Chapter 1 Materials Planning: General
Information
Materials planning - complete overview
Master data
Basic information on consumption-based planning
Executing the planning run
Evaluating the planning run
8/12/2019 02_LO525_General Information.doc
2/23
SAP AG
R
Chapter 1 b!ectives
"ou will have learned the position of materials
planning in the logistics chain and important #$P
terminolog" for materials planning
"ou will %now the master data re&uired for materials
planning
"ou will have learned the business basics of
consumption-based planning as well as the
procedure and the environment of this t"pe of
planning
"ou will %now how materials planning is carried outand the possibilities available for evaluating the
results
B" the end of this chapter:
8/12/2019 02_LO525_General Information.doc
3/23
SAP AG
R
Materials Planning - 'omplete verview
'onvert
Planned
order
Indep(re&mts
)epedent re&mts
#ales and
distribution
processing
Reservations
Purchasing
functions
Purchase orders
#chedule lines
Purchase
re&uisition
*arehouse
Production
order
Invoice
verification
Materials
planning)emand
management
The main task of materials planning is to determine which material is required, the quantity required and when
it is required.
The internal planning elements of materials planning and of purchasing are the planned orders and thepurchase requisitions. Internal planning elements are known as order proposals.
The main focus of this course LO525 is external procurement.
8/12/2019 02_LO525_General Information.doc
4/23
SAP AG
R
PurchasingPurchasingdatadata
Material Master RecordGeneral dataGeneral data
#torage location#torage locationdatadata
+orecast data+orecast data
'onsumption data
$ccounting$ccountingdatadata
MRP dataMRP data
Material number
)escription
,nit of measure
echnical data
MRP t"pe
Planned deliver".in-houseproduction time
/ot si0e
MRP controller
Procurement t"pe
Purchasing group
Goods receiptprocessing time
1aluation price
1aluation procedure
MRP indicator forstorage location
#pecial procurement t"pefor storage location
The data required for consumption!ased planning is stored in the material master record at plant le"el.
8/12/2019 02_LO525_General Information.doc
5/23
SAP AG
R
MRP Procedures
MRP procedureMRP procedure
$utomatic reorder$utomatic reorder
point planningpoint planningManual reorderManual reorder
point planningpoint planning
MRPMRP'onsumption-based'onsumption-based
planningplanning
Reorder pointReorder point
planningplanning+orecast-based+orecast-based
planningplanningime-phasedime-phased
planningplanning
#s opposed to $%&, consumption!ased planning procedures are !ased on material consumption.
In reorder point planning, the system checks whether the a"aila!le stock le"el falls !elow the reorder pointdefined for the material. If it does, procurement must !e triggered. 'ou can determine the reorder pointmanually or, it can also !e calculated automatically using the material forecast.
In forecast!ased planning, historical data is used in the material forecast to estimate future requirements. Theserequirements are known as forecast requirements and are immediately a"aila!le in planning.
In timephased planned, historical data is also used in the material forecast to estimate future requirements.(owe"er, in this procedure, the planning run is only carried out according to predefined inter"als.
)or all consumption!ased planning procedures, sales orders, planned independent requirements, reser"ations,and so on are not rele"ant to planning.
In $%&, sales orders, planned independent requirements, reser"ations, and so on are planned directly asrequirements.
The $%& procedure is defined per material and plant. Therefore, the same material can !e planned in differentplants using different $%& procedures.
8/12/2019 02_LO525_General Information.doc
6/23
SAP AG
R
'onsumption-Based Planning
+uture re&uirements are calculated from past
consumption values
It is assumed that the re&uirements are either
constant or linear
Irregularities in consumption are buffered b" a
safet" stoc%
*onsumption!ased planning procedures are especially useful+
for materials procured externally
for trading goods
for * materials #-* analysis
for operating supplies
for goods that are not directly procured for an order, !ut are always required in large quantities
8/12/2019 02_LO525_General Information.doc
7/23
SAP AG
R
BM Explosion for 'onsumption-Based
Materials
$ssembl"
'omponents planned b"
MRP
)ependent re&mts.dependent reservations
Reorder pointReorder point
'omponents planned b"
consumption-based
procedures
/o dependent requirements are created for materials planned using any of the consumption!ased planning
procedures.
8/12/2019 02_LO525_General Information.doc
8/23
SAP AG
'onsumption-Based Planning: Procedure and
Environment
MRP
2et re&mts calculation
/ot-si0e calculation
#cheduling
Inventor" mgmt
Material master+orecast
$$
MaterialMaterial
$
B B '
B
33Purchasing
)efine procurement
The main task of the planning run is to determine which material is required, how much of the material is
required and when it has to !e a"aila!le.
)or each requirement date, the system compares a"aila!le stock with requirements in the net requirementscalculation. If the requirements cannot !e co"ered !y existing stocks, the system calculates the shortagequantity.
In the lotsi0e calculation, the system groups the net requirement quantities according to the lotsi0ingprocedure selected.
These order quantities are then scheduled.
8/12/2019 02_LO525_General Information.doc
9/23
SAP AG
R
'arr"ing ut the Planning Run
Planning run for one plant - online 4total planning5
Planning run for one plant - bac%ground processing
4total planning5
Planning run for one material - online 4single-item planning5
$$
MaterialMaterial
Plant
8/12/2019 02_LO525_General Information.doc
10/23
SAP AG
R
Evaluating the Planning Result
Planning result with interactive processing options
2/6 $//*E) +R #I2G/E-IEM P/$22I2G BE+RE #$1I2G 7
MRP lists 4individual evaluation . collective evaluation5
'urrent stoc%.re&uirements list 4individual evaluation .
collective evaluation5
8/12/2019 02_LO525_General Information.doc
11/23
SAP AG
R
MRP /ist /a"out for 'onsumption-Based
Planning
MRP listMRP list
Material information
2umber of exception messages
Processing indicator
'onsumption values
)ate
Exception message
Receipt.Re&mt &uantit"
$vailable &uantit"
1ariable header1ariable header
MRP elementsMRP elements
Planned orders
Purchase re&uisitions
Production orders
Pruchase orders
Plant stoc%.
#torage location stoc%
'ontents'ontents
+orecast re&uirementsPlanningPlanning
runrun
(
(
(
#ales orders
Reservations
The $%& list displays the results of the last planning run. *hanges to receipts, issues or stocks that occur
!etween planning runs are not displayed.
In the header of the $%& list, you can display "arious data for the material using the 1etailed header3 !utton.
The system creates exception messages for the e"aluation of critical situations. 'ou can search for theseexception messages in the $%& list.
8/12/2019 02_LO525_General Information.doc
12/23
SAP AG
R
#toc%.Re&uirements /ist /a"out
'urrent stoc%.re&uirements list'urrent stoc%.re&uirements list
Material information
'onsumption values
)ate
Exception message
Receipt . re&mts &uantit"
$vailable &uantit"
1ariable header1ariable header
MRP elementsMRP elements
Planned orders
Purchase re&uisitions
Production orders
Purchase orders
Plant stoc% .
#torage location stoc%
'ontents'ontents
+orecast re&uirements
(
(
(
'ontents'ontentsre-read onre-read on
accessaccess
#ales orders
Reservations
The current stock4requirements list always displays the uptodate situation of receipts, issues and stocks. That
is, the contents of the stock4requirements list are reread each time the list is accessed.
The layout of the list is similar to that of the $%& list.
hen processing the stock4requirements list, you can always refresh the display.
8/12/2019 02_LO525_General Information.doc
13/23
SAP AG
R
Evaluating the Planning Run ,sing the MRP
/ist
#election b" exception messages
#election b" MRP controller
#election b" stoc% receipt ranges of coverage
#election b" MRP date.processing date
#election b" materials with new exceptions
#election b" procurement
'ollective evaluation'ollective evaluation
#earch function- Exception messages
- Planning segments
- )ate of the MRP elements
Material memo
Period totals
Individual evaluationIndividual evaluation
The mass e"aluation of materials is carried out using the collecti"e display of the $%& list.
# series of selection criteria is a"aila!le for selecting the desired $%& lists.
'ou can define the layout of the collecti"e display per user using the sort functions.
# search function is a"aila!le for searching for exception messages or certain dates.
8/12/2019 02_LO525_General Information.doc
14/23
SAP AG
R
Evaluating the #toc%.Re&uirements /ist
#election b" product group
#election b" class
#election b" MRP controller
#election b" vendor
'ollective evaluation'ollective evaluation
#earch functions
- Exception messages
- Planning segments- )ate of the MRP elements
Material memo
Period totals
Individual evaluationIndividual evaluation
The mass e"aluation of materials can also !e carried out using the collecti"e display of the current
stock4requirements list.
8/12/2019 02_LO525_General Information.doc
15/23
SAP AG
R
Priority: if several exception messages exist for one MRP element, the system
will display the message allocated the highest priority
Creation of the MRP list depending on the exception message created
Splitting into exception gro!ps for the selection
Exception Messages
"he following settings can #e made in 'ustomi0ing:
Exceptions indicate:
2ew order proposals created in the planning r!n
$ates in the past%start, finish or opening date&
Pro#lems in BM explosion
Pro#lems in scheduling
Rescheduling
8/12/2019 02_LO525_General Information.doc
16/23
SAP AG
R
/a"out of the Planned rder
Planned order
8eader
Material data.Plant
Procurement t"pe
#torage location
)ates
+irming
The planned order is the $%& controller3s planning tool for managing dates and quantities as well as the
procurement dates for co"ering requirements.
The system ad6usts planned orders automatically to suit changed dates or quantities.
To a"oid automatic ad6ustments, you can firm planned orders. )irm planned orders are not changedautomatically in the planning run.
8/12/2019 02_LO525_General Information.doc
17/23
SAP AG
R
Chapter 1 Review 495
Materials planning relieves the MRP controller of routinewor% and automaticall" plans procurement proposals tocover material shortages(
In consumption-based planning the s"stem useshistorical data to forecast future re&uirements(
Materials planning can be executed as a total planning runfor all materials relevant to planning 4online or inbac%ground mode5 and as single-item planning for onematerial onl"(
6ou can evaluate the planning run using the followingevaluation tools:
MRP list 4displa"s the situation at the time of the lastplanning run5
current stoc%.re&uirements list 4up-to-date situation5
planning result 4interactive processing option beforesaving the results of the planning run5
8/12/2019 02_LO525_General Information.doc
18/23
'hapter 9 Exercises: Executing the Planning Run
A new raw material is to #e planned in plant 1''' of the
company (or this p!rpose, the material master record is createdand the material is planned !sing the single)item planning r!n
1 Goto the main men! of the material master record:
Logistics Materials management Material master
* Create the material master record
+n the material master, select the f!nction:
Material Create (special) Raw material
nter the material n!m#er -./*/MM)00nter the indicator for mechanical engineeringSelect the p!sh#!tton for displaying the views and select thefollowing:
asic data
P!rchasing
MRP 1 and *
Acco!nting
Select the p!sh#!tton entitled, organi2ational levels and enterthe plant 1''', the storage location '''1 and the MRP profile-/*/
nter the #ase !nit of meas!re PCin the asic $ata screenand maintain a material description of yo!r choice
"he p!rchasing gro!p ''1 is responsi#le for p!rchasing "hematerial #elongs to the material gro!p ''1
Chec3 the data on the MRP screen 4hy is it not possi#le tooverwrite the planned delivery time5
66666666666666666666666666666666666666666666666
8/12/2019 02_LO525_General Information.doc
19/23
Monthly cons!mption val!es are to #e created for thismaterial Starting from the MRP screen, select ExtrasConsumption +n the screen that appears, enter the periodindicator Mand the following cons!mption data
Previo!s month 78'
Previo!s month 1 7''
Previo!s month * 89'
Previo!s month 8 8'
Previo!s month 7 8/'
Previo!s month / 87'
Previo!s month ; 8/'
Previo!s month 8;'
Previo!s month < 87'
Previo!s month 9 8/'
Previo!s month 1' 87'
Ret!rn to the MRP screen #y selecting Back
+n the acco!nting screen, enter the val!ation class 8'''Select the standard price val!ation and enter a standard priceof =1'
8/12/2019 02_LO525_General Information.doc
20/23
8 Save the material master record and then carry o!t materialsplanning for the material:
Access the MRP men!:Logistics Materials management Materials planning MRP
"o carry o!t the planning r!n, select,
Planning run Sng-item, Sng-level
+n the planning r!n, the system is only to create planned
orders An MRP list is always to #e created for the res!lts ofthe planning r!n
After the planning r!n, display the MRP list "o do this, select,
Evaluations MRP list!n"ivi"ual "ispla#
$isc!ss the res!lts of the planning r!n $isplay the detailedheader and scroll thro!gh it "o do this, select the p!sh#!tton,
$etaile" %ea"er"hen, access the stoc3>re?!irements list "o do this, select,
Evaluations Stock&re'mts list
+ncrease the ?!antity of the planned order #y 1'' pieces "odo this, position the c!rsor on the planned order and select,
Environment C%ange element
Change the ?!antity in the header of the planned order andret!rn to the stoc3>re?!irements list #y selecting, Back
8/12/2019 02_LO525_General Information.doc
21/23
"hen refresh the display of the stoc3>re?!irements list "o dothis select:
ListReres%
@ow do yo! 3now that the planned order is firmed and whatdoes this mean5
66666666666666666666666666666666666666666666666
Convert the changed planned order into a p!rchasere?!isition
"o do this, position the c!rsor on the planned order and select:Environment Convert Pln"r"purre'
Chec3 the data in the following screen and save the p!rchasere?!isition Ret!rn to the stoc3>re?!irements list #y selecting,Back
After having done this, access the MRP list again 4hy canyo! not see the changes here5
66666666666666666666666666666666666666666666666
8/12/2019 02_LO525_General Information.doc
22/23
'hapter 9 #olutions: Materials Planning in General
Executing the Planning Run
-o ;( *h" can "ou not overwrite the planned deliver"time3
"he planned delivery time cannot #e changed as it wasdefined Cannot #e overwrittenB in the MRP profile +f amaterial is created !sing an MRP profile, then the val!esthat were defined Cannot #e overwrittenB can only #e
changed #y changing the MRP profile
-o re?!irements sit!ation"o prevent man!al changes from #eing adE!steda!tomatically #y the planning r!n, yo! can firm orderproposals and sched!le lines (irmed elements are nolonger changed a!tomatically @owever, they can still #e
changed man!ally, and yo! can also reset the firmedindicator
*h" can "ou not see the changes between twoplanning runs in the MRP list3
"he MRP list contains the res!lts of the last planning r!n"his list is not !pdated !ntil the planning r!n is carried o!t
again"he stoc3>re?!irements list is availa#le for chec3ing c!rrent
8/12/2019 02_LO525_General Information.doc
23/23
changes "he data in this list is !pdated every time it isaccessed