Proposed Residential DevelopmentLand to the west of Newtown Road, Highbridge
Design and Access Statement
Land to the west of Newtown Road, Highbridge
C O N T E N T S p a g e
1.0 Int roduct ion
2.0 S i te and sur rounding area
3.0 Pol icy Cons iderat ions
4.0 Const ra ints S i te access & h ighways i ssues
F looding
Ecology
Archaeology
5.0 The Proposals Layout and appearance
Landscape
Access
6.0 Conclus ion
1
2
4
56789
10111212
13
Land to the west of Newtown Road, Highbridge
1.0 Introduction
page 1
The Newtown Road site lies on the western side of Highbridge. The site is
currently occupied by Delta Engineering and includes a modern single
storey office building located at the entrance to the site off Newtown
Road, tarmaced areas used for car parking, several warehouse units,
yard and hard surfaced areas.
On the southern part of the site is a privately owned track from Newtown
Road which leads to the pumping station and the boatyard.
Sedgemoor District Council ’s adopted Local Plan allocates the
application site for housing under Policy H17. The Plan recognises that
the site forms a large redevelopment opportunity close to the centre
of Highbridge. This application seeks to bring forward the development
of the first phase of the H17 allocation.
The development of the H17 allocation in two phases will not prejudice
the comprehensive development of the site. The application site
(phase 1) is separated from the boatyard site (phase 2) by a public
footpath and a major public sewer that links the water treatment works
to the west of the site with the works to the south of the River Brue.
The surrounding area consists of mixed residential developments to
the north, south and east, the boatyard (accessed from Clyce Road)
to the south, a pumping station to the west and open space within
Apex Park to the north of the application site.
The site is in proximity to, but outside, the defined Severn Estuary
area with its many nationally and internationally important wildlife
designations including RAMSAR, Special Protection Area, Special Area
of Conservation, Site of Special Scientific Interest, National Nature
Reserve and County Wildlife Site status.
The application site lies within the flood plain as identified on the
Local Plan proposals map.
Outline planning permission (including details of the proposed means
of access) is being sought for the site’s residential development
comprising a mix of flats and houses. The proposal is described in
more detail in the accompanying Design and Access Statement
ILLUSTRATIVE LAYOUT
Land to the west of Newtown Road, Highbridge
2.0 Site and surrounding area
page 2
The site subject of the application comprises 2.8 hectares of land at the
western end of Newtown Road, some 400m west of the defined town
centre and is allocated for residential development in the Adopted
Local Plan. The town centre is approximately 400m east of the site
with direct footpath connections available allowing easy access
for pedestrians via Newtown Road and Tyler Way. The town centre
offers a wide range of services and facilities as well as employment
opportunities, and these are supplemented by the Western Industrial
Estate and IslePort Business Park further to the east. St. Johns Junior
School and the King Alfred Secondary School are 400 and 600m north
respectively. Access to the site is via Newtown Road.
The site currently accommodates the premises of Delta Engineering
but there are several underused buildings on the site and overall the
visual appearance is one of a semi-redundant former industrial site
which does not relate well to it ’s residential surroundings or make a
positive contribution of the appearance of the area.
The site is roughly triangular in shape with the apex at the eastern
boundary providing the site access onto Newtown Road. The northern
boundary abuts a footpath/cycle way set within a grass corridor, north
of which are the mixed residential areas off Kiln Drive and Moorland
Road which are 2 and 3 storeys in height and extend to the north and
north-west. The southern boundary of the site primarily adjoins existing
2 storey residential development off Sparks Way and Smith Way. At the
western end the site abuts the existing boat yard to the south which is
also allocated for residential development in the local plan.
Site Location Plan
Extract from Sedgemoor District Council Local Plan Proposals Map
Land to the west of Newtown Road, Highbridge page 3
West of the site is the existing water treatment works, access to which
runs along the length of the site’s southern boundary in the form of
a 3m concrete access road which connects to Newtown Road to
the east. To the north and west of the treatment works is Apex Park, a
County Wildlife site and area of informal open space.
There exists three principal buildings on the site together with large areas
of open storage associated with the engineering business. Nearest
Newtown Road is a single storey storage building with low pitched
roof and brick elevations. The eastern elevation which greets visitors
and anyone approaching the site entrance is featureless save for one
emergency doorway. Within the central area of the site exists a 4 bay,
2 storey warehouse building with pitched roof, whilst at the western end
of the site is a very large 2 bay, 2 storey warehouse building also under
a pitched roof. Given the utilitarian appearance of these buildings
together with the open storage of large scale plant and equipment,
residential redevelopment provides an opportunity to created a more
sympathetic and visually appealing form of build development in an
area already characterised by 2 and 3 storey houses.
Further south of the site is the River Brue with the old river course forming
a spur terminated by existing flood defences adjacent the western end
of the site. The new course of the river runs south of the boat yard site
eastwards toward the southern end of the town centre and is crossed by
New Clyce Bridge, a footpath/cycleway which proceeds south from Clyce
Road and links with a pathway heading due west towards the coast.
The site is a brown field allocated housing site in a sustainable location
2.1 Site and surrounding area
within the town. It is approaching the end of it ’s useful economic life and
given the site constraints (see section 4) residential redevelopment is
the most viable option as recognised in the Local Plan for the district.
DELTA ENGINEERING BUILDINGSENTRANCE TO THE SITE FROM NEWTOWN ROAD
LOOKING EAST ACROSS THE SITE FROM THE WATER TREATMENT WORKS
LOOKING EAST ALONG CLYCE ROAD VIEW ACROSS THE SITE TOWARDS THE HOUSING IN NEWTOWN ROAD
ENTRANCE TO APEX PARK
Land to the west of Newtown Road, Highbridge
The site is allocated for residential redevelopment in the Adopted Local
Plan (September 2004) which is fairly up to date. Work is progressing in
respect of the replacement Local Development Framework where a
second round of issues and options consultation in
respect of the Core Strategy took place between
June and August 2007. In addition, the Council has
published a draft Urban Potential Study for comment
(July/August 2007) which continues to identify the
site as suitable for residential development and
will form part of the evidence base for the Core
Strategy and Allocations DPD.
The wider site including the boat yard is subject to Policy H17 of the
Local Plan which states that:
‘The site forms a large redevelopment opportunity close to the centre
of Highbridge. The boat yard site offers the opportunity for a riverside
development which incorporates marine facilities. Access will be from
Newtown Road.
Provision is to be made for a cycle link from the adjoining Apex Park
to the south side of the River Brue. This link would not only provide
improved access to Burnham on Sea but would also form part of a
wider recreational cycle path along the coast.
The site adjoins the Bridgewater Bay National Nature Reserve and
consultation with English Nature will be required.
PROPOSAL H17
Land west of Newtown Road and adjoining boat yard, Highbridge (as
defined on the proposals map) is allocated for housing.’
Appendix 4.1 contains additional criteria for the development of
allocated housing sites. The Design Brief for Policy H17 provides guidance
for a comprehensive development to remove all industrial buildings
and uses to enable the redevelopment of the site with a suitable
range and mix of housing sizes and densities. Any development will
be required to safeguard important natural features and the adjacent
SSSI and minimise the visual impact of the development when viewed
from Apex Park. The new estate road should incorporate access to
the pumping station with existing vehicular connections to Clyce Road
terminated. Pedestrain and cycleway access should be provided from
Clyce Road to connect with the wider network of of public paths.
The proposed development has been designed in accordance with
both this guidance and national planning policy guidance, primarily
in the form of Planning Policy Statements PPS1, PPS3 (Housing), PPG13,
PPS9 (Nature Conservation) and PPS25 (Flood Risk).
3.0 Policy Considerations
page 4
Land to the west of Newtown Road, Highbridge
Despite its somewhat open and semi-redundant appearance the site
is heavily constrained by issues relating to flood defences, public rights
of way and easements, access, contaminated land remediation,
ecology, the linear nature of the site, multiple ownerships, etc, etc.
Some constraints are purely physical and effectively determine the
extent of developable land and the layout of the development (flood
4.0 Constraintsdefences, easements and rights of way) whilst others have significant
viability implications (decontamination works, increasing and finished
levels, etc). Finally, due to the ecological sensitivity of the wider area
studies have been commissioned to consider whether there are any less
tangible impacts which require mitigation.
page 5
Land to the west of Newtown Road, Highbridge
This section considers these constraints and the work that is being
commissioned to address them, some of which takes the form of
separate reports and analysis whilst others are addressed by the
illustrative layout itself which shows that the site can be developed
without resulting in any demonstrable harm to interests of acknowledged
importance.
Ownership issues mean that the allocation will come forward in 2
phases and it is therefore necessary to demonstrate that the first phase
subject of this application will not prejudice the implementation of
any future phase on the residual boat yard land. This is demonstrated
on the illustrative layout which shows access to the residual land
maintained and enhanced and incorporates the important north-
south footpath cycleway link which can then progress over the new
Clyce Bridge and beyond. Due to public rights of way and easements
(see below) the siting of development illustrated in the application will
not prejudice the ability to accommodate any form of development
on the residual land due to the separation distances involved.
The constraints plan identifies the route of 3 easements or rights of
way which restrict the form of development. The existing access to the
water treatment works can be realigned and provided by means of the
new site access and internal road layout. The public foot path which
runs east-west from Smith Way combined with the sewer easement
in same area results in a strip of undevelopable land that will form a
buffer and amenity area between the proposed development and
future redevelopment of the boatyard site.
4.1 ConstraintsSITE ACCESS & HIGHWAYS ISSUES
A Transportation Assessment has been prepared by Peter Brett Associates.
The study obviously identifies the sustainable location of the site and
the potential for future journeys to be made by non-motorised modes
of transportation. Existing pedestrian and cycle links will obviously be
enhanced by the construction of the new links through the site which will
enhance the permeability of the overall area. Otherwise, the wider road
network can accommodate future vehicular traffic from the site and the
residual boat yard land providing for up to 150 dwellings in total. No off site
mitigation works are considered necessary but the enhancement of the
footpaths and cycle ways on site combined with a Travel Plan Statement
will provide real benefits in transportation terms. A further benefit will be
a reduction in HGV movements associated with the existing industrial
operation which could intensify significantly at any time.
The point of access into the existing site is narrow and not well defined.
The footpath/cycle way access into Apex Park is poorly identified and
the entire route is uninspiring and poorly surveilled, which will have a
consequent impact upon levels of usage, as people may not feel
comfortable to use it particularly in the evening. The proposed access
design addresses these constraints and is discussed in more detail in the
following section.
page 6
Land to the west of Newtown Road, Highbridge
4.2 Constraints
FLOODING
Given the site’s location adjacent to the River Brue estuary a Flood Risk
Assessment has been prepared by consultant engineers Clarke Bond.
Flood risk is obviously a serious consideration in this area and is becoming
more so generally. However, the engineers have demonstrated that new
flood defence measures can tie in with those that exist at present to
fully mitigate the risks associated with tidal flooding in models predicting
events up to 2110. The defences take the form of a slight increase in site
levels across the development combined with bunds on the southern
and western boundaries to protect against any tidal surge. These areas
have been incorporated into the design in the form of more structural
landscaping strips.
page 7
Extract from Environment Agency’s flood map
Land to the west of Newtown Road, Highbridge
ECOLOGY
Whilst the site itself does not have any nature conservation value, the
surrounding areas of the Brue Estuary are part of the wider Bridgewater
Bay SSSI and Special Protection Area (SPA). As already noted, Apex Park
is a County Wildlife Site (CWS) as is the non-tidal extent of the river
Brue.
A request for a formal screening opinion was submitted to the Local Planning
Authority who subsequently confirmed that the proposed development
was not EIA development and therefore no formal environmental
statement is required. However, given the proximity of the sensitive
ecological designations an
ecological assessment has
been prepared by the Wessex
Ecological Consultancy.
Whilst there are some areas of interest on the site (grassland and the
hedge on the western boundary) these are of low ecological importance
and in any event they will be largely unaffected by the proposed
development or can be mitigated
by specific replacement planting
of species which areas on site. No
evidence of protected species using
the site was found during the various
surveys as it is considered unlikely that
any direct impact would result in the
development.
Disturbance to birds roosting at 2 sites
in the estuary was considered in detail
following survey work and a thorough
review of existing data sources.
The assessment concludes that for
a variety of reasons the proposed
development is unlikely to adversely
affect these areas.
4.3 Constraints
page 8
Land to the west of Newtown Road, Highbridge page 9
4.4 ConstraintsARCHAEOLOGY
Due to the importance of the general area in
archaeological terms an archaeological desk
based assessment of the site was carried out
by Bristol & Region Archaeological Services.
The evidence suggests that the study area
comprised undeveloped land from at least the
mid 19th century and probably long before
although early wharves on the site were in
place on the northern bank of the Brue by the late 18th century on
or very close to the site’s location. From the mid 19th century the site
was progressively developed for industrial uses associated with the
construction of new wharves following major alterations to the drainage
of the Brue in the first decade of that century. Works also involved
the development of railway sidings and yards serving the new dock
facilities and this industrial use continued during the first part of the 20th
century. In the second half of the 20th century the dock facilities were
abandoned and the railway tracks were removed after 1958
although the site obviously remains in industrial occupation to this
day.
The desk based assessment found no evidence for features of
archaeological interest even though it lies within an area of
archaeological potential. The evidence also suggests that the
area has undergone potentially damaging development with
the construction works associated with the industrial use of the
site. It is considered that a suitably worded condition requiring
an archaeological watching brief during the initial construction
phases of the proposed development would be appropriate.
Highbridge 1888
Land to the west of Newtown Road, Highbridge
5.0 The Proposals
ILLUSTRATIVE SITE LAYOUT PLAN
page 10
two and three storey to reflect context;
cycle link through site;
enhanced links to the cycleway/footpath along the site’s northern boundary;
retain landscape buffer in north west corner;
apartment blocks to overlook footpath/cycleway link to north;
entrance/gateway feature required to development and footpath/cycleway link
to north;
opportunity for landscaped buffer between site and boatyard;
opportunity for landscape buffer to housing to the south with flats providing
surveillance;
create own sense of place within the development.
•
•
•
•
•
•
•
•
•
DESIGN PRINCIPLES
Land to the west of Newtown Road, Highbridge page 11
5.1 The ProposalsLAYOUT AND APPEARANCE
The flood mitigation measures will screen the development from the
south and west and offer increased protection for the adjacent SSSI.
Thus, the layout is focused internally to produce a typical coastal village
linear street pattern. The use of appropriate materials and architectural
detailing will give a maritime feel to the development as a whole.
The layout is focused on a central junction which provides the required
access to the boatyard and water treatment works and opens up a
vista towards the new Clyce bridge. A feature entrance to courtyard
parking for units 59-69 will make an attractive focal point for the new
internal pedestrian and cycle paths. These routes offer direct links
into the existing rights of way network assisting the integration of the
development into the surrounding area.
Building heights have been restricted to no greater than three storeys
to respect the predominately low rise housing surrounding the site .
Three storey elements have been used to for the gateway building
and to add interest to the overall skyline. Three storey apartments were
alos considered appropriate for the northern central section of the site
where overlooking from habitable rooms and communal activity will
be beneficial to the security and safety of people on the cycleways
and footpaths.
The existing access to Delta Engineering is narrow and runs parallel to
the cycleway access to Apex Park. By combining the two entrances the
layout illustrates how the bland and undistictive entrance to the Park
can be made more welcoming with an attractive gateway to serve
both the proposed residential development and Apex Park.
The layout seeks to address any possible conflict between introducing
a landmark building at the entrance to the site, required to give the
development context and presence, and the two storey terraced
and semi-detached housing to the north and south. Therefore, the
proposed three storey “gateway” apartment block is sited behind a
landscaped square. Thus, an attractive setting is created by a small
formal square with seating around a sculpture or similar artwork possibly
with a maritime theme reflecting the area’s nautical history.
The building will be sensitively designed to overlook this public amenity area
giving future occupiers a pleasing outlook whilst ensuring the main habitable
rooms will not intrude upon the privacy of the neighbouring rear gardens.
Land to the west of Newtown Road, Highbridge page 12
5.2 The Proposals
The layout proposes a mix of houses and flats
comprising a variety of one, two, three and four bedroom properties.
This mix should encourage a range of potential occupiers resulting in
a more diverse and vibrant community.
LANDSCAPE
The layout has been designed to incorporate the flood defence bund
as a landscape buffer protecting the amenity and outlook of the
housing on Smith Way and screening views of the pumping station
and boatyard. It will also reinforce the existing buffer protecting the
wildlife park.
Altough the bund will offer significant protection, at the north west
corner, where the site adjoins the Apex Park wildlife site, the proposed
dwellings are set back away from the boundary to enable the existing
green buffer to be supplemented and strengthened to protect this
habitat.
Within the development the planting will be more formal with standard
trees set in tree grilles to soften the areas of
courtyard parking. Hard landscaping and street
furniture will be used to differentiate between
public and private spaces.
ACCESS
The development will be accessed from Newtown
Road. It is proposed that the access will run along the existing cycleway
serving Apex Park which forms the northern boundary of the site. This
additional land will enable the provision of a 5.5m carriageway with
separate pedstrian and cycleways.
Within the site the layout has been subject to a number of constraints
including the 6m easement for the sewer, existing rights of way and the
need to maintain access to both the pumping station and boatyard.
Therefore it is proposed that the housing is served by a single access
road stretching from Newtown Road to the Water Treatment Works
reflecting the established linear street pattern and building form of
the surrounding residentail development. The emphasis on frontage
Land to the west of Newtown Road, Highbridge page 13
5.3 The Proposalsdevelopment with occassional formal squares takes elements from the
built form to the north and south.
In accordance with the guidance contained in Manual for Streets, the
houses on the southern half of the site will have direct vehicle access
to off street parking. This helps to generate activity and can establish a
positive relationship between the street and its surroundings. The use of
railings and low vegetation along curtilages will not restrict visibility but
will clearly differentiate between public and private areas and the use of
different surface materials will alert drivers when pedestrians or cyclists are
likely to be crossing the road.
The layout proposes a number of cycleway links to give ease of access
through the development connecting existing rights of way and encouraging
residents to walk or cycle to local shops and facilities. At present the
footpaths and cycleways are somewhat bland and uninteresting offering
no significant focal points and run behind rear garden fences and lock
up garages creating long narrow and unattractive routes which can be
intimidating.
The layout has been designed to ensure that both the existing and
proposed routes are well overlooked so pedestrians and cyclists will feel
safe and secure. Apartments blocks are proposed for the northern half of
the site where first and second floor living rooms and kitchens will overlook
the cycleway providing informal surveillance.
Informal crossings giving priority to pedestrians and cyclists will be created
through careful use of surface materials encouraging vehicles to give
way and where there are significant changes in level to accommodate
existing accesses alternative sloping paths will be provided to ensure
inclusion for the less mobile.
ConclusionThe redevelopment of brownfield land to provide new housing is an
important objective of the Council. Brownfield sites are often hampered
by high development costs associated with remediation and other
constraints but bringing these sites forward is imperative if longer term
objectives of regenerating areas and protecting Greenfield sites are to
be fulfilled. This application is supported by a raft of evidence which
demonstrates that the land can be developed in an appropriate manner
and facilitate future development on the adjacent boatyard site. The
development will create a new sense of place and a gateway to Apex
park; all within a sustainable location.
FOOTPATHS AND CYCLEWAYS SHOULD BE CONVENIENT, INVITING AND SAFE AND DESIGNED TO ACCOMMODATE PEDESTRIANS OF ALL AGES SIZES AND ABILITIES. GOOD QUALITY LANDSCAPING, GARDENS AND INTERESTING ARCHITECTURE MAKE A WALK OR
CYCLE RIDE AN ENJOYABLE EXPERIENCE