  • Pearl GTL Project

    LINDE ENGINEERING

    Contractor Project No: 5887 Shell Project No: HP-3000-QAT

    Project Document Number: T- 4.234.573 Project Rev.: B Page 2 of 5

    Purchase Order Number:

    2MH127

    N/A Tag/Item Number(s):

    ASU Unit(s):

    Z PCWBS:

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    F B 15.03.2008 Ready for construction SB UA ZG RFC

    E A 26.01.2008 Ready for construction SB UA MC/ZG RFC

    D O 25.11.07 Company comments implemented IU UA/IO MC CCI

    C 02.10.07 Issued for company comments UA IO ZG ICC

    B 19.09.07 Issued for review UA IO ZG IFR

    A 18.09.07 Issued for internal review UA IO ZG IIR

    GAMA Rev.

    Project Rev Date Description

    Prepared By

    Checked By

    Approved By Status

    No. No. ORIGINATOR

    LINDE ENGINEERING AG

    Document Title:

    ITP FOR SITE PREPARATION AND EARTH WORKS

    Document No.

    GAM ITP QAC GTL 021 F LOC 470

    Contractor

    Gama Qatar Co. W. L. L. Org.

    Code Doc. Type

    Disc. Code

    Geogr. Area

    Seq. No

    Rev. No Vendor Code

    Project Document Number: T-4.234.573 Rev No: B

  • C2 ASU PEARL GTL PROJECT

    Document No: GAM-ITP-QAC-GTL-021

    INSPECTION AND TEST PLAN

    Site Preparation and Earthworks (FSI) DATE: 15.03.08 REV. F

    S. GAMA QATAR E. Not Used X. LINDE QC C. PEARL GTL A. FUGRO (TPI)

    I: INSPECTION / TEST R: DOCUMENT REVIEW S: SURVEILANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be Verified Control Procedure Reference Responsible Party Acceptance

    Criteria Verifying Documents S X C A

    T-4.234.573 REV-B PAGE 4 of 5

    Fill Material

    a) Classification of Soil b) Particle Size Distribution

    c) Optimum Moisture Content

    : Every 1000 m3 /one pile

    T-13.376.490

    As per ASTM: D422 and BS

    1377 As per ASTM:

    D 1557

    I Lab Reports 1.0 R

    S

    I

    2.0

    Water

    a) Chlorides

    b) Sulphates

    c) Ph d)Total Solids

    Once a day/any source change T-13.376.490

    Laboratory

    BS 6068 and BS3148

    Lab reports & Source Certificate R R R I

    3.0 Excavation(FSI) a) Soil condition of excavated

    bottom b) Excavation completed and

    approved for next activity

    T.13.376.490;T.13.377.360 QC Engineer Latest RFC & No cracks & voids

    Surveyor Report GAM-QCR-QAC-GTL-001/006/008

    I H S

    4.0 Fill (In situ)

    a) Visual inspection prior backfilling and scarifying the top

    150 mm of sub grade b) Area free of deleterious material prior to backfilling c) Adjacent below ground

    structure correctly coated and protected in accordance with

    project specification

    T-13.376.490

    Area Free from Deleterious

    Material & as Specification

    Checklist No GAM-QCR-QAC-GTL-007

    I S Laboratory & Site Engineer S

  • C2 ASU PEARL GTL PROJECT. Document No: GAM-ITP-QAC-GTL-021

    INSPECTION AND TEST PLAN Site Preparation and Earthworks(FSI) DATE: 15.03.08 REV.F

    S. GAMA QATAR E. Not Used X. LINDE QC C. PEARL GTL A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT REVIEW S: SURVEILANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be Verified Control Procedure Reference Responsible Party Acceptance

    Criteria Verifying Documents S X C A

    T-4.234.573 REV-B PAGE 5 of 5

    2

    5.0 Soil density (compaction) and layer thickness(FSI)

    Type (A): Every 300 m2 Type (B): Every750 m2 Type (c): Every400 m3

    T-13.376.490;T.13.377.360 Laboratory

    As per Project Specification and

    ASTM D2922, D3017, D556 and

    D216

    Lab report GAM-QCR-QAC-GTL-003

    I S S I

    6.0

    Level of Final Grade Elevation T-13.376.490

    Surveyor & Site Engineer

    Latest Project RFC

    Drawings for final grade levels

    Surveyor Report

    Final Elevation Checks GAM-QCR-QAC-GTL-006

    I S/R S

    kapak-SITE EARTH WORKS.pdfITP FOR SITE EARTH WORKS-15.03.2008.pdfFill Material Water