    Providing value to the

    customer

    Operations Function is the Key

    Performance

    Value =Cost

    (the above Value Equation was developed

    by Procter and Gamble)

    Performance = 1 x Quality + 2 x Speed +

    3 x Flexibility

  • 7/31/2019 02. Value Time Flexibility

    2/20

    Quality : How well goods or services meets /exceeds customer expectations.

    Speed : Time needed to deliver the goods /services.

    Flexibility : How easily firm can change theproduct or process to meet specific needs of

    the customer.

    1 2 3 are weightages ( will vary from situationto situation related to product & market )

    Cost Direct Indirect

    Objective Subjective

    Cost to Acquire use and dispose of the goods

  • 7/31/2019 02. Value Time Flexibility

    3/20

    Quality - you will study in detail when you study

    ..TQM

    Understanding Time [ or Lead Time ]

    * Speed * Response Time * Quickness Etc

    The Interval between start and end of any

    activity or series of activities

    in Lead Time : Mean / Average

    : Range: Variability

    All are important to customers

  • 7/31/2019 02. Value Time Flexibility

    4/20

    Categories of Lead Times

    Design Lead Time

    From Product Concept to design

    From design to prototype

    From prototype to job one

    Also

    From product introduction to product

    revision

  • 7/31/2019 02. Value Time Flexibility

    5/20

    Sourcing Lead Time

    Supplier Selection

    Supplier certification / registration

    Indenting . Order Processing

    Order receipt by supplier till despatch

    Transit time.

    Receipt / Inspection / Taking into stock

    Response time to attend to problems and

    revision requests.

  • 7/31/2019 02. Value Time Flexibility

    6/20

    Manufacturing Lead Time

    Order Registration.

    Translation to works order.

    Processing from start to end.

    Putting to distribution system.

  • 7/31/2019 02. Value Time Flexibility

    7/20

    Distribution Lead Time

    Re Packing

    Despatch

    Transit

    Installation / Commissioning

  • 7/31/2019 02. Value Time Flexibility

    8/20

    Complaint Attending Lead

    Time Registration of Complaint

    Analysis

    Initiating Action

    Attending to complaint

    Getting Feed Back

  • 7/31/2019 02. Value Time Flexibility

    9/20

    Total Product Delivery Lead TimeIs the sum of

    Design Lead Time

    Sourcing Lead Time

    Manufacturing Lead Time

    Distribution Lead Time

    Depending on the situations and inventory policy, some

    or all components of lead time will be present.

    TPDLT has to match customer lead time that is the

    time he is ready to wait for the given product or

    service. Here againwe need to consider competitors.

  • 7/31/2019 02. Value Time Flexibility

    10/20

    Time to Market

    Time taken to conceive, design, produce and

    deliver a new product.

    Time to product

    Time taken to deliver to a customer an existing

    product ( from order to delivery).

  • 7/31/2019 02. Value Time Flexibility

    11/20

    Two time based strategies

    1. Fast to market. 2. Fast to product.

    Fast to marketThis is a strong and effective strategy

    especially in fields where

    Technology or Fashion advancement is. fast.

  • 7/31/2019 02. Value Time Flexibility

    12/20

    Fast to Product

    Is also an effective strategy to compete in market

    where the customer is not ready to wait once he

    decides.

    This strategy incidentally also improves

    performance in quality, inventory, flexibility and

    cost. [ how? ]

  • 7/31/2019 02. Value Time Flexibility

    13/20

  • 7/31/2019 02. Value Time Flexibility

    14/20

    Lead Time to Market

    Product OldTime

    NewTime

    Honda

    AT & T

    Navistar

    Hewlett Packard

    Cars

    Phone

    Trucks

    Printers

    5.0 years

    2.0 years

    5.0 years

    4.5 years

    2.0 years

    1.0 years

    2.5 years

    22.0

    months

  • 7/31/2019 02. Value Time Flexibility

    15/20

    Lead Time to Product

    Product Old Time New Time

    General Electric Circuit breaker

    boxes

    3 Weeks 3 days

    Motorola Pagers 3 weeks 2 hours

    Hewlett Packard Test equipment 4 weeks 5 days

    Brunswick Fishing reels 3 weeks 1 week

    Matsushita Washing machines 360 hours 2 hours

    Harley -Davidson Motorcycles 360 days < 3 days

  • 7/31/2019 02. Value Time Flexibility

    16/20

    Time based Competition in Europe Olivetti (typewriter production) Through put

    time reduced from 20 days to 3 days.

    Michelin (steel cord): Setup time reduced by 90percent.

    Uno a Erre (world leader in gold jewellery)Production lead time reduced by 90 percent.

    Fiat Aiazione (parts of aircraft engines): Leadtime reduced by 50 percent.

    Innocenti S. Eustachio (manufacturingequipment)Lead time reduced by 30 per cent.

    Europa Metalli (world leader in non ferrousmetals) Set up time reduced by 70 percent.

    [ these are examples of 1990s think now ]

    time an enigma ?

    Fl ibili

  • 7/31/2019 02. Value Time Flexibility

    17/20

    Flexibility

    An Operations Strategy

    The ability of an OM System to

    respond quickly to changes.

    Measured by range and time to

    externally and internally generated

    changes.

  • 7/31/2019 02. Value Time Flexibility

    18/20

    Externally Generated

    Changes in Product

    Design, volume, Mix,

    Life Cycle ,

    delivery Time , etc..

    Internally Generated

    Machine Breakdown

    Absenteeism

    Materials Connected

    Issues

    Process and technology

    development

  • 7/31/2019 02. Value Time Flexibility

    19/20

    Types of Flexibilities

    Mix Flexibility Range.

    products/volumeChange over flexibility From one product to

    another

    Modification flexibility Minor modification in

    product

    Volume flexibility Increase or decrease in

    volume

    Rerouting andprogramme flexibility

    Due to breakdown andother problems

    Material flexibility Variation in type and

    quality of materials