1
OMB’s Super-CircularUnderstanding and Complying with the
New OMB Administrative Requirements,Cost Principles, and Audits Requirements
for Grants and Other Agreements
Charles W. HesterCPA, FCPA, CFF, CFE, CGFM, ICFP
1
This course will attempt to cover:
• The Federal shift from compliance to performance
• New focus on risk
• New time and effort certification
• New rules on procurement
• Written controls on cash management and allowability
• New rules on travel, meals, and conferences
• New controls on computers
• Conflicts/fraud/gratuity rules
• New rules on audits of Non-federal recipients
• Changes to close-out/management decisions
2
2
We will also try to cover:
• Developing and negotiating cost allocation plans & indirect cost rates
• Effective Sub-recipient monitoring
• Successfully applications for grants and agreements
• OMB, GAO & COFAR plans for the future
3
4
3
Super-Circular – a chronology• February 28, 2012: OMB advance notice of
proposed guidance
• February 1, 2013: OMB notice of proposed guidance
• December 26, 2013: OMB issuance of uniform guidance
• December 26, 2014: Super-Circular implementation
– Administrative rules and cost principles for grant years starting after December 25, 2014
– Single Audits for fiscal years starting after December 25, 20145
Super-Circular• Title 2 CFR – Grants and Agreements
– Subtitle A – Office of Management and Budget Guidance for Grants and Agreements
• Chapter 1 – Office of Management and Budget Government-wide Guidance for Grants and Agreements (§1 – §199)
• Chapter II – Office of Management and Budget Circulars and Guidance (§200 – §299)
– Subtitle B – Federal Agency Regulations for Grants and Agreements (§300 – §5999)• Chapters III (DHHS) through LIX (Gulf Coast Ecosystem
Restoration Council)
6
4
2 CFR Part 1 – About Title 2 and Subtitle A
• Subpart A – Introduction to Title 2 of the CFR (§1.100 – §1.110)
• Subpart B – Introduction to Subtitle A §1.200 – §1.1.230)
• Subpart C – Responsibilities of OMB and Federal Agencies (§1.300 – §1.305)
7
2 CFR Chapter 1
• Parts 2 – 24 = Reserved
• Part 25 = Universal Identifier and System of Award Management
• Parts 26 – 169 = Reserved
• Part 170 – Reporting Sub-award and Executive Compensation Information
• Parts 171 – 174 = Reserved
• Part 175 = Award Terms for Trafficking in Persons
• Part 176 = Award Terms for Assistance Agreements That Include Funds Under the American Recovery and Reinvestment Act of 2009 (P.L. 111-5)
8
5
2 CFR Chapter 1 (Continued)
• Parts 177 – 179 = Reserved
• Part 180 = OMB Guidelines to Agencies on Government-wide Debarment and Suspension (Non-procurement)
• Part 181 = Reserved
• Part 182 = Government-wide Requirements for Drug-Free Workplace (Financial Assistance)
• Parts 183 – 199 = Reserved
9
The Super-Circular2 C.F.R. Part 200
• Subpart A – Acronyms and Definitions (§200.0 –§200.99)
• Subpart B – General Provisions (§200.100 – §200.113)
• Subpart C – Pre-Federal Award Requirements and Contents of Federal Awards (§200.200 – §200.212)
• Subpart D – Post Federal Awards Requirements (§200.300 – §200.345)
• Subpart E – Cost Principles (§200.400 – §200.475)
• Subpart F – Audit Requirements (§200.500 – §200.521)
• Appendix I through XI
10
6
Appendices in the Super-Circular
• I – Full text of notice of funding opportunity
• II - Contract Provisions for Non-federal Entity Contracts Under Federal Awards
• III - Indirect (F&A) Costs Identification and Assignment, and Rate Determination for Institutions of Higher Education (IHEs)
• IV - Indirect (F&A) Costs Identification and Assignment, and Rate Determination for Non-profit Organizations
11
More Appendices
• V - State/Local Government and Indian Tribe-Wide Central Service Cost Allocation Plans
• VI - Public Assistance Cost Allocation Plans
• VII - States and Local Government and Indian Tribe Indirect Cost Proposals
12
7
Still more Appendices
• VII – Non-profit Organizations Exempted From Subpart E, Cost Principles of Part 200
• IX - Hospital Cost Principles
• X - Data Collection Form (Form SF–SAC)
• XI – Compliance Supplement
• XII – Award Terms and Conditions for Recipient Integrity and Performance Matters (NEW)
13
Final guidance covers all aspects of Federal Government grants
• Administrative rules
• Cost principles
• Single Audit requirements
• Issued December 26, 2013 (Merry Christmas or Baa Humbug!)
• Becomes effective December 26, 2014
• Federal Government Departments/Agencies must issue any needed implementing regulations to meet that deadline
14
8
Supersedes many OMB Circulars
• Administrative Rules– A-102
– A-110 (2 CFR 215)
• Cost Principles– A-21 (2 CFR 220)
– A-87 (2 CFR 225)
– A-122 (2CFR 230)
• Other• A-50 (Audit follow up on Single Audits)
• A-89 (Catalog of Federal Government Domestic Assistance)
• A-133 (Single Audit Requirements)15
Intended to streamline grant rules
• Eliminate duplicative and conflicting guidance
• Focus on performance over compliance
• Encourage efficient use of IT
• More consistent treatment of costs
• Limit costs to best use Federal Government resources
• Strengthen oversight
• Target audits to risk of fraud, waste, and abuse
16
9
OMB’s Super-CircularUnderstanding and Complying with the
New Administrative Requirementsfor Grants and Other Agreements
Charles W. HesterCPA, FCPA, CFF, CFE, CGFM, ICFP
17
Subpart A: Acronyms and Definitions
• Acronyms are all in §200.0– Lots of acronyms (45)
• Definitions in §200.1 to §200.99– Lots of definitions
18
10
Subpart B: General Provisions (§200.100 – §200.113)
• Rules flow down to sub-recipients • Federal agencies cannot impose additional or
conflicting provisions• Table shows which requirements relate to
which grant types• Federal agencies must establish conflict-of-
interest policies on awards• Recipients must disclose all illegal acts to
Federal Government in writing (Appendix XII)
19
Subpart C: Pre-award Requirements (§200.200 – §200.212)
• Federal Government and pass-through entities must use Federal Grant and Cooperative Agreement Act (FGCA) to determine appropriate award instrument
• Agencies can make fixed-amount awards, but shouldn’t permit profit
• Pass-through entities that have prior approval, can make fixed-amount sub-awards
20
11
Public Notice
• Federal agencies must include programs in CFDA
• Must provide specific information to GSA
• Provide public notice of all competitive grant opportunities
21
Federal agency review of competitive applications
• Must have a merit review process that is described in public notice
• Agency must consider risk posed by grant applicants before making award
• Agency or pass-through agency may impose additional restrictions for “high-risk” grantees
• Agency must publicize all grant awards
22
12
Subpart D – Post-award Requirements
• Standards for Financial and Program Management (§200.300 – §200.309)
• Property Standards (§200.310 – §200.316)
• Procurement Standards (§200.317 –§200.326)
• Performance and Financial Monitoring and Reporting (§200.327 – §200.329)
• Sub-recipient Monitoring and Management (§200.330 – §200.332)
23
Subpart D – Post-award Requirements
• Record Retention and Access (§200.333 –§200.337)
• Remedies for Non-Compliance (§200.338 –§200.342)
• Closeout (§200.343)
• Post-Closeout Adjustments and Continuing Responsibilities (§200.344)
• Collection of Amounts Due (§200.345)24
13
Subpart D – Post-award Requirements
• Cover financial management and program management
• Must administer grants in accordance with National Priority Requirements (public welfare, anti-discrimination, environment, etc.)
• Agency must require financial and performance reporting in accordance with OMB standards
25
Financial Management Rules
• States follow their own procedures
• Financial management systems of allentities:
– Must allow for required reports
– Must permit tracing of funds to be sure they were spent in accordance with the rules
26
14
Financial Management Rules (continued)
• Show all Federal funds received and expended
• Accurate, current, and complete accounting information
• Records show fund source and application
• Adequate internal controls
• Comparison of budget vs. expenditures
• Written procedures dealing with advance payments and allowability of costs
27
Internal Controls
• Reasonable assurance that grant programs are in compliance
– Follow GAO internal control standards
– Follow COSO internal control framework
• Take prompt action when non-compliance identified
• Reasonable measures to protect Personally Identifiable Information (PII)
28
15
Payments (advance funding)
• States are covered by CMIA
• Other entities must minimize the time for advance funding
• Advancing funds is the norm
• Advance payments should be consolidated
• Grantees can request funds as frequently as they want with EFT
• Otherwise can request funds at least monthly
29
Other Rules on Payments
• If entity does not qualify for advance funding, reimbursement is first choice
• If entity doesn’t have financial resources for reimbursement, Federal Government can provide advance of working capital
• Agencies cannot withhold any funds unless:– Grantee has violated requirements
– Grantee is delinquent on Federal debt
30
16
Depository Accounts for Advanced Funds
• Federal Government cannot require separate bank accounts
• Funds must be kept in insured accounts
• Use interest bearing accounts, unless:– Grantee receives <$120,000 per year
– Account not expected to earn >$500 per year
– Minimum balance requirements not feasible
• Grantee can keep first $500 of interest
• Additional interest should be remitted to HHS31
Cost Sharing/Matching
• Not required
• Voluntary committed matching is not expected, and can’t be used as a factor in the award decision
• Criteria for considering voluntary matching must be described in notice of funding opportunity
32
17
Cost sharing must be accepted when it is:
• Verifiable from the entity’s records
• Not charged to, or used as cost sharing on, another award
• Necessary, reasonable, and allowable
• Included in the approved award budget
Unrecovered indirect costs can be claimed as cost sharing only with
the agency’s approval33
Valuing Third Party Contributions
• For real property donated as direct cost, lesser of:
– Book value at time of donation
– Current FMV
• Use FMV for equipment
• Volunteer time should be valued at usual rates
• Employee time donated by third parties valued at usual rates, including fringe benefits
34
18
Program Income
• Grantees encouraged to earn program income
• Grantee governmental revenues are not considered program income
• Agency may approve offsetting income with costs
• Revenue from selling property is not program income
35
Use of Program Income
• Deductive method
• Additive method
• Cost sharing
• Default methods– For most grants, use deductive method
– For IHE’s and non-profit research institutions, use additive method
• No obligation after the grant period
36
19
Budget revisions needing approval –Non-construction Grants
• Change in scope or objectives
• Change or significant reduction of time of a key person (PI or PD)
• Transfer out of participant support costs
• Change in cost-sharing
• Switch between construction and non-construction
• For grants >$150,000 then transfers >10% of total award
37
Budget revisions needing approval – Construction Grants
• Change in scope or objectives
• Need for additional funds
• Need for costs requiring prior approval
No other restrictions on budget revisions can be
placed on construction or non-construction grants
38
20
Property Standards• Same insurance for property acquired under
Federal award
• Real property
• Title vests in grantee– Use for original purpose as long as needed
– When no longer needed, Federal Government decide:• Keep and reimburse Federal Government
• Sell and reimburse Federal Government
• Give to Federal Government and get reimbursed
39
Federal Government-Owned Property
• Federal Government retain title
• Entities submit annual report of Federal-owned property in the their custody
• When no longer needed, report to the Federal Government
• If agency doesn’t need it any more, they declares it excess
– May be able to donate research equipment to educational/research institution
• “Exempt” property: acquired under award and Federal Government decided to give it to entity
40
21
Supplies
• Title vests with grantee
• If FMV at end of project <$5,000 then no further obligation to the Federal Government
41
Equipment• Title vests in grantee, but cannot encumber the
property
• Use until project ends or need for it ends
• States manage equipment under their rules
• Others: when equipment is no longer needed, can be used on other Federal Government programs
• For disposition, if FMV is over $5,000 per unit, then treat like real property
• If FMV <$5,000 per unit no accountability42
22
Intangible Property
• Title vests with grantee
• Cannot encumber it without approval from Federal Government
• For disposition, treat like equipment
• Federal Government have a royalty-free, non-exclusive right to use, and can authorize others
• For research data, FOIA may apply
43
Procurement• States follow their own rules
• All entities must incorporate required contract provisions
• Non-state entities have extra requirements– Use their own procedures
– Have conflict-of-interest rules, including organizational conflicts-of-interest
– Deal with only responsive/responsible contractors
– Ensure full and open competition• No geographical preferences
44
23
Additional Rules for Non-state Agencies
• Simple rules for micro-purchases – Usually <$3,000
– $2,000 if Davis-Bacon applies
• Small purchase procedures– For procurements <$150,000
– But organization must follow its own rules
• Large procurements require formal quotes
• Must have a cost or price analysis of any procurement >$150,000
45
Monitoring• Pass-through entity must monitor sub-
recipients
• Frequency of reporting– At least annually
– At most quarterly
• Use OMB approved reporting data
• Promptly report any known problems or favorable events
• Agency can make site visits as warranted46
24
Differentiate between Vendors/ Contractors and Sub-recipients
• Use the proper award instrument
• Impacts the amount of monitoring that is required
• Substance of agreement is more important than the form of the agreement
47
Factors indicative of aSub-recipient
• Determines eligibility (e.g., of beneficiaries)
• Performance measured against grant objectives
• Responsible for programmatic decision-making
• Required adherence to Federal grant rules
• Uses the funds to support its program as distinct from providing goods or services for a program of the “pass-through” entity
48
25
Factors indicative of a Vendor/Contractor
• Provides goods and services in normal course of business
• Provides similar goods/services to other customers
• Operates in a competitive environment
• Goods/services are ancillary to the Federal Government program
• Not subject to Federal assistance program rules
49
Requirements for Pass-through Entities
• Provide necessary information to sub-grantees
• Impose Federal Government regulations
• Evaluate each applicant for sub-grant for risk of non-compliance in order to determine appropriate monitoring
50
26
Indirect Cost Rate Requirementsfor Pass-through Entities
• Accept Federal Government negotiated rate, when applicable
• Negotiate an indirect cost rate using Federal cost principles
• Allow a minimal rate of 10% of modified total direct costs for entities that are unable to develop an indirect cost rate
– Entity cannot have had a negotiated rate in the past
– Not for some state and local governments
51
Records Retention• Generally 3 years from filing of financial
reports
• For real property and equipment, 3 years after disposition
• Many individual issues — all relating to 3 years
• Keep records if there is litigation, audit issue, etc.
52
27
Access to Records
• Agency, its Inspector General and GAO have access to all award-related records
• That requirement should be passed on to sub-recipients
• Includes timely and reasonable access to employees
• Access continues as long as records are retained
53
Remedies for Non-compliance
• Withhold cash payments
• Disallow costs claimed
• Wholly or partly terminate
• Initiate suspension and debarment
• Withhold future awards
• Other remedies that are legally available
54
28
Termination can be effected by:
• Agency, if grantee fails to perform
• Agency, with consent of grantee
• Grantee can terminate– If grantee wants to terminate in part, Federal
Government may decide to terminate entire project
• Termination must be in writing
• Obligations after termination are un-allowable
55
Close-out does not affect
• Federal Government right to disallow costs
• Obligation to make appropriate refunds
• Continuing responsibilities– Audit
– Property management
– Records retention
56
29
QUESTIONS!
Remember
E-mail me if you think of
anything later!
57
OMB’s Super-CircularUnderstanding and Complying with the
New Cost Principlesfor Grants and Other Agreements
Charles W. HesterCPA, FCPA, CFF, CFE, CGFM, ICFP
58
30
Subpart E: Cost Principles
• General Provisions (§200.400 –§200.401)
• Basic Considerations (§200.402 –§200.411)
• Direct and Indirect (F&A) Costs (§200.412– §200.415)
59
Subpart E: Cost Principles
• Special Considerations for State, Local Governments, and Indian Tribes (§200.416 – §200.417)
• Special Considerations for Institutions of Higher Education (§ 200.418 –§200.419)
• General Provisions for Selected Items of Cost (§ 200.420 – §200.475)
60
31
Subpart E: Cost Principles• Grantee is responsible for operating effectively
and efficiently• Grantee must follow the rules• Accounting practices must be in accordance
with the cost principles • For IHEs, recognize the dual role of students
as trainees and research workers• Federal Government can provide prior
approval for some costs ahead of time
61
To be allowable, costs must:• Be necessary and reasonable
• Be allocable
• Conform to the cost principles and award
• Be treated consistently• No double dipping• Be adequately documented
• Reduced by any applicable credits
• Conform to GAAP
62
32
Reasonableness
• Prudent person rule
• Ordinary and necessary
• Sound business practices
• Arms-length bargaining
• Use of established practices
63
Allocability
• Charges relate to benefits
• All activities are charged a fair share
• Cannot reallocate to avoid restrictions
• But can reallocate if costs are OK under either program
64
33
Conform to any limitations
• Program laws and regulations
• Specific grant provisions
• Cost principles
65
Consistent treatment
• Like costs in like circumstances are treated consistently
– Direct vs. indirect
– Federal Government vs. Non-federal Government
– Budgeted costs vs. un-budgeted costs
66
34
Not claimed twice
• All costs can be claimed only once
• They cannot be charged to two grants
• Cannot be charged to one grant and used as cost sharing on another
67
Adequate documentation• The regulations generally do not set forth
specific documentation standards
• However, they provide more guidance for salary and wages
• Otherwise, the reasonable person (auditor?) must decide
• Contemporaneous documentation is always more credible than documentation prepared after-the-fact
68
35
Total costs
• Include both direct and indirect
• No one rule for classification
• Must be consistent
Note how frequently consistency is cited
69
Direct costs• Identified with final cost objective. Examples
include:– Salaries of persons working on project
– Travel associated with the project
– Approved capital expenditures
• un-allowable costs must be allocated indirect costs if they:
– Include salaries
– Occupy space
– Benefit from the indirect costs70
36
Indirect costs
• Indirect costs are those having a common or joint purpose
• Not readily assignable
• Minor items can be classified as indirect, if treated consistently
• Allocation plan can be simple or complex
• Indirect costs may be limited by law
• The rules contain some special provisions for IHEs and State/Local governments
71
Facilities and Administrative costs• Major IHEs and non-profits must classify
their indirect costs as either facilities costs or administrative costs
• Facilities costs:– Depreciation on buildings and equipment
– Operations and maintenance expenses
• Administrative costs– General expenses
– Other indirect costs not included as facilities expenses
72
37
Selected items of cost• Lists 55 items (alphabetical order)
• Some items relate to just one type of grantee
• If a cost is not in the list, that doesn’t mean that it’s allowable or that it’s un-allowable
• In a conflict between the cost principles and the Federal award, the award takes precedence
• We will cover items that have changed or that sometimes create problems
73
Some costs are almostalways un-allowable
• Alcoholic beverages
• Uncollectible debts
• Contingency reserves
• Contributions
• Entertainment and employee morale
• Fund raising
• Goods or services for personal use
• Under-recovery on other Federal grants
• Use allowances74
38
Salaries and Wages(Compensation for personal services)
• Salary must be reasonable
• There may be limits on total salary rate
• Reasonable incentive compensation is permissible
• Many special provisions for IHEs
75
Documentation requirements
• Rules are more flexible
• Charges must be supported by:– System of internal controls
– In official records of entity
– Reflect total compensated activity
– Include Federal Government and Non-federal activity
– Comply with entity’s accounting policies
• Special, more flexible rules for IHEs
76
39
Using budget estimatesfor salary allocations
• Use for interim accounting purposes, if– System produces reasonable estimates
– Timely recording of significant changes• Short-term fluctuations can be ignored
– Internal control system compares actuals with budgets
Cost sharing should be supported the same as direct charges
77
Fringe benefits include time not worked
• Fringe benefits must be based on law, agreement, or established policy
• Can use cash basis (charge leave when it is taken)
• Can accrue leave costs
• When employment terminates, payments for leave are indirect costs
78
40
Pension plan costs
• Pension accruals– Must conform to GAAP
– Must be funded within 6 months of year end
• “Golden parachutes” are prohibited
79
Legal defense costs
• All related costs are un-allowable if:– Organization is defending criminal, civil, or
administrative charges, and
– Organization loses or agrees with a compromise disposition
• Lots of detailed rules which should be consulted in the event of criminal or civil suits
80
41
General governmental costs prohibited for State and Local Governments
• General governmental costs include:– Governor, State Legislature, Judiciary, etc.
– General public support (e.g., police and fire)
• For Councils of Government and Tribes:– CEO direct costs are OK
– 50% of such costs can be included in indirect cost rate without documentation
• Agency may approve the travel costs of general government employees if they are related to a specific award
81
Idle facilities and idle capacity
• Idle facilities are unused, in excess of current needs
– Generally un-allowable, but OK if needed for workload fluctuations
– If the need for the facilities has been reduced because of changed circumstances, costs are OK for up to one year
• Reasonable idle capacity is OK
82
42
Interest• Generally un-allowable
• Building related interest OK:– for State and Local Governments, after October 1, 1980
• For land, after September 1, 1995
– For IHEs, after September 23, 1982
– For non-profits, September 29, 1995
• For all equipment related interest is OK
• For fiscal years starting after December 31, 2015, interest related to acquiring intangible assets is OK
83
Lobbying
• Costs to improperly influence Federal Executive Branch employee regarding a grant or regulation are un-allowable
• For IHEs and non-profits:– Attempts to influence any election, referendum,
Federal or state legislation are un-allowable
– OK to factually respond to legislative requests
– OK to try to reduce costs or otherwise assist Federal grant
84
43
Costs of memberships
• Professional, technical associations, and publications are OK
• Civic or community organizations are OK, with approval
• Country clubs or social clubs are un-allowable
• Organizations whose primary purpose is lobbying are un-allowable
85
Rental costs
• Generally OK
• Only cost of ownership allowed if:– Sale and leaseback arrangement, or
– Less-than-arms-length lease
• If GAAP requires treatment as capital lease– No more than maximum allowable if item was
purchased at time of lease
– Interest calculation based on rules in effect at theoretical purchase date
86
44
Taxes
• OK if legally required to pay
• For State and Local Governments, taxes are not OK if:
– They are self-assessed, and
– They have a disproportionate effect on Federal programs
87
Travel
• Generally OK
• Must conform to grantee’s policies
• First or business class is un-allowable
• If no policy, use Federal rules
• Costs limited to commercial rates
• Direct foreign travel must be approved in advance
88
45
QUESTIONS!
Remember
E-mail me if you think of
anything later!
89
OMB’s Super-CircularUnderstanding and Complying with the
New Audits Requirementsfor Grants and Other Agreements
Charles W. HesterCPA, FCPA, CFF, CFE, CGFM, ICFP
90
46
Subpart F: Single Audit Requirements
• General (§200.500)
• Audits (§200.501 – §200.507)
• Auditees (§200.508 – §200. 512)
• Federal Agencies (§200.513)
• Auditors (§200.514 – §200.520)
• Management Decisions (§200.521)
91
Subpart F: Single Audit Requirements
• A Non-federal entity that expends $750,000 in Federal funds in a fiscal year must have a Single Audit or program-specific audit
• No Single Audit required if entity is below the threshold
• Federal funds do not include procurements
• Pass-through entities responsible for adequate review of sub-recipients
92
47
Other audits must buildupon the Single Audit
• Single Audit substitutes for other audit requirements
• GAO & OIGs must consider Single Audit and build upon it for their additional audits
• No restriction on GAO & OIGs from conducting audits
– Federal Government must pay for them
• 2014 Compliance Supplement will contain a list of available program-specific audit guides
93
Auditee responsibilities
• Procure the Single Audit
• Prepare financial statements
• Follow up and correct findings
• Provide the auditor with all necessary access to information
• Prepare Schedule of Expenditures of Federal Government Awards (SEFA)
94
48
Auditor selection• Use normal procurement processes
• Objective is to obtain high quality audit
• Must obtain the auditor’s peer review report
• Consider experience, availability of staff, etc.
• Try for affirmative action
• Auditor who prepares indirect cost rate proposal for entity that receives over $1 million in indirect costs cannot perform the audit
95
Audit submission and follow-up
• Auditee must prepare schedule of prior findings
• Prepare corrective action plan for current findings
– Show the status of findings
– Can drop corrected findings
• Auditee must submit reporting package
96
49
Federal agency may act as cognizant agency or oversight agency for audits
• Cognizant: auditees receive >$50 million– Provide technical audit advice, coordinate
audits, etc.
– Obtain or conduct quality control reviews of selected audits
– Coordinate resolution of cross-cutting findings
• Otherwise oversight agency– May assume the responsibilities of a cognizant
agency
97
Auditor requirements
• Comply with GAGAS
• Cover the entire entity
• Cover the financial statements and SEFA
• Cover internal control
• Cover compliance & performance
• Follow up on prior findings
• Auditor must complete and sign parts of the Data Collection Form
98
50
Reporting requirements
• Opinion on financial statements and SEFA
• Report on internal control over financial reporting and grant compliance
– Show scope of testing and results
• Compliance for each major program
• Schedule of findings and questioned costs
• Material weaknesses and significant deficiencies
99
Audit findings• Known or likely questioned costs >$25,000 for
major programs– Provide information to help judge the prevalence
and consequences of the questioned costs
• Known questioned costs >$25,000 for non-major programs
• Explain any qualification of opinion on major programs
• Known or likely fraud
• Sufficient detail for a corrective action plan100
51
More requirements for audit findings• Information about the programs
• Criteria and condition
• Statement of cause that can serve as a basis for recommendations
• Possible effect to enable agency or pass-through entity to facilitate prompt corrective action
• How the questioned costs were computed
• Whether the sample was statistically valid101
Major program determination
• Step one is identify the Type A programs (large dollar programs)
• Inclusion of large loan programs should not exclude other programs as Type A
• For most entities, Type A programs are larger of $750,000 or 3% of total Federal funds expended
102
52
Step two• Identify “Type A” programs that are low
risk by applying risk factors contained in §200.519 and determining that programs have:
– Been audited as major in one of the last two years
– No material weaknesses in internal control
– No modified opinion on compliance
– Questioned costs of less than 5% of funds expended in the program
103
Step three
• Identify “Type B” programs that are “high risk” by applying criteria contained in §200.519 but:
– Limit the number of Type B programs on which to assess risk to ¼ the number of Type A programs and
– Use an approach which provides that different Type B programs are audited as major over time
104
53
Step four
• Determine and audit as major programs:– All Type A programs not determined to be low
risk
– All Type B programs determined to be high risk
– Any additional needed to comply with the “percentage of coverage” rule
105
Percentage of Coverage Rule
• Current– For normal auditees, 50% of the Federal funds
expended– For low risk auditees, 25% of the Federal funds
expended
• Future (§200.518(f))– For normal auditees, 40% of the Federal funds
expended– For low risk auditees, 20% of the Federal funds
expended
106
54
Criteria to Be a “Low Risk” Auditee
• Audits completed annually and reporting packages submitted on time
• Unmodified opinions on financial statements and Schedule of Expenditures of Federal Awards
• No material weaknesses in internal control
• No doubt about ability to continue as a “going concern”
107
Low-risk criteria (continued)
• No findings in the past two audits related to:– Material weakness in internal controls over
major programs
– Modified opinion on major program compliance
– Known or likely questioned costs exceeding 5% of the total expended in a Type A program
108
55
Management Decision
• The decision must clearly state whether or not the finding is sustained, the reasons, and the expected action– Federal Agency
– Pass-through entity
– Time requirements
– Reference numbers
109
OMB’s Proposed changes to theCompliance Supplement
• Proposed guidance contained information on reducing the number of compliance issues to be tested
• Specific compliance issues not cited in the “Super-Circular”
• Will presumably show up in the 2016 Compliance Supplement
12/9/2015 110
56
OMB proposed six areas to be tested instead of fourteen
• Allowable activities and costs– Combines the first two issues in current
compliance Matrix
• Cash management
• Eligibility
• Reporting
• Sub-grantee monitoring
• Special tests12/9/2015 111
Seven areas would be dropped
• Davis-Bacon
• Equipment and real property management
• Matching, level of effort, and earmarking
• Period of availability of Federal funds
• Procurement and suspension and debarment
• Program income
• Real property acquisition and relocation assistance
12/9/2015 112
57
June 2015 Compliance Supplement
• Part 1 – Background, Purpose, and Applicability
• Part 2 – Matrix of Compliance Requirements
• Part 3 – Compliance Requirements
• Part 4 – Agency Program Requirements
• Part 5 – Clusters of Programs
• Part 6 – Internal Control
• Part 7 – Guidance for Auditing Programs Not Included in This Compliance Supplement
• Appendices
12/9/2015 113
Part 1 – Background, Purpose, and Applicability
• Effective for audits of fiscal years beginning after June 30, 2014
• Auditors shall consider the Supplement and laws, regulations and OMB Guidance in determining compliance requirements
• Auditors should not consider the Supplement to be a “safe harbor” for identifying audit procedures.
12/9/2015 114
58
Part 2 – Matrix of Compliance Requirements
12/9/2015 115
Part 3 – Compliance Requirements
A = Activities Allowed or Un-allowed B = Allowable Cost – Cost Principles
C = Cash Management D = Reserved
E = Eligibility F = Equipment and Real Property Management
G = Matching, Level of Effort, Earmarking
H = Period of Performance
I = Procurement and Suspension and Debarment
J = Program Income
K = Reserved L = Reporting
M = Sub-recipient Monitoring N = Special Tests and Provisions
12/9/2015 116
59
Part 4 – Agency Program Requirements
• For each Federal program (except R&D & SFA) included provides:
– Program Objectives and Program Procedures
– Information about compliance requirements specific to a program
– Other Information where it is considered useful• Example, when a program allows funds to be
transferred to another program
12/9/2015 117
Part 5 – Clusters of Programs
• As defined in 2 CFR §200.17 and §200.518– Research and Development (R&D)
– Student Financial Aid (SFA)
– Certain other programs designated by a State for Federal awards that the State provides to sub-recipients that meet the definition of “cluster of programs”
12/9/2015 118
60
Part 6 – Internal ControlIN 2013, THE COMMITTEE OF SPONSORING ORGANIZATIONS OF THE TREADWAY COMMISSION (COSO) UPDATED THE “INTERNAL CONTROL – INTEGRATED FRAMEWORK,” AND, IN SEPTEMBER 2014, THE GOVERNMENT ACCOUNTABILITY OFFICE (GAO) ISSUED AN UPDATED “STANDARDS FOR INTERNAL CONTROL IN THE FEDERAL GOVERNMENT,” COMMONLY REFERRED TO AS “THE GREEN BOOK.” DUE TO THE NEED TO UPDATE OTHER PARTS OF THIS SUPPLEMENT FOR THE UNIFORM GUIDANCE IN 2 CFR PART 200, OMB WAS UNABLE TO ALSO UPDATE PART 6 FOR THE REVISIONS TO COSO AND THE GREEN BOOK WITHOUT DELAYING THE ISSUANCE OF THIS SUPPLEMENT. SINCE THE 2014 VERSION OF PART 6 IS OUT OF DATE, IT WAS NOT CARRIED FORWARD TO THIS SUPPLEMENT. NON-FEDERAL ENTITIES AND THEIR AUDITORS SHOULD LOOK TO THE COSO AND GREEN BOOK FOR GUIDANCE ON INTERNAL CONTROLS UNTIL PART 6 IS UPDATED. OMB PLANS TO UPDATE PART 6 FOR THE 2016 COMPLIANCE SUPPLEMENT.
12/9/2015 119
COSO’s New 2013Internal Control Integrated Framework
• Has gained wide acceptance following financial control failures in the early 2000’s
• Most widely used framework in the US
• Also widely used around the world
61
12/9/2015 121
Key Concepts – Timeless
• A process
• Provides reasonable assurance
• Geared to Achievement of objectives related to– (1) operation,
– (2) compliance, and
– (3) reporting
• In a strategic planning - performance measurement setting
62
Project deliverable #1 – Internal Control-Integrated Framework (2013 Edition)
• Consists of three volumes:
– Executive Summary
– Framework and Appendices
– Illustrative Tools for Assessing Effectiveness of a System of Internal Control
• Sets out:
– Definition of internal control
– Categories of objectives
– Components and principles of internal control
– Requirements for effectiveness
Project deliverable #2 – Internal Control over External Financial Reporting: A Compendium....
• Illustrates approaches and examples of how principles are applied in preparing financial statements
• Considers changes in business and operating environments during past two decades
• Provides examples from a variety of entities – public, private, not-for-profit, and government
• Aligns with the updated Framework
12/9/2015 124
63
Summary of Updates
What was not changed... What was changed...
• Core definition of internal control
• Three categories of objectives and five components of internal control
• Each of the five components ofinternal control are required foreffective internal control
• Important role of judgment in designing, implementing and conducting internal control, and in assessing its effectiveness
• Changes in business and operatingenvironments considered
• Operations and reporting objectives expanded
• Fundamental concepts underlying five components articulated as principles
• Additional approaches and examples relevant to operations, compliance, and non-financial reporting objectives added
Update expected to increase ease of use and broaden application
Control Environment
Risk Assessment
Control Activities
Information & Communication
Monitoring Activities
Summary of UpdatesCodification of 17 principles embedded in the original Framework
1. Demonstrates commitment to integrity and ethical values2. Exercises oversight responsibility3. Establishes structure, authority and responsibility4. Demonstrates commitment to competence5. Enforces accountability
6. Specifies relevant objectives7. Identifies and analyzes risk8. Assesses fraud risk9. Identifies and analyzes significant change
10. Selects and develops control activities11. Selects and develops general controls over technology12. Deploys through policies and procedures
13. Uses relevant information14. Communicates internally15. Communicates externally
16. Conducts ongoing and/or separate evaluations17. Evaluates and communicates deficiencies
64
12/9/2015 127
12/9/2015 128
65
Part 7 – Guidance for Auditing Programs Not Included
• Purpose is to provide the auditor with guidance on how to identify the applicable compliance requirements for programs not included and for program-specific audits when a guide is not available.
– The Compliance Supplement only includes the largest and/or riskiest Federal programs.
12/9/2015 129
Appendices to theCompliance Supplement
• I – Federal Programs Excluded from the A-102 Common Rule and Portions of Part 200
• II – Federal Agency Codification of Government-wide Requirements and Guidance for Grants and Cooperative Agreements
• III – Federal Agency Single Audit and Program Contacts
• IV – Internal Reference Tables12/9/2015 130
66
Appendices - Continued
• V – List of Changes for the 2015 Compliance Supplement
• VI – Program-Specific Audit Guides
• VII – Other Audit Advisories
• VIII – SSAE 16 Examinations of EBT Service Organizations
• IX – Compliance Supplement Core Terms
12/9/2015 131
Program-Specific Audit Guides
• Department of Agriculture (www.usda.gov/oig/rptsauditsgde)– Food and Nutrition Service - Audits of Multi-State Food Processors,
(Report No: 27009e), 11/30/1999
• Department of Housing and Urban Development– HUD Consolidated Audit Guide (www.hudoig.gov/reports-
publications/audit-guides/consolidated-audit-guides)
• Department of Energy– DOE Audit Guidance for For-Profit Recipients, April 2012
energy.gov/management/downloads/policy-flash-2012-39 and related Frequently Asked Questions (energy.gov/sites/prod/files/For-Profit%20Audit%20Guidance%20FAQs%20June%202012.pdf)
12/9/2015 132
67
USDA - OIG
12/9/2015 133
HUD - OIG
12/9/2015 134
68
DOE – Management
12/9/2015 135
Subpart D – Single Audit Information for Recipients of Recovery Act Funds
• Procedures (§176.200 )
• Award Terms – Recovery Act transactions listed in Schedule of Expenditures of Federal Awards and Recipient Responsibilities for Informing Sub-recipients (§176.210)
12/9/2015 136
69
ARRA Award Terms
• Subpart A – Reporting and Registration Requirements Under Section 1512 of the 2009 ARRA
• Subpart B – Buy American Requirements Under Section 1605 of the 2009 ARRA
• Subpart C – Wage Rate Requirements under Section 1606 of the 2009 ARRA
• Subpart D – Single Audit Information for Recipients of Recovery Act Funds
12/9/2015 137
Data Collection Form (SF-SAC)
12/9/2015 138
70
Changes to SF-SAC
• Part I – General Information
• Part II – Financial Statements (To be completed by Auditor)
• Part III – Federal Programs (To be completed by Auditor)
12/9/2015 139
Requirements for Pass-through Entities
• §200.425 = May charge Federal awards for the cost of agreed‐upon‐procedures engagements to monitor sub‐recipients. Costs are allowable only if:
1. Conducted in accordance with GAGAS,
2. Paid for and arranged by the pass‐through entity, and
3. Limited to activities allowed or un‐allowed; allowable cost/cost principles, and reporting.
12/9/2015 140
71
GAGAS 2011
• Chapter 5 = Standards for Attestation Engagements
– Introduction
– Examination Engagements
– Review Engagements
– Agreed-Upon Procedures Engagements
12/9/2015 141
Agreed-Upon Procedures Engagements
• Additional GAGAS Field Work Requirements– Communicating significant deficiencies; material
weaknesses; instances of fraud; non-compliance with laws, regulation and agreements; and abuse
• Additional GAGAS Reporting Requirements– Reporting auditors’ compliance with GAGAS; and
distributing reports
• Additional GAGAS Considerations– Establishing an understanding regarding services to be
performed; and reporting
12/9/2015 142
72
AICPA’s SSAE
• AT 20 = Defining Professional Requirements in SSAEs
• AT 50 = SSAE Hierarchy
• AT 101 = Attest Engagements– AT 9101 = Interpretations of AT 101
• AT 201 Agreed-Upon Procedures– Interpretations of AT 201
• AT 301 = Financial Forecasts and Projections
12/9/2015 143
AICPA’s SSAE - Continued
• AT 401 = Reporting on Pro Forma Financial Information
• AT 501 = Examination on an Entity’s Internal Control over Financial Reporting that is Integrated with an Audit of its Financial Statements
– Interpretations of AT 501
12/9/2015 144
73
AICPA’s SSAE - Continued
• AT 601 = Compliance Attestation
• AT 701 = Management’s Discussion and Analysis
• AT 801 = Reporting on Controls at a Service Organization
• QC 10 = A Firm’s System of Quality Control
12/9/2015 145
AICPA’s Revised Guides
12/9/2015 146
74
12/9/2015 147
Agreed-Upon Procedures Audits
• Non-traditional Audits– Applying Agreed-Upon Procedures to
Specified Financial Statement Elements
– Applying Agreed-Upon Procedures to Non-Financial Information
– Reporting on Specified Elements
– Reporting on Compliance
12/9/2015 148
Agreed-Upon Procedures Audits - Continued
• Non-traditional Audits– Reporting on Internal Control
• Control Self-Assessment
– Risk Assessment Services
– Performance Measurement Services
75
QUESTIONS!
Remember
E-mail me if you think of
anything later!
149
OMB’s Super-CircularUnderstanding where they are going next so
as to be ahead of the curve!
Charles W. HesterCPA, FCPA, CFF, CFE, CGFM, ICFP
150
76
151
So, do we have any clues?
• 2 C.F.R. 300 through 5999
• Council of Financial Assistance Reform (COFAR) Q&As
– The CFO Council
• Digital Accountability and Transparency Act of 2014 (DATA Act)
– P.L. 109-282 as amended by Section 6202(a) of P.L. 110-252 (31 U.S.C. 6101)
• OMB Memorandum M-14-17, Metrics for Uniform Guidance (200 CFR 200) dated Sept. 30, 2014
152