3
Do not scale. All drawings, layouts and area calculations are indicative only and are subject to approval by the relevant Authorities and alterations due to Design Development. Drawings are not to be used for construction. All apartment and balcony areas are calculated as Gross Floor Area in accordance with the Method of Measurement for Residential Property as published by the Property Council of Australia. © COPYRIGHT Bruce Henderson Architects P/L ARBV Reg No. 50072 SCALE: DRAWN: DATE: REVISION Nº: JOB Nº: DRAWING STATUS: DRAWING Nº: PROJECT: DRAWING TITLE B 22.12.2015 BHA 35017 Town Planning TP-501 19 SALMON STREET, PORT MELBOURNE TYPOLOGY E - FACADE STATEGY BALCONY ELEMENT ADDRESSES CORNER CONDITION ALLOWING FOR FACADE ARTICULATION AND MAXIMISING VIEWS ARCHITECTURAL FINS TO SIDE ELEVATION ARTICULATES FACADE AND FACILITATES CLIMBING PLANTS MULTILEVELS OF PLANTING AT-GRADE ADJACENT TP PEDESTRIAN ACCESSWAY SOFTENS BUILT FORM AND PROVIDES INTERFACE TO PEDESTRIAN REACH. LOW LEVEL PLANTER ELEMENTS TO STREET FRONTAGE PROVIDES SCREENING TO SEMI PRIVATE SPACE 01 - FRONT FACADE CONSISTENT TREATMENT OF L3 FACADE ALLOWS STREET LEVEL ARTICULATION TO BECOME MORE VISUALLY DOMINANT AT TOP LEVEL TO READ MORE RECESSIVE VARYING ARTICULATION AND DIVISION OF TO TOP LEVEL ACHIEVED SCALE THROUGH PARTY WALL PROJECTIONS AND EXPRESSED BATTEN TREATMENTS RECESSIVE UPPER LEVELS PODIUM SCALE STREET SCALE VARYING BALCONY TREATMENTS DRAWN FROM ALTERNATIVE ASSEMBLIES OF A CONSISTENT PALETTE OF MATERIALS. CREATES VISUAL INTEREST AND VARIETY OF DETAIL WHILE MAINTAINS A HARMONIOUS AND COHESIVE FEEL TO THE STREETSCAPES INRODUCTION OF PLANAR BALCONY ELEMENTS WITH MINIMAL PROJECTIONS AND ENCLOSURE CREATES REDUCTION IN SCALE ALONG FACADE AT INTERVALS BRICK FACADE TREATMENTS AT STREET LEVEL. URBAN DOMESTIC EXPRESSION AND USE OF FINE GRAIN DETAIL FULL HEIGHT MASONARY ENTRY MARKERS INCORPORATING ADRESS/MAIL CREATION OF VERTICAL FINS TO END FACADE ALLOWS DISTINCTION OF LOWER 3 STOREYS, PROVIDES VERTICAL EXPRESSION AND ARTICULATIONOF WALL SURFACE WHILE ALLOWING OPPORTUNITY FOR INTEGRATION OF CLIMBING PLANTS INTO ARCHITECTURE 02 - REAR (SERVICE LANE) ELEVATION BRICK FACADE TO LOWER LEVEL PODIUM TO CREATE 'PLINTH' EXPRESSED FRAME ELEMENTS TO REAR FACADE WITH ANGLED FIN ELEMENTS, RESTRICTING DIRECT VIEWS TO BALCONY SPACES OPPOSITE CREATION OF STRONG EXPRESSION OF 3 STOREY FRM ALLOWS UPPER STOREY TO BE SET BACK WITH VISUALLY RECESSIVE EXPRESSION INTRODUCTION OF VISUAL BREAK IN DOMINANT REAR STREETSCAPE FACADE TO CREATE VARIETY OF SCALE AND VISUAL INTEREST CONSISTENT EXPRESSION OF UPPER STOREY WITH EXPRESSED PARTY WALLS AND EXPRESSED BATTENS REV DATE DESCRIPTION - 22.12.2015 AUTHORITY SUBMISSION A 14.04.2016 PARAPET HEIGHTS UPDATED B 23.06.2016 REVISION TO ROADWAY LAYOUT & GROUP 3/4 REV DATE DESCRIPTION

01 - FRONT FACADE · 01 - front facade vertical fin elements to end facade to articulate wall surface and provide opportunity for integration of climbing plants into architecture

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 01 - FRONT FACADE · 01 - front facade vertical fin elements to end facade to articulate wall surface and provide opportunity for integration of climbing plants into architecture

Do not scale. All drawings, layouts and area calculations areindicative only and are subject to approval by the relevantAuthorities and alterations due to Design Development.Drawings are not to be used for construction. All apartmentand balcony areas are calculated as Gross Floor Area inaccordance with the Method of Measurement for ResidentialProperty as published by the Property Council of Australia.

© COPYRIGHT Bruce Henderson Architects P/LARBV Reg No. 50072

SCALE:

DRAWN:

DATE:

REVISION Nº:

JOB Nº:

DRAWING STATUS: DRAWING Nº:

PROJECT:

DRAWING TITLE

B

22.12.2015

BHA

35017

Town Planning TP-501

19 SALMON STREET, PORT MELBOURNE

TYPOLOGY E - FACADE STATEGY

BALCONY ELEMENTADDRESSES CORNERCONDITION ALLOWINGFOR FACADEARTICULATION ANDMAXIMISING VIEWS

ARCHITECTURAL FINS TOSIDE ELEVATIONARTICULATES FACADEAND FACILITATESCLIMBING PLANTS

MULTILEVELS OFPLANTING AT-GRADEADJACENT TP PEDESTRIANACCESSWAY SOFTENSBUILT FORM ANDPROVIDES INTERFACE TOPEDESTRIAN REACH.

LOW LEVEL PLANTERELEMENTS TO STREETFRONTAGE PROVIDESSCREENING TO SEMIPRIVATE SPACE01 - FRONT FACADE

CONSISTENT TREATMENT OF L3 FACADEALLOWS STREET LEVEL ARTICULATION TOBECOME MORE VISUALLY DOMINANT ATTOP LEVEL TO READ MORE RECESSIVE

VARYING ARTICULATION ANDDIVISION OF TO TOP LEVELACHIEVED SCALE THROUGHPARTY WALLPROJECTIONS ANDEXPRESSED BATTENTREATMENTS

RECESSIVEUPPERLEVELS

PODIUMSCALE

STREETSCALE

VARYING BALCONY TREATMENTS DRAWN FROMALTERNATIVE ASSEMBLIES OF A CONSISTENTPALETTE OF MATERIALS. CREATES VISUALINTEREST AND VARIETY OF DETAIL WHILEMAINTAINS A HARMONIOUS AND COHESIVE FEELTO THE STREETSCAPES

INRODUCTION OF PLANAR BALCONYELEMENTS WITH MINIMAL PROJECTIONSAND ENCLOSURE CREATES REDUCTION INSCALE ALONG FACADE AT INTERVALS

BRICK FACADE TREATMENTS AT STREETLEVEL. URBAN DOMESTIC EXPRESSIONAND USE OF FINE GRAIN DETAIL

FULL HEIGHT MASONARYENTRY MARKERSINCORPORATINGADRESS/MAIL

CREATION OF VERTICAL FINS TO ENDFACADE ALLOWS DISTINCTIONOF LOWER 3 STOREYS, PROVIDESVERTICAL EXPRESSION ANDARTICULATIONOF WALL SURFACE WHILEALLOWING OPPORTUNITY FORINTEGRATION OF CLIMBING PLANTSINTO ARCHITECTURE

02 - REAR (SERVICE LANE) ELEVATION

BRICK FACADE TO LOWERLEVEL PODIUM TOCREATE 'PLINTH'

EXPRESSED FRAME ELEMENTS TOREAR FACADE WITH ANGLED FINELEMENTS, RESTRICTING DIRECTVIEWS TO BALCONY SPACESOPPOSITE

CREATION OF STRONGEXPRESSION OF 3STOREY FRM ALLOWSUPPER STOREY TO BE SETBACK WITH VISUALLYRECESSIVE EXPRESSION

INTRODUCTION OF VISUALBREAK IN DOMINANT REARSTREETSCAPE FACADE TOCREATE VARIETY OF SCALEAND VISUAL INTEREST

CONSISTENT EXPRESSION OFUPPER STOREY WITHEXPRESSED PARTY WALLS ANDEXPRESSED BATTENS

REV DATE DESCRIPTION- 22.12.2015 AUTHORITY SUBMISSIONA 14.04.2016 PARAPET HEIGHTS UPDATEDB 23.06.2016 REVISION TO ROADWAY LAYOUT & GROUP 3/4

REV DATE DESCRIPTION

Page 2: 01 - FRONT FACADE · 01 - front facade vertical fin elements to end facade to articulate wall surface and provide opportunity for integration of climbing plants into architecture

REAR COURTYARDEXPRESSED ON SITE FACADE

CONSISTENT EXPRESSION OF RECESSIVE UPPERSTOREYS WITH RHTMIC EXPRESSED BATTEN ARTICULATION

REDUCTION OF SCALEWITHIN LANEWAY AT STREET EDGE TO 2 STOREY BRICK. 'MENS SCALE' WITH RECESSIVE FORM OVER

INTRODUCTION OF 2STOREY EXPRESSEDBALCONY TOPUNCTUATE THEFACADE

RECESSIVEUPPERLEVELS

PODIUMSCALE

INTRODUCTION OF PLANTERS AT GROUNDLEVEL BREAKS DOWN SCALE OF PODIUM ATSTREET LEVEL

01 - FRONT FACADE

VERTICAL FIN ELEMENTS TO END FACADE TO ARTICULATE WALL SURFACE AND PROVIDE OPPORTUNITY FOR INTEGRATION OFCLIMBING PLANTS INTO ARCHITECTURE

02 - REAR COURTYARD

INCORPORATION OF PLANTERS TO STREET INTERFACE

INCORPORATION OFANGLED BLADES TOHABITABLE ROOMS AT L2ALLOWS FOR DIRECTOVERLOOKING TO BESCREENED WHILEMAXIMISING THE OBLIQUEVIEWS OUT , SOLAR ACCESSAND VENTILATION

RHYTMIC ARTICULATION OFFACADES THROUGHINTRODUCTION OF FEATURE FRAMESREFLECTING FENESTRATIONLIGHT PATTERN MATERIALSPALETTE TO WITHINCOURTYARDS FOR MAXIMUMLIGHT REFLECTION

Do not scale. All drawings, layouts and area calculations areindicative only and are subject to approval by the relevantAuthorities and alterations due to Design Development.Drawings are not to be used for construction. All apartmentand balcony areas are calculated as Gross Floor Area inaccordance with the Method of Measurement for ResidentialProperty as published by the Property Council of Australia.

© COPYRIGHT Bruce Henderson Architects P/LARBV Reg No. 50072

SCALE:

DRAWN:

DATE:

REVISION Nº:

JOB Nº:

DRAWING STATUS: DRAWING Nº:

PROJECT:

DRAWING TITLE

B

22.12.2015

BHA

35017

Town Planning TP-502

19 SALMON STREET, PORT MELBOURNE

TYPOLOGY C - FACADE STRATEGY

REV DATE DESCRIPTION- 22.12.2015 AUTHORITY SUBMISSIONA 14.04.2016 PARAPET HEIGHTS UPDATEDB 23.06.2016 REVISIONS TO ROADWAY LAYOUT & GROUP 3/4

REV DATE DESCRIPTION

Page 3: 01 - FRONT FACADE · 01 - front facade vertical fin elements to end facade to articulate wall surface and provide opportunity for integration of climbing plants into architecture

EROSION OF END FRAMETO EXPOSE BALCONYFRONTAGE

REDUCTION OF VISUALSCALE TO REARLANEWAY TRANSITION

MAIN PLUMBER STREETUNITS HAVECAPABILITY TO BECONVERTED TORETAIL/COMMERCIALAT GROUND LEVEL

ENTRY POINTS DEFINED BYVERTICAL MARKERELEMENTS

INTRODUCTION OF PLANARBALCONY ELEMENTS WITHMINIMAL PROJECTION ANDREDUCTION OF SCALEPUNCTUATED FACADERYTHYM

VARYING BALCONYTREATMENTS DRAWNFROM MATERIAL PALETTECREATES VISUALINTEREST

ESTABLISHING OF ROBUST 3STOREY STREET EDGE. MORECOMMERCIAL/LARGERSCALE EXPRESSION TOPLUMMER STREET

METAL HOOD ELEMENTSDEFINE ENTRY POINTS.ENTRY ELEMENTSSEPERATED FROM RETAILUSAGE TO ALLOW COMBINEDOR INDEPENDANT ACCESS TORETAIL AT GROUND FLOORAND RESIDENTIAL UNIT OVER

RECESSIVE UPPER LEVELARTICULATED THROUGHINTRODUCTION OFPROJECTING PARTY WALLSAND SURFACE MOUNTEDBATTENS

2 STOREY SCALE ISVARIED THROUGHINTRODUCTION OFHOOD ELEMENTS

CREATION OF 2 STOREYBRICK TOWNHOUSEEXPRESSION

SEMI ACTIVE FRONTAGE

..

..

Do not scale. All drawings, layouts and area calculations areindicative only and are subject to approval by the relevantAuthorities and alterations due to Design Development.Drawings are not to be used for construction. All apartmentand balcony areas are calculated as Gross Floor Area inaccordance with the Method of Measurement for ResidentialProperty as published by the Property Council of Australia.

© COPYRIGHT Bruce Henderson Architects P/LARBV Reg No. 50072

SCALE:

DRAWN:

DATE:

REVISION Nº:

JOB Nº:

DRAWING STATUS: DRAWING Nº:

PROJECT:

DRAWING TITLE

B

22.12.2015

BHA

35017

Town Planning TP-503

19 SALMON STREET, PORT MELBOURNE

TYPOLOGY A - FACADE STRATEGY

REV DATE DESCRIPTION- 22.12.2015 AUTHORITY SUBMISSIONA 14.04.2016 PARAPET HEIGHTS UPDATEDB 23.06.2016 REVISIONS TO ROADWAY LAYOUT & GROUP 3/4

REV DATE DESCRIPTION

RECESSIVEUPPERLEVELS

2 STOREYLANEWAYSCALE

RECESSIVEUPPERLEVELS

STREETSCALE 3STOREYHARD EDGE

01 - FRONT FACADE FACING PLUMMER STREET

02 - REAR ELEVATION