Well CompletionTechniques

Page 2: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Objectives

At the end of this lecture, you should be able to:Describe typical completion proceduresList and describe basic well completion techniquesList the advantages and disadvantages of the well completion techniques

Page 3: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Well Completions

After drilling, the well is “completed” for production of oil or gas

May use the drilling rig for the initial well completion or utilize workover/completion rig

Decision is based on location and economics

Page 4: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Well Completion Operations

Consists of a series of operations whose aim is to provide the means of communication between the reservoir and the surface:

Perforating Sand control installationProduction packer settingRunning the tubing string (with its components)Safety valve installation (SSSV, SCSSV)Xmas tree installation

Page 5: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Well Completion Techniques

Open hole

Liner (cemented, slotted or perforated)

Cased hole

Tubingless or Slimhole

Page 6: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Open Hole (Barefoot) Completion

New reservoir

Casing

Page 7: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Open Hole Completions

AdvantagesEliminate Casing and Perforating costsMaximum wellbore diameter opposite production intervalEasy to deepen well if requiredEasily converted to screen or perforated liner completion

DisadvantagesExcessive Water or gas production difficult to controlNot easy to stimulate producing intervalOpen hole section may require frequent clean–outCan only be applied in well consolidated formation

Page 8: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Liner Completions

Slotted orperforated Permanent

Page 9: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Screen/Slotted Liner Completions

AdvantagesRelatively cheap because of casing cost savingsEliminate perforating costsScreen can be sized for sand controlImproves bore–hole stability

DisadvantagesExcessive water or gas production difficult to controlMud cake not removed – can result in damage Not easy to stimulate producing interval – n o selectivityReduced diameter across producing interval

Page 10: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Perforated Liner CompletionsAdvantages

Excessive water and gas easily controlledSelective stimulation possibleRelatively cheaper than Perforated Casing configurationAdaptable to sand control techniquesAdaptable to multiple completionsProduction Logging easy to run

DisadvantagesWell bore diameter restrictedPerforating cost can be significantGreater danger of productivity impairment from completion skins Liner cementation not as easily or as good as primary cementation

Page 11: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Cased Hole

Oil or gasreservoir

Page 12: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Perforated Casing Completions

AdvantagesExcessive water and gas easily controlledSelective stimulation possibleWell can be easily deepenedAdaptable to sand control techniquesAdaptable to multiple completions

DisadvantagesPerforating cost can be significantReduction of wellbore diameterGreater danger of productivity impairment from completion skins

Page 13: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Tubingless or Slimhole

Oil or gasreservoir

Two to three strings can berun for multiple completions

Smaller diametertubing string

Page 14: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Completion Type Advantages DisadvantagesCased Hole - Pressure control

- Isolation of zones- Control of stimulation- Wellbore Stability

- More expensive- Limited communication

to reservoir- Possible cement damage

Liner - Less expensive thancasing entire hole

- Pressure andstimulation control(when cemented)

- Wellbore stability

- Cementing more difficult- No control of flow if not

cemented- Slots plugged w/formation- Limited control of

stimulationOpen Hole - Maximum flow area

- Minimize damage- No control of flow- Limited or no control of

stimulation- Hole collapse in weak

formationsSlimhole - Lower Cost - Limited Workover

capability due to smallhole

- Limited stimulation rate- No zone isolation

Completions

Page 15: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

7 7 ””

9 5/89 5/8””

13 3/813 3/8

2020””Conventional CementedConventional Cemented

5 5 ½½ ””

7 7 ””

9 5/89 5/8””

13 3/813 3/8

18 5/818 5/8Cemented LinerCemented Liner Cemented Cemented MonoboreMonobore

5 5 ½½ ””

7 7 ””

9 5/89 5/8””

13 3/813 3/8

4 1/24 1/2””tubingtubing

3 1/23 1/2””tubingtubing

Typical Casing Schemes

Page 16: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Well Completions (Vertical Wells)

Single Zone

Multiple Zones

Page 17: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Single Zone Completion

* Single zone completion - One reservoir is producing.

Open-ended Packer

Page 18: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Multiple Zone Completion* Multiple zone completion - More than one reservoir is

producing.

Open - ended(Commingled) Dual packer

Page 19: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Deviated and Horizontal Wells

Special application of basic completion methodsEarly approach was to utilize openhole completions in horizontal wells

Problems with sand controlProblems with controlling fluids

Issues with standard completion equipmentWireline tools, etc.

Page 20: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Deviated Wells

Deviations up to approximately 60-65o

Standard equipment generally suitableTool length and diameter of major concern

Radius of curvature of drilled wellboreAffects ability to run casingLimits tool lengthAffects artificial lift installations

Page 21: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Horizontal Wells

Required new/modified completion equipment or techniques

Zonal isolationPlacement of equipment in horizontalStimulation techniquesPerforatingProduction loggingIntervention Issues

Page 22: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Horizontal Completions

Openhole CompletionTrue openholeSlotted or preperforated liner/casingSegmented uncemented liner/casing

Cased and Cemented CompletionPremium completionLiner/casing run to end of horizontal and cemented in place

Page 23: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Slotted Liner in Open Horizontal Hole

PACKER

LINER HANGER

Slotted Liner

• Used worldwide

• Prevents hole collapse

• Eases re-entry

• Total lack of zone isolation options

• Do not use where water breakthrough is anticipated

• Do not use where stimulation is required

Page 24: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Cemented ConventionalPACKER

LINER HANGER

CEMENT

North Sea EuropeFar East Alaska

• Conventional completion turned horizontal

• All zone isolation & flow control options

• High expense

• Loss of productivity. Formation damage from cement. Perforation damagePERFORATIONS

Page 25: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

4 1/2” tubing

Packer SC-1LRSeal borereceptacle

Bull plug

0.040” slotted liner0.012” pre-packedslim pak screens

West Africa - Horizontal Well

Page 26: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

West Africa - ECP with Slotted Liner

5 1/2” TR-SSSV

5 1/2” Tubing

Side Pocket Mandrel(Gaslift) 4 1/2” Tubing

SPM (Circulation)

Permanent gauges

ELTSR

9 5/8” Packer (ca 60°)

9 5/8” Shoe (90°)8 1/2” Lateral drainage hole: 2000 - 3000 Ft.

External Casing Packer

Page 27: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

IT 4447485

Page 28: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Considerations

Type of formationHomogeneousHeterogeneousNaturally Fractured

Type of wellOil or gasNear oil/gas contact or oil/water contact

Page 29: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Homogeneous Formation

Easy to accommodate completion designGenerally requires little isolation of zonal segmentsWell adapted to openhole completion if reservoir is competent

Page 30: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Heterogeneous Formation

Reservoir quality and pressure can vary of horizontal lengthMay require “segments” be isolated to accommodate selective stimulationDepending on permeability, some sections may require little or significant stimulationCemented and perforated or segmented uncemented liner completion appropriate

Page 31: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Naturally Fractured Reservoir

Must pick proper wellbore orientationDesire to intersect the maximum number of fractures by drilling perpendicular to the fracture orientationMust leave fractures in an undamaged stateBest suited for openhole or preperforated liner completion

Page 32: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Naturally Fractured Reservoir

If fracture density is low, then well may not be economical without massive stimulationCased and cemented completion will allow hydraulic fracture treatment to attempt to create fractures perpendicular to the wellbore

Page 33: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Oil and Gas Wells

Stimulation requirements dictate best well completion approachCan you obtain suitable stimulation with the casing completion configuration?Small acid treatments may be accomplished in an openholeor uncemented liner completionLarge hydraulic fracture treatment will generally require cased and cemented completion

Page 34: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Gas/Oil or Oil/Water Contacts

Need the ability to perform remedial actions in the horizontal sectionMay require the ability to provide zonal isolationSelective isolation ability is a major benefit in the completiondesign

External casing packers (ECP)New “sliding sleeve” or ported liners

Page 35: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

TVD

Leg “B”Azimuth 197°

Leg “A”Azimuth 48°

KOP = 1040 m

KOP = 1054 m

MD = 1435 mDev = 90.6°TVD = 1102

MD = 1421 mDev = 89.3°TVD = 1106

Open Hole 6 1/8” Open Hole 6 1/8”Casing 3 1/2”

CASING 7” - N80

240 m 311m

- South America

Page 36: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Well Planning- Drivers

An “Effective” Well is that Well which contributes maximum monetary value over its life cycle.Key Drivers

Optimize well costsOptimize well productivityOptimize life-cycle operating expense

Page 37: 01-Reservoir 02-Well Completion Methods

Copyright 2008, NExT, All rights reserved

Summary

You should now be able to:List typical and describe completion techniques for vertical, deviated and horizontal wellsList advantages and disadvantages for the completion techniquesDescribe typical completion procedures