  • T-4.234.578 Rev. B Page 2 of 8

    Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No: 5887 Project Document Number: T- 4.234.578 Project Rev.: B Page 2 of 8

    Purchase Order Number:

    2MH127

    Tag/Item Number(s): N/A

    Unit(s): ASU

    PCWBS: Z

  • T-4.234.578 Rev. B Page 3 of 8

    QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    E B 25.06.08 Ready for Construction FB EO AG RFC

    D A 14.05.08 Company Comment Incorporated FB AB AG CCI

    C O 02.02.08 Issued for company comments IU UA/MC ZG ICC

    B 31.01.08 Issued for review BR UA/MC ZG IFR

    A 27.01.08 Issued for internal review SB UA/MC ZG IIR

    GAMA Rev.

    Project Rev

    Date Description Prepared

    By Checked

    By

    Approved By

    Status

    No. No. ORIGINATOR

    LINDE ENGINEERING AG

    Document Title:

    ITP FOR PRE-CAST CONCRETE WORKS

    Contractor

    Gama Qatar Co. W. L. L.

    Document No. LOC 470

    GAM ITP QAC GTL 027 E Org.

    Code

    Doc.

    Type

    Disc. Code

    Geogr. Area

    Seq.

    No

    Rev. No

    Vendor Code

    Project Document Number: T-4.234.578

    Rev No: B

  • T-4.234.578 Rev. B Page 4 of 8

    Doc. Title : Inspection Test Plan for Pre-Cast Concrete Works

    Doc No : GAM-ITP-QAC-GTL-027 Rev. E

    Date: 25.06.08

    1.0

    Before pre-casting, bottom surface preparation

    a) Level

    Visual Inspection

    Site

    Engineer

    Visual Inspection

    Visual

    I

    R

    S

    b) Cleanliness

    2.0

    a) Re bar Work

    a. Material ASTM A615 Gr 60 & BS 4449 ;T.13.377.360E

    QA/QC INSPECTOR& Site Engineer

    As per specification Test Certificate R R R

    b. Check bar size , lap, spacing &Location

    As per Drawing

    As per drawings and Table 1b of ASTM A615/BS 8110-1

    GAM-QCR-QAC-GTL-014

    I W S

    c. Number of bars As per drawing

    As per drawings I W S

    d. Length of bars As per drawing

    As per drawings and ACI 315 I W S

    e. Hook As per drawing & DEP 34.19.20.31

    As per ACI 315 I W S

    f. Bending As per drawing & DEP 34.19.20.31

    As per ACI 315 I W S

    g. Reinforcement surface ASTE A615 &DEP 34.19.20.31 ;T.13.377.360E

    Free from mortar, rust, oil or other coatings

    Visual I W S

    h. Placing, spacers, cover, Splices

    As per drawing & DEP 34.19.20.31; T.13.377.360E

    As per drawings and ACI 315

    GAM-QCR-QAC-GTL-014 I W S

    b) Preservation of rebar

    Storage & Cover with plastic DEP 34.19.20.31 Site Engineer Visual Inspection Visual I S S

    QQQ AAA TTT AAA RRR

  • Doc. Title : Inspection Test Plan for Pre-Cast Concrete Works

    Doc No : GAM-ITP-QAC-GTL-027 Rev. E

    Date: 25.06.08

    T-4.234.578 Rev. B Page 5 of 8

    QQQ AAA TTT AAA RRR

    3.0

    Form Work

    a. Cleanliness

    STANDARD DRAWINGS ACI 117, 301, AND 347 ;T.13.377.360E

    QC & Site Engineer

    Free from Oil & Grease Visual

    I W S

    b. Location, and elevation As Per Drawing & 50 mm concrete cover shall be maintained

    GAM-QCR-QAC-GTL-006

    c. Frames, and Supports Firm to be 50mm Concrete level is Maintained GAM-QCR-QAC-GTL-

    010/012/013/014 d. Chamfer As Per Drawing

    e. Form oil Wax spray Visual

    f. Dimension checked As Per Drawing GAM-QCR-QAC-GTL-014

    g. Tie wire check No tie wire within the 50mm concrete cover area

    Visual

    4.0 Anchor Bolts and Embedded items (If Applicable)

    a) Size, type, number, location, Elevation being firmly supported protected from damage before concreting.

    b) Location, elevation, Protected from Damage After Concreting.

    As per drawings ;T.13.377.360E

    Site Engineer & QA/QC INSPECTOR

    To comply with the relevant drawing sin Size type number Location elevation Tolerances etc.

    GAM-QCR-QAC-GTL-011 I W S

    c) Material As per Drawing and or Specification

    As per LS 443-01 Test Certificate R R R

    5.0 Cleaning of form work and rebar

    Form works & rebar to be blown clean with air , bottom surface to cleaned with magnet, rebar to be water washed

    T-13.376.358 DEP-34.19.20.31

    Site Engineer Accept without foreign Material

    VISUAL I W S

  • Doc. Title : Inspection Test Plan for Pre-Cast Concrete Works

    Doc No : GAM-ITP-QAC-GTL-027 Rev. E

    Date: 25.06.08

    T-4.234.578 Rev. B Page 6 of 8

    QQQ AAA TTT AAA RRR

    6.0

    PRECAST Concreting

    a) Pre pour arrangements and concrete pour card signed

    T-13.376.358 DEP-34.19.20.31 ;T.13.377.360E BS 8110 (T.4.132.872)

    Site Engineer & QA/QC INSPECTOR

    Pour Card should be Signed by QCI &Contractor

    GAM-QCR-QAC-GTL -009/010/012/014

    I

    H

    W

    b) Concrete discharging

    T-13.376.358 DEP-34.19.20.31 ;T.13.377.360E

    Should not be more Than 1.5 meters Height

    VISUAL

    I

    H

    W

    c) Concrete compaction T-13.376.358 DEP-34.19.20.31 ;T.13.377.360E

    By Vibrators

    VISUAL

    I

    H

    W

    d) Concrete Finish T-13.376.358 DEP-34.19.20.31 ;T.13.377.360E

    Not to exceed the Required limits as per specification.

    VISUAL I

    H

    W

    7.0 Curing

    Curing Data Sheet contains 1) Date of pour 2) End of Curing 3) Acknowledgment of water

    placement daily

    T-13.376.358 DEP-34.19.20.31; T.13.377.360E

    Site Engineer 10DaysCuring Period for all Concrete

    GAM-QCR-QAC-GTL-015 W S S

    8.0 Post Pour Inspection

    1) External Dimensions

    T-13.376.358 DEP-34.19.20.31 ;T.13.377.360E

    Site Engineer As Per Drawing

    GAM-QCR-QAC-GTL-015 I I I

    2) Bolt positions

    9.0 Repair of Concrete

    a. Identification of repair

    T-13.376.358 DEP-34.19.20.31 ;T.13.377.360E

    QA/QC Inspector & Site Engineer

    Visual inspection

    GAM-QCR-QAC-GTL-010

    I H W

    b. Authorization to repair Visual inspection

    I H W

    c. Proper repair As per approved Repair procedure

    I S S

    d. Surface preparation & Release

    Visual inspection

    I H S

    e.Painting & Coating As per Manufacturers recommendation

    GAM-QCR-QAC-GTL-031

    I W S

  • Doc. Title : Inspection Test Plan for Pre-Cast Concrete Works

    Doc No : GAM-ITP-QAC-GTL-027 Rev. E

    Date: 25.06.08

    T-4.234.578 Rev. B Page 7 of 8

    QQQ AAA TTT AAA RRR

    10.0 Lean Concrete

    a. Ground condition T-13.376.490

    QA/QC & Site Engineer

    Compliance with Compaction &level Requirements

    Visual I R S

    b. Location and Level Drawings As per latest drawings GAM-QCR-QAC-GTL-006 I R S

    c. Surface inspection T-13.376.358 DEP-34.19.20.31& T.13.377.360E

    No Cracks (or) Voids Visual I S S

    d. Cleaning of foundation

    Refer to item # 6.0 ;T.13.377.360E

    No loose Particle & Refer to item # 6.0

    Visual I H S

    e. Pouring lean Concrete Refer to item # 7.b Refer to item # 7.b GAM-QCR-QAC-GTL-013 I S S

    f. Thickness T-13.376.358 DEP-34.19.20.31

    50 mm Minimum GAM-QCR-QAC-GTL-013 I I I

    g. Curing Refer to item # 8.0 Refer to item # 8.0 Visual I S S

    h. Coating

    Manufacturer Data Sheet

    Prime Coat-0.075-0.1 Kg/m2, Neat Coat 0.6 kg/m2, Dilute 1:1 with clean water

    GAM-QCR-QAC-GTL-031

    I S S

    11.0

    Installation

    Level

    As Per RFC Drawing

    QCI

    As Per RFC Drawing

    RFC Drawing I R S

    Plumb

    Site Engineer

    Visual I R S

    Orientation RFC Drawing I R S

    Anchor Bolts GAM-QCR-QAC-GTL-011 I W S

    Location RFC Drawing I W S

    Transportation for installation As Per RFC Drawing & DEP-34.19.20.31

    After Completion of Curing Period with GAM-QCR-QAC-GTL-015

    I S S

  • Doc. Title : Inspection Test Plan for Pre-Cast Concrete Works

    Doc No : GAM-ITP-QAC-GTL-027 Rev. E

    Date: 25.06.08

    T-4.234.578 Rev. B Page 8 of 8

    QQQ AAA TTT AAA RRR

    12.0

    Testing a) Fresh concrete

    Temperature T-13.376.358 DEP-34.19.20.31

    Laboratory

    Every truck of concrete shall be tested & check for Temperature of Fresh Concrete 30c

    GAM-QCR-QAC-GTL-017

    I S S I

    Slump Test Frequency 1 Test for 1 mix

    T-13.376.358 DEP-34.19.20.31

    Laboratory/ Supplier

    BS EN 12350-2- Testing Fresh Concrete to every truck of concrete

    Lab Report GAM-QCR-QAC-GTL-017

    I S/R S/R I

    b) Hardened concrete

    Compressive strength @7 & 28 days (cube sample as per BS 1881) Testing Frequency as per T-13.376.358 Section 3.33

    T-13.376.358 DEP-34.19.20.31

    Laboratory

    BS EN 12390-3 Testing of Hardened concrete-strength of test specimens

    Laboratory Report/Supplier GAM-QCR-QAC-GTL-020

    I S/R R

    I

    Chloride content Maximum 0.10% by Weight of cement

    Laboratory Report/Supplier GAM-QCR-QAC-GTL-019

    R R R

    Sulphate content Maximum 4% by Weight of cement

    Laboratory Report/Supplier GAM-QCR-QAC-GTL-018

    R R R

    Water Absorption Maximum 4% at 28 And 48 days

    Laboratory Report/Supplier

    R R R

    Volume of permeable voids Maximum 4% at 28 And 48 days

    Laboratory Report/Supplier

    R R R

    Chloride Ion Permeability Very Low as per ASTM C1202

    Laboratory Report/Supplier

    R R R