1
R E V I S I ONS $$$$$$SYSTI ME $$$$$ $$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$ $$$$USERNAME$$$$ 8/17/99 SHEET NO. PROJECT REFERENCE NO. R-5829 77 8 832 772 774 7 75 780 784 785 786 788 789 790 791 792 794 795 796 798 799 800 801 802 807 808 809 810 8 1 1 812 813 814 816 817 818 820 821 82 3 825 826 827 828 829 830 833 834 835 837 840 842 843 845 846 847 848 849 850 851 852 854 855 858 859 861 862 866 868 87 0 876 877 879 881 884 886 887 888 889 890 891 892 893 894 895 896 900 905 907 782 - 783 909 9 9 3 91 1 99 4 9 13 9 9 2 9 15 91 6 9 17 912 9 18 920 92 3 9 14 9 10 9 19 9 2 1 922 92 6 982 9 81 98 0 979 97 8 9 8 3 9 7 7 9 8 4 9 8 5 9 85 B 9 8 6 9 87 991 9 88 92 4 92 5 927 92 8 92 9 93 0 9 32 933 934 9 3 5 9 3 6 9 37 938 940 9 41 9 42 94 3 9 5 0 9 53 9 54 9 5 5 956 958 9 59 9 6 0 965 9 6 6 9 6 7 9 72 9 73 9 7 4 97 5 9 39 9 5 1 952 9 6 1 94 7 9 8 949 962 9 6 3 9 6 4 9 6 8 9 6 9 970 9 7 1 944 945 946 9 76 9 0 8 9 08 A 993 A 9 11 A 993 B 9 11 B 9 11 C 91 1 D 911 E 9 94 A 9 94 B 99 4 C 9 94 D 9 9 4 E 9 94 F 9 1 2 A 9 12 B 908 B 9 12 C 9 1 4 A 9 14 B 914 C 909 A 909 B 909 C 909 D 909 E 909 F 909 G 909 H 9 0 9 I 910 A 918 A 923 A 9 31 A 9 3 1 B 9 31 D 931 E 9 4 1 A 9 2 4 A 95 2 B 9 24 B 95 0 A 9 5 1 A 9 52 A 9 5 2 C 9 52 D 952 E 9 52 F 9 5 4 A 9 5 5 A 955 B 964 A 964 B 964 D 93 7 A 9 3 7 B 9 37 C 93 7 D 9 37 E 937 F 9 3 7 G 9 3 7 H 937 I 937 J 937 K 9 37 L 9 3 7 Q 939 A 941 B 94 2 A 942 9 42 K 942 B 9 42 D 9 4 2 J 943 A 943 B 985 A 98 4 A 9 8 3 A 983 B 9 8 7 A 9 8 7 B 987 C 987 D 9 9 5 9 7 5 A 975 B 975 C 964 C 91 4 D 91 4 E 9 14 F 91 4 G 97 1 A 991 A 10 + 00 15 + 00 20 + 00 25 + 00 30 + 00 35 + 0 0 40 + 00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00 85+00 90 + 0 0 9 5 + 00 100 + 00 1 0 5 + 00 11 0 + 00 1 15 + 00 120 + 00 HARDEE'S OL D ROCK QUARRY RD NEW BARBOUR RD W E DWA R D S T P ONDF I EL D RD N PONDF I EL D RD S B OO N H I LL D R GINGER DR NORT HS I DE DR DR DONNI E H J ONE S J R BL VD BARDEN S T N PI NE S T RAI NS M I LL RD SERVICES TIRE PRINCETON CENTER CLEARANCE DEACON JONES MOTORS RAY SMITH PEDIATRICS PRINCETON HALL TOWN DEPT. FIRE PRINCETON DAY CARE PRINCETON ME D I C I N E , P A H O R I Z ON F A MI L Y C HU RC H S AN C T UA R Y P R A I S E CHURCH BAPTIST GRACE T O U C H P E R F E C T P O O LE S T L I N DA S T HI NNANT S T L EE S T ME RC E R S T S MI T H S T C OMME R C I A L DR ( OP E R A TE D B Y NOR F OL K S OUT HE R N) NC R A I L R OA D C O. ( OP E R A TE D B Y NOR F OL K S OUT HE R N) NC R A I L R OAD C O. NEW BALL PARK ROAD EXTENS I ON ALT US 70 9 2 6 D 926 G 926 F 9 2 6 C 9 26 B 9 26 A 926 E 9 9 6 9 9 7 N E W B A LL P A R K R D NEW BAL L PARK ROAD EXTENS I ON LEGEND PROPOSED TRAFFIC SIGNAL PROPERTY LINES EXISTING RIGHT OF WAY EXISTING ROADWAY TO BE REMOVED EXISTING ROADWAY TO BE RESURFACED PROPOSED ROADWAY CEMETERIES PROPOSED CONTROL OF ACCESS PROPOSED RIGHT OF WAY JURISDICTIONAL STREAM LINES SLOPE STAKES FILL LINE SLOPE STAKES CUT LINE SLOPE STAKES TRANSITION LINE HISTORIC PROPERTY (MERIT PENDING) MONOLITHIC ISLAND PROPOSED CURB AND GUTTER, PROPOSED STRUCTURE EXISTING STRUCTURE TO REMAIN PROPOSED CONST. EASEMENT LEGEND PROPOSED TRAFFIC SIGNAL PROPERTY LINES EXISTING RIGHT OF WAY EXISTING ROADWAY TO BE REMOVED EXISTING ROADWAY TO BE RESURFACED PROPOSED ROADWAY CEMETERIES PROPOSED CONTROL OF ACCESS PROPOSED RIGHT OF WAY JURISDICTIONAL STREAM LINES SLOPE STAKES FILL LINE SLOPE STAKES CUT LINE SLOPE STAKES TRANSITION LINE HISTORIC PROPERTY (MERIT PENDING) MONOLITHIC ISLAND PROPOSED CURB AND GUTTER, PROPOSED STRUCTURE EXISTING STRUCTURE TO REMAIN PROPOSED CONST. EASEMENT PI Sta 92+59.22 D L = 1,692.61' T = 855.37' R = 4,750.00' PI Sta 112+97.46 D L = 2,379.64' T = 1,201.00' R = 7,125.00' PI Sta 136+84.19 D L = 2,366.03' T = 1,208.10' R = 4,750.00' MA T C H L I N E S T A . 49 + 00 S T A . 49 + 0 0 MA T C H L I N E CURVE DATA M AT CHL I NE S T A. 124 + 00 A C SC Sta. 11+52.00 SC Sta. 11+52.00 15 + 0 0 PT Sta. 18+44.94 20 + 0 0 10 + 00 SC Sta. 11+68.00 1 5 + 0 0 CS Sta. 19+62.40 2 0 + 00 ST Sta. 21+30.40 TS Sta. 22+50.97 SC Sta. 24+42.97 25 + 00 CS Sta. 27+00.48 ST Sta. 28+92.48 3 0 + 0 0 - R P 1 C - - L P1 C- - L P 1 A - - L P1 A- - L P 1 C - - R P 1 C - - L - TS Sta. 28+57.79 SC Sta. 32+41.79 CS Sta. 42+11.12 ST Sta. 45+95.12 SC Sta. 11+68.00 CS Sta. 17+68.39 ST Sta. 19+36.39 TS Sta. 20+81.75 SC Sta. 22+41.75 PT Sta. 24+47.96 25 + 0 0 1 0 +0 0 15 +0 0 2 0 +00 2 5 +00 30 +00 35 +0 0 4 0 +00 4 5 +00 12 ' PS 1 2 ' PS 2 ' - 6 " C & G PC Sta. 15+31.07 PT Sta. 24+11.30 PC Sta. 38+66.22 PT Sta. 41+78.53 15 +00 10 +00 PC Sta. 12+99.85 PT Sta. 14+58.56 15 +00 2 0 +0 0 2 5 +00 -Y1- STA. 13+00.00 BEGIN CONSTRUCTION 20 + 00 15 + 00 10 + 00 15 + 00 PC Sta. 19+33.15 20 + 00 PT Sta. 21+54.82 25+00 30+00 PC Sta. 31+65.69 35 + 00 40 + 00 4 5 + 0 0 P T S t a . 45 + 00 . 31 POT Sta. 46+57.00 1 2 ' F D PS 4 ' F D P S 12' FDPS 10' FDPS 10' FDPS 12' FDPS 2' FDPS 2' FDPS 2 ' F D PS 2 ' F D PS 12' FDPS 12' FDPS 4 ' F D PS 4 ' F D PS 4' FDPS 4' FDPS -L- STA. 46+08.11, 49.00' RT -LP1C- ST STA. 10+00.00 = BEGIN LOOP 1C TIE TO EXISTING -SER1- STA. 46+41.00 DR DONNIE JONES EXT END SERVICE ROAD 1 -SER2- POT Sta. 10+00.00 GINGER DR. BEGIN SERVICE ROAD 2 -SER3- POT Sta. 10+00.00 BOON HILL DR. BEGIN SERVICE ROAD 3 -Y2- STA. 22+57.52 -SER3- POT STA. 46+39.32 = OLD ROCK QUARRY RD. EXT. END SERVICE ROAD 3 -L- STA. 46+20.93, 49.00' LT -LP1A- ST STA. 10+00.00 = BEGIN LOOP 1A -Y1- POT Sta. 10+00.00 BEGIN US 70A 2 ' - 6 " C & G 6 ' F D PS 6 ' F DPS -L- POT STA. 10+00.00 US 70 BEGIN NCDOT TIP PROJECT R-5829 10+00 -Y1- STA. 34+56.21 -RP1C- POT STA. 32+73.66 = END RAMP 1C -Y1- STA. 34+42.97 -SER1- POT STA. 10+00.00 = DR DONNIE JONES EXT BEGIN SERVICE ROAD 1 -Y1- STA. 34+29.74 -LP1C- POT STA. 22+14.95 = END LOOP 1C 10 + 0 0 PC Sta. 12+16.91 PT Sta. 12+91.99 15 + 00 PC Sta. 15+09.70 PT Sta. 19+01.11 20 +0 0 PC Sta. 20+50.47 PT Sta. 22+28.73 25 + 00 PC Sta. 25+98.65 PT Sta. 28+03.44 30 + 00 35 + 0 0 -SER3- STA. 12+50.00 -SER2- POT STA. 37+08.51 = BOON HILL DR. END SERVICE ROAD 2 -L- STA. 26+51.31, 49.00' RT -RP1C- ST STA. 10+00.00 = BEGIN RAMP 1C -L- STA. 18+00.00 BEGIN MILLING AND RESURFACING BEGIN WIDENING BEGIN CONSTRUCTION BEGIN PROJECT R-5829 -L- STA. 59+54.07, 49.00' LT ST STA. 10+00.00 = BEGIN -RP1A- PC Sta. 15+37.51 PT Sta. 17+92.02 R 75' R 75' R 50' R 50' R 75' R 75' R20 ' R20 ' R 20' R 20' R50 ' R50 ' R25 ' R40 ' R20 ' R20 ' R20 ' R20 ' R 30' R 30' R 35' R 35' R 45' R 45' R 50' R 50' R 20' R 20' R 10' R 20' R20 ' R20 ' R A M P C L OO P C L OO P A R A M P A L A N ET A P E R LANE TAPER LANE TAPER 02 5 025 025 025 025 0 2 5 0 2 5 0 2 5 025 02 5 025 025 025 0 2 5 0 2 5 0 25 025 025 025 025 025 0 2 5 025 02 5 02 5 025 025 0 2 5 0 2 5 02 5 0 2 5 025 025 025 025 025 025 0 25 0 2 5 025 025 025 0 25 0 2 5 025 025 025 0 25 02 5 0 2 5 02 5 0 25 025 02 5 EX BEGIN SERVICE ROAD 3 CONNECTOR -Y2- STA. 19+60.00 END RECONSTRUCTION -Y2- STA. 11+60.00 BEGIN RECONSTRUCTION R 35' R 35' R 50' R 50' R 25' R 25' 150 ' 150 ' L A N ET A P E R 300 ' 250' 300' -SER3- STA. 28+48.47 -SER3CON- POT STA. 19+16.77 = END SERVICE ROAD 3 CONNECTOR 025 0 2 5 0 0 07 08 0 8 08 08 0 8 00 0 5 0 5 0 7 00 08 08 0 0 0 8 08 00 08 0 0 07 07 00 02 5 06 06 00 0 0 0 5 0 5 00 0 0 0 4 0 0 00 04 04 00 04 04 0 0 00 04 0 4 0 0 00 06 06 00 00 04 0 4 0 0 02 5 0 0 0 4 04 00 00 06 06 00 0 25 025 00 0 25 12 ' F D P S 2 4 ' 36 ' 50 ' MEDI AN 3 6 ' 24 ' 50 ' MEDI AN 50 ' MEDI AN 24 ' 24 ' 2 4 ' 24 ' 50 ' MEDI AN 48 ' L ANE T APER 2 ' PS 2 ' PS 2 ' PS 2 ' PS 48 ' 1 6 ' 1 6 ' 16' 16 ' 24 ' 3 6 ' 2 4 ' 20 ' 20 ' 2 4 ' 24 ' 2 ' PS 2 ' PS 2' PS 2' PS 24 ' 1 0 +00 15 +00 2 0 +0 0 2 5 + 00 30 + 00 35 + 00 40 + 0 0 45 +0 0 - Y1 - -L- STA. 60+28.00 BEGIN EB BRIDGE WIDENING BEGIN WB BRIDGE RECONSTRUCTION -L- STA. 63+46.00 END EB BRIDGE WIDENING END WB BRIDGE RECONSTRUCTION -SER1- STA. 23+06.00 BEGIN BRIDGE -SER1- STA. 25+90.00 END BRIDGE -L- STA. 115+40.00 BEGIN BRIDGE -Y1- STA. 30+35.00 END BRIDGE -Y1- STA. 29+05.58 -L- STA. 46+12.03 = -L- STA. 38+35.00 BEGIN RECONSTRUCTION END MILLING AND RESURFACING END WIDENING 1 0 PO T St a . 1 9 +16 . 7 7 10 + 0 0 1 5 + 0 0 0 4 02 5 0 0 0 25 12 ' 24 ' 24 ' MEDI AN 36 ' - Y1 - - Y1 - -SER1- - S E R 1 - - S E R 1 - -SER2- - S E R 2 - - S E R 3 C ON - - S E R 3 - 80 ' 60 ' 60 ' 6 0 ' -L- STA. 115+76.74 -Y2- POT STA. 14+27.34 = -Y2- POT STA. 10+00.00 BEGIN RAINS MILL RD. -Y2- POT Sta. 25+08.56 END RAINS MILL RD. 00 0 2 5 02 5 025 025 02 5 02 5 02 5 02 5 02 5 0 25 0 25 02 5 0 2 5 025 -L- PC STA. 82+20.00 BEGIN WIDENING BEGIN MILLING AND RESURFACING END RECONSTRUCTION -L- PCC STA. 100+85.00 BEGIN RECONSTRUCTION END WIDENING END MILLING AND RESURFACING 10+00 15 +0 0 PT Sta. 18+44.94 2 0 + 00 -Y1- STA. 23+56.36 -RP1A- POT STA. 28+31.66 = END RAMP 1A -Y1- STA. 23+82.83 -LP1A- POT STA. 22+19.17 = END LOOP 1A -Y1- STA. 27+77.00 BEGIN BRIDGE 08 025 - R P 1 A - 7 0 70 70 24 ' -L- STA. 116+14.00 END BRIDGE PCC Sta. 100+96.45 50 +00 PC Sta. 53+47.23 55 +00 6 0 +00 PT Sta. 61+21.68 6 5 +00 7 0 +0 0 02 5 025 025 025 00 07 0 7 00 - Y1 - HO LT SP ONDR D . POT STA. 73+77.66 -Y1- STA. 73+68.81 END CONSTRUCTION END US 70A 80 ' 24 ' 2 ' PS 2 ' PS PIs Sta 11+12.03 F Ls = 168.00' LT = 112.03' ST = 56.03' PI Sta 15+80.32 L = 794.40' T = 412.32' R = 1,202.00' PIs Sta 20+18.42 F Ls = 168.00' LT = 112.03' ST = 56.03' PIs Sta 23+79.08 F Ls = 192.00' LT = 128.11' ST = 64.10' PI Sta 25+72.96 L = 257.51' T = 130.00' R = 762.00' PIs Sta 27+64.58 F Ls = 192.00' LT = 128.11' ST = 64.10' CURVE L1 CURVE RP1A1 CURVE RP1A2 CURVE RP1C1 CURVE RP1C2 PIs Sta 11+01.94 F Ls = 152.00' LT = 101.94' ST = 51.22' PI Sta 71+36.53 L = 692.94' T = 5,984.53' R = 226.00' CURVE LP1C F PIs Sta 31+13.85 F Ls = 384.00' LT = 256.06' ST = 128.05' PI Sta 37+31.12 L = 969.33' T = 489.33' PIs Sta 43+39.18 F Ls = 384.00' LT = 256.06' ST = 128.05' PIs Sta 11+12.03 F Ls = 168.00' LT = 112.03' ST = 56.03' PI Sta 14+74.60 L = 600.39' T = 306.60' R = 1,202.00' PIs Sta 18+24.42 F Ls = 168.00' LT = 112.03' ST = 56.03' PIs Sta 21+88.77 F Ls = 160.00' LT = 107.02' ST = 53.66' PI Sta 23+48.63 L = 206.22' T = 106.88' R = 318.00' PI Sta 20+44.62 L = 221.67' T = 111.47' R = 850.00' PI Sta 38+63.88 L = 1,334.62' T = 698.19' R = 1,840.00' CURVE SER1-1 CURVE SER2-1 CURVE SER2-2 CURVE SER2-3 CURVE SER2-4 SE = 0.08 SE = 0.07 SE = 0.08 SE = 0.07 SE = 0.08 SE = 0.08 TRANS = 199.5' CURVE SER1-2 SE = 0.06 SE = 0.05 TRANS = 504' TRANS = 210' TRANS = 204' TRANS = 180' TRANS = 252' TRANS = 228' TRANS = 228' PI Sta 12+54.59 L = 75.08' T = 37.68' R = 360.00' PI Sta 17+41.75 L = 391.41' T = 232.05' R = 290.00' PI Sta 21+41.47 L = 178.26' T = 91.00' R = 360.00' PI Sta 27+03.90 L = 204.79' T = 105.25' R = 360.00' SE = 0.04 TRANS = 104' SE = 0.04 TRANS = 104' SE = 0.04 TRANS = 104' SE = 0.04 TRANS = 104' R = 2,870.00 CURVE LP1A PIs Sta 11+01.94 Ls = 152.00' LT = 101.94' ST = 51.22' SE = 0.08 TRANS = 199.5' CURVE SER3-1 CURVE SER3-2 SE = 0.06 SE = 0.04 TRANS = 204' TRANS = 156' CURVE -SER3CON- DS = 35 MPH PI Sta 57+45.78 L = 774.45' T = 398.55' SE = 0.07 TRANS = 228' R = 1,330.00' CURVE Y1-1 PI Sta 13+79.35 L = 158.71' SE = 0.06 R = 1,060.00' CURVE Y2-1 T = 79.50' TRANS = 178.5' PI Sta 20+17.29 L = 880.23' T = 486.23' R = 833.00' PI Sta 16+75.81 L = 254.51' T = 138.31' R = 262.00' PI Sta 40+22.61 L = 312.31' T = 156.40' R = 2,300.00' SE = 0.04 T R AN S = 123 . 5 ' TRANS = 360' D D D D D D D D D D D D D D D D D PI Sta 71+36.53 D L = 692.94' T = 5,984.53' R = 226.00' TRANS = 360' SE = 0.05 SE = 0.05 SE = 0.05 CURVE L2-1 CURVE L2-2 CURVE L2-3 WETLAND LIMITS BOUNDARY DELINEATED POND BOUNDARY WETLAND LIMITS BOUNDARY DELINEATED POND BOUNDARY INCOMPLETE PLANS NOT FOR R/W ACQUISITION OR CONSTRUCTION CONCEPT ALTERNATIVE ONLY SUBJECT TO CHANGE WITHOUT NOTICE NOT FOR CONSTRUCTION WEST PRINCETON AREA ALTERNATIVE 2 WITH OPTION A MAP 200 0 50 PLANS 100 100 To minimize environmental impacts, the westbound entrance ramp proposed in the northwest quadrant of the U.S. 70-70A interchange shown in the 2017 public meeting map has been replaced with a loop ramp here. The proposed service road connecting U.S. 70-A to Commercial Drive shown in the 2017 public meeting map has been revised, and is now proposed to connect directly to Dr. Donnie H. Jones Jr. Boulevard. The proposed service road connecting Old Rock Quarry Road with Rains Mill Road shown in the 2017 public meeting map has been realigned. The realignment removes a stop condition that was originally proposed at the intersection of Old Rock Quarry Road and the proposed service road. A new roadway connection has been added to maintain access to Eagles Crest Lane, Northside Drive, and the southern portion of Old Rock Quarry Road. US 70 is proposed to go over Rains Mill Road. Rains Mill Road would maintain existing elevation. C A

02 0 50 CEMETERIES JURISDICTIONAL STREAM LINES 2 5 0 … · 2018-10-15 · r e v is io n s y r e 9 ts sta. 22+50.97--8 2 ' 1 + services 2 6 9 5 8 0 5 0 9 5 l i n. d 9 2 5 0-3 9 a

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 02 0 50 CEMETERIES JURISDICTIONAL STREAM LINES 2 5 0 … · 2018-10-15 · r e v is io n s y r e 9 ts sta. 22+50.97--8 2 ' 1 + services 2 6 9 5 8 0 5 0 9 5 l i n. d 9 2 5 0-3 9 a

RE

VISIO

NS

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

8/17/99

SHEET NO.PROJECT REFERENCE NO.

R-5829

778

832

772 774775

780 784

785 786 788 789790

791792

794795

796 798

799800

801802 807

808809

810811

812 813814

816817818

8208218

23

825826

827

828

829830

833

834835

837

840

842

843845

846

847

848 849850851

852 854

855 858859

861

862

866 868

870

876877

879881

884

886

887888

889890

891

892

893894

895

896

900

905

907

782-783

909

993

911

994

913

992

915 916 917

912

918

920

923

914

910

919

921

922

926

982

981

980

979

978

983

977

984

985

985B

986987

991

988

924

925

927

928

929

930

932

933 934

935

936

937

938

940941

942

943

950

953 954

955

956

958959 960

965 966 967

972

973 974

975

939

951

952

961

947

948

949

962963

964

968 969970 971

944

945

946

976

908

908A

993A

911A

993B

911B

911C

911D

911E

994A

994B

994C

994D 994E

994F

912A

912B

908B

912C

914A

914B

914C

909A

909B

909C

909D

909E

909F

909G

909H

909I

910A

918A

923A

931A

931B

931D

931E

941A

924A

952B

924B

950A951A

952A

952C952D

952E

952F

954A

955A

955B

964A

964B

964D

937A

937B

937C

937D

937E937F937G 937H 937I 937J 937K

937L

937M

937N

937Q

937O

937P

937R

939A941B

942A

942C

942E

942G

942I

942K

942B

942D

942F

942L

942H

942J

943A

943B

943C

985A

984A

983A

983B

987A

987B

987C

987

D

995975A

975B

975C

964C

914D

914E

914F

914G

971A

991A

10+00

15+0

0

20+0

0

25+0

0

30+0

0

35+00

40+00

45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00 85+00

90+00

95+00

100+00

105+00

110+00

115+00

120+00

HARDEE'S

OL

D

RO

CK

QU

AR

RY

RD

NE

W

BA

RB

OU

R

RD

W

EDW

ARD ST

PO

ND

FIE

LD

RD

N

PO

ND

FIE

LD

RD

S

BOON HIL

L DR

GINGER DR

NO

RT

HSID

E

DR

MAJE

STIC

DR

DR

DO

NNIE H JO

NES JR BLVD

BA

RD

EN

ST

N PIN

E ST

RAIN

S

MIL

L R

D

SERVICESTIRE

PRINCETON

CENTERCLEARANCE

DEACON JONES

MOTORSRAY SMITH

PEDIATRICSPRINCETON

HALLTOWN

DEPT.FIRE

PRINCETON

DAY CAREPRINCETON

MEDICINE, PAHORIZON FAMILY

CHURCHSANCTUARYPRAISE

CHURCHBAPTISTGRACE

TOUCHPERFECT

POOLE ST

LIND

A ST

HIN

NA

NT ST

LEE ST

MER

CER ST

SMITH ST

COM

MER

CIAL DR

(OPER

ATED

BY NORFO

LK SO

UTH

ERN)

NC R

AILRO

AD

CO.

(OPER

ATED

BY NORFO

LK SO

UTH

ERN)

NC R

AILRO

AD

CO.

NE

W

BALL PAR

K

RO

AD

EXTENSIO

N

ALT US 70

926D

926G

926F

926C

926B

926A

926E

996

997

NEW

BALLPARK RD

NE

W

BA

LL P

AR

K

RO

AD

EX

TE

NSIO

N

LEGEND

PROPOSED TRAFFIC SIGNAL

PROPERTY LINES

EXISTING RIGHT OF WAY

EXISTING ROADWAY TO BE REMOVED

EXISTING ROADWAY TO BE RESURFACED

PROPOSED ROADWAY

CEMETERIES

PROPOSED CONTROL OF ACCESS

PROPOSED RIGHT OF WAY

JURISDICTIONAL STREAM LINES

SLOPE STAKES FILL LINE

SLOPE STAKES CUT LINE

SLOPE STAKES TRANSITION LINEHISTORIC PROPERTY (MERIT PENDING)

MONOLITHIC ISLANDPROPOSED CURB AND GUTTER,

PROPOSED STRUCTURE

EXISTING STRUCTURE TO REMAIN

PROPOSED CONST. EASEMENT

LEGEND

PROPOSED TRAFFIC SIGNAL

PROPERTY LINES

EXISTING RIGHT OF WAY

EXISTING ROADWAY TO BE REMOVED

EXISTING ROADWAY TO BE RESURFACED

PROPOSED ROADWAY

CEMETERIES

PROPOSED CONTROL OF ACCESS

PROPOSED RIGHT OF WAY

JURISDICTIONAL STREAM LINES

SLOPE STAKES FILL LINE

SLOPE STAKES CUT LINE

SLOPE STAKES TRANSITION LINEHISTORIC PROPERTY (MERIT PENDING)

MONOLITHIC ISLANDPROPOSED CURB AND GUTTER,

PROPOSED STRUCTURE

EXISTING STRUCTURE TO REMAIN

PROPOSED CONST. EASEMENT

PI Sta 92+59.22

D

L = 1,692.61'

T = 855.37'

R = 4,750.00'

PI Sta 112+97.46

D

L = 2,379.64'

T = 1,201.00'

R = 7,125.00'

PI Sta 136+84.19

D

L = 2,366.03'

T = 1,208.10'

R = 4,750.00'

MATC

HLI

NE

STA. 4

9+00

STA. 4

9+00

MATC

HLI

NE

CURVE DATA

MATC

HLIN

E S

TA. 124+00

A

C

SC Sta. 11+52.00

SC Sta. 11+52.00

15+00

PT Sta. 18+44.94

20+00

10+00

SC Sta. 11+68.00

15+00

CS Sta. 19+62.40

20+00

ST Sta. 21+30.40

TS Sta. 22+50.97

SC Sta. 24+42.97

25+00

CS Sta. 27+00.48

ST Sta. 28+92.48

30+00

-RP1C-

-LP1C-

-LP1A-

-LP1A-

-LP1C-

-RP1C-

-L-

TS Sta. 28+57.79

SC Sta. 32+41.79

CS Sta. 42+11.12ST Sta. 45+95.12

SC Sta. 11+68.00

CS Sta. 17+68.39

ST Sta. 19+36.39

TS Sta. 20+81.75

SC Sta. 22+41.75PT Sta. 24+47.96

25+00

10+00

15+00

20+00

25+00

30+00

35+00

40+00

45+00

12' PS

12' PS

2'-6" C&G

PC Sta. 15+31.07

PT Sta. 24+11.30

PC Sta. 38+66.22

PT Sta. 41+78.53

15+00

10+00

PC Sta. 12+99.85

PT Sta. 14+58.56

15+00

20+00

25+00

-Y1- STA. 13+00.00BEGIN CONSTRUCTION

20+00

15+00

10+00

15+00

PC Sta. 19+33.15

20+00

PT Sta. 21+54.82

25+00 30+00

PC Sta. 31+65.69

35+00

40+00

45+00

PT Sta. 45+00.31

POT Sta. 46+57.00

12' F

DPS

4' FDPS

12' FDPS

10' FDPS10' FDPS

12' FDPS

2' FDPS

2' FDPS

2' FDPS

2' FDPS

12' FDPS

12' FDPS

4' FDPS

4' FDPS

4' FDPS

4' FDPS

-L- STA. 46+08.11, 49.00' RT-LP1C- ST STA. 10+00.00 =BEGIN LOOP 1C

TIE TO EXISTING-SER1- STA. 46+41.00DR DONNIE JONES EXTEND SERVICE ROAD 1

-SER2- POT Sta. 10+00.00GINGER DR.BEGIN SERVICE ROAD 2

-SER3- POT Sta. 10+00.00BOON HILL DR.BEGIN SERVICE ROAD 3

-Y2- STA. 22+57.52-SER3- POT STA. 46+39.32 =OLD ROCK QUARRY RD. EXT.END SERVICE ROAD 3

-L- STA. 46+20.93, 49.00' LT-LP1A- ST STA. 10+00.00 =BEGIN LOOP 1A

-Y1- POT Sta. 10+00.00BEGIN US 70A

2'-6" C&G6' FD

PS

6' FDPS

-L- POT STA. 10+00.00US 70BEGIN NCDOT TIP PROJECT R-5829

10+00

-Y1- STA. 34+56.21-RP1C- POT STA. 32+73.66 =END RAMP 1C

-Y1- STA. 34+42.97-SER1- POT STA. 10+00.00 =DR DONNIE JONES EXTBEGIN SERVICE ROAD 1

-Y1- STA. 34+29.74-LP1C- POT STA. 22+14.95 =END LOOP 1C

10+00

PC Sta. 12+16.91

PT Sta. 12+91.99

15+00

PC Sta. 15+09.70

PT Sta. 19+01.11

20+00

PC Sta. 20+50.47

PT Sta. 22+28.73

25+0

0

PC Sta. 25+98.65

PT Sta. 28+03.44

30+00

35+00

-SER3- STA. 12+50.00-SER2- POT STA. 37+08.51 =BOON HILL DR.END SERVICE ROAD 2

-L- STA. 26+51.31, 49.00' RT-RP1C- ST STA. 10+00.00 =BEGIN RAMP 1C

-L- STA. 18+00.00BEGIN MILLING AND RESURFACINGBEGIN WIDENINGBEGIN CONSTRUCTIONBEGIN PROJECT R-5829

-L- STA. 59+54.07, 49.00' LTST STA. 10+00.00 =BEGIN -RP1A-

PC Sta. 15+37.51

PT Sta. 17+92.02

R 75'

R 75'

R 50'

R 50'

R 75'

R 75'

R 20'

R 20'

R 20'

R 20'

R 50'

R 50'

R 25'

R 40'

R 20'R 20'

R 20'R 20'

R 30'

R 30'

R 35'

R 35'

R 45'

R 45'

R 50'R 50'

R 20'

R 20'

R 10'

R 20'

R 20'

R 20'RAMP C

LOOP C

LOOP A

RAMP A

LANE TAPER

LANE TAPER

LANE TAPER

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

0250

25

025

025

025

025 025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

EX

-SER3CON- STA. 10+00.00

BEGIN SERVICE ROAD 3 CONNECTOR

-Y2- STA. 19+60.00END RECONSTRUCTION

-Y2- STA. 11+60.00BEGIN RECONSTRUCTION

R 35'

R 35'

R 50'

R 50'

R 25'

R 25'

150'

150'

LANE TAPER

300'

250'

300'

-SER3- STA. 28+48.47

-SER3CON- POT STA. 19+16.77 =

END SERVICE ROAD 3 CONNECTOR

025

025

00

07

08

08

08

08

08

00

05

05

07

00

08 08

00

08

08

00

08

00

07

07

00

025 0

6 06 00 00

05

05

00

00

04

00

00

04

04

00

04

04

00

00

04

04 00

00

06

06

00

00

04

04

00

025

00

04

04

00

00

06

06

00

025

025

00

025

12' F

DPS

24'

36'

50'

ME

DIA

N

36'

24'

50'

ME

DIA

N

50'

ME

DIA

N

24'

24'

24'

24'

50'

ME

DIA

N

48'

LA

NE T

APER

2' P

S

2' P

S

2' P

S

2' P

S

48'

16'

16'

16'

16'

24'

36'

24'

20'

20'

24'

24'

2' PS

2' PS

2' PS

2' PS24'

10+00

15+00

20+00

25+00

30+00

35+00

40+00

45+00

-Y1-

-L- STA. 60+28.00BEGIN EB BRIDGE WIDENINGBEGIN WB BRIDGE RECONSTRUCTION

-L- STA. 63+46.00END EB BRIDGE WIDENINGEND WB BRIDGE RECONSTRUCTION

-SER1- STA. 23+06.00BEGIN BRIDGE

-SER1- STA. 25+90.00END BRIDGE

-L- STA. 115+40.00BEGIN BRIDGE

-Y1- STA. 30+35.00END BRIDGE

-Y1- STA. 29+05.58-L- STA. 46+12.03 =

-L- STA. 38+35.00BEGIN RECONSTRUCTIONEND MILLING AND RESURFACINGEND WIDENING

10 POT Sta. 19+

16.77

10+0015+00

04

025

00

025

12'

24'

24'

ME

DIA

N

36'

-Y1-

-Y1-

-SER1-

-SER1-

-SER1-

-SER2-

-SER2-

-SER3CON-

-SER3-

80'

60'

60'

60'

-L- STA. 115+76.74-Y2- POT STA. 14+27.34 =

-Y2- POT STA. 10+00.00BEGIN RAINS MILL RD.

-Y2- POT Sta. 25+08.56END RAINS MILL RD.

00

025

025

025

025

025

025

025

025

025

025

025

025

025

025

-L- PC STA. 82+20.00

BEGIN WIDENING

BEGIN MILLING AND RESURFACING

END RECONSTRUCTION

-L- PCC STA. 100+85.00

BEGIN RECONSTRUCTION

END WIDENING

END MILLING AND RESURFACING

10+00

15+00

PT Sta. 18+44.94

20+00

-Y1- STA. 23+56.36-RP1A- POT STA. 28+31.66 =END RAMP 1A

-Y1- STA. 23+82.83-LP1A- POT STA. 22+19.17 =END LOOP 1A

-Y1- STA. 27+77.00BEGIN BRIDGE

080

25

-RP1A-

70

70

70

24'

-L- STA. 116+14.00END BRIDGE

PCC Sta. 100+96.45

50+00

PC Sta. 53+47.23

55+00

60+00

PT Sta. 61+21.68

65+00

70+00

025

025

025

025

00

07

07

00

-Y1-

HOLTS POND RD.

POT STA. 73+77.66

-Y1- STA. 73+68.81END CONSTRUCTIONEND US 70A

80'

24'

2' P

S

2' P

S

PIs Sta 11+12.03

F

Ls = 168.00'

LT = 112.03'

ST = 56.03'

PI Sta 15+80.32

L = 794.40'

T = 412.32'

R = 1,202.00'

PIs Sta 20+18.42

F

Ls = 168.00'

LT = 112.03'

ST = 56.03'

PIs Sta 23+79.08

F

Ls = 192.00'

LT = 128.11'

ST = 64.10'

PI Sta 25+72.96

L = 257.51'

T = 130.00'

R = 762.00'

PIs Sta 27+64.58

F

Ls = 192.00'

LT = 128.11'

ST = 64.10'

CURVE L1CURVE RP1A1

CURVE RP1A2

CURVE RP1C1 CURVE RP1C2

PIs Sta 11+01.94

F

Ls = 152.00'

LT = 101.94'

ST = 51.22'

PI Sta 71+36.53

L = 692.94'

T = 5,984.53'

R = 226.00'

CURVE LP1C

F

PIs Sta 31+13.85

F

Ls = 384.00'

LT = 256.06'

ST = 128.05'

PI Sta 37+31.12

L = 969.33'

T = 489.33'

PIs Sta 43+39.18

F

Ls = 384.00'

LT = 256.06'

ST = 128.05'

PIs Sta 11+12.03

F

Ls = 168.00'

LT = 112.03'

ST = 56.03'

PI Sta 14+74.60

L = 600.39'

T = 306.60'

R = 1,202.00'

PIs Sta 18+24.42

F

Ls = 168.00'

LT = 112.03'

ST = 56.03'

PIs Sta 21+88.77

F

Ls = 160.00'

LT = 107.02'

ST = 53.66'

PI Sta 23+48.63

L = 206.22'

T = 106.88'

R = 318.00'

PI Sta 20+44.62

L = 221.67'

T = 111.47'

R = 850.00'

PI Sta 38+63.88

L = 1,334.62'

T = 698.19'

R = 1,840.00'

CURVE SER1-1 CURVE SER2-1 CURVE SER2-2 CURVE SER2-3 CURVE SER2-4

SE = 0.08SE = 0.07

SE = 0.08

SE = 0.07 SE = 0.08 SE = 0.08TRANS = 199.5'

CURVE SER1-2

SE = 0.06 SE = 0.05

TRANS = 504' TRANS = 210'

TRANS = 204' TRANS = 180'

TRANS = 252'TRANS = 228'

TRANS = 228'

PI Sta 12+54.59

L = 75.08'

T = 37.68'

R = 360.00'

PI Sta 17+41.75

L = 391.41'

T = 232.05'

R = 290.00'

PI Sta 21+41.47

L = 178.26'

T = 91.00'

R = 360.00'

PI Sta 27+03.90

L = 204.79'

T = 105.25'

R = 360.00'

SE = 0.04

TRANS = 104'

SE = 0.04TRANS = 104'

SE = 0.04

TRANS = 104'

SE = 0.04

TRANS = 104'

R = 2,870.00

CURVE LP1A

PIs Sta 11+01.94

Ls = 152.00'

LT = 101.94'

ST = 51.22'

SE = 0.08TRANS = 199.5'

CURVE SER3-1 CURVE SER3-2

SE = 0.06 SE = 0.04

TRANS = 204' TRANS = 156'

CURVE -SER3CON-

DS = 35 MPH

PI Sta 57+45.78

L = 774.45'

T = 398.55'

SE = 0.07

TRANS = 228'

R = 1,330.00'

CURVE Y1-1

PI Sta 13+79.35

L = 158.71'

SE = 0.06R = 1,060.00'

CURVE Y2-1

T = 79.50'

TRANS = 178.5'

PI Sta 20+17.29

L = 880.23'

T = 486.23'

R = 833.00'

PI Sta 16+75.81

L = 254.51'

T = 138.31'

R = 262.00'

PI Sta 40+22.61

L = 312.31'

T = 156.40'

R = 2,300.00'

SE = 0.04

TRANS = 123.5'

TRANS = 360'

D

DD

D D D

D

D

DDDD DDDDD

PI Sta 71+36.53

D

L = 692.94'

T = 5,984.53'

R = 226.00'

TRANS = 360'

SE = 0.05SE = 0.05 SE = 0.05

CURVE L2-1 CURVE L2-2 CURVE L2-3

WETLAND LIMITS BOUNDARY

DELINEATED POND BOUNDARY

WETLAND LIMITS BOUNDARY

DELINEATED POND BOUNDARY

INCOMPLETE PLANSNOT FOR R/W ACQUISITION OR CONSTRUCTION

CONCEPT ALTERNATIVE ONLYSUBJECT TO CHANGE WITHOUT NOTICE

NOT FOR CONSTRUCTION

WEST PRINCETON AREA ALTERNATIVE 2 WITH OPTION A MAP

200050

PLANS

100100

To minimize environmental impacts, the westboundentrance ramp proposed in the northwest quadrant of theU.S. 70-70A interchange shown in the 2017 public meetingmap has been replaced with a loop ramp here.

The proposed service road connecting U.S. 70-Ato Commercial Drive shown in the 2017 publicmeeting map has been revised, and is nowproposed to connect directly to Dr. Donnie H.Jones Jr. Boulevard.

The proposed service road connecting Old RockQuarry Road with Rains Mill Road shown in the 2017public meeting map has been realigned. Therealignment removes a stop condition that wasoriginally proposed at the intersection of Old RockQuarry Road and the proposed service road.

A new roadway connection has been addedto maintain access to Eagles Crest Lane,Northside Drive, and the southern portion ofOld Rock Quarry Road.

US 70 is proposed to go over Rains Mill Road.Rains Mill Road would maintain existingelevation.

C A