    Preventive Maintenance (PM)Procedure

    Effective date: Date

    Contents copyrighted GMP-ONLINE-CONSULTANCY.COMReproduction, photocopying, storage or transmission by magnetic or electronic means strictly prohibited. Authorization to photocopyitems for internal or personal use is granted by GMP-Online-Consultancy. Violation of copyright will result in legal action, including civiland/or criminal penalties, and suspension of service.

    The Engineering Technician or designee assures that PreventiveMaintenance work is done according to the Preventive Maintenance Programand is completed by their due dates. If Preventive Maintenance work is notpossible the Engineering Technician or designee must inform the EngineeringHead or designee and the Quality Assurance for supervision.

    The Engineering Technician or designee reviews the Preventive Maintenancedocumentation for:

    Completeness

    AccuracyGood Documentation Practice

    The Engineering Technician or designee supports the Engineering head ordesignee by creating periodically maintenance trending reports.

    4.3 Quality Assurance The Quality Assurance (QA) Manager approves the Preventive Maintenance

    Program and planned Preventive Maintenance schedule. The Quality Assurance Manager must audit the Preventive Maintenance

    Program and work including the corresponding documentation and raw dataregularly in the frame of the self inspection program at least once every 12

    months.This includes but is not limited to:

    Completeness Accuracy cGMP compliance Good Documentation Practice

    Quality Assurance always needs to agree in case of skipping a PreventiveMaintenance work altogether (skip the Work Order) and rescheduling the work at anew date. The decision must be justified and documented cross-referencing the

    Work Order number.

    5. Procedure

    5.1 Generate Preventive maintenance work orderEngineering head or designee is responsible for issuing the planned maintenanceaccording the maintenance schedule. He/she releases the Preventive MaintenanceWork Order from the PM System and schedules the PM in the production plan.If the Work Order does not require plant/equipment shutdown, or will have nooperational impact, the Engineering Head or designee schedules the PM accordingto the availability of engineering technician resources. He/she allocates the

    engineering resources to the work orders and generates (prints) work orders out ofthe PM system.