    STRAIGHT MOTION NETS ALPHAbelt S2400INSTALLATION-MAINTENANCEINSTRUCTIONS:

    The installation procedure of the conveyor beltsALPHAbelt 2400 is simple and fast.

    Step 1:On the drive shaft and on the idle shaft put theneeded amount of sprockets ALPHAbelt S2400.The teeth of all the sprockets must be in the samestraight line (drawing 1).The middle sprocket of the drive shaft and themiddle sprocket of the idle shaft, must, as well, bein the same straight line (drawing 2).Lock on the shafts the two middle sprockets

    (drawing 2).Step 2:You receive each belt in one or roles.Connect the end of the one role with thebeginning of the other. Never connect the end ofthe one role with the end of the other or thebegiining of the one with the beginning of theother. Insert the connection rod through the holesof the segments, and cut it 1 cm shorther than thebelts width. By using a thermal device, create ahead (make the diameter smaller) of the twoedge holes of the segments, in order to prevent

    any possible extraction of the connection rod fromthe segments.

    Step 3:Put the conveyor belt on the conveyor and theteeth of the sprockets in the insertions of the belt.

    The belt which is under the metallic construction(to the return of the belt), is not obligatory to bestreched (drawing 3).

    Step 4:

    The belt is ready to function.Attention: The middle should be in the middle (inrelation to the width) of the metallic constructionand should touch any point of it, because this willcause its early damage or even break of the belt.Give motion to the belt and watch, for a whole turnof the belt, first the sprockets on the drive shaftand then on the idle shaft, to be in the properinsertions of the belt.If this is not happen, repeat the steps 1 & 3.

    When you need to uninstall the belt, just extract

    one or more plastic connection rods, in order todivide the belt in smaller pieces.

    Drawing 1

    Drawing 2

    Drawing 3

    Page 9

  • 7/29/2019 0009-10EN

    2/2

    STRAIGHT MOTION NETS ALPHAbelt S2400INSTALLATION-MAINTENANCEINSTRUCTIONS:

    The metallic construction on which the beltfunctions is the main factor that defines its lastingduration. To succeed the longest duration of thebelt, place a plastic wear strip between the beltand the metalic construction (drawing 4).

    To succeed the maximum capacity of the belt, isuseful to put a roller right after the dirve shaft(drawing 5), so as the belt to work with moresprockets teeth.

    To avoid the belt contacting with the floor if there

    is an expansion (in case of temperature increase),intall sliding rollers (drawing 3).

    The plastic motion sprockets, when installedproperly on a square drive shaft, ensure the rightmotion transmission, without causing side slidingsof the belt or jumping of the belt. The right motiontransmission through the plastic sprockets,eliminates the need to use belts stretchers andside guides.

    When the sprockets are installed on the shaft and

    the shaft on the metallic construction, the upperpoint of the sprockets diametre (in relation to theteeth of the sprockets), should be in the samestraight line with the upper point of the metallicconstruction, on which the belt moves (drawing 6).The motion sprockets can move the belt in bothdirections, under certain circumstances.

    Attention:Once a year, you should check the condition ofthe connection rod.If its diameter becomes smaller in percentage15% and more, it should be replaced, becauseotherwise it will cause problems such as: a.Jumping of the sprockets, b. Disability to extractthe connection rod from the belt, c. Early andgreat damage of the belt, in the points that contactthe sprockets, d. Unreasonable break of the belt,e. Early damage of the sprockets teeth.During the function of the belt, a grease to theconnection rod (even with water), will give much

    longer duration.