61
Equity Office Panorama I 7630 South Chester Street Englewood, CO 80127 Testing Summery Report UPS Testing Reference #0244 Prepared By: Carlton Electric, Inc. 1284 S. Cherokee Street Denver, CO 80223 303-722-5742

0244 Panorama I UPS Testing

Embed Size (px)

Citation preview

Page 1: 0244 Panorama I UPS Testing

Equity Office Panorama I

7630 South Chester Street Englewood, CO 80127

Testing Summery Report UPS Testing

Reference #0244

Prepared By:

Carlton Electric, Inc. 1284 S. Cherokee Street

Denver, CO 80223 303-722-5742

Page 2: 0244 Panorama I UPS Testing

0244 Panorama UPS Testing

Two UPS units labeled North and South

Index

Section I. UPS ATS

Section II. Panel TCGSDP

Section III. Powerware 375 UPS North and Bypass

Section IV. Panel UPS DP North

Section V. Powerware 375 UPS South and Bypass Section VI. Panel UPS DP South

Page 3: 0244 Panorama I UPS Testing

Page 1 of 3 All Information contained within this document is confidential and proprietary. This document and

information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of

Carlton Electric.

1284 S. Cherokee St. Phone (303)722-5742 Denver, CO 80223 Fax (722)722-5749

STEP-BY-STEP PROCEDURE

Step Date Tim

e

PROCEDURE Action

By Comp

1) The following will be done at the beginning of each

shift.

Contact a Equity Office Representative or maintenance

personal.

Carlton __x___

2) Meet with Equity Office personnel and obtain security

access badges form the main lobby security desk.

Carlton

__NA_

3) Hold a MOP meeting to review steps to be conducted

during maintenance activity

Carlton

__x___

4) Proceed to the Electrical room and gain access to the

two Powerware UPS modules (May be done in

advance)

Carlton

__x___

5) Set up tools and test equipment. Carlton __x___

6) Record all UPS Name Plate information and UPS

locations. Compare to equipment to the Contract

Short Form and update information if necessary.

Carlton _see

photo_

7) With Permission from Equity Office, Carlton will

begin Anual UPS and Battery Maintenance on the

Powerware 375 300kva UPS Systems located in the

UPS Electrical room.

Carlton _x____

8) Perform the battery maintenance by recording the

following;

DC String Voltage

DC Charging Current

AC millivolts per battery

DC voltage per battery

AC millivolts on string

Perform visual inspection on each battery looking for

Carlton _See

Report

for

Details

____

Page 4: 0244 Panorama I UPS Testing

Page 2 of 3 All Information contained within this document is confidential and proprietary. This document and

information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of

Carlton Electric.

post seal cracks

corrosion on posts and cabling

battery case swelling

Thermal heat inspection

Battery MFG

Battery M/N

Battery Date Code

Number of Battery Strings

Number of Batteries per string.

9) Complete On-Line physical inspection of UPS

Systems by checking:

DC and AC Capacitors

Fan operation

verify proper operational parameters are

correct

Check air filters: (replace if necessary)

Check for proper air movement, in and around

the equipment

Inspect Instruments and record Equipment

readings

Verify status indicating lights are functional

Verify alarm and system status indication

lights are displaying correct equipment

operational status

Identify any abnormal noise or Vibration

Verify automatic transfer systems are enabled

Carlton _See

Report

for

Details

_____

10)

Start Generator

Place Transfer switch into Manual and transfer

load onto Generator and confirm voltages

before proceeding

Place Bypass module 2 in bypass

Open battery string

Open UPS control power

Place voltage drain on Cap banks

Verify 0 voltage at Cap banks

Replace 30 Capacitors Alum 12000UF on DC

string.

Close control power.

Start up UPS

Carlton

_N/A__

Page 5: 0244 Panorama I UPS Testing

Page 3 of 3 All Information contained within this document is confidential and proprietary. This document and

information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of

Carlton Electric.

Close battery string

Place Bypass Module 2 in Normal

11) Capacitor replacement and Battery test complete

Carlton _N/A__

___

12) Carlton will verify no alarms or notices present prior

to departure.

Carlton _N/A__

13) All tools and test equipment will be picked up and

work area clean prior to departure

Carlton _x____

Page 6: 0244 Panorama I UPS Testing

Section I UPS ATS

Page 7: 0244 Panorama I UPS Testing

-400.0

-350.0

-300.0

-250.0

-200.0

-150.0

-100.0

-50.00

0.000

50.00

100.0

150.0

200.0

250.0

300.0

350.0

400.0

V

8:15:00.257 AM6/28/2010

8:15:00.274 AM6/28/2010

3 mSec/Div16.678 (mS)

Name Date Time Duration RMS UnitsWaveform V1 6/28/2010 8:15:00.257 AM 16.678 281.7 VWaveform V2 6/28/2010 8:15:00.257 AM 16.678 282.6 VWaveform V3 6/28/2010 8:15:00.257 AM 16.678 282.2 V

Waveform V1281.74 Vrms, 6.62 %THD

0

10

20

30

40

50

60

70

80

90

100

1 5 10 15 20 25 30 35 40 45 506/28/2010 - 8:15:00.258 AM

6/28/2010 - 8:15:00.000 AMVal3.000 Waveform V1-330.8 Waveform V2355.5 Waveform V3

Waveform V1

(%) (%) (%)H01 100.0H02 0.1H03 6.5H04 0.0H05 0.8H06 0.0H07 0.3H08 0.0H09 0.3H10 0.0H11 0.2H12 0.0H13 0.2H14 0.0H15 0.1H16 0.0H17 0.2

H18 0.0H19 0.1H20 0.0H21 0.0H22 0.0H23 0.2H24 0.0H25 0.2H26 0.0H27 0.0H28 0.0H29 0.2H30 0.0H31 0.2H32 0.0H33 0.0H34 0.0

H35 0.2H36 0.0H37 0.3H38 0.0H39 0.0H40 0.0H41 0.2H42 0.0H43 0.2H44 0.0H45 0.0H46 0.0H47 0.2H48 0.0H49 0.2H50 0.0

Recording Start Date 6/28/2010 - 8:15:00 AMRecording Duration 0 (s)Instrument ID Model: 3945 - 1 1:220240 2.6

Channel Name: Waveform V1Frequency: 59.96 HzVoltageRatio: 1.000

Photo Report

1

Page 8: 0244 Panorama I UPS Testing

-400.0

-200.0

0.000

200.0

400.0

A

8:15:00.257 AM6/28/2010

8:15:00.274 AM6/28/2010

3 mSec/Div16.678 (mS)

Name Date Time Duration RMS UnitsWaveform I1 6/28/2010 8:15:00.257 AM 16.678 350.8 AWaveform I2 6/28/2010 8:15:00.257 AM 16.678 343.7 AWaveform I3 6/28/2010 8:15:00.257 AM 16.678 349.5 A

Waveform INeutral 6/28/2010 8:15:00.257 AM 16.678 53.76 A

Waveform I1350.84 Arms, 7.57 %THD

0

10

20

30

40

50

60

70

80

90

100

1 5 10 15 20 25 30 35 40 45 506/28/2010 - 8:15:00.258 AM

6/28/2010 - 8:15:00.000 AMVal477.9 Waveform I1-273.8 Waveform I2-192.9 Waveform I311.20 Waveform INeutral

Waveform I1

(%) (%) (%)H01 100.0H02 0.4H03 4.5H04 0.2H05 6.0H06 0.1H07 1.0H08 0.0H09 0.1H10 0.0H11 0.3H12 0.0H13 0.2H14 0.0H15 0.1H16 0.0H17 0.2

H18 0.0H19 0.1H20 0.0H21 0.0H22 0.0H23 0.1H24 0.0H25 0.1H26 0.0H27 0.0H28 0.0H29 0.1H30 0.0H31 0.1H32 0.0H33 0.0H34 0.0

H35 0.1H36 0.0H37 0.0H38 0.0H39 0.0H40 0.0H41 0.0H42 0.0H43 0.0H44 0.0H45 0.0H46 0.0H47 0.0H48 0.0H49 0.0H50 0.0

Channel Name: Waveform I1Frequency: 59.96 HzCurrentRatio: 1.000

1

Page 9: 0244 Panorama I UPS Testing

-600.0

-400.0

-200.0

0.000

200.0

400.0

600.0

V

8:15:00.257 AM6/28/2010

8:15:00.274 AM6/28/2010

3 mSec/Div16.678 (mS)

Name Date Time Duration RMS UnitsWaveform U1 6/28/2010 8:15:00.257 AM 16.678 488.8 VWaveform U2 6/28/2010 8:15:00.257 AM 16.678 487.7 VWaveform U3 6/28/2010 8:15:00.257 AM 16.678 487.3 V

Waveform U1488.81 Vrms, 1.21 %THD

0

10

20

30

40

50

60

70

80

90

100

1 5 10 15 20 25 30 35 40 45 506/28/2010 - 8:15:00.258 AM

6/28/2010 - 8:15:00.000 AMVal333.9 Waveform U1-686.3 Waveform U2352.4 Waveform U3

Waveform U1

(%) (%) (%)H01 100.0H02 0.0H03 0.6H04 0.0H05 0.8H06 0.0H07 0.3H08 0.0H09 0.0H10 0.0H11 0.2H12 0.0H13 0.2H14 0.0H15 0.0H16 0.0H17 0.2

H18 0.0H19 0.1H20 0.0H21 0.0H22 0.0H23 0.2H24 0.0H25 0.1H26 0.0H27 0.0H28 0.0H29 0.2H30 0.0H31 0.1H32 0.0H33 0.0H34 0.0

H35 0.2H36 0.0H37 0.2H38 0.0H39 0.0H40 0.0H41 0.2H42 0.0H43 0.1H44 0.0H45 0.0H46 0.0H47 0.2H48 0.0H49 0.1H50 0.0

Channel Name: Waveform U1Frequency: 59.96 HzVoltageRatio: 1.000

3

Page 10: 0244 Panorama I UPS Testing

NamePower Line1Power Line2Power Line3

Power Sum of Phases

Photo:Start Date: 6/28/2010Start Time: 8:15:00 AMDuration: 0:0.000 (M:S)W: -6.425E+3 WVAR: -98.53E+3 WVA: 98.74E+3 WPower Factor: -65.00E-3Displacement Power Factor: -64.00E-3TAN: 15.56VoltageRatio: 1.000CurrentRatio: 1.000

4

Page 11: 0244 Panorama I UPS Testing

Photo Report

OperatorCarlton ElectricJoe Tate1284 So Cherokee Street

Denver , CO 802233038841536

Test SiteEquity Office

,

Database: C:\Program Files\DataView\DataFiles\PowerPad\PAN 1 ATS normal.dvb

CommentsPanorama 01 / ULA UPS Testing

277/480 volt 3 phase reading taken at ATS

5

Page 12: 0244 Panorama I UPS Testing

Carlton Electric Joe Tate 1284 South Cherokee Street Denver CO 80223 303 - 884 - 1536 [email protected]

0244 PAN I UPS Testing Chiller Panel Inspection Prepared For:

Equity Office Tom Hoisington Panorama Corporate Center 9100 East Panorama Drive, Suite 125 Englewood, Colorado 80112 (303) 495-6699

Page 13: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43052.is2 1/8/2000 9:19:27 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 87.6°F

Image Range 83.3°F to 93.0°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 9:19:27 PM

Page 14: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43053.is2 1/8/2000 9:20:25 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 90.3°F

Image Range 85.3°F to 95.1°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 9:20:25 PM

Page 15: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43054.is2 1/8/2000 9:20:56 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 89.1°F

Image Range 81.5°F to 95.1°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 9:20:56 PM

Page 16: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43055.is2 1/8/2000 9:21:25 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 88.0°F

Image Range 82.2°F to 95.0°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 9:21:25 PM

Page 17: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43056.is2 1/8/2000 9:22:01 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 84.1°F

Image Range 80.4°F to 89.2°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 9:22:01 PM

Page 18: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43057.is2 1/8/2000 9:22:33 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 84.8°F

Image Range 79.0°F to 88.7°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 9:22:33 PM

Page 19: 0244 Panorama I UPS Testing

1284 South Cherokee Street

Summary All temperature readings are in normal range We were able to test only the primary source of power. Secondary was unavailable do to usage. All Gear was visually inspected for defects

Page 20: 0244 Panorama I UPS Testing

Power Photo:

ATS Summery

The ATS that feeds the Panel TCGSDP appears to be in good functional condition.

Power Quality Photo: We placed the three phase watt meter on this panel to get an idea of the power

quality that is coming into the building. This would also give us an idea of the condition of the UPS units.

During this Photo UPS South was powered on with no load. Note that the Current or ‘I’ reading has some

‘Flat Topping’ of the sine wave. This is common with the old UPS units as they relied heavily on Pulse

Width Modulation like the older VFD’s.

Note that the current wave form for A Phase shows more flat topping then the other two phases. A phase

would fail on the inverter 4 hours later.

Thermal Image: All Terminations were within limits for Temperature.

Page 21: 0244 Panorama I UPS Testing

Section II Panel TCGSDP

Panel TCGSDP Summery Thermal Imagery: All Terminations were within limits of temperature. At the conclusion of the testing we arranged the breakers to bypass the UPS units.

Page 22: 0244 Panorama I UPS Testing

Section III Powerware 375 UPS North w/ Bypass

UPS North External Bypass Panel: Thermal Imagery: All readings were within Normal Temperature. Kirk Key Interlock is missing from MIB Breaker. This will allow Utility power to be thrown in with UPS Output power (>30 degrees out of phase) and that could be very dangerous as it would be equivalent to a 3Phase 480 volt short.

Page 23: 0244 Panorama I UPS Testing
Page 24: 0244 Panorama I UPS Testing

Page 1 of 2 All Information contained within this document is confidential and proprietary. This document and

information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of

Carlton Electric.

1284 S. Cherokee St. Phone (303)722-5742 Denver, CO 80223 Fax (722)722-5749

Location: __PAN 1___UPS North____________________________

. Liebert PPC Inspection Checklist

Unit Model Number: __Powerware 375____________________________

Technician/Date: __Joe Tate _________________________________

Exterior Inspection

_x__ Confirm that the exterior of unit is clean and cables, connections and

housings are securely fastened.

_x__ Use vacuum to clean exterior ventilation openings and grilles.

Interior Inspection:

_x__ Remove accessible exterior panels and pull quick disconnect ground

connection terminals located on the unit chassis.

_N/A_ Perform IR scan on all electrical connections in transformer, mains and

unit and panel boards and document with photos:

(No Load available on unit for Thermal scan)

_x__ Inspect all wire and conductors’ insulation for damage.

_x__ Check all transformer terminal connections for tightness. Re-torque if

necessary.

_x__ Check all breaker connections for tightness. Re-torque if necessary.

_x__ Check all terminal block connections for tightness. Re-torque if necessary.

_x__ Check transformer mounting bolts for tightness. Re-torque if necessary.

_x__ Check that the intake and exhaust air screens are clean and free of

obstructions.

Page 25: 0244 Panorama I UPS Testing

Page 2 of 2 All Information contained within this document is confidential and proprietary. This document and

information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of

Carlton Electric.

_x__ Reconnect the panel ground wires Replace side panels, leaving access to

circuit breakers for the following procedure:

_x__ Check and record the input voltage at the main input breaker. Measured

voltages should correspond to the unit’s nameplate input voltage.

Volts, phase A to phase B = ___488.8_________________

Volts, phase B to phase C = ___487.7_________________

Volts, phase C to phase A = ___487.7_________________

_x___ Check and record the voltages at the line-side terminals of the output

circuit breaker. Measured voltages should correspond to the unit’s nameplate

output voltage (within +4%,-0%). (Reading not availabler)

Volts, phase A to phase B = _____0_______________

Volts, phase B to phase C = _____0_______________

Volts, phase C to phase A = _____0_______________

Volts, phase A to neutral = _____0_______________

Volts, phase B to neutral = _____0_______________

Volts, phase C to neutral = _____0_______________

.CONTROL VOLTAGE:

_x__ Measure and record the DC control voltage on terminals 1 (+) and 3 (com).

N/A_ Control Voltage = ____________________

Page 26: 0244 Panorama I UPS Testing

Page 1 CARLTON ELECTRIC

CABINET: 1

STRING VOLTAGE: NA Max C rate of rise: NA

AC RIPPLE CURRENT: NA

DC VOLTS AC MV DC VOLTS AC MV

BATTERY : 1 6.03 0F 21 7.97 0F

2 5.23 0F 22 7.2 0F

3 5.22 0F 23 5.23 0F

4 5.56 0F 24 5.22 0F

5 11.76 4.61 25 5.41 0F

6 5.33 0F 26 6.45 0F

7 5.56 0F 27 5.22 0F

8 5.23 0F 28 5.45 0F

9 5.36 0F 29 7.97 0F

10 5.4 0F 30 6.33 0F

11 5.78 0F 31 5.72 0F

12 5.88 0F 32 5.11 0F

13 10.51 0F 33 7.48 0F

14 7.21 0F 34 5.1 0F

15 5.22 0F 35 4.8 0F

16 3 0F 36 3.2 0F

17 7.27 0F 37 7.61 0F

18 5.42 0F 38 3.89 0F

19 5.22 0F 39 5.27 0F

20 5.36 0F 40 3.11 0F

Page 27: 0244 Panorama I UPS Testing

CABINET: 2

STRING VOLTAGE: NA Max C rate of rise: NA

AC RIPPLE CURRENT: NA

DC VOLTS AC MV DC VOLTS AC MV

BATTERY : 1 7.61 0F 21 5.99 0F

2 5.08 0F 22 5.61 0F

3 7 0F 23 5.22 0F

4 4.21 0F 24 5.12 0F

5 10.03 0F 25 8.96 0F

6 5.23 0F 26 7.23 0F

7 5.22 0F 27 6.75 0F

8 7.1 0F 28 4.86 0F

9 10.01 0F 29 9.8 0F

10 5.32 0F 30 3.55 0F

11 6.45 0F 31 4.83 0F

12 3.11 0F 32 5.78 0F

13 7.05 0F 33 8.07 0F

14 6.22 0F 34 7.23 0F

15 5.02 0F 35 6.58 0F

16 5.22 0F 36 8.1 0F

17 7.45 0F 37 9.71 0F

18 3.45 0F 38 5.23 0F

19 3.44 0F 39 5.45 0F

20 3.1 0F 40 7.82 0F

Page 28: 0244 Panorama I UPS Testing

Carlton ElectricSummery page

Cabinet 1:

Cabinets 1 and 2: All batteries in these cabinets are at least 8 years old. All batteries failed

the internal Impedance measurments.

Cabinet 2:

Cabinet 3:

Cabinets 3 and 4: These two cabinets were emptied of all batteries.

Summery:

Page 29: 0244 Panorama I UPS Testing

Note position of Control Circuit Breaker. Also Switches S2 and S3 (Battery Disconnect are in the open position. Summary of UPS North diagnostics:

UPS > Batteries > Cabinets 1 & 2 > Total of 80 batteries: The batteries in this unit were manufactured by Dynasty (Original OEM) and were at least 8 years old. These were completed discharged all the way down to the Core Cell.

UPS > Batteries > Cabinets 3 & 4 > these cabinets were emptied out in Dec of 2007.

UPS > Controls: The UPS was found with the main control circuit breaker in the off position. Battery disconnects switches S2 & S3 were also in the open position.

UPS > Rectifier board: There were 4 attempts to fire up the rectifier board. Rectifier CB1 had been left in the closed position but when 480 volts was applied CB1 Tripped. Further attempts were not made as permissions would need to be given to proceed with board repairs and maintenance.

UPS > Summery

Page 30: 0244 Panorama I UPS Testing

Section IV

Panel UPS DP North

Page 31: 0244 Panorama I UPS Testing

Carlton Electric Joe Tate 1284 South Cherokee Street Denver CO 80223 303 - 884 - 1536 [email protected]

0244 PAN I UPS Testing Panel UPS DP North Prepared For:

Equity Office Tom Hoisington Panorama Corporate Center 9100 East Panorama Drive, Suite 125 Englewood, Colorado 80112 (303) 495-6699

Page 32: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43064.is2 1/9/2000 11:46:55 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 88.4°F

Image Range 86.3°F to 93.3°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 11:46:55 PM

Page 33: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43065.is2 1/9/2000 11:47:22 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 87.1°F

Image Range 85.8°F to 90.4°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 11:47:22 PM

Page 34: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43066.is2 1/9/2000 11:48:11 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 87.1°F

Image Range 85.3°F to 90.2°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 11:48:11 PM

Page 35: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43067.is2 1/9/2000 11:48:48 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 89.2°F

Image Range 86.8°F to 99.5°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 11:48:48 PM

Page 36: 0244 Panorama I UPS Testing

1284 South Cherokee Street

Summary All temperature readings are in normal range All Gear was visually inspected for defects

Page 37: 0244 Panorama I UPS Testing

Section V

Powerware 375 UPS South w/ Bypass

UPS South External Bypass Panel: Thermal Imagery: All readings were within Normal Temperature. Kirk Key Interlock is missing from MIB Breaker. This will allow Utility power to be thrown in with UPS Output power (>30 degrees out of phase) and that could be very dangerous as it would be equivalent to a 3Phase 480 volt short.

Page 38: 0244 Panorama I UPS Testing

Carlton Electric Joe Tate 1284 South Cherokee Street Denver CO 80223 303 - 884 - 1536 [email protected]

0244 PAN I UPS Testing Panel UPS South Bypass Prepared For:

Equity Office Tom Hoisington Panorama Corporate Center 9100 East Panorama Drive, Suite 125 Englewood, Colorado 80112 (303) 495-6699

Page 39: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43058.is2 1/8/2000 10:24:02 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 86.1°F

Image Range 85.1°F to 89.6°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 10:24:02 PM

Page 40: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43059.is2 1/8/2000 10:24:34 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 84.7°F

Image Range 83.8°F to 88.7°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 10:24:34 PM

Page 41: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43060.is2 1/8/2000 10:25:21 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 85.5°F

Image Range 84.7°F to 88.5°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 10:25:21 PM

Page 42: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000108_43061.is2 1/8/2000 10:26:24 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 86.3°F

Image Range 85.3°F to 88.7°F

Lens Description 20mm/F0.8

Image Time 1/8/2000 10:26:24 PM

Page 43: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43062.is2 1/9/2000 12:44:33 AM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 88.9°F

Image Range 88.3°F to 90.2°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 12:44:33 AM

Page 44: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43063.is2 1/9/2000 12:45:22 AM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 88.1°F

Image Range 86.8°F to 88.9°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 12:45:22 AM

Page 45: 0244 Panorama I UPS Testing

1284 South Cherokee Street

Summary All temperature readings are in normal range All Gear was visually inspected for defects

Page 46: 0244 Panorama I UPS Testing

Page 1 of 2 All Information contained within this document is confidential and proprietary. This document and

information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of

Carlton Electric.

1284 S. Cherokee St. Phone (303)722-5742 Denver, CO 80223 Fax (722)722-5749

Location: __PAN 1___UPS South____________________________

. Liebert PPC Inspection Checklist

Unit Model Number: __Powerware 375____________________________

Technician/Date: __Joe Tate _________________________________

Exterior Inspection

_x__ Confirm that the exterior of unit is clean and cables, connections and

housings are securely fastened.

_x__ Use vacuum to clean exterior ventilation openings and grilles.

Interior Inspection:

_x__ Remove accessible exterior panels and pull quick disconnect ground

connection terminals located on the unit chassis.

_N/A_ Perform IR scan on all electrical connections in transformer, mains and

unit and panel boards and document with photos:

(No Load available on unit for Thermal scan)

_x__ Inspect all wire and conductors’ insulation for damage.

_x__ Check all transformer terminal connections for tightness. Re-torque if

necessary.

_x__Check all breaker connections for tightness. Re-torque if necessary.

_x__ Check all terminal block connections for tightness. Re-torque if necessary.

_x__ Check transformer mounting bolts for tightness. Re-torque if necessary.

_x__ Check that the intake and exhaust air screens are clean and free of

obstructions.

Page 47: 0244 Panorama I UPS Testing

Page 2 of 2 All Information contained within this document is confidential and proprietary. This document and

information herein is not to be copied, reproduced or disclosed to any third party without prior written consent of

Carlton Electric.

_x__ Reconnect the panel ground wires Replace side panels, leaving access to

circuit breakers for the following procedure:

_x__ Check and record the input voltage at the main input breaker. Measured

voltages should correspond to the unit’s nameplate input voltage.

Volts, phase A to phase B = ___488.8_________________

Volts, phase B to phase C = ___487.7_________________

Volts, phase C to phase A = ___487.7_________________

_x___ Check and record the voltages at the line-side terminals of the output

circuit breaker. Measured voltages should correspond to the unit’s nameplate

output voltage (within +4%,-0%). (Reading not availabler)

Volts, phase A to phase B = _____0_______________

Volts, phase B to phase C = _____0_______________

Volts, phase C to phase A = _____0_______________

Volts, phase A to neutral = _____0_______________

Volts, phase B to neutral = _____0_______________

Volts, phase C to neutral = _____0_______________

.CONTROL VOLTAGE:

_x__ Measure and record the DC control voltage on terminals 1 (+) and 3 (com).

120v_ Control Voltage = ____________________

Page 48: 0244 Panorama I UPS Testing

Page 1 CARLTON ELECTRIC

CABINET: 1

STRING VOLTAGE: NA Max C rate of rise: NA

AC RIPPLE CURRENT: 1.7A

DC VOLTS G Ohms DC VOLTS AC MV

BATTERY : 1 11.6 5.35 21 11.8 4.53

2 11.7 5.2 22 11.77 4.6

3 11.5 5.3 23 11.7 4.55

4 11.6 4.6 24 11.8 5.22

5 11.8 4.47 25 11.74 4.35

6 11.6 5.1 26 11.6 4.6

7 11.7 4.4 27 11.75 8.65

8 11.77 4.54 28 11.7 4.92

9 11.8 4.44 29 11.71 10.99

10 11.8 4.6 30 11.8 9.84

11 11.7 4.4 31 11.77 8.76

12 11.7 4.5 32 11.7 11.23

13 11.8 4.72 33 11.7 15.82

14 11.8 4.52 34 11.7 6.79

15 11.8 4.5 35 11.8 6.77

16 11.8 4.5 36 11.7 8.47

17 11.77 4.89 37 11.74 4.75

18 11.75 4.8 38 11.8 5.96

19 11.7 4.7 39 11.7 4.99

20 11.8 4.4 40 11.7 4.55

Page 49: 0244 Panorama I UPS Testing

CABINET: 2

STRING VOLTAGE: NA Max C rate of rise: NA

AC RIPPLE CURRENT: 1.99

DC VOLTS AC MV DC VOLTS AC MV

BATTERY : 1 11.76 4.98 21 11.78 0F

2 11.7 5 22 9.88 9.39

3 11.82 4.99 23 11.11 8.66

4 11.77 5.21 24 11.65 5.67

5 11.72 5.15 25 11.74 6.77

6 11.77 4.95 26 11.21 6.33

7 11.67 4.6 27 11.13 6.76

8 11.77 5 28 11.45 4.98

9 11.78 5.22 29 11.63 0F

10 11.43 5.23 30 11.55 4.88

11 10.55 5.22 31 11.71 4.86

12 11.33 5.4 32 11.7 4.85

13 11.76 10.9 33 11.76 5.48

14 11.78 6.4 34 11.77 5.52

15 11.77 5.53 35 11.55 5.6

16 11.76 5.61 36 11.7 4.9

17 11.76 5.62 37 11.71 9.76

18 11.01 5.68 38 11.75 5.62

19 11.8 5 39 11.77 5.65

20 11.79 5.67 40 11.78 6.25

Page 50: 0244 Panorama I UPS Testing

Carlton ElectricSummery page

Cabinet 1:

Batteries in cabinets 1 and 2 have been left off for to long to be considered reliable

enough for maintaining a load for any length of time. The cut off from the manufacturere

for Impedance is 4.0 Gig Ohms and all of these batteries exceed that limit.

Cabinet 2:

Cabinet 3:

The batteries in cabinets 3 and 4 have been left without a charge for to long to recover or

even get a goot test read off of.

Summery:

Page 51: 0244 Panorama I UPS Testing

Summary of UPS South diagnostics:

UPS > Batteries > Cabinets 1 & 2 > Total of 80 batteries: The batteries in this unit are a Generic manufacture and are dated 12/2007. These show a propensity to maintain a charge albeit week.

UPS > Batteries > Cabinets 3 & 4 > these cabinets were disconnected in December of 2007. The Batteries were left behind in the cabinets and will need to be disposed of at some point. Some batteries are showing signs of leaking acid at the terminals.

Page 52: 0244 Panorama I UPS Testing

UPS > Controls: The UPS was found with the main control circuit breaker in the on

position however the unit was off. Battery disconnects switches S2 & S3 were also in the closed position. The Mimic Panel fired up on day two of testing but was so burned in that it could hardly be made out (see photo above - yes it is on).

UPS > Rectifier board: The 3phase bridge rectifier was in good condition and performed adequately. Rectifier CB1 had been left in the closed position.

Page 53: 0244 Panorama I UPS Testing

UPS > Inverter boards: The 3phase inverter boards fired up when the control power was

first reset. The unit functioned properly and went into normal mode. Sometime between 1530 and 0800 the next day the unit failed out at the inverter board. Both 800A SCR fuses were blown on the A phase inverter bus. We replaced the fuses on the A phase using fuses out of the UPS North (Inverter A Phase in photo above). The issue appears to be a bas sequencing board for the inverter. No further tests were completed without further authorization.

Page 54: 0244 Panorama I UPS Testing

UPS Inverter Board Continued:

Scope Reading A: A Phase Inverter at 0 volts before fuse replacement. Scope Reading B: B Phase Inverter at 544 volts per specification for equipment.

Scope Reading A: A Phase After fuse Replacement > During Capacitor Discharge state. Scope Reading B: B Phase during Capacitor discharge state.

Page 55: 0244 Panorama I UPS Testing

A Phase Sequencing Board. Note the Scorch mark in the center of the board around the Resistor.

Further attempts were not made for Start Up or Repairs as permissions would need to be given to proceed with board repairs and maintenance (We are also looking for spare parts for this model of UPS.

UPS > Summery: Between the batteries needing replacement, The Mimic Panel being next to useless, and the boards that will need to be replaced, I would recommend replacement of the UPS Unit as a whole. Even with reconditioning due to the age of the unit (appears to be between 1992 and 1996 when the building was completed) I would have a hard time believing in the reliability of this unit. Spare OEM parts for this unit appear to be nonexistent (I am looking actively for any available) and that would be another good reason not to rely on this.

Joe Tate
Polygon
Page 56: 0244 Panorama I UPS Testing

Section VI Panel UPS DP South

Page 57: 0244 Panorama I UPS Testing

Carlton Electric Joe Tate 1284 South Cherokee Street Denver CO 80223 303 - 884 - 1536 [email protected]

0244 PAN I UPS Testing Panel UPS DP South Prepared For:

Equity Office Tom Hoisington Panorama Corporate Center 9100 East Panorama Drive, Suite 125 Englewood, Colorado 80112 (303) 495-6699

Page 58: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43068.is2 1/9/2000 11:50:32 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 83.3°F

Image Range 82.0°F to 88.7°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 11:50:32 PM

Page 59: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43069.is2 1/9/2000 11:50:55 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 83.5°F

Image Range 81.5°F to 87.4°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 11:50:55 PM

Page 60: 0244 Panorama I UPS Testing

1284 South Cherokee Street

IR20000109_43070.is2 1/9/2000 11:51:14 PM

Graph

Visible Light Image

Image Info Background Temperature 68.0°F

Emissivity 0.95

Average Temperature 83.2°F

Image Range 81.5°F to 88.7°F

Lens Description 20mm/F0.8

Image Time 1/9/2000 11:51:14 PM

Page 61: 0244 Panorama I UPS Testing

1284 South Cherokee Street

Summary All temperature readings are in normal range All Gear was visually inspected for defects