01 VKT_2012 April Version Aditiya Rev 1

Embed Size (px)

Citation preview

  • 7/31/2019 01 VKT_2012 April Version Aditiya Rev 1

    1/4

    C.V Project Manager.

    PROJECT MANAGER (New Float Plant, Container and Cold / Hot repairs)

    JOB OBJECTIVE:

    To grow in and with an organisation that will utilise my skills & nurture mycapabilities by providing me with the opportunities to learn new things and face new

    challenges as an individual and as a team member.

    EXPERIENCE Extracts

    A dedicated and seasoned professional with 18 years and 8 month of extensive experience in

    Manpower Management, Projects Management, Manufacturing management , Plant Management,Development, Design, maintenance, Quality, and Safety. During 18 years:

    Built 3 green field float lines (500 ~ 700 TPD)

    1 Architectural and Automotive Plants at AIS INDIA

    Provided utility engineering to more than 10 projects in China, Russia.

    Maintenance of 2 float lines in AIS India ( 1994 to 2001)

    Shift manager: Handling entire process line along with product shipment in AIS India. Around

    150 person per shift man management (2001 to 2004)

    Handling Of Projects in AIS India (2004 to 2007)

    600 TPD Green field in Yanbu Saudi Arabia (2007 ~ 2009)

    Cold repairs of 600 TPD Float line Jakarta Indonesia. (2010 ~ 2011)

    Presently working on designing 600 TPD cold repair of existing float furnace and container 180 TPD

    furnace. Jakarta Indonesia ( 2012 ~ 2013).

    Presently working as aPROJECT MANAGER

    (Greenfield, Cold or Hot Repair and Conversion of existing Facilities)

    o Expertise in determining companys mission & strategic direction as conveyed through policies & corporate

    objectives; successful management of the entire operations with focus on top line and bottom-line

    performance.

    o Schedule bound progress and completion of project. Strong in Discipline & Time Management

    o Adroit in conducting regular evaluations of project achievability, availability, quality assurance, continuous

    improvement, benchmarking, and knowledge sharing, training, succession planning and cost management.

    o Adhere the local government body requirement for setting up project and operational requirement.

    Rules vary from location to location , thus need to go through local authority guide line .

    o Meets financial objectives by forecasting requirements; preparing an annual budget; scheduling

    expenditures; analyzing variances; initiating corrective actions.

    o Enhancing department and organization reputation by accepting ownership for carrying out new and difficult

    requests; exploring opportunities to add value to job accomplishments.

    o At worksite co-ordination with client for smooth handling of Civil, Electrical, Mechanical, product

    line Construction and Commissioning activity.

    o Expertise in making Plant layout as per process requirement.

    1

    VINOD KUMAR TURKIPresent location Jakarta Indonesia.Cell : 06281310032203, E-mail: [email protected] ,

    Contact dtails of India. + 91 9821021980, 02227548700ROW HOUSE NO 2, PLOT 13, SEC 4, SAI KRIPA BLDG, GOVINDA C.H.S KOPAR KHERNA NAVI MUMBAIINDIA

    mailto:[email protected]:[email protected]
  • 7/31/2019 01 VKT_2012 April Version Aditiya Rev 1

    2/4

    C.V Project Manager.

    o Strong to identify improvement opportunities within critical processes to reduce Waste, Process

    Variation, Cost, Technical development and enhancement as per the prevalent industry requirements.

    o Achieving operational objectives by contributing information and recommendations to strategic plans and

    reviews; preparing and completing action plans; implementing production, productivity, quality, and

    customer-service standards; resolving problems; completing audits; identifying trends; determining system

    improvements; implementing change.

    o Supporting human resource objectives by recruiting, selecting, orienting, training, assigning,

    scheduling, counseling, and disciplining employees; communicating job expectations; planning,monitoring, appraising, and reviewing job contributions; planning and reviewing compensation

    actions; enforcing policies and procedures.

    o Updating job knowledge by participating in educational opportunities; reading professional

    publications; maintaining personal networks; participating in professional organizations.

    CORE COMPETENCE

    - Plant Operations - Project Planning & Management - Energy Conservation

    - Lean Manufacturing - 5 S - Cost saving initiatives

    - Process Improvement - Quality/ Safety Operations - Business Development

    - Packaging Design & Development - Training & Development - ROI Accountability- Maintenance Operations - Team Management - Budgeting

    - Green Field Project Coordination - Internal &external Client Relationship Mgmt

    Management Skills:

    Project management.

    Predictive and Preventive Maintenance

    Spare Part Management and Inventory Control

    QS-9000 and TQM Implementation

    5 S , kaizen, Poka Yoke

    MPCP( MANAGING POINTS CONTROLING POINTS)

    PDCA CYCLE (PLAN DO CHECK ACT)

    Carried out the Energy Audit for all equipments with periodic monitoring of the same.

    Task Group , ISO Certification

    SKILL

    Know how and implementation techniques of management tools

    Liaison for statuary requirements. Preparing time scale diagram.

    Preparing Plant Layout as per process flow

    Project schedules.

    Recruitment from talent pool.

    Prepare Quotation for the project and negotiations with suppliers

    Vendor development to develop indigenous machine.

    Estimating the cost of Project.

    Designing of utility system for plant.

    Designing of fuel and fuel back system.

    Designing Fire fighting system.

    Designing tailor made machine (production).

    Designing of batch house.

    2

  • 7/31/2019 01 VKT_2012 April Version Aditiya Rev 1

    3/4

  • 7/31/2019 01 VKT_2012 April Version Aditiya Rev 1

    4/4

    C.V Project Manager.

    COMPUTER PROFICIENCY: Basic Computer Certificate Course (Excel, MS Word, Power Point), AutoCAD

    PERSONAL DOSSIER

    Date of Birth : 26th Jan, 1970

    Languages Known : English (Fluent), Hindi, Urdu, Kashmiri, Bahasa elementaryHobby : Interested in Coin collection, cricket, horse riding, writing, music.

    Passport no : Z1902394 valid till May 2019Contract status : Family Visa.

    Innovation thrive enthusiasm high, Motivation stimulates the interest.

    4