8/13/2019 01we Bond Worked Example Combinations of Actions
1/14
Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN wi th worked examples 13-14 June 2013, Dubli n
Worked example com na on o
i n
Dr Andrew Bond
Director, Geocentrix Ltd
Chairman TC250/SC7
8/13/2019 01we Bond Worked Example Combinations of Actions
2/14
Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN wi th worked examples 13-14 June 2013, Dubli n
Worked example
combination of actions
DESIGN SITUATION
8/13/2019 01we Bond Worked Example Combinations of Actions
3/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
Design situation for combination of actions
6m Bfdn
btank
By LfdnLtank
Bx
2005-13 Geocentrix Ltd. All rights reserved3
8/13/2019 01we Bond Worked Example Combinations of Actions
4/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
Design situation for combination of actions
Roof loading 0.6 kPa
Partition loading 0.8 kPa
Wind loading 1.15 kPa
h
gnore no ona oa s
h
dfdn
h
2005-13 Geocentrix Ltd. All rights reserved4
8/13/2019 01we Bond Worked Example Combinations of Actions
5/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
EN 1997-1 2.4.6.1(2)P
Eurocode 7 defines the representative action Frep as:
Fk = characteristic value
= =
>
=, ,1 ,
1 1
rep k k j k i k ij i
. , , ,
Gk,j = characteristic permanent action; Qk,i = characteristic variable actionQk,1 = leading variable action; Qk,i>1 = accompanying variable action
2005-13 Geocentrix Ltd. All rights reserved5
8/13/2019 01we Bond Worked Example Combinations of Actions
6/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
Combination of actions
Combin-ation
Rep.varble
actions
Limitstate
Design situation(DWL = design working
life)
Example
C aracter-istic
0 Qk ULS Persistent perio ~ DWL Norma use
ULS Transient (period
8/13/2019 01we Bond Worked Example Combinations of Actions
7/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
Combination of actions for buildings
Action 0 1 2Imposed loads in buildings (EN 1991-1-1)
A: domestic, residential areas 0.7 0.5 0.3
B: office areas 0.7 0.5 0.3
C: congregation areas 0.7 0.7 0.6
: s opp ng areas . . .
E: storage areas 1.0 0.9 0.8
F: traffic area, vehicle weight 30kN 0.7 0.7 0.6
: ra c area, ve c e we g160kN
. . .
H: roofs 0 [0.7] 0 0
- -
Wind loads on buildings 0.6 [0.5] 0.2 0
Values in [brackets], given in BS EN 1990, replace values in EN 1990
2005-13 Geocentrix Ltd. All rights reserved7
8/13/2019 01we Bond Worked Example Combinations of Actions
8/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
Partial factors for buildings
Action Symbol Set B Set C
Permanent Unfavourable su erior 1.35, .
Favourable (inferior) G,inf 1.0
Variable Unfavourable Q 1.5 1.3
Accidental Unfavourable A 1.0Seismic Unfavourable AE 1.0
2005-13 Geocentrix Ltd. All rights reserved8
8/13/2019 01we Bond Worked Example Combinations of Actions
9/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
Worksheet combination of actions
Calculate these combinations:
action with Set B factors
2. As 1, but removable
3. Imposed loads as leadingvariable action/Set B factors
. ,
5. As 2, with Set C factors
6. As 3, with Set C factors7. As 1, for SLS
8. As 2, for SLS
2005-13 Geocentrix Ltd. All rights reserved9
. ,
8/13/2019 01we Bond Worked Example Combinations of Actions
10/14
Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN wi th worked examples 13-14 June 2013, Dubli n
Worked example
combination of actions
SOLUTION
8/13/2019 01we Bond Worked Example Combinations of Actions
11/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
Solution combination of actions
# Limitstate
Leadingvariable
Removedpermanent
NEd(kN)
MEd(kNm)
action actions?
1 ULS Wind No 2400 2405
3 ULS Imposed No 2510 1443
4 ULS Wind No 1802 2084
5 ULS Wind Yes 1631 2084
6 ULS Imposed No 1898 12507 SLS Wind No 1688 0
8 SLS Wind Yes 1631 0
2005-13 Geocentrix Ltd. All rights reserved11
mpose o
8/13/2019 01we Bond Worked Example Combinations of Actions
12/14
Eurocodes:
Background & Applications
w wor e examp es - une, u n
Summary of key points
Geotechnical engineers need to understand combinations of actionsto ensure effective communication with structural engineers
ULS verifications are normally checked with Persistent/Transient (the
SLS verifications are normally checked with Quasi-Permanent (i.e.average loading) combination
2005-13 Geocentrix Ltd. All rights reserved12
8/13/2019 01we Bond Worked Example Combinations of Actions
13/14
Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN wi th worked examples 13-14 June 2013, Dubli n
blo .eurocode7.com
www.decodingeurocode2.com
www.decodin eurocode7.com
DECODING THE EUROCODES
8/13/2019 01we Bond Worked Example Combinations of Actions
14/14
Eurocodes:
Background & Applications
GEOTECHNICAL DESIGN wi th worked examples 13-14 June 2013, Dubli n
Geotechnical designw wor ex m l