  • Pearl GTL Project

    LINDE ENGINEERING

    Contractor Project No : 5887 Shell Project No: HP-3000-QAT

    Project Document Number: T- 4.234.068 Project Rev.: B Page 2 of 18

    Purchase Order Number: 2MH127

    N/A Tag/Item Number(s):

    ASU Unit(s):

    Z PCWBS:

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    E B 29.01.2008 Ready For Construction SB UA/MC ZG RFC

    D A 12.11.2007 Company Comments Incorporated IO MC ZG CCI

    C O 08.10.2007 Issued for Company Comments IO MC ZG ICC

    B1 Issued for Review IO MC ZG IFR

    A1 Issued for Internal Review IO MC ZG IIR

    Approved By

    GAMA Project Rev Rev. Date Description

    Prepared By

    Checked By Status

    No. No. ORIGINATOR

    Document Title:

    LINDEGINEERING AG

    METHOD STATEMENT FOR ESTABLISHMENT OF PERMANENT BENCHMARKS

    Document No.

    GAM MTS CIV GTL 002 E

    LOC470

    Contractor

    Gama Qatar Co. W. L. L. Org.

    Code Doc. Type

    Disc. Code

    Geogr. Area

    Seq. No

    Rev. No Vendor Code

    Project Document Number: T-4.234.068 Rev No: B

  • Doc. Title : GAM-MTS-CIV-GTL-002 Rev. E Method Statement for Establishment of Permanent Benchmarks

    Date : 29.01.2008

    T-4.234.068 Rev. B Page 4 of 18

    QQQ AAA TTT AAA RRR

    TABLE OF CONTENTS

    1. INTRODUCTION _________________________________________________________________5

    1.1. GENERAL _________________________________________________________________________5 1.2. SCOPE_____________________________________________________________________________5

    2. HSSE ___________________________________________________________________________5 3. REFERENCE ____________________________________________________________________6 4. DEFINITIONS ___________________________________________________________________6 5. METHOD OF EXECUTION ________________________________________________________7

    5.1. PRE-COMMENCEMENT WORKS ____________________________________________________7 5.1.1. Work Permit ____________________________________________________________________________ 7 5.1.2. Traffic Management Plan__________________________________________________________________ 7 5.1.3. Equipment and Personnel__________________________________________________________________ 7 5.1.4. Existing Underground Facilities_____________________________________________________________ 7 5.1.5. Access Road ____________________________________________________________________________ 7 5.1.6. Barricades and Safety Signboard ____________________________________________________________ 8

    5.2. EQUIPMENT & MANPOWER ________________________________________________________8 5.2.1. Equipment _____________________________________________________________________________ 8 5.2.2. Manpower _____________________________________________________________________________ 8

    5.3. METHOD OF EXECUTION __________________________________________________________9 5.3.1. General ________________________________________________________________________________ 9 5.3.2. Excavation _____________________________________________________________________________ 9 5.3.3. Concrete Works _________________________________________________________________________ 9 5.3.4. Completion of Works _____________________________________________________________________ 9

    6. QUALITY ASSURANCE___________________________________________________________10 7. ATTACHMENTS_________________________________________________________________10

    7.1. JOB SAFETY ANALYSIS ___________________________________________________________10 7.2. PROPOSED LOCATION OF BENCHMARKS __________________________________________10

  • Doc. Title : GAM-MTS-CIV-GTL-002 Rev. E Method Statement for Establishment of Permanent Benchmarks

    Date : 29.01.2008

    T-4.234.068 Rev. B Page 5 of 18

    QQQ AAA TTT AAA RRR

    1. INTRODUCTION

    1.1. GENERAL

    This document describes the methods of activities for the establishment of permanent benchmarks that shall be carried out in Ras Laffan Industrial City of the State of Qatar for Pearl GTL Project.

    1.2. SCOPE

    Establishment of Permanent Benchmark Facilities shall take place on the dedicated place(s) as per approved layout area. The construction & erection activities shall be carried out by Gama Qatar.

    2. HSSE

    All works shall be in compliance with the State of Qatar laws and regulations, Ras Laffan Industrial City and International standards, codes, Contractor and Company requirements and instructions.

    In addition all employees and GAMA Subcontractor employees on site will have through Contractor Site Safety Induction and GAMA Qatar Safety induction for site safety, health, environmental and security prior to work activities. Other training courses will be attended as required by Contractor or Company as required.

    At a minimum a generic Risk Assessment will have been prepared by the Risk Assessment Team (RAT) ranking the hazards associated with project works and control measures to be taken to mitigate the hazards to an acceptable level.

    Each work scope or task will have a completed and approved Job Safety Analysis (JSA) identifying the potential hazards and control measures that will be implemented to protect people and environment.

    The JSA will be used by Supervisor as the basis of conducting his daily Pre-Task meeting and his weekly Tool Box Talk (TBT).

    In addition to the above, all employees will wear required PPE and highly visible vest where traffic or other hazards may exist. For additional safety instructions and precautions please review the JSA completed for Establishment of Benchmark facilities.

  • Doc. Title : GAM-MTS-CIV-GTL-002 Rev. E Method Statement for Establishment of Permanent Benchmarks

    Date : 29.01.2008

    T-4.234.068 Rev. B Page 6 of 18

    QQQ AAA TTT AAA RRR

    3. REFERENCE

    Qatar Construction Standard T.4-095.955 Project HSSE Program Overall T.4-095.303 Project HSSE Construction Plan T.4-129.849 Permit to Work Procedure T.4-132.867 Technical Specification Survey and Monitoring

    DEP 34.11.00.11 Site Preparation and Earthworks including Tank Foundations and Tank Farms

    T-13.376.352 Amendments and/or Supplements to Site Preparation and Earthworks including Tank Foundations and Tank Farms T-13.376.490 Project Specific Specification for Site Preparation DEP 34.19.20.31-Gen Reinforced Concrete Foundations and Structures

    T-13.376.358 Amendments and/or Supplements to Reinforced Concrete Foundations and Structures

    Other specifications and procedures of Contractor, Company and RLIC.

    4. DEFINITIONS Company : QSGTL and/or its PMC (JK) Contractor : Linde Engineering AG Subcontractor or Gama : Gama Qatar ITP : Inspection and Test Plan QCR : Quality Control Record

    QCP : Quality Control Procedure QA/QC : Quality Assurance / Quality Control

    TPI : Third Party Inspection ASTM : American Society for Testing and Materials

  • Doc. Title : GAM-MTS-CIV-GTL-002 Rev. E Method Statement for Establishment of Permanent Benchmarks

    Date : 29.01.2008

    T-4.234.068 Rev. B Page 7 of 18

    QQQ AAA TTT AAA RRR

    5. METHOD OF EXECUTION

    5.1. PRE-COMMENCEMENT WORKS

    5.1.1. Work Permit

    All facilities shall be executed with the required permit to work. After receiving the related permit, the execution will take place in the scope of job requirements.

    5.1.2. Traffic Management Plan

    Works shall not interrupt any kind of vehicle traffic or any access roads to any gates. In case of this kind of activity a revised traffic management plan shall be provided.

    5.1.3. Equipment and Personnel

    All equipment shall be inspected and approved by the CONTRACTOR, and all personnel shall be inducted and trained before mobilization.

    5.1.4. Existing Underground Facilities

    Prior to work commencement, the existing and possible underground structures and installations shall be checked by means of As-Built Drawings issued by the Contractor or the Company. The locations of such installations shall be marked at site and posted with signs. After the area has been barricaded, possible relocation or removal applications for the same shall be studied. Same studies shall be submitted to the Contractor and the Company for approval. Should any underground facility be encountered in spite that they have not been pointed out in the drawings, Contractor shall be informed immediately; and approval of Contractor and Company shall be waited before proceeding with the relocation or removal of the same. The barricades for such activities shall be temporary.

    5.1.5. Access Road

    The access roads may be diverted for some periods during the execution of the works in order to ensure smooth execution of the works in the area. However, no such diversion shall take place without prior written consent of the Contractor or the Company. After the locations of access roads have been excavated, they shall be backfilled to allow traffic in and within the area.

  • Doc. Title : GAM-MTS-CIV-GTL-002 Rev. E Method Statement for Establishment of Permanent Benchmarks

    Date : 29.01.2008

    T-4.234.068 Rev. B Page 8 of 18

    QQQ AAA TTT AAA RRR

    5.1.6. Barricades and Safety Signboard

    All work areas shall be barricaded and posted with signs before roadworks. Barricades shall be formed by scaffolding pipes, and shall be subject to Contractor and Company approval before being put to use; and the signboards shall be placed hundred meter intervals. Barricades shall be kept in place until the cooling water pipes have installed and the area have been filled. Since no night activities are foreseen, the site shall be kept closed during the night preventing any pedestrian or vehicle traffic. The requirement for illumination shall be reviewed by Contractor, when this condition is expected to change due to other works or a change in the work schedule.

    5.2. EQUIPMENT & MANPOWER

    5.2.1. Equipment

    - Concrete Mixer Truck

    - Excavator

    - Steel Pins

    - Barricades

    - Formwork

    - Shovels

    - Compactors

    - Wheel Barrows (if required)

    In addition to the equipment given herein above other personnel shall be established to service to the mentioned groups, if needed. The concrete will be placed manually unless deemed otherwise by the job supervisor.

    5.2.2. Manpower

    - Site Engineer / Supervisor

    - Foreman

    - HSE Officer

    - Safety Workers (for barricades and housekeeping)

    - Operators

    - Truck drivers

    In addition to the groups given herein above other personnel shall be established to service to the mentioned groups, if needed.

    Handover of works shall be executed under supervision of Civil and Mechanical Supervisors.

  • Doc. Title : GAM-MTS-CIV-GTL-002 Rev. E Method Statement for Establishment of Permanent Benchmarks

    Date : 29.01.2008

    T-4.234.068 Rev. B Page 9 of 18

    QQQ AAA TTT AAA RRR

    5.3. METHOD OF EXECUTION

    5.3.1. General

    The benchmarks shall be constructed according to the existing benchmarks in adequate frequency. To ensure the required stability, the benchmarks shall be constructed with reinforced concrete. To specify the coordinates of the benchmarks, angular and dimensional values shall be obtained by using total stations and implementing closed traverse method. Besides, in order to specify and determine the levels, Automatic Levels shall be used as stated in the Method Statement for Surveying Works (T-4.234.067). The proposed location of the benchmarks is presented in Attachment 2.

    5.3.2. Excavation

    1. Locations of existing underground pipes, drains, cables, etc. and shall be obtained and shall take the utmost precaution to prevent damage.

    2. Excavation works shall be carried out in compliance with relevant Company and Contractor documents

    3. Depth of trench shall be in accordance with relevant Contractor and Company documents for bedding material beneath the pipe.

    4. If a trench is over-excavated, the over-excavated portion shall be replaced with appropriate engineered fill laid and compacted as per project specifications.

    5. Water in the trench shall be removed by pumping or other methods approved by Contractor and shall be discharged to the temporary or permanent drainage ditches or other sewers, in such a manner that other work shall not be affected. Any debris transferred to the trenches or sewers shall be cleaned out.

    6. The location of the benchmarks shall be excavated up to 0.6-m depth.

    5.3.3. Concrete Works

    - The concrete that shall be used for the construction of permanent benchmarks shall be transported to designated area.

    - The concrete shall be poured to the excavation up to the ground level. The concrete shall be plain concrete in accordance with DEP 34.19.20.31-Gen and T-13.376.358.

    - The steel pins shall be placed in the concrete foundation.

    - The proposed location of benchmarks to be established will be submitted to the Contractor prior to the establishment.

    - The concrete will be cured as per DEP 34.11.00.11 and T-13.376.352.

    5.3.4. Completion of Works

    - The concreted area shall be barricaded to protect the established benchmark.

    - After the work is completed, Contractor shall check the elevation of the benchmarks.

  • Doc. Title : GAM-MTS-CIV-GTL-002 Rev. E Method Statement for Establishment of Permanent Benchmarks

    Date : 29.01.2008

    T-4.234.068 Rev. B Page 10 of 18

    QQQ AAA TTT AAA RRR

    6. QUALITY ASSURANCE

    A Quality Assurance System shall be operated conforming to related standards.

    Controls and checks shall be established and documented thru relevant Company, Contractor and Subcontractor documents including related QCP, ITP and QCRs.

    7. ATTACHMENTS

    7.1. JOB SAFETY ANALYSIS

    7.2. PROPOSED LOCATION OF BENCHMARKS

  • JSA for: T-4.234.068

    Normal Approvals: Name DateJSA by:

    Job Supervisor:

    Name DateDiscipline Superindent (Linde)

    HSSE Representative (Linde)

    2.Permit To Work.

    LINDE EMERGENCY TELEPHONE NO. HSSE MANAGER: Pearl HOT LINE :

    Approval required for hazardous work detailed in the Linde Work Permit Procedure.Changing conditions and emergency proceduresStop work. Switch off equipment.Supervisor directs personnel to nearest and safest muster point considering wind direction. Supervisor counts all employees. Missing employees are reported to Linde HSSE Dept. When all clear is given check with Linde HSSE before returning to work.

    1. The following Personal Protective Equipment shall be worn:Coveralls, safety glasses, safety helmet, safety shoes and gloves. Signature

    OTHERS (List Below):

    Additional Approvals (Determined by Job Supervisor in correlation with Linde HSSE Manager).

    Department/Section doing JSA: HSSE & Construction JSA Members:Job Performers:

    General job requirements / Common Personal Protective Equipment.

    Signature

    JOB SAFETY ANALYSIS FORM

    Page No: 1 of 5Job being analysed: Establishment of Permanent Benchmarks

    NEW REVISED

    QQQ AAA TTT AAA RRR

  • RISKRANK

    1.1 1.1.1 Area shall be properly maintained and all survey equipment and materials must be properly stored and picked up.

    1.1.2 Housekeeping shall be on on going and picked up at the end of the day.

    1.2 Improper use of hand tools, hand and eye injuries while installing markers.

    B 2 LOW

    1.2.1 Employees shall wear the proper PPE when using hammers or other devices for installing survey markers i.e. approved eye protection and gloves.

    B 1 LOW

    1.3 Personal injuries from lifting - strains, sprains while mobilizing survey equipment.

    B 2 LOW

    1.3.1 Ensure employee use proper lifting techniques i.e. lift with their legs, and not with their back. B 1 LOW

    1.4 Hit by traffic or equipment while performing survey works.

    1.4.1 Survey employees shall wear a flourescent orange work vest wherever required.

    1.4.1.1 Barricade and secure the working area with signboard.

    1.4.2 Audible reversing alarms on all vehicles and equipment

    3 LOW LOW2B

    LOW2 LOW B 1

    Slip, trip and fall hazards.

    B

    1 Surveying of the benchmark levels.

    B

    CONSEQUENCESHAZARDS / POTENTIAL ADDITIONAL

    CONTROLSMAIN

    CONTROLS

    JOB SAFETY ANALYSIS / RISK ASSESSMENT FOR T-4.234.068

    SCOPE : ESTABLISHMENT OF PERMANENT BENCHMARKS

    Residual RiskInitial Risk

    RP CITEM ACTIVITY CP

    QQQ AAA TTT AAA RRR

  • RISKRANKCONSEQUENCES

    HAZARDS / POTENTIAL ADDITIONALCONTROLS

    MAINCONTROLS

    JOB SAFETY ANALYSIS / RISK ASSESSMENT FOR T-4.234.068

    SCOPE : ESTABLISHMENT OF PERMANENT BENCHMARKS

    Residual RiskInitial Risk

    RP CITEM ACTIVITY CP

    QQQ AAA TTT AAA RRR

    2.1 2.1.1 Route of services such as cable/pipeline route shall be determined by referring to existing services as built drawings and using existing cable/pipe detectors.

    2.1.2 Excavation shall be carried out manually using hand tools untill the buried component is identified.

    2.1.3 Exposed underground cables, pipes, foundation,& cable trenches shall be supported to avoid breaking under weight.

    2.2 Personnel or machines falling B 2 LOW

    2.2.1 Ensure to properly barricaded the area and provide warning signboards.

    B 1 LOW

    2.3 Accumulation of water. B 2 LOW 2.3.1 Refer to Dewatering Method of Statement B 1 LOW

    2.4 2.4.1 Ensure no employees are allowed to be inside the operating radius of the excavator while it is working.

    2.4.1.1

    2.4.2 Provide competent banksmen wearing high reflective vests and flags.

    2.5 Improper use of equipment.

    C 3 MED

    2.5.1 Equipment operators shall be competent in the SAFE use and operation of their equipment.

    2.5.1.1

    2.5.1.2

    All tools shall be inspected & colour coded.Proper training and regular toolbox meetings to be conducted

    B 2 LOW

    3 MED

    2.1.1.1

    2.1.1.22.1.1.3

    Ensure cable detector are calibrated & not defective.Perform trial pit excavation.Used plastic bladed shovels when excavating expose live cables.

    B

    Striking of underground utilities, e.g. cables and pipelines.

    C

    2

    2 LOW

    Employees being struck by excavating machinery.

    C 2 LOW

    Discuss in TSTI / TBT / HIP.

    B 2 LOW

    Excavation Works.

  • RISKRANKCONSEQUENCES

    HAZARDS / POTENTIAL ADDITIONALCONTROLS

    MAINCONTROLS

    JOB SAFETY ANALYSIS / RISK ASSESSMENT FOR T-4.234.068

    SCOPE : ESTABLISHMENT OF PERMANENT BENCHMARKS

    Residual RiskInitial Risk

    RP CITEM ACTIVITY CP

    QQQ AAA TTT AAA RRR

    3.1 3.1.1 All materials on the trucks shall be effectively secured during transportation.

    3.1.2 Operators and Job Supervisor shall ensure that the vehicle is not overloaded.

    3.1.3 All trucks shall be equipped with covering canvas with ropes for easy (un)covering and have a suitable ladder available for removing the covering.

    3.2 Reversing C 3 MED 3.2.1 Audible reversing alarms on all vehicles and equipment B 2 LOW

    3.3 Speeding.

    C 4 MED

    3.3.1 Operators shall be made aware of traffic rules and regulations; penalty system shall be implemented if required.

    3.3.1.1

    3.3.1.2

    Drivers should attend defensive driving training.Enforcement of traffic regulations. B 3 LOW

    4.1 4.1.1 Area shall be properly maintained all equipment and materials must be properly stored and picked up.

    4.1.1.1 Removed unnecessary materials in the work place.

    4.1.2 Housekeeping shall be on going and picked up at the end of the day.

    4.2 4.2.1 Ensure correct equipment use for the job.

    4.2.2 Ensure the use of equipment according to manufacturers guidelines

    4.3 Improper use of equipment C 3 MED

    4.3.1 Equipment operators shall be competent in the SAFE use and operation of their equipment.

    4.3.1.1 All tools shall be inspected & colour coded. B 2 LOW

    3 MED

    3.1.1.1

    3.1.1.2

    Ensure that materials are properly secured by means of correct sling belt or canvass to prevent materials from falling.No overloading of materials on the trucks.

    3 Loading, transportation and Topsoil removal.

    Material falling from trucks.

    D

    3 MED B 3

    4 Backfilling & Compaction activities (if a trench is over excavated).

    Slip, trip, and fall hazards.

    C

    B 2 LOW

    3 LOWB

    LOW

    Vibration hazard.

    C 2 LOW

    4.2.1.14.2.1.2

    Properly maintained equipment.Ensure trained & qualified employee will carry out the job.

  • RISKRANKCONSEQUENCES

    HAZARDS / POTENTIAL ADDITIONALCONTROLS

    MAINCONTROLS

    JOB SAFETY ANALYSIS / RISK ASSESSMENT FOR T-4.234.068

    SCOPE : ESTABLISHMENT OF PERMANENT BENCHMARKS

    Residual RiskInitial Risk

    RP CITEM ACTIVITY CP

    QQQ AAA TTT AAA RRR

    5.1 5.1.1 Break the job down into manageable portions.

    5.1.1.1

    5.1.2 Ensure all employees use proper lifting techniques i.e. lift with their legs not their back.

    5.2 5.2.1 Use the right tools for the job. 5.2.1.15.2.2 Never use defective hand tools

    5.3 5.3.1 Housekeeping shall be a priority, walk & work areas shall be kept free of unnecessary materials.

    5.3.1.1 All scrap rebar /timber to be taken to the designated recycle area.

    5.3.2 Area shall be properly maintained and all materials must be properly stored and picked up.

    5.4 5.4.1 Ensure protrude nails were properly bent or removed from the timber.

    5.4.1.1

    5.4.2 Ensure to have a good housekeeping.

    5.4.3 Unnecessary personnel shall be excluded from the rebar & formwork area.

    5.5 Injuries due to rebar ends C 3 MED 5.5.1 All rebars ends should be capped. B 1 LOW

    5.6 Hand & Finger injuries-Bruising-Cuts while assembling bars & timber B 2 LOW

    5.6.1 Ensure all employees wear appropriate working gloves. B 1 LOW

    Fall from same level

    C

    5

    LOW

    The safe work methods and hazards associated with tasks shall be covered in daily TSTI / TBT.

    B

    Personal injuries back, muscle strains, sprains.

    C LOW

    Improper use of hand tools.

    C 2 LOW All tools shall be inspected & colour coded.

    B 2 LOW

    2

    LOW

    Foot injury due to presence of protruding nails.

    All denailed nail should be properly stacked & disposed of.

    Formwork & rebar work activities.

    2 LOW B 2

    2

    B 3 LOW LOWB 1

  • RISKRANKCONSEQUENCES

    HAZARDS / POTENTIAL ADDITIONALCONTROLS

    MAINCONTROLS

    JOB SAFETY ANALYSIS / RISK ASSESSMENT FOR T-4.234.068

    SCOPE : ESTABLISHMENT OF PERMANENT BENCHMARKS

    Residual RiskInitial Risk

    RP CITEM ACTIVITY CP

    QQQ AAA TTT AAA RRR

    6.1 Concrete splash to eye. B 2 LOW 6.1.1 Use appropriate safety glass. B 1 LOW6.2 Fall in lean concrete

    B 3 LOW

    6.2.1 Ensure all employees have a suitable base to stand on while pouring lean concrete.

    6.2.1.1 Work will be properly supervised at all times. B 2 LOW

    6.3 6.3.1 Ensure all employees use proper lifting techniques i.e. lift with their legs not their back.

    6.3.1.1 Discuss in TSTI/TBT.

    6.3.2 Ensure employee managing the concrete hose has good footing to properly balance his movement.

    6.4.1 Ensure all employees wear the proper PPE, approved eye protection, head protection, hearing protection if needed and rubber boots.

    B 1 LOW

    6.4.2 Emnsure all employees have proper hand protection (gloves) to protect them

    B 1 LOW

    2

    6 Pouring of concrete.

    Personal injuries from pushing, pulling, lifting, and carrying hose concrete.

    C

    6.4 Exposure to lean concrete.

    B 2 LOW

    LOW2 LOW B

  • 002 - Permanent Benchmarks -29.01.2008.pdf002 - Permanent Benchmarks -29.01.2008.pdf

    GAM-MTS-CIV-GTL-002 Permanent Benchmarks Rev. D.pdf