    Building Services DesignProcess

  • 7/23/2019 01building Services Design Process

    2/38

    Building Services

    Europe Building

    ServicesMiddle East- MEPServices

    Asian Countries M&EServices

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    3/38

    Building Services

    Branch o" Engineering that co%inesall the uilding services in uildings

    Services 'ther than Architectural and Structural

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    4/38

    Building Services Engineer

    Building Services are (hat %a)e auilding co%e to li"e.

    A uilding %ust do (hat it is designed todo not *ust provide shelter ut also ean environ%ent (here people can live(or) and achieve.

    Building Services Engineer is the one(ho %a)es that happen

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    5/38

    Building Services

    Building Services represent +,-,o" the construction costs in uildings

    /,-, o" the energ$ consu%ed are

    due to uildings

    0,-1, o" the energ$ consu%ed inuildings are due to Building

    Services

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    6/38

    Building Services -Bac)ground Building Services has a rich histor$

    ASH2E (as "or%ed in 344 $ the %erger o" A%ericanSociet$ o" Heating and A5C engineers "ounded in 314/ and

    A%erican Societ$ o" 2e"rigerating Engineers "ounded in34,/.

    Building Services (ere "or%all$ recogni6ed in 3470 (iththe "or%ation o" 8Chartered 9nstitution o" Building Services

    :C9BS;.

  • 7/23/2019 01building Services Design Process

    7/38

    Building ServicesEngineering E=EC9CES

    =ighting

    Electrical po(erdistriution

  • 7/23/2019 01building Services Design Process

    8/38

    Building ServicesEngineering Energ$ suppl$ gas electricit$ and po(er

    ?atural and articial lighting

    Escalators and li"ts

    Heating and air conditioning

    >entilation and re"rigeration

    @ater drainage and plu%ing

    Acoustics

    Fire detection and protection Securit$ and alar% s$ste%s

  • 7/23/2019 01building Services Design Process

    9/38

    2ole o" Building Services Engineer

    Four distinct areas associated (ith it Design

    Manu"acture

    9nstallation Maintenance

    no(ledge o" :the aove architecture; %a)es a co%plete BuildingServices Engineer

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    10/38

    2ole o" Building Services Engineer

    Building Design

  • 7/23/2019 01building Services Design Process

    11/38

    Develop%ents

    Building Services Manage%ent

    Facilities Manage%ent

    @ater %anage%ent

    =ighting Design

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    12/38

    Building Services Manage%ent

    For @hat Higher energ$ ecienc$

    Maintain appropriate co%"ort

    levels Higher productivit$

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    13/38

    Energ$ Ecienc$

    DEPE?DS '? Building envelope5"aric

    Building Services

    Manage%ent o" uilding services :o"tenneglected;

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    14/38

    Facilities Manage%ent

    DEF9?9

  • 7/23/2019 01building Services Design Process

    15/38

    Facilities Manage%ent

    Areas covered Propert$ Strateg$ ualit$ Polic$

    Maintenance Polic$ Purchasing Polic$ etc.

    Space Manage%ent Co%%unication and 9n"rastructure

    including uilding "aric

    Building Maintenance

    Ad%inistration and Contract Manage%ent including catering cleaning %ail roo%health and sa"et$

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    16/38

    Facilities Manage%ent

    P2'FESS9'?A= 9?S

  • 7/23/2019 01building Services Design Process

    17/38

    9nstitution pro%oting uilding services

    9nternationall$ C9BSE

    ASH2AE

    =ocall$ Pa)istan Engineering Council

    9nstitution o" Engineers Pa)istan

    ASH2AE Pa)istan Chapter Pa)istan H>AC2 Societ$

    Pa)istan Jreen Building Council

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    18/38

    Sustainailit$

    Sustainale develop%ent is onethat %eets the needs o" thepresent (ithout co%pro%ising the

    ailit$ o" "uture generations to%eet their o(n needs.

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    19/38

    Building Services Design Process

    Design o" uilding services proceedsthrough the "ollo(ing phases.

  • 7/23/2019 01building Services Design Process

    20/38

    Building Services Design Process

    Concept Stage

  • 7/23/2019 01building Services Design Process

    21/38

    Building Services Design Process

    For eLa%ple the reduced spacereuired "or duct(or) %a$ allo(revisions to the structural design andsustantial cost savings. 2educed ductspace %a$ also e a solution "orarchitectural design concepts such asvaulted ceilings. Si%ilarl$ i" underoorair distriution is to e considered thisis the ti%e to evaluate that optionecause it aGects uilding height andservices design.

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    22/38

    Building Services Design Process

  • 7/23/2019 01building Services Design Process

    23/38

    Building Services Design Process

  • 7/23/2019 01building Services Design Process

    24/38

    Building Services Design Process

  • 7/23/2019 01building Services Design Process

    25/38

    Building Services Design Process

    Po(er reuire%ents o" the pro*ect

    =i"e sa"et$ anal$sis (hich deter%ines thet$pe o" re ghting s$ste%

    @ater reuire%ents o" the pro*ect

    Possiilities "or "uture gro(th or eLpansion Acoustic reuire%ents Applicale codes and standards

    Space availale "or euip%ent

    2eliailit$ reuire%ents Budgets "or capital costs and operating costs

    Sustainailit$ reuire%ents

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    26/38

    Building Services Design Process

    Schematic Design 9n this phase the designer selects and

    co%pares appropriate s$ste%s to %eet theuildingOs "unctional needs and develops

    reco%%endations "or the o(ner.

  • 7/23/2019 01building Services Design Process

    27/38

    Building Services Design Process

    Preliminary During this phase uilding services

    engineer coordinates the MEP s$ste%s (itharchitectural and structural s$ste%s to

    resolve potential conicts. Building lighting calculations are rened

    Building po(er calculations are reneddetail load schedules are prepared

    H>AC calculations are rened Euip%ent si6es and capacities are

    selected

    S$ste% la$outs are developed

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    28/38

    Building Services Design Process

    Final Design and Preparationof Construction Documents 9n this stage the preli%inar$ la$outs

    and euip%ent selections are "ull$developed and the nal dra(ings andspecications are co%pleted.

    So%e pro*ects involve preparing

    alternative designs (ith ids "or alloptions. 9n such cases the pri%ar$option generall$ receives the %osteGort during the design

    Engr. Fahad Hasan !.H.Associates"ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    29/38

    Building Services Design Process

    Construction Phase

  • 7/23/2019 01building Services Design Process

    30/38

    Building Services Design Process

    Acceptance or CommissioningPhase

  • 7/23/2019 01building Services Design Process

    31/38

    Building Services Design Process

    5 steps for successful completion of complexbuilding proect

    @hether itOs a ne( hospital renovation o" an eListinglaorator$ or eLpansion o" a %anu"acturing "acilit$co%pleL uilding s$ste%s in co%pleL uilding t$pes are

    designed to per"or% at high levels. Ho(ever i" notco%%issioned properl$ the high-per"or%ing "acilit$ $outhought (as eing uilt could e severel$underper"or%ing. 9n "act a recent stud$ $ =a(renceBer)ele$ ?ational =aorator$ sho(s that in the I.S. alonenearl$ Q3, illion is (asted through energ$ ineciencies

    such as air duct lea)ages unalanced airo( valvelea)ages i%proper controls setup and so on.

    Ho( can $ou save %one$ and ensure that $our co%pleLuilding is co%%issioned properl$ For starters there areve si%ple steps.

    Engr. Fahad Hasan !.H.Associates

    "ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    32/38

    Building Services Design Process

    !" Start earlyBegin the co%%issioning process during thepre-design or design stages. Rust ecause theul) o" the co%%issioning eGort ta)es place

    a"ter construction co%pletion does not %eanthat $ou should (ait until then to eginco%%issioning.

  • 7/23/2019 01building Services Design Process

    33/38

    Building Services Design Process

    #" $a%e a clear planCreate a co%%issioning plan that denes the roles and eLpectations o"

    each sta)eholder throughout the co%%issioning process. Mostsucontractors do not understand (hat is eLpected o" the% duringco%%issioning drasticall$ slo(ing the process. Preparing a

    co%%issioning plan as earl$ as possile is )e$ to %aintaining thespeed necessar$ to co%plete the pro*ect on ti%e (ith no loss o"

    ualit$.

  • 7/23/2019 01building Services Design Process

    34/38

    Building Services Design Process

    &" Put it into the scheduleCo%%issioning activities should e uilt rightinto the %aster construction schedule. B$incorporating the various co%%issioning tas)sas line ite%s in the %aster schedule the$ are%ore li)el$ to e co%pleted in the properseuence "or a success"ul result. Addingco%%issioning to the %aster schedule alsorein"orces each sta)eholderOs responsiilitiesover ti%e and ree%phasi6es the collaorativenature o" the process $ putting co%%issioning"ront and center "or ever$one to see.

    .

    Engr. Fahad Hasan !.H.Associates

    "ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    35/38

    Building Services Design Process

    '" Document the processDocu%enting each co%%issioning actTcreatinga log o" per"or%ance standards inspectionstesting and i" necessar$ corrective actions "ors$ste%s and euip%entTveries that allrelevant design and construction (or) %eetsthe o*ectives estalished during the pre-designand5or design stages. Detailed inders housingthese co%%issioning logs )no(n as 8turnoverpac)ages can then e created and %aintainedto serve as a historical record o" theco%%issioning process "or the "acilit$Oss$ste%s.

    Engr. Fahad Hasan !.H.Associates

    "ahad#$hassociates.co%

  • 7/23/2019 01building Services Design Process

    36/38

    Building Services Design Process

    5" (rain the operators

  • 7/23/2019 01building Services Design Process

    37/38

    Building Services Design Process

    Summing it upAlthough not a co%prehensive list these ve steps are thecornerstone o" a good co%%issioning process.

  • 7/23/2019 01building Services Design Process

    38/38

    Building Services Design Process

    than% you

    )*A

    Engr. Fahad Hasan !.H.Associates

    "ahad#$hassociates co%