PROJECT : DATE :
REVISION : 01
CONTRACT NO. : ECERDC - P010/0396
CONTRACTOR : MARIMAS SDN. BHD
DESCRIPTION OF ITEM : WORK METHOD STATEMENT - BITUMINOUS WATERPROOFING FOR FLAT ROOF
REFERENCE NO. : MSB/MCRIC/WMS/0036
NOTES :
CONSULTANT'S COMMENTS : (Please add separate sheet if space is insufficiect)
STATUS : ABC
DESIGNATION :NAME :
DATE :SIGNATURE :
KLCCPSB'S COMMENTS : (Please add separate sheet if space is insufficiect)
27/01/2012
Note: Please tick ( / ) on the relevant status
REVIEW & RESUBMITREJECTED
WORK METHOD STATEMENT (WMS)SUBMISSION REVIEW FORM
THE PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 THE MUADZAM SHAH CATTLE RESEARCH AND INNOVATION CENTRE, PAHANG DARUL MAKMUR.
REVIEWED & ACCEPTED
STATUS : ABC
DESIGNATION :NAME :
DATE :SIGNATURE :
ECERDC / E.R COMMENTS : (Please add separate sheet if space is insufficiect)
STATUS : ABC
DESIGNATION :NAME :
DATE :SIGNATURE :
Note: Please tick ( / ) on the relevant status
Note: Please tick ( / ) on the relevant status
REVIEWED & ACCEPTEDREVIEW & RESUBMITREJECTED
REVIEWED & ACCEPTEDREVIEW & RESUBMITREJECTED
PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM
SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR
CONTRACT NO: ECERDC-P010/0396
MARIMAS SDN.BHD.
(Company no. 85438-H)
WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING
REV 01
WORK METHOD OF STATEMENT – BITUMINOUS WATERPROOFING FOR FLAT ROOF (TNB SUBSTATION)
PRODUCT : Nitoproof 1000
1.0 INTRODUCTION
This work method statement covers the applying bituminous waterproofing work for flat roof at TNB
Substation for Proposed Construction and Completion of Package 1 of The Muadzam Shah Cattle
Research and Innovation Centre, Pahang Darul Makmur.
This work method statement provides information concerning method of application to ensure
compliance with contract requirements and drawings besides to perform safe working environment and
compliance to the safety requirements.
2.0 SCOPE OF WORK
Nitoproof 1000 from FOSROC shall be used in accordance with the manufacturer’s current application
instructions. For more information of the product, kindly refer to Cut Sheet Submission reference no.
MSB/MCRIC/CS/0119. (Refer to Attachment 1)
3.0 WORK SEQUENCE FLOW
Surface preparation Application of Nitoproof
1000 1st
coat
Application of Nitoproof
1000 2nd
coat
Cement render
PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM
SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR
CONTRACT NO: ECERDC-P010/0396
MARIMAS SDN.BHD.
(Company no. 85438-H)
WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING
REV 01
4.0 WORK METHODOLOGY
The works shall be carried out by FOSROC waterproofing specialist and shall be carried out in
accordance with the manufacturer’s specification.
4.1 Surface Preparation
All surfaces to be waterproofed should be clean, sound and dry. The surface shall be clean of oil,
grease and all loosely adhering particles by using wire brushing. The surface shall ensure free of
surface water or bleeding.
4.2 Application of Nitoproof 1000
The drum contained with Nitoproof 1000 shall be stirred thoroughly. The surface shall be
applied with the full coat of Nitoproof 1000 by using brush, roller or spray equipment prior to
application of second coat at right angle to the first. However, the first coat shall be dried fully
before application of second coat.
4.3 Laying of Cement Render
Nitoproof 1000 should not be left exposed to UV light for more than 14 days. So that, laying of
cement render is a must with the thickness as per drawing / specification with the periods. At
the corner part, floor rendering must be fillet angle to prevent leakage.
PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM
SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR
CONTRACT NO: ECERDC-P010/0396
MARIMAS SDN.BHD.
(Company no. 85438-H)
WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING
REV 01
5.0 SAFETY AND ENVIRONMENTAL
5.1 Safety
1) All workers shall provide with PPE (Personal Protective Equipment) and shall be worn
everytime they are enter the site. Safety Manager / Safety Supervisor shall ensure all the
workers wear all the safety equipments provided.
2) Impervious gloves and barrier cream should be used when handling these products.
3) Eye protection should be worn. If accidental eye contamination occurs, wash thoroughly
with plenty of water and seek medical advice.
4) If the product contacted with skin occurs, it must be removed before curing takes place.
Wash out with an industrial skin cleaner followed by plenty of soap and water.
5) Safety Manager / Safety Supervisor shall ensure that the activity shall be carried out in a
safe manner.
6) All workers shall be advised to report any accident or injury to supervisor and proper
treatment to be obtained.
7) The Safety Supervisor / Safety Manager shall ensure that the workers understand the safety
regulations and explain in detail in particular hazards, where the workers are working and
the precaution to be taken to ensure their safety.
5.2 Environmental
1) All workers shall educate on good environmental management practices and well disciplined
to environment.
2) The garbage bin shall be provided at the working area and Supervisor shall ensure its must
be collected regularly and disposed off at the approved dumpsite.
PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM
SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR
CONTRACT NO: ECERDC-P010/0396
MARIMAS SDN.BHD.
(Company no. 85438-H)
WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING
REV 01
3) Safety Manager/Supervisor shall ensure that no open burning of construction or
domestic wastes is practiced.
4) All workers shall ensure that all tools and equipment machinery are in good condition to
avoid any oil leakage that could harm to environment.
5) Open burning of construction and domestic wastes on the site premises is strictly
prohibited
6) All tools and equipment shall be maintained in good working order and sited away
from sensitive properties.
PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 OF THE MUADZAM
SHAH CATTLE RESEARCH AND INNOVATION CENTRE PAHANG DARUL MAKMUR
CONTRACT NO: ECERDC-P010/0396
MARIMAS SDN.BHD.
(Company no. 85438-H)
WORK METHOD STATEMENT FOR BITUMINOUS WATER PROOFING
REV 01
Attachment 1 : Attachment 1 : Attachment 1 : Attachment 1 : Cut Sheet for Cut Sheet for Cut Sheet for Cut Sheet for BituminousBituminousBituminousBituminous Waterproofing (Nitoproof 1000)Waterproofing (Nitoproof 1000)Waterproofing (Nitoproof 1000)Waterproofing (Nitoproof 1000)