01. EDG Emergency Diesel Generators Kashagan Project | Kazakhstan
Skema’S modular SubStationS can be used for a wide variety of applications including lv/Mv/hv packaged substa-tions, local equipMent rooMs, con-trol rooMs, generator power plant rooMs, personnel refuges and as general process or utility buildings. they are fully aSSembled and rigor-ously teSted within Skema facilitieS before being shipped to site, by land, sea or air, ready for rapid inStalla-tion and commiSSioning.
02. Local equipment room – Fabrication yard | Ravenna Italy
02.
0706
03. Modular substations Karachaganak Project | Kazakhstan
04. Process utility buildings Fabrication yard | Atyrau Kazakhstan
05. Modular substation Hannibal Sour Gas Project | Tunisia
06. Local equipment rooms Fabrication yard | Ravenna Italy
03.
05.
04.
06.
0908
the modular SubStationS
07.
09.
08.
10.
OnE OF THE MOST IMPORTAnT
AnD DISTIncTIvE FEATuRES OF
SKEMA’S MODuLAR SubSTATIOnS
IS THE OPPORTunITy THEy AFFORD
TO cREATE A unIquE AnD FuLLy
cuSTOMIZAbLE SOLuTIOn, In Ac-
cORDAncE wITH EAcH cLIEnT’S
InDIvIDuAL SPEcIFIcATIOnS, THE
EnvIROnMEnTAL REquIREMEnTS,
THE EnvIROnMEnTAL cOnDITIOnS
AnD THE PROjEcT-SPEcIFIc TRAnS-
PORT SPORT SIZE LIMITATIOnS.
Skema’s Modular Substations can
be designed with fire ratings as
per the client’s requirements, and
with the capacity to withstand both
seismic and blast events. They are
suitable for ambient temperatures of
between -40°c and +50°c, resist-
ant to harsh environmental condi-
tions and supplied with special paint
coating cycles that are appropri-
ate for each specific application.
Skema’s Modular Substations are
space-efficient, highly reliable and
fully integrated, and equipped with
the latest state-of-the-art technol-
ogy for Oil & Gas applications. They
are designed to work safely in harsh,
potentially explosive and chemically
contaminated environments, and are
intended for both onshore and off-
shore Oil & Gas / petrochemical plants.
A modular approach is key to creat-
ing large-scale structures, taking due
account of the transit constraints or
any potentially problematic conditions
(weight limits, road or railway transport,
presence of nearby structures, etc.).
turnkey SolutionS
During the project, Skema acts as an
EPc contractor, managing, co-ordinat-
ing and monitoring every aspect of the
project: detailed design, project man-
agement, scheduling, procurement
and expediting, qA/HSE manage-
ment, documentation, fabrication, all
multidisciplinary installation activities
(architectural, mechanical, E&I, HvAc,
etc.), and testing and pre-commis-
sioning at Skema’s fabrication yards.
In addition, Skema can transport
the equipment onto seagoing ves-
sels, and can also provide trans-
portation to site and full installation
and commissioning, as well as op-
erational support and maintenance
for the life cycle of the installation.
1110
07. HvAc and monitoring room Kashagan Project | Kazakhstan
08. Modular substations Kashagan Project | Kazakhstan
09. Modular substation Hannibal Sour Gas Project | Tunisia
10. Switchroom Kashagan Project | Kazakhstan
1312
11. Modular substation Kashagan Project | Kazakhstan
12. Modular substation Karachaganak Project | Kazakhstan
13. Fabrication yard Atyrau Kazakhstan
14. Fabrication yard Atyrau Kazakhstan
11.
13.
12.
14.
the SyStemS within
SKEMA’S MODuLAR SubSTA-
TIOnS AFFORD THE OPPORTunITy
TO cREATE A cOMPLETE AnD FuL-
Ly cuSTOMIZAbLE SubSTATIOn
ALLOwInG FOR Any InTERnAL
cOnFIGuRATIOn OF THE SwITcH-
GEAR TO bE InSTALLED. SuITAbIL-
ITy FOR THE SPEcIFIc cOnDITIOnS
OF SERvIcE IS ALSO ASSuRED.
In order to support the primary inter-
nal equipment (Lv/Mv/Hv switchgear
or DcS) the following typical systems
are supplied:
Insulation for energy conservation, >
using non-combustible materials
with type-tested fire resistance
(fire-resistant up to 120 minutes)
Special painting cycles and inter- >
nal anti-skid floors
Heating ventilation and Air condi- >
tioning (HvAc) system engineered
to guarantee the ambient operat-
ing conditions
Pressurization system including air- >
filtering systems for contaminants
and toxic or corrosive substances
Gas, smoke, heat and fire detec- >
tion system, conventional or ad-
dressable, with monitoring panels
that can interface with DcS and
field control systems
Transformer bay or equipped >
rooms
Security, IT and Telecoms in- >
cluding PA/GA system to allow
personnel to monitor and control
normal activities
coating systems and corrosion pro- >
tection for rust prevention even in
extremely corrosive hot/humid en-
vironments subject to the presence
of dust, salt and corrosive gasses
Lighting and small power distri- >
bution system
Equipment rated for hazardous >
areas as per the AtEx 94/9/Ec
directive
Automatic fire-fighting systems: >
total flooding, clean agent, envi-
ronmentally friendly
Emergency Diesel Generators >
battery and uninterruptible Power >
Supply (uPS system)
15.
18.
16. 17.
19.
1514
15. Switchroom Hannibal Sour Gas Project | Tunisia
16. PSA 1 “complex D” HvAc and monitoring room Kashagan Project | Kazakhstan
17. LSA “complex D” HvAc and monitoring room Kashagan Project | Kazakhstan
18. LSA IbEEv utility shelter “complex D” control room and HvAc room Kashagan Project | Kazakhstan
19. LSA IbEEv utility shelter “complex D” control room and HvAc room Kashagan Project | Kazakhstan
20.
22.
21.
23.
deSign, engineering and 3d
SKEMA uTILIZES A cOMPREHEnSIvE
cOMPuTER-bASED DESIGn SyS-
TEM DEDIcATED TO cARRyInG OuT
EnGInEERInG cALcuLATIOnS RELAT-
InG TO STRucTuRES, LIFTInG AnD
LOADOuT.
The system makes it possible to con-
duct three-dimensional analysis of
building structures, space optimiza-
tion, clash avoidance and safety tol-
erances; to study static and dynamic
loads for lifting, transportation, blast
and seismic loads; to create innova-
tive designs and building components.
A complete 3D model of the building
can be created by Skema’s special-
ists during the engineering phase.
The model features all of the systems
and auxiliaries, and is used for the
following purposes:
To avoid clashes between every- >
thing that is to be installed with-
in the building
To optimize space and cable routing >
To determine the installation >
sequence for each system
To verify the required space for >
the installation and the removal of
major pieces of equipment
To verify expansion potential >
(free space for installation of fu-
ture equipment, or equipment in-
stalled by others)
1716
20. Process utility building
21. Lv and Mv modular substation
22. clashes investigation
23. Skidded drilling center
load out and tranSportation
THE KnOw-HOw IT HAS AcquIRED
OvER MAny yEARS OF AccuMu-
LATED ExPERIEncE, ASSEMbLInG
STRucTuRES OF DIFFEREnT DIMEn-
SIOnS AnD wEIGHTS, HAS ALLOwED
SKEMA TO DEvELOP SKILLS AnD Ex-
PERTISE In RELATIOn TO vARIOuS
TyPES OF LIFTInG, HAnDLInG AnD
TRAnSPORTATIOn OPERATIOnS.
Skema’s Engineering team is accus-
tomed to dealing with the problems
of international shipping, documenta-
tion and certificates, custom duties or
special requirements for each type of
transport such as:
Road transportation >
barge or ship >
Airfreight >
Rail transport. >
Skema can deal with SPMT han-
dling, lifting and transport opera-
tions under exceptional conditions,
as well as barge dressing and setting.
Skema can also provide the follow-
ing additional engineering services
for load out and transport: grillage
and sea-fastening calculations,
ballasting calculations, mooring
details, sea transport analysis and
load out manuals, offshore lifting
calculations, handling temporary
equipment, dimensioning and lift-
ing, checking of lugs/spreader bars,
general arrangements and details of
temporary structures for transport.
24.
26.
25.
27.
24. Lifting operations of local equipment rooms Fabrication yard | Ravenna Italy
25. Air cargo transport of packaged substation Kashagan Project | Kazakhstan
26. barge transport of local equipment rooms Kashagan Project | Kazakhstan
27. Handling operations of local equipment rooms Fabrication yard | Ravenna Italy
1918
technical data
enVironmental conditionS
operating temperatures -40°c ÷ +50°c
relative humidity up to 95%
climate range Hot desert climate ÷ cold arctic climate
wind velocity up to 40 m/s (140 km/h, cyclonic wind)
Snow loads up to 1 meter of snow
Seismic loads (pga) Specific to site, up to 0.18 g
hazardous areas (atex) customizable also for installation in Zone 1
building conStruction
air tightness weatherproofing
<< 0.25 m3/h/m2 @ 50 PaOn request, continuously welded construction
ambient overpressure Adjustable up to 150 Pa
insulation u-value < 0.5 w/m2/K
ingress degree of protection for enclosures up to IP65
fire resistance (offshore) A, H, b constructions with up to 120 minutes’ fire resistance as per IMO SOLAS - Type-tested in compliance with FTP code
Structural fireproofing (offshore) jetfire j15
blast-resistance building design Low damage up to 2.5 bar peak overpressure (capability for lab testing of blast barriers)
rust and corrosion protection Zinc-rich painting cycle with 275 μm dry coatHot dip galvanizing - Tropicalization
winterization Heat tracing - Space heaters
noise and vibration-35 db acoustic insertion lossAnti-vibration mountings on rotating or vibrating parts for mitigation at source.
iaQ (indoor air Quality) Dust and particle filtration customized up to HEPA filtering classup to G1 air-purity class as per ISA s71.04
Sil class (Safety integrity level) Available SIL2 for safety equipment
2120
© Skema Milan - Italy
www.skemaq.it