최소의투입비용
• Starting at $2,863• Scalable to large clusters
““가까운가까운 미래의미래의 데이터센터데이터센터””
Source: http://oraclestore.oracle.com/OA_HTML/ibeCCtpSctDspRte.jsp?section=114701
Source: www.dell.com/database as of 03/07/052
Think BigThink Big
Start small
CX500 SAN
Scalable Enterprise starts with GridScalable Enterprise starts with GridOracleOracle 1010gg Database and RACDatabase and RAC
PE6850 4xCPU
PE2850 1xCPU
PE2850 2xCPU
중소형 비지니스• 150 CC Users• .5TB Storage
SE-1
PE2850 2xCPU
RAC: 2 nodes
Entry LevelEasy as Dell: Installation CD, 배치 서비스, 원스탑 쇼핑 또는 One P.O.
Business Continuance: 높은 용이성
Dev/Lab System
중형 비지니스• 600 CC Users• 1-5TB Storage
Dev/Lab System
투자보호: Leverage common industry building blocks through outScalable IT: Pay as you grow…
Dep
artm
enta
l
CX700 SAN
RAC: 8 nodes
중대형 기업체• 2400 CC Users• 10TB Storage
Div
isio
nal
PE2850 2xCPU
AS: 96 nodes | RAC: 8 nodes
기업체 : HQ• 20K CC Users• 15TB Storage
Divisional HQ
Redundant Site
CX700 SAN
그리드그리드
Dell|Dell|OracleOracle GridGrid--ComputingComputing
기업기업 관리자관리자
®®
클러스트된클러스트된어플리케이션어플리케이션 서버서버
®®
클러스트된클러스트된
데이타베이스데이타베이스 서버서버
®®
Grid OnGrid On--Demand Performance: Demand Performance: 동적동적 자원자원 할당할당
AvailibilityAvailibility on demandon demand
Database utilizationDatabase utilization
프로덕션프로덕션서버서버풀풀
기업기업 관리자관리자
®®
클러스트된클러스트된어플리케이션어플리케이션 서버서버
®®
클러스트된클러스트된데이타베이스데이타베이스 서버서버
®®Scale as you growScale as you grow
작업량작업량 감지기가감지기가 능력을능력을 늘릴늘릴필요성을필요성을 탐지해탐지해 낸다낸다
새로운새로운 서버서버 노드가노드가 클러스트로클러스트로
된다된다
GridGrid의의 높은높은 이용편의성이용편의성최종최종 유저는유저는 Server FailureServer Failure를를 볼볼 수수 없다없다..
AvailibilityAvailibility on demandon demand 프로덕션프로덕션서버서버풀풀
클러스트된클러스트된데이타베이스데이타베이스 서버서버
®®
기업기업관리자관리자
®®
클러스트된클러스트된어플리케이션어플리케이션 서버서버
®®
다운시간다운시간 없다없다
최종최종 유저에겐유저에겐 투과성이투과성이 있다있다(failing(failing은은 남아있는남아있는 노드로노드로넘긴다넘긴다))새로운새로운 서버가서버가 클러스트로클러스트로 된다된다..
Grid Grid 동적동적 자원자원 재구성재구성::작업량작업량 균형을균형을 위한위한 재할당재할당
AvailibilityAvailibility on demandon demand 프로덕션프로덕션서버서버풀풀
클러스트된클러스트된데이타베이스데이타베이스 서버서버
®®
기업기업관리자관리자
®®
클러스트된클러스트된어플리케이션어플리케이션 서버서버
®®어플리케이션어플리케이션이용도이용도
Database utilizationDatabase utilization작업량의작업량의 균형균형
작업량작업량 모니터가모니터가 클러스터클러스터이용도의이용도의 불균형을불균형을 탐지해탐지해 낸다낸다
이용도가이용도가 떨어지는떨어지는 클러스터에서클러스터에서서버를서버를 제거하고제거하고 높은높은 작업량을작업량을갖는갖는 클러스터를클러스터를 추가한다추가한다
Dell Runs MissionDell Runs Mission--Critical Order System on Critical Order System on OracleOracle 1010gg
• 시스템의 전체 퍼포먼스 5배 향상
• 리얼타임 fault tolerance로 비즈니스 연속성 구현
• 자동화된 관리로 인해 사람이 할 수 있는 실수를 크게 감소시킨다
• 미래의 요구사항을 충족하기 위해서 기술은 그 영역을 확장해 나갈 것이다.
Moved from 52 CPUMoved from 52 CPU’’s in 2 RISC servers s in 2 RISC servers to six Dellto six Dell PowerEdgePowerEdge 44--waysways
1212개월개월 ROI ROI 평가평가= $1.749 million = $1.749 million 비용절감비용절감 효과효과
Source: Oracle sponsored ROI Study: Source: Oracle sponsored ROI Study: Dell Moves European Sales Operations to Oracle Enterprise Grid oDell Moves European Sales Operations to Oracle Enterprise Grid on Dell Systemsn Dell Systems Published by Mainstay Partners, Dec 2004 Published by Mainstay Partners, Dec 2004
The Proof is in The PerformanceThe Proof is in The Performance
Spee
d
77%faster
UNIX
Pric
e
49%less
UNIX
Dell 2-processor PowerEdge 2850/Windowsvs.
UNIX 4-processor server
Source: Based on testing by Dell in Nov. 2004 comparing similarly configured 4-P UNIX server with 1.28 GHz processors and 2-PPowerEdge 2850 server with 3.4 GHz processors. Dell expects server testing performance to vary with processor speed. Server prices obtained from companies’ respective websites as of 11/29/04.•
주요벤더사는?• Sun, HP, IBM
고객이 선택하는 이유는?- Mission critical , Fault-tolerant
systems
어떤 고객들인가?- 4개의 CPU 이상의 프로세싱 파워를요구하는 고객들
The Enterprise Database The Enterprise Database 환경환경
Comparing Unix with LinuxComparing Unix with Linux
• Unix– 대규모 확장성– 입증된 가용성– 질적인 지원– 진보된 솔루션
• Linux– 제한된 확장성– 제한된 가용성– 제한된 지원– 진보되지않은 솔루션
So why would a customer migrate?
ScaleScale--Up ComputingUp Computing
• What is the largest number of CPUs in a scale-up Unix server from HP, IBM or Sun?
– typically 64 cores. With dual-core technology that effectively means 128 CPUs now in most cases
• What is their value proposition?– Availability, scalability, reliability and flexibility
• How do they achieve scalability?– Through internal expansion that allow many CPUs to share access
to a common memory pool and that allow the machine to run a single operating system
• How do they achieve high availability?– Through internal redundancy
• What is the largest number of CPUs in a scale-up Intel server from Dell?
- 4 CPUs. Dell doesn’t sell servers with more than 4 CPUs. That means a single Dell server cannot be an “enterprise solution” because it simply isn’t scalable enough.
• What is Dell’s key value proposition?- Low-cost, industry-standard, modular computing elements that de
liver a flexible, affordable, standard-based approach to enterprise computing.
• How does Dell achieve scalability?– Through external expansion that allow many servers to cooperate
together in a grid to support large workloads• How does Dell achieve high availability?
- Through external redundancy.
ScaleScale--Out ComputingOut Computing
Computing on Demand Scaling OutComputing on Demand Scaling Out
• Expensive costly components• High incremental costs• Single point of failure• Enterprise service at high cost
• Low cost modular components• Low incremental costs• No single point of failure• Enterprise service at low cost
Large Dedicated Server Oracle Grid
Our Path to GridOur Path to Grid
• Standardize – Cost effective Dell servers – Intel Xeon & Itanium 2 processors– Tiered EMC Networked Storage
• Consolidate onto– Oracle 10g Databases with Real Application
Clusters and Automatic Storage Management– EMC Networked Storage
• Automate– Operation & management
• Lower cost industry standard technology now exists to meet or exceed the QoS, manageability, flexibility and performance previously offered only by expensive SMP solutions
• Project MegaGrid Objectives:– How do you design and deploy?– How do you monitor, analyze and tune for performance?– How do you scale?– How do you manage?
ProjectProject MegaGridMegaGrid
Our MethodologyOur Methodology
• Identify a real world enterprise workload– Cramer Systems, British Telecom workload– Cramer’s Voice / Data service provisioning software– Web-based application – CPU and I/O intensive
• Establish a baseline on SMP servers– 550,000 transactions / hour
• Jointly design and build an enterprise grid infrastructure– Clustered database, servers, networked storage
• Measure performance, scalability, and management while progressively scaling the infrastructure
– Scale up to terabytes of data
• Document best practices and quantify the advantages
Performance (Cramer 4 Benchmark)
Tran
sact
ions
per
Hou
r
550K 580K
1.07M
Value
E 15K PE 1750 PE 7250
Pric
e
$2.6M
$40K
$129K
E 15K PE 1750 PE 7250
ProjectProject MegaGridMegaGrid ResultsResults
Proving the Power of Standards & Scale-OutServerServer list pricing was obtained from dell.com and sun.com as oflist pricing was obtained from dell.com and sun.com as of December 3, 2004, and includes server hardware costs only.December 3, 2004, and includes server hardware costs only.
Cluster Cluster Cluster Cluster
ProjectProject MegaGridMegaGrid –– Phase II PlansPhase II Plans
• Enterprise Application Consolidation - Expand Applications workload to include Cramer, Oracle Application Server and OracleApplications
• Continued Scalability of The Grid - Continue to scale environment, adding additional nodes and storage to the Oracle 10g database cluster
• Business Continuance - Expand testing to focus on best practices for performing upgrade and patch management in large-scale clusters without disruption and protection against component failure in the Grid
• Backup to Disk – Test online backup to disk solutions leveraging ATA storage
• Workload management – Capture the procedures for provisioning resources to react to changes in workload demand – includes migration of data / storage from one system to another
• Document Additional Best Practices - Publish Best Practices for deployment, upgrade and management of business applications in large-scale clusters
How to Learn MoreHow to Learn More
• Websites– www.dell.com/megagrid– www.emc.com/megagrid– www.oracle.com/megagrid
• Content– Joint Best Practices and whitepapers– Frequently Asked Questions– News and Upcoming Events
Tech Support
Pro Services
Oracle Licenses
9i AS/DB/RAC
Implementation
Hardware
Oracle
Partners
Hardware Vendors
Traditional Approach
Perception of ComplexityPerception of Complexity
Tech SupportTech Support
The SingleThe Single--Source EnterpriseSource Enterprise
TraditionalTraditional Dell|OracleDell|Oracle
ImplementationImplementation
Prof. ServicesProf. Services
1010gg AS/DB/RACAS/DB/RAC
Oracle LicencesOracle Licences
OSOS
HWHW
®®
PartnerPartner CustomerCustomer
PartnerPartner ®®
®®
PartnerPartner ®®
Red HatRed Hat
HW VendorHW Vendor
Red HatRed Hat
®®
®®
®®
®®
®®
Oracle Sizing Support & ServicesOracle Sizing Support & Services
DeploymentDeployment
ConsultativeConsultativeSizingSizing
Real Sizing Real Sizing and/or POCand/or POC
• Engage ETA (ISIS)• Engage DPS• Potential Site Survey• Potential SOW•• More AccurateMore Accurate
• Engage DPS/ISIS• Utilize POC Center• Onsite POC’s• Recreate Customer
Environment• Provide Baseline• SOW•• Extremely AccurateExtremely Accurate
InitialInitialSizingSizing
• SC or TSR• Engage sizing tools
and whitepapers• Utilize ET/FEM• Utilize ETA (ISIS)•• SWAG or EstimateSWAG or Estimate
AC
CU
RA
CY
COST