City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES1 EXECUTIVE SUMMARY This chapter of the Draft Environmental Impact Report (Draft EIR) is prepared pursuant to the California Environmental Quality Act (CEQA) for the proposed mixed‐use residential, hotel, and commercial project (Project). In accordance with CEQA Guidelines Section 15123, this chapter provides a brief description of the Project; identifies significant effects and proposed mitigation measures or alternatives that would reduce or avoid those effects; describes areas of controversy known to the lead agency; and presents issues to be resolved. A. PROJECT LOCATION The Project Site is generally located at 1020 S. Figueroa Street, within the South Park district of the Central City Community Plan Area in Downtown Los Angeles. The Project Site is served by a network of regional transportation facilities that provide access to the greater metropolitan area. Regional access to the Project Site is provided by the Pasadena/Harbor Freeway (I‐110/SR 110), located approximately 0.3 miles to the west; the Santa Monica Freeway (I‐10) located approximately 0.5 miles to the south; and the Hollywood Freeway (US‐101), located approximately 1.5 miles to the north. The Project Site is located approximately 0.2 miles north of the Pico Station operated by the Los Angeles County Metropolitan Transportation Authority (Metro) which serves the Blue Line and the Expo Line. The Project Site is also located approximately 0.4 miles from the 7th Street/Metro Center Station which provides rail service to the Blue, Expo, Red, and Purple Lines. The Project Site is also served by multiple bus and shuttle lines, including multiple Metro bus lines and the DASH Downtown Shuttle Route. The approximately 2.7‐acre Project Site is bounded by S. Figueroa Street to the west, S. Flower Street to the east, W. Olympic Boulevard to the north, and 11 th Street to the south. The Project Site is located in a regional center which serves as a commercial and entertainment center for Los Angeles and the surrounding communities. The Project area is characterized by a mix of entertainment, commercial, restaurant, bar, office, and residential uses. Adjacent to the Project Site and to the west across S. Figueroa Street is LA LIVE, an entertainment, hotel, and residential complex; south of LA LIVE and just southwest of the Project Site is the Staples Center Arena, a multipurpose sports arena; further to the southwest is the Los Angeles Convention Center, which regularly features conventions, trade shows, and exhibitions. To the north of the Project Site across W. Olympic Boulevard are several high‐rise mixed‐use residential and commercial buildings. These include the 28‐story 717 Olympic mixed‐use project; a car wash building that also encompasses two restaurants and a ticket agency that is proposed to be developed as a mixed‐use tower (Olympic Tower); and further north is the 13‐story Hotel Figueroa. To the immediate east of the Project Site is the 11‐story Petroleum Building, a designated City Cultural‐Historic Monument (HCM No. 596), which includes office above ground level commercial uses fronting W. Olympic Boulevard; a surface parking lot and the one‐story El Cholo restaurant fronting S. Flower Street; and mid‐and high‐rise multi‐family residential and mixed use buildings further east across S. Flower Street. To the south of the Project Site across 11 th Street, is Oceanwide Plaza, a high rise mixed‐use residential, commercial, and hotel project that is currently under construction; further south is another mixed‐use project under construction, known as Circa (1200 Fig Project); the Metro Pico Station; and new and recently rehabilitated high‐rise residential and mixed‐use buildings.

0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

     

 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐1

EXECUTIVE SUMMARY 

This chapterof theDraftEnvironmental ImpactReport (DraftEIR) ispreparedpursuant to theCaliforniaEnvironmental Quality Act (CEQA) for the proposedmixed‐use residential, hotel, and commercial project(Project).InaccordancewithCEQAGuidelinesSection15123,thischapterprovidesabriefdescriptionoftheProject;identifiessignificanteffectsandproposedmitigationmeasuresoralternativesthatwouldreduceoravoid those effects; describes areas of controversy known to the lead agency; and presents issues to beresolved.

A.  PROJECT LOCATION 

TheProjectSiteisgenerallylocatedat1020S.FigueroaStreet,withintheSouthParkdistrictoftheCentralCityCommunityPlanArea inDowntownLosAngeles. TheProjectSite isservedbyanetworkof regionaltransportationfacilitiesthatprovideaccesstothegreatermetropolitanarea.RegionalaccesstotheProjectSite isprovidedby thePasadena/HarborFreeway (I‐110/SR110), locatedapproximately0.3miles to thewest; the SantaMonica Freeway (I‐10) located approximately 0.5miles to the south; and theHollywoodFreeway(US‐101), locatedapproximately1.5milestothenorth. TheProjectSiteis locatedapproximately0.2 miles north of the Pico Station operated by the Los Angeles County Metropolitan TransportationAuthority (Metro) which serves the Blue Line and the Expo Line. The Project Site is also locatedapproximately0.4miles fromthe7thStreet/MetroCenterStationwhichprovides rail service to theBlue,Expo, Red, and Purple Lines. The Project Site is also served bymultiple bus and shuttle lines, includingmultipleMetrobuslinesandtheDASHDowntownShuttleRoute.

Theapproximately2.7‐acreProjectSiteisboundedbyS.FigueroaStreettothewest,S.FlowerStreettotheeast,W.OlympicBoulevardtothenorth,and11thStreettothesouth.TheProjectSiteislocatedinaregionalcenter which serves as a commercial and entertainment center for Los Angeles and the surroundingcommunities. The Project area is characterized by a mix of entertainment, commercial, restaurant, bar,office,andresidentialuses.AdjacenttotheProjectSiteandtothewestacrossS.FigueroaStreetisLALIVE,anentertainment,hotel,andresidentialcomplex;southofLALIVEandjustsouthwestoftheProjectSiteisthe Staples Center Arena, a multipurpose sports arena; further to the southwest is the Los AngelesConventionCenter,whichregularlyfeaturesconventions,tradeshows,andexhibitions.TothenorthoftheProject Site across W. Olympic Boulevard are several high‐rise mixed‐use residential and commercialbuildings. These include the 28‐story 717 Olympic mixed‐use project; a car wash building that alsoencompasses two restaurants anda ticket agency that isproposed tobedevelopedas amixed‐use tower(OlympicTower);andfurthernorthisthe13‐storyHotelFigueroa.TotheimmediateeastoftheProjectSiteis the 11‐story Petroleum Building, a designated City Cultural‐HistoricMonument (HCMNo. 596), whichincludesofficeabovegroundlevelcommercialusesfrontingW.OlympicBoulevard;asurfaceparkinglotandtheone‐storyElCholorestaurant frontingS.FlowerStreet;andmid‐andhigh‐risemulti‐familyresidentialandmixedusebuildings further east across S. Flower Street. To the southof theProject Site across11thStreet,isOceanwidePlaza,ahighrisemixed‐useresidential,commercial,andhotelprojectthatiscurrentlyunderconstruction; furthersouth isanothermixed‐useproject underconstruction,knownasCirca(1200FigProject);theMetroPicoStation;andnewandrecentlyrehabilitatedhigh‐riseresidentialandmixed‐usebuildings.

Page 2: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐2

B.  PROPOSED PROJECT 

The Project Site is currently developed with the nine‐story Luxe City Center Hotel (Luxe Hotel) on thenorthwestportionoftheProjectSitewiththeremainderoftheProjectSitedevelopedwithsurfaceparking.The Luxe Hotel includes 178 guest rooms, a main lobby, meeting rooms, an interior restaurant, anindoor/outdoorbarandloungearea,afitnesscenter,andaone‐levelparkingdeckwithparkingbelowandabovethedeck.

TheProjectwoulddemolishtheLuxeHotel,surfaceparking,andrelatedimprovementsontheProjectSiteinorder to construct a newmixed‐use residential, hotel, and commercial development. The Project wouldincludeup to1,129,284square feet (sf)of floorarea(approximately9.7:1 floorarearatio [FAR]) in threetowersatopaneightlevelpodium(Podium)withuptofoursubterraneanlevelsandfourlevelsabovegrade.TheProjectwouldincludeatotalofupto300hotelrooms,650residentialcondominiumunits,and80,000sfofrestaurant,retail,andothercommercialusesatthefirsttwolevelsalongallstreetfrontages.Thefirstandsecond levels of the Podiumwould also include commercial uses with the third and fourth levels of thePodiumincludinghotelamenitiesand14work/liveloftunits.TheProjectisdesignedtorespectthecontextandcharacterof theadjacenthistoricPetroleumBuildingbysteppingback fromthecornerofS.FigueroaStreetandW.OlympicBoulevardtoallowviewsofthecornerofthePetroleumBuilding.ThedesignwouldalsonotobstructviewsofthePetroleumBuilding’sarchitecturallydistinguishedfacadesalongW.OlympicBoulevardandFlowerStreet,whichareprimarycharacter‐definingfacadesfeaturingelaboratearchitecturaldetailing originally intended for public view. Parking for vehicles would be providedwithin up to foursubterranean levels beneath the Podium. Bicycle parkingwould be provided on Site in compliancewithLAMCrequirements.

TheProjectwouldincludetworesidentialtowersandonehoteltower.PhaseIoftheProjectwouldincludetheconstructionofthe34‐storyHotelTower,locatedonthecornerof11thStreetandS.FigueroaStreetandthe construction of the 32‐story Residential Tower 1 thatwould include up to 290 residential units andwouldbelocatedatthecornerof11thStreetandS.FlowerStreet.DuringPhase2,the38‐storyResidentialTower2wouldbeconstructedthatwould includeupto360residentialunitsandwouldbe locatedat thecornerofS.FigueroaStreetandW.OlympicBoulevard.

The Project would provide a 5,000 sf outdoor public plaza along S. Figueroa Street that would supportconnectivity between the Project and LA LIVE while also encouraging pedestrian activity and an activestreetfront. Theoutdoorplazawould incorporate landscape features, seating, andpotential forpublicartdisplayareas. Inaddition, theProjectwould includethePodiumGardenTerrace, locatedat thetopof thePodium that would serve each of the three towers for Project residents, guests and hotel patrons. ThePodiumGardenTerracewouldfeatureabaranddiningareaneartheHotelTower,openareasforadultandchildrenrecreationalactivities,pools,strolling/exerciseareasforpets,andquiet/passiveareaswithshadedzones.Thetopleveloftheresidentialtowerswouldincluderooftopamenitydecksforusebyresidents,andthetop/penthouseleveloftheHotelTowerwouldincludearooftopamenitydeckwithapool,bar,lounge,andgreenspaceareasforhotelpatronsandvisitors.

Vehicular access into the Podiumwould be fromW.Olympic Boulevard, S. Flower Street and 11th Street.ParkingaccesstothePodiumforresidencesandcommercialvisitorswouldbefromW.OlympicBoulevard.Forresidents‐only,accesswouldbeprovidedfrom11thStreet. AvehicleentrywaytothePodiumfromS.FlowerStreetwouldbeprovidedforcommercialvisitorsandservicevehicles.Forhotelvisitors,aseparate

Page 3: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐3

hotel‐only motor‐court drop off area would be provided off of 11th Street. Loading for service vehiclesrelatedtohotel,residentialandcommercialuseswouldbeonthegroundlevel, interiortotheProjectSite.PedestrianaccesstotheHotelTowerandlobbywouldbefromahotelmotor‐courton11thStreetandfromthe hotel lobby fronting S. Figueroa Street. Pedestrian access to the two stories of commercial andrestaurant frontage along the periphery of the Podium fronting 11th Street, S. Figueroa Street, S. FlowerStreet,andW.OlympicBoulevardwouldbedirectlyfromthosestreetsatthegroundlevelorviaelevators,stairsorescalators.AccesswouldalsobeprovidedfromtheparkingareaswiththePodium’ssubterraneanlevels.EachresidentialtowerwouldhaveagroundlevellobbythatwouldbeaccessiblefromstreetlevelorviaelevatorsfromtheresidentialparkingareaswithinthePodium.Pedestrianaccesstotheresidentialunitsin the Podium at the street level would be via either the Residential Tower 1 or Residential Tower 2residentiallobbies.

New lightingwould includesignage,commercialaccent lighting,wayfinding,balcony lighting,andsecuritymarkings.Projectsignagewouldincludeonandoff‐sitesignageinvariousforms,includingwallsigns,digitaldisplays and streaming signage, supergraphic signs, open panel roof signs, hotel building identification,residentialbuildingidentification,retailandrestaurantbuildingidentification,parkingentryidentification,loadingdockentry identification,andwayfindingsignage. Nobillboardsignage isproposed.Thegraphicsandsignageprogramwouldsupportanactivestreetfrontexperienceonallsides,butparticularlyalongtheFigueroa corridor that would mix art and signage graphic components. Pursuant to the provisions ofChapterI,Article3,Section13.11oftheMunicipalCode,theProjectwouldestablishasigndistrict,(Figand11th SignDistrict) thatwould encompass theProject Site. TheFig and11th SignDistrictwould establishregulationsandprovisionsregardingsignagearea, illumination levels,hoursofoperation, typeofsignage,locationofsignage,compatibilityofsignage,amongotherspecificregulations.

Discretionary entitlements, reviews, and approvals required for implementation of the Project wouldinclude,butwouldnotnecessarilybelimitedto,thefollowing:

CertificationofanEnvironmentalImpactReport;

Development Agreement by and between the City of Los Angeles and the Applicant, pursuant toCaliforniaGovernmentCodeSection65864etseq;

TransferofFloorAreaRights(TFAR)pursuanttoLAMCSections14.5.6and14.5.8through14.5.12fromtheLosAngelesConventionCenter(CityOwnedDonorSite)at1201S.FigueroaStreet,tothesubjectsite,locatedat1020S.FigueroaStreet,LosAngelesallowinganFARof9.7:1and1,129,284sfinlieuofa6:1FAR;

ApprovalofanewSignDistrict(LAMCSection13.11);

ProjectPermitComplianceforSignage;

DeterminationundertheCityCenterRedevelopmentPlan,asnecessarytoallowaresidentialuseinacommercialzoneoracommercialuseinaresidentialzone;

Master Conditional Use Permit for the sale and service of alcohol and live entertainment (LAMCSections12.24.W.1andW18);

SitePlanReviewforaprojectresultinginanincreaseof50residentialunitsandgreaterthan50,000sfofnonresidentialfloorarea.(LAMCSection16.05);

Page 4: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐4

VestingTentativeTractMap(LAMCSection17.15),includingeasements,dedications,andwaivers,ifnecessary;

VariationfromDowntownDesignGuide,LosAngelesSportsandEntertainmentStreetscapePlan,andDowntownStreetStandards

Otherapprovalsasneededandasmayberequiredsuchasconstructionpermits,includingbuildingpermits,grading,excavation,foundation,andassociatedpermits;

Haulroutepermit,asmayberequired;and

Otherapprovalsasneededandasmayberequired.

C.  PUBLIC REVIEW PROCESS 

As furtherdescribed inChapter1, Introduction, theCitycirculatedaNoticeofPreparation (NOP) toState,regional,andlocalagencies,andmembersofthepublicfora31‐dayreviewperiod,commencingFebruary3,2016andendingMarch4,2016.TheNOPwasbasedonanInitialStudywhichdeterminedthattheProjecthadthepotentialtoresultinsignificantimpactstotheenvironment.TheNOPandInitialStudyareprovidedinAppendicesA‐1andA‐2ofthisDraftEIR.

Inaddition,apublicscopingmeetingwasheldonFebruary18,2016attheLUXECityCenterHotelwithintheProjectSite, locatedat1020S.FigueroaStreet,LosAngeles,CA90015. Themeetingwasheld inanopenhouseorworkshopformatandprovidedinterestedindividuals,groups,andpublicagenciestheopportunitytoviewmaterials,askquestions,andprovideoralandwrittencommentstotheCityregardingthescopeandfocus of the Draft. The presentation materials and other documentation from the Scoping Meeting areprovidedinAppendixA‐3,ScopingMeetingMaterials,ofthisDraftEIR.Nowrittencommentswerereceivedatthepublicscopingmeeting.LettersandcommentsreceivedduringtheNOPcommentperiodareincludedinAppendixA‐4,NOPComments, of thisDraftEIR. ThisDraftEIRwillbe released foraminimum45‐daypublic commentperiod. Following thepublic commentperiod, aFinalEIRwillbeprepared that includesresponsestocommentsreceivedontheDraftEIR,alongwithanynecessarycorrectionsandadditionstothedocument.

D.  AREAS OF CONTROVERSY/ISSUES TO BE RESOLVED 

The following summarizes the environmental concerns raised in response to the NOP, including verbalcommentsreceivedatthepublicscopingmeetingheldduringtheNOPcirculationperiod.ThewrittenpubliccommentsareincludedinAppendixA‐4:

Generalconcernaboutheightanddensity,neighborhoodcompatibility

Cumulativetrafficimpacts

Potentialimpactsontribalculturalresources

PotentialimpactsonI‐110/I‐10freewayaccess

Potentialimpactsonexistingpublictransitduringconstructionandoperation

AirqualityimpactsfromconstructionandoperationoftheProject

Potentialimpactsonhydrologyandwaterquality

Page 5: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐5

ConsistencywiththeDowntownDesignGuide

PotentialimpactsonthePetroleumBuilding

Concernabouthealthhazardsduringconstruction

E.  SIGNIFICANT AND UNAVOIDABLE ENVIRONMENTAL IMPACTS 

SignificantunavoidableimpactscouldoccurasaresultofProjectimpacts,andcumulativeimpacts.Basedontheanalysis contained inChapter4,Environmental ImpactAnalysis, theProjectwould result in significantand unavoidable Project construction impacts related to noise and vibration, cumulative constructionimpactsrelatedtonoiseandtraffic,andProjecttrafficimpactsatthreeintersections.

F.  ALTERNATIVES 

The State CEQA Guidelines, Section 15126.6(a) require an EIR to “describe the range of reasonablealternatives to theproject, or to the locationof theproject,whichwould feasibly attainmostof thebasicobjectivesoftheprojectbutwillavoidorsubstantiallylessenanyofthesignificanteffectsoftheproject,andevaluatethecomparativemeritsofthealternatives.”TheStateCEQAGuidelinesemphasizethattheselectionofprojectalternativesbebasedprimarilyontheabilitytoreducesignificantimpactsrelativetotheproposedproject,“evenifthesealternativeswouldimpedetosomedegreetheattainmentoftheprojectobjectives,orwouldbemorecostly.”1TheStateCEQAGuidelinesfurtherdirectthattherangeofalternativesbeguidedbya“rule of reason,” such that only those alternatives necessary to permit a reasoned choice are analyzed.2Basedonananalysisofthesealternatives,anenvironmentallysuperioralternativeisidentified.

Threealternatives,aswellasanenvironmentallysuperioralternative,areanalyzedChapter5,Alternatives,of thisDraftEIRandsummarizedbelow. Thethreealternativesselectedforevaluation includethe1)NoProject/No Build Alternative; 2) Reduced Density Alternative; and 3) Residential with Ground LevelCommercialAlternative.

1.  Alternative 1:  No Project/No Build Alternative 

TheNoProject/NoBuildAlternativeconsistsofthecircumstanceunderwhichtheprojectdoesnotproceed,pursuant to Section 15126.6(e)(3)(B) of the State CEQA Guidelines. Under the No Project/No BuildAlternative, no new development would occur within the Project Site. This Alternative consists of thecircumstanceunderwhichtheProjectdoesnotproceed.ThepropertywouldmaintaintheLuxeHotel,whichisa112,748sf,ninestorybuilding,thatincludes178guestrooms,amainlobby,meetingspacearea,interiorrestaurant,anindoor/outdoorbarandloungearea,fitnesscenter,andaone‐levelparkingdeckwithparkingbelowandabovethedeck.TheLuxeHotelissurroundedbysurfaceparking.Thenorthlot,onthecornerofW.OlympicBoulevardandS.FigueroaStreetisusedforhotelguestparkingandspecialeventparking;thesouth lot, located south of the Luxe Hotel on S. Figueroa Street, is used for overflow parking, limousinestaging, and construction/maintenance vehicle parking; the southeastern lot, located on 11th StreetextendingfromS.FigueroaStreettoS.FlowerStreetisleasedforpublicparking.

1 CEQAGuidelinesSection15126.6(b).2 Ibid.,Section15126.6(f).

Page 6: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐6

2.  Alternative 2:  Reduced Density Alternative 

TheReducedDensityAlternativewouldprovidethesameusesastheProject;butatareduceddensitythatwouldcomplywiththeprovisionsoftheLAMCwithoutaTFAR.ThetotalFARwouldbelimitedto6:1withafloorareaof699,960sf,whichisapproximately62percentofthefloorareaoftheProject(9.7:1FAR).

The Reduced Density Alternative would include a hotel with 186 guest rooms with meeting rooms,restaurant,andspafacilities(175,000sf, including10,000sfmeetingroomsand10,000sfamenities);403residentialunits (475,360sf);and49,600sfofcommercial/retail/restaurantspaceon the first two levels.The residential development would include similar amenities to those of the Project, although scaledcommensuratewiththereductioninresidentialunits.Thedensityofthehotel,residential,andcommercialuses would be reduced approximately 38 percent, commensurate with the 38 percent reduction in FAR,while including the 75 percent retail frontage on the ground level. Parking would be provided in asubterraneanstructuresimilartothatoftheProject,althoughrequiringlesssubterraneanparkingthanthatoftheProject.TheReducedDensityAlternativewouldincludetwotowers:a353,508sfhotelandresidentialtowerwith a commercial podium on the Phase 1 portion of the Project Site and a 346,462 sf residentialtowerwithcommercialpodiumonthePhase2portion.

3.  Alternative 3:  Residential with Ground Level Commercial Alternative 

The Residential with Ground Level Commercial Alternative would utilize the entire site for a residentialdevelopmentwith50,000sfofgroundlevelcommercial(retail/restaurant)usewithintheprovisionofthezoningcode. ThisAlternativewould include669,960sfresultinginanFARof6.0:1. TheResidentialwithGroundLevelAlternativewould include520residentialdwellingunitsofsimilarsizeandconfiguration tothe Project. The residential developmentwould be provided in two residential towerswith 15,000 sf ofresidentialamenities.ThisAlternativewouldincludeparkinginasubterraneanstructure.

4.  Environmentally Superior Alternative 

Section15126.6(e)(2)of theStateCEQAGuidelines indicates thatananalysisofalternatives toaproposedprojectshallidentifyanenvironmentallysuperioralternativeamongthealternativesevaluatedinanEIRandthatifthe“noproject”alternativeistheenvironmentallysuperioralternative,theEIRshallidentifyanotherenvironmentallysuperioralternativeamongtheremainingalternatives.

A comparative summary of the environmental impacts anticipated under each Alternative to theenvironmental impacts associated with the Project is provided in Table 5‐7, Comparison of ImpactsAssociatedwiththeAlternativesandtheProject, inChapter5,Alternatives,ofthisDraftEIR. Chapter5alsoprovidesamoredetailedevaluationofthepotentialimpactsassociatedwitheachAlternative.Asindicatedin Table 5‐7, the No Project/No Build Alternative would have less impact than the Project or otheralternatives as itwouldhaveno impacts on the environment. Further, itwould avoid theProject’s shorttermsignificantandunavoidableconstructionimpactsassociatedwithnoise,vibration,andtrafficaswellastrafficoperations.Therefore,theNoProject/NoBuildAlternativeisconsideredtheoverallenvironmentallysuperiorAlternative. However,theNoProject/NoBuildAlternativewouldnotmeetanyProjectobjectivesandwouldnotprovidethebenefitsassociatedwiththeProject.Itwouldnotresultinthedevelopmentofamixedusedevelopmentprovidingconventioncenterhotelrooms,Downtownresidentialdevelopment,andtransitorienteddevelopment.

Page 7: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐7

In accordance with the State CEQA Guidelines requirement to identify an environmentally superiorAlternative other than the No Project/No Build Alternative, a comparative evaluation of the remainingAlternatives indicates that the Residential with Ground Level Commercial Alternative, would be theenvironmentally superior Alternative due to the reductions in traffic when evaluated with LOS trafficcriteria. TheResidentialwithGroundLevelCommercialAlternativewouldgenerate fewer traffic impactsthantheReducedDensityAlternative,reducingtheamountoftripgenerationandeliminatingasignificantintersection impact at one location. However, both the Residential with Ground Level CommercialAlternative and theReducedDensityAlternative,while reducing impacts from thoseof theProjectwouldcontinue to result in significant traffic impactsdue to operations and continue to have a significant noiseimpactduetoconstructionaswellasasignificantcumulativeimpactontraffic.

TheResidentialwithGroundLevelCommercialAlternativewouldalsoresultinlessimpactforsomeotherenvironmental topics than the Reduced Density Alternative. The Ground Level Commercial Alternativewouldresultinfewerimpactsthataretrafficrelatedincludingairemissionandnoiseimpactsduetotraffic.ThisAlternativewouldalsoresultislessimpactonwaterandwastewaterutilityservices.Relatedtothesetopics,theGroundLevelCommercialAlternative3wouldalsoresultinalowerlevelofenergyconsumption.

TheResidentialwithGroundLevelCommercialAlternativewouldonlypartiallymeettheProjectObjectives.Itwouldmeet theProject’sObjective’s regarding theoveralldesignof theProject. However, itwouldnotmeet Project Objectives regarding the contribution of hotel rooms to serve the Los Angeles ConventionCenter,orthecomplementarymixofusesanticipatedwiththeProject.ItwouldmeettheProjectObjectivesregardingtheprovisionofhousingunitsandtheProject’seconomicobjectives,butnottothesameextentasthe Project. Further, it would not so fully fulfill the Project Objectives regarding the implementation oftransitorienteddevelopment.

G.  SUMMARY OF ENVIRONMENTAL IMPACTS 

This section provides a summary of impacts, Project Design Features, mitigation measures, and level ofsignificanceafterimplementationofmitigationmeasuresassociatedwithProject.ThesummaryisprovidedbyenvironmentalissueareabelowinTableES‐1,SummaryofProjectImpacts,ProjectDesignFeatures,andMitigationMeasures.

Page 8: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016     Executive Summary 

 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐8

Table ES‐1  

Summary of Project Impacts, Project Design Features, and Mitigation Measures 

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

A.Aesthetics/VisualResources

ImpactStatementAES‐1:Constructionactivitiesandassociatedequipmentandmaterialswouldbescreenedandtemporaryfencing,barriers,andwalkwayswouldbeinspectedtoremoveunauthorizedmaterialsandensuretheyaremaintainedinareasonablemannerthroughouttheconstructionperiod.Asaresult,effectsonvisualcharacterduetoshorttermconstructionactivitieswouldbelessthansignificant.

PDF‐AES‐1:ConstructionFencing:TheApplicantshallprovideandmaintainaconstructionfenceforsafetyandtoscreenviewstotheProjectSiteduringconstructiontotheextentfeasible.Thefenceshallbelocatedalongthenorth,south,eastandwestperimetersoftheProjectSitewithaminimumheightof8feet.TheApplicantshallensurethroughappropriatepostingsandregularvisualinspectionsthatnounauthorizedmaterialsarepostedontemporaryconstructionbarriersortemporarypedestrianwalkways,andthatsuchtemporarybarriersandwalkwaysaremaintainedinareasonablemannerthroughouttheconstructionperiod.

Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementAES‐2:TheProjectwouldreplacetheexistingLuxeHotelandparkinglotswithamoderndevelopmentthatincludesthreetowers,aPodium,publicplaza,andstreetscapeimprovements.TheProjectarchitectureanddesignwouldrespondtoandbecompatiblewithsurroundingdevelopment,includingtheadjacentPetroleumBuilding.ComparedtoexistingconditionswiththeLUXEHotelbuilding,surfaceparkinglots,andlimitedlandscaping,theProjectwouldimprovevisualconditions,particularlyduetosignificantupgradestothestreetscapeandpedestrianenvironment.Therefore,theProjectwouldhavealessthansignificant

PDF‐AES‐2:ScreeningofUtilities:TheProjectwouldvisuallyscreennewtransformersandotherutilitiesassociatedwiththeProjectfrompublicview.

Nomitigationmeasuresarerequired. LessthanSignificant

Page 9: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐9

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

impactwithrespecttoaestheticcharacter.

ImpactStatementAES‐3:TheProjectwouldnotobstructorsubstantiallydegradevaluedfocalorpanoramicviewsonoracrosstheProjectSite.Projectimpactsonviewswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementAES‐4:TheProjectwouldnotcreateanewsourceoflightorglarethatwouldsubstantiallyalterthecharacterofoff‐siteareas,whichcurrentlyexperiencehighilluminancelevels;wouldresultinlightspillofgreaterthan3.0footcandlesatadjacentlight‐sensitivereceptors;orcauseexcessiveglareandcontrastcomparedtoexistingconditions.Therefore,impactsregardinglightandglarewouldbelessthansignificant.

PDF‐AES‐3:IlluminatedSigns:IlluminatedsignswillbedesignedtocomplywiththerequirementsofCALGreen,includingrequiring65percentdimmingatnight.

Nomitigationmeasuresarerequired. LessthanSignificant

PDF‐AES‐4:Glare.Glassandotherbuildingmaterialsusedinexteriorfaçadesshallbelowreflectiveand/ortreatedwithanon‐reflectivecoatinginordertominimizeglare.Priortoissuanceofabuildingpermit,theDepartmentofBuildingandSafetyshallreviewtheexteriorbuildingmaterialstoconfirmthattheydonotexceedthereflectivityofstandardbuildingmaterials,andwouldnotcausesignificantglareimpactsonmotoristsornearbyresidentialuses.

Page 10: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐10

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

ImpactStatementAES‐5:TheProjectwouldnotshadeshadow‐sensitiveusesformorethanthreehoursbetweenthehoursof9:00A.M.and3:00P.M.PST,ormorethanfourhoursbetweenthehoursof9:00A.M.and5:00P.MPDT.Shade/shadowimpactswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementAES‐6:TheProjectwouldbesubstantiallyconsistentwithapplicableguidelinesorregulationsrelatedtoaestheticsorvisualquality.Impactswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

B.AirQuality

ImpactStatementAQ‐1:ConstructionoftheProjectwouldnotexceedtheapplicableSCAQMDdailyregionalnumericthresholdsforVOC,NOX,CO,SO2,PM10,orPM2.5.Therefore,regionalconstructionemissionimpactswouldbelessthansignificant.

PDF‐AQ‐2:ConstructionMeasures:TheProjectshallutilizeoff‐roaddiesel‐poweredconstructionequipmentthatmeetsorexceedstheCARBandUSEPATier4off‐roademissionsstandardsforequipmentratedat50hporgreaterduringProjectconstruction.Equipment,suchastowercranes,weldersandpumpsshallbeelectricoralternativefueled(i.e.,non‐diesel).Totheextentpossible,polepowerwillbemadeavailableforusewithelectrictools,equipment,lighting,etc.Alternative‐fueledgeneratorsshallbeusedwhencommercialmodelsthathavethepowersupplyrequirementstomeettheconstructionneedsoftheProjectarereadilyavailablefromlocalsuppliers/vendors.Theserequirementsshallbeincludedinapplicablebiddocumentsandsuccessfulcontractor(s)mustdemonstratetheabilitytosupplysuchequipment.Acopy

Nomitigationmeasuresarerequired. LessthanSignificant

Page 11: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐11

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

ofeachunit’scertifiedtierspecificationormodelyearspecificationandCARBorSCAQMDoperatingpermit(ifapplicable)shallbeavailableuponrequestatthetimeofmobilizationofeachapplicableunitofequipment.

PDF‐AQ‐3:ControlofVOCs:TheProjectshallutilizelow‐emittingmaterialspursuanttotherequirementsoftheLEEDLow‐EmittingMaterialCreditorequivalent.Indoorcoatingsshallbelimitedto50gramsperliterofVOCsorless.

ImpactStatementsAQ‐2andAQ‐3:ConstructionoftheProjectwouldnotexceedtheSCAQMDlocalizedsignificancethresholdsforCO,NOX,PM10,andPM2.5atnearbysensitivereceptors.ImpactsregardingtheProject’scontributiontolocalCO,NOX,PM10,andPM2.5concentrationswouldbelessthansignificant.

SeePDF‐AQ‐2 Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementAQ‐4:TheProject’scontributiontoregionalemissionsduringoperationswouldbelessthansignificant.ProjectoperationalemissionswouldbebelowtheSCAQMDnumericindicatorsforVOC,NOX,CO,SO2,PM10andPM2.5.

PDF‐AQ‐1:GreenBuildingMeasures:TheProjectwouldbedesignedandoperatedtomeetorexceedtheapplicablerequirementsoftheStateofCaliforniaGreenBuildingStandardsCodeandtheCityofLosAngelesGreenBuildingCodeandachievetheequivalentoftheUSGBCLEEDSilverCertificationlevel.Greenbuildingmeasureswouldinclude,butarenotlimitedtothefollowing:

TheProjectwouldimplementaconstructionwastemanagementplanto

Nomitigationmeasuresarerequired. LessthanSignificant

Page 12: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐12

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

divertallmixedconstructionanddemolitiondebristoCitycertifiedconstructionanddemolitionwasteprocessors,consistentwiththeLosAngelesCityCouncilapprovedCouncilFile09‐3029.

TheProjectwouldbedesignedtooptimizeenergyperformanceandreducebuildingenergycostby14percentfornewconstructioncomparedtotheTitle24BuildingEnergyEfficiencyStandardsasspecifiedintheLEED2009EnergyandAtmospherecredit1(EAc1).

TheProjectwouldbedesignedtooptimizeenergyperformanceandreducebuildingenergycostbyinstallingenergyefficientappliancesthatmeettheUSEPAENERGYSTARratingstandardsorequivalent.

TheProjectwouldincludedouble‐panedwindowstokeepheatoutduringsummermonthsandkeepheatinsideduringwintermonths.

TheProjectwouldincludelightingcontrolswithoccupancysensorstotakeadvantageofavailablenaturallight.

TheProjectwouldreduceoverallpotablewaterusebyaminimumof50percentcomparedtobaselinewaterconsumption.Reductionswouldbeachievedthroughdrought‐tolerant/Californianativeplantspeciesselection,artificialturf,irrigationsystemefficiency,alternativewatersupplies

Page 13: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐13

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

(e.g.,rainwaterharvestingforuseinlandscaping),and/orsmartirrigationsystems(e.g.,weather‐basedcontrols).

TheProjectwouldreduceindoorpotablewaterusebyaminimumof40percentcomparedtobaselinewaterconsumptionbyinstallingwaterfixturesthatexceedapplicablestandards.

TheProjectwouldprovideon‐siterecyclingareas,consistentwithCityofLosAngelesstrategiesandordinances,withthegoalofachieving70percentwastediversionby2020,and90percentby2025.

ToencouragecarpoolingandtheuseofelectricvehiclesbyProjectresidentsandvisitors,theApplicantshalldesignateaminimumof8percentofon‐siteparkingforcarpooland/oralternative‐fueledvehicles,andtheProjectdesignwillprovidefortheinstallationoftheconduitandpanelcapacitytoaccommodatefutureelectricvehiclechargingstationsinto10percentoftheparkingspaces.

SeealsoPDF‐AQ‐3

ImpactStatementAQ‐5andAQ‐6:LocalizedimpactsduetoProjectoperationswouldbelessthansignificant.ProjectoperationalemissionsofNOX,CO,PM10andPM2.5

SeePDF‐AQ‐1 Nomitigationmeasuresarerequired. LessthanSignificant

Page 14: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐14

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

wouldbelessthantheSCAQMDnumericthresholds.

ImpactStatementAQ‐7:ProjectimpactsregardingtheconcentrationofCOatintersectionsintheProjectvicinitywouldbelessthansignificant.ThenumberoftraffictripsgeneratedbytheProjectwouldnotcontributetotheformationofCOhotspotsinexcessoftheapplicablestandards.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementAQ‐8:ImpactsfromtheemissionofTACswouldbelessthansignificantforProjectconstructionandlessthansignificantwithrespecttoProjectoperations.BasedontheState’srecentlyupdatedconservativeHRAguidelines,theProject’sconstruction‐periodemissionsofDPM,aState‐recognizedhumancarcinogen,incloseproximitytosensitiveoff‐siteresidentialreceptorstothenorth,east,southeast,andsouthwouldresultinalessthansignificantincreaseinlife‐timecancerrisktothoseresidentialuses.HealthimpactsfromtheremovalandtransportofcontaminatedsoilsandmaterialsfromtheProjectSitewouldnotsubstantiallycontributetoconstructionhealthrisksandwouldbelessthansignificant.TheProjectwouldnotincludepermanentsources(equipment,etc.)thatwouldgeneratesignificantamountsoflong‐termTACemissionsin

SeePDF‐AQ‐2 Nomitigationmeasuresarerequired. LessthanSignificant

Page 15: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐15

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

excessoftheHRAguidelines.

ImpactStatementAQ‐9:Impactsregardingconsistencywithapplicableplansandpolicieswouldbelessthansignificant.ConstructionandoperationoftheProjectwouldbeconsistentwiththeRTPprojectionsthatareusedinpreparingtheAQMP.TheProjectwouldcontributetolandusepatternsthatreducevehicletrips,andwouldincludeProjectDesignFeaturesthatreduceenergyconsumption,thusreducingairqualityemissions.Further,theProjectwouldcomplywithapplicablecontrolmeasures.Therefore,theProjectwouldcontributetoreductionsinairqualityemissionsinthemannersuggestedintheapplicableplans.

SeePDF‐AQ‐1 Nomitigationmeasuresarerequired. LessthanSignificant

C.CULTURALRESOURCES

1.ArchaeologicalandPaleontologicalResources

ImpactStatementARCH‐1: Impactsonburiedhistoricarchaeologicalresourcesareconsideredpotentiallysignificant,astheProjectwouldinvolveexcavationsintosoilswiththepotentialtoretainresourcesassociatedwiththeformerturnofthe20thcenturyresidentialusesontheProjectSite.

NotApplicable MM‐ARCH‐1:TheApplicantshallretainaqualifiedArchaeologistwhomeetstheSecretaryoftheInterior’sProfessionalQualificationsStandardsforanarchaeologist,whoshallsuperviseanarchaeologicalmonitorthatwillbepresentduringconstructionexcavationssuchasgrading,trenching,grubbing,oranyotherexcavationactivityassociatedwiththeProject.

LessthanSignificantafterMitigation

Page 16: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐16

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

ThefrequencyofmonitoringshallbedeterminedbytheArchaeologistbasedontherateofexcavationandgradingactivities,proximitytoknownarchaeologicalresources,thematerialsbeingexcavated(nativeversusfillsoils),andthedepthofexcavation,andiffound,theabundanceandtypeofarchaeologicalresourcesencountered.Full‐timefieldobservationcanbereducedtopart‐timeinspectionsorceasedentirelyifdeterminedappropriatebytheArchaeologist.

MM‐ARCH‐2:Intheeventthathistoricorprehistoricarchaeologicalresources(e.g.,bottles,foundations,refusedumps,NativeAmericanartifactsorfeatures,etc.)areunearthedduringground‐disturbingactivities,theApplicantshallhaltorredirectground‐disturbingactivitiesawayfromthevicinityofthefind,sothatthefindcanbeevaluatedbyaqualifiedArchaeologist.Abufferareaofatleast25feetshallbeestablishedaroundthefindwhereconstructionactivitiesshallnotbeallowedtocontinue.Workshallbeallowedtocontinueoutsideofthebufferarea.AllarchaeologicalresourcesunearthedbyProjectconstructionactivitiesshallbeevaluatedbytheArchaeologist.TheApplicantshallcoordinatewiththearchaeologistandtheCitytodevelopanappropriatetreatmentplanforthe

Page 17: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐17

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

resourcesiftheyaredeterminedtobepotentiallyeligiblefortheCaliforniaRegisterorpotentiallyqualifyasuniquearchaeologicalresourcespursuanttoCEQA.Preservationinplace(i.e.,avoidance)shallbeconsideredasatreatmentmeasurefirst.Ifpreservationinplaceisnotfeasible,treatmentmayincludetheimplementationofarchaeologicaldatarecoveryexcavationstoremovetheresourcefromtheProjectSitealongwithsubsequentlaboratoryprocessingandanalysis.Anyarchaeologicalmaterialcollectedshallbecuratedatapublic,non‐profitinstitutionwitharesearchinterestinthematerials,suchastheNaturalHistoryMuseumofLosAngelesCountyortheFowlerMuseum,ifsuchaninstitutionagreestoacceptthematerial.Ifnoinstitutionacceptsthearchaeologicalmaterial,itshallbedonatedtoalocalschoolorhistoricalsocietyforeducationalpurposes.TheArchaeologistshalldeterminetheneedforarchaeologicalconstructionmonitoringinthevicinityofthefindthereafter.

MM‐ARCH‐3:TheArchaeologistshallprepareafinalreportandappropriateCaliforniaDepartmentofParksandRecreationSiteFormsattheconclusionofarchaeologicalmonitoring.Thereportshallincludeadescriptionofresourcesunearthed,ifany,treatment

Page 18: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐18

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

oftheresources,resultsoftheartifactprocessing,analysis,andresearch,andevaluationoftheresourceswithrespecttotheCaliforniaRegisterofHistoricalResources.ThereportandtheSiteFormsshallbesubmittedbytheApplicanttotheCity,theSouthCentralCoastalInformationCenter,andrepresentativesofotherappropriateorconcernedagenciestosignifythesatisfactorycompletionoftheProjectconstruction.TheApplicant,inconsultationwiththearchaeologistandtheCity,shalldesignaterepositoriesmeetingStatestandardsintheeventthatarchaeologicalmaterialisrecovered.ProjectmaterialshallbecuratedinaccordancewiththeStateHistoricalResourcesCommission’sGuidelinesforCurationofArchaeologicalCollections.

ImpactStatementPALEO‐1:AlthoughtheProjectSitehasbeenpreviouslydisturbedthroughgradingand/ordevelopmentfortheconstructionoftheLuxeCityCenterHotel,itispossiblethatProjectgradingandexcavationmayencounternativesoil/sedimentassociatedwitholderQuaternaryAlluvium,theFernandoFormation,andthePuenteFormationdepositsthathavehighpotentialforcontainingburiedpaleontologicalresources.Asaresult,thepotentialexistsforconstructiontodirectlyorindirectlydestroyburied

NotApplicable MM‐PALEO‐1:AqualifiedPaleontologistshallattendapre‐grademeetinganddevelopapaleontologicalmonitoringprogramforexcavationsintoolderQuaternaryAlluviumdeposits.AqualifiedPaleontologistisdefinedasaPaleontologistmeetingthecriteriaestablishedbytheSocietyforVertebratePaleontology.ThequalifiedPaleontologistshallsuperviseapaleontologicalmonitorwhoshallbepresentduringconstructionexcavationsintoolderQuaternaryAlluviumdeposits.Monitoringshall

LessthanSignificantafterMitigation

Page 19: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐19

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

uniquepaleontologicalresourcesorsitesoruniquegeologicfeatures.Impactstoburiedpaleontologicalresourcesareconsideredpotentiallysignificant.

consistofvisuallyinspectingfreshexposuresofrockforlargerfossilremainsand,whereappropriate,collectingwetordryscreenedsedimentsamplesofpromisinghorizonsforsmallerfossilremains.ThefrequencyofmonitoringinspectionsshallbedeterminedbythePaleontologistandshallbebasedontherateofexcavationandgradingactivities,proximitytoknownpaleontologicalresourcesorfossiliferousgeologicformations(i.e.,QuaternaryAlluviumdeposits),thematerialsbeingexcavated(i.e.,nativesedimentsversusartificialfill),andthedepthofexcavation,andiffound,theabundanceandtypeoffossilsencountered.Full‐timefieldobservationcanbereducedtopart‐timeinspectionsorceasedentirelyifdeterminedadequatebythequalifiedPaleontologist.

Page 20: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐20

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

MM‐PALEO‐2:Ifapotentialfossilisfound,thepaleontologicalmonitorshallbeallowedtotemporarilydivertorredirectgradingandexcavationactivitiesintheareaoftheexposedfossiltofacilitateevaluationand,ifnecessary,salvage.Abufferareaofatleast25feetshallbeestablishedaroundthefindwhereconstructionactivitiesshallnotbeallowedtocontinue.Workshallbeallowedtocontinueoutsideofthebufferarea.AtthePaleontologist’sdiscretionandtoreduceanyconstructiondelay,thegradingandexcavationcontractorshallassistinremovingrocksamplesforinitialprocessing.

MM‐PALEO‐3:Anyfossilsencounteredandrecoveredshallbepreparedtothepointofidentificationandcataloguedbeforetheyaredonatedtotheirfinalrepository.Anyfossilscollectedshallbecuratedatapublic,non‐profitinstitutionwitharesearchinterestinthematerials,suchastheLosAngelesCountyNaturalHistoryMuseum,ifsuchaninstitutionagreestoacceptthefossils.Ifnoinstitutionacceptsthefossilcollection,theyshallbedonatedtoalocalschoolintheareaforeducationalpurposes.Accompanyingnotes,maps,andphotographsshallalsobefiledattherepositoryand/orschool.

Page 21: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐21

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

MM‐PALEO‐4:Followingthecompletionoftheabovemeasures,thePaleontologistshallprepareareportsummarizingtheresultsofthemonitoringandsalvagingefforts,themethodologyusedintheseefforts,aswellasadescriptionofthefossilscollectedandtheirsignificance.ThereportshallbesubmittedbytheProjectApplicanttotheleadagency,theNaturalHistoryMuseumofLosAngelesCounty,andrepresentativesofotherappropriateorconcernedagenciestosignifythesatisfactorycompletionoftheProjectandrequiredmitigationmeasures.

ImpactStatementTCR‐1:TheProjectwouldnotresultinasubstantialadversechangeinthesignificanceofatribalculturalresourceasdefinedinPublicResourcesCodeSection21074.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

2.HistoricalResources

ImpactStatementHIST‐1:TheProjectwoulddemolishtheLuxeHotel,recommendedineligibleatthenational,Stateandlocallevels,andtherefore,therewouldnodirectProjectimpactsonhistoricalresources.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementHIST‐2:TheProjectwouldnotreduceormateriallyimpairtheintegrityorsignificanceofimportanthistoricalresourcesintheProjectvicinitysuchthattheireligibilityfor

NotApplicable SeemitigationmeasureMM‐NOISE‐2regardingconstructionvibrationimpacts.

Significantandunavoidable,requirestheconsentoftheproperty

Page 22: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐22

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

listingonaregisterofhistoricalresourceswouldbesubstantiallychanged.However,duringconstructionindirectvibrationimpactsonthePetroleumBuildinghavethepotentialtoexceedavibrationthresholdshouldtheconsentofthepropertyownernotbesecuredfortheinstallationofcontinuouslyoperationalautomatedvibrationalmonitorsonthePetroleumBuilding.Therefore,indirectimpactsonthePetroleumBuildingareconservativelyconcludedtobesignificantandunavoidable.

ownerofthePetroleumBuildingtoimplementtheproposedmitigation.

D.GREENHOUSEGASEMISSIONS

ImpactStatementGHG‐1:TheProjectwouldgenerateGHGemissionsduetoconstructionandoperationalactivities;however,thenetincreaseinannualGHGemissions,directlyandindirectly,wouldbeconsistentwiththeCityofLosAngelesLAGreenPlanandSustainableCitypLAn.Therefore,astheProjectwouldbeconsistentwiththeapplicableCity’sgoalsandactionsforGHGemissions,GHGemissionsandassociatedimpactswouldbelessthansignificant.

SeePDF‐AQ‐1andPDF‐AQ‐2 Nomitigationmeasuresarerequired. LessthanSignificant

Page 23: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐23

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

ImpactStatementGHG‐2:TheProjectwouldbeconsistentwiththeAB32goalsandCARBguidelinesforassessingGHGemissions.Further,theProjectwouldincludelandusecharacteristicsanddesignfeaturesthatwouldbeconsistentwithState,Regional,andLocalRegulationsforreducingGHGemissions.Therefore,astheProjectwouldbeconsistentwithapplicableplans,policiesandregulationsadoptedforthepurposeofreducingGHGemissions,impactsregardinggreenhousegasreductionplanswouldbelessthansignificant.

SeePDF‐AQ‐1 Nomitigationmeasuresarerequired. LessthanSignificant

E.HAZARDSANDHAZARDOUSMATERIALS

ImpactStatementHAZ‐1:Excavationwouldencountercontaminatedsoilsandabandonedfuelfacilities,whichifnotproperlyhandledinaccordancewithapplicablefederal,state,andlocalregulations,couldexposepeopletocontaminants,resultinginapotentiallysignificantimpact.ExcavationoftheProjectSitecouldalsoposearisktoconstructionworkersandfuturebuildingoccupantsduetosoilswithpollutantconcentrationsabovefederalandstateremediationlevels.Thisisconsideredapotentiallysignificantimpact.Lastly,historicbusinessdirectoriessuggestlandusesoftenassociatedwithsoilcontaminationweredemolishedandreplacedpriortomodernhazardousmaterialstracking

PDF‐HAZ‐1:RemovalofUSTandAssociatedPiping:The530‐gallondieselUSTandassociatedpipingabandonedinplacebeneaththeexistinghoteldrivewayandlandscapedmedianshallberemovedinaccordancewiththeprovisionsoftheCovenantandAgreementrecordedwiththeCityonJune21,2013,includingtherequiredpermitting,soilsamplingandtesting,andreportingtotheLAFD.

MM‐HAZ‐1:SoilManagementPlan.BecausetheProjectSitecontainssubsurfacecontaminantsthatwouldbeencounteredduringexcavationactivities,theApplicantshallretainaqualifiedenvironmentalconsultanttoprepareaSoilManagementPlanforContaminatedSoils(SMP)duringProjectdesigndevelopment,whichwillbesubmittedtotheCityofLosAngelesDepartmentofBuildingandSafetyforreviewandapprovalpriortothecommencementofexcavationandgradingactivities.TheSMPshallbeimplementedduringexcavationandgradingactivitiesontheProjectSitetoensurethatanycontaminatedsoilsareproperlyidentified,excavated,and

LessthanSignificantafterMitigation

Page 24: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐24

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

requirementsandremediationstandards.Theexistingon‐sitestructurespreventsoilsproposedforexcavationfrombeingtestedforsubsurfacecontamination.Asaresult,thepotentialpresenceofsoilcontaminationinuntestedareasoftheProjectSiteisconsideredapotentiallysignificantimpact.

disposedofoff‐site,asfollows:

TheSMPshallbepreparedandexecutedinaccordancewithSouthCoastAirQualityManagementDistrict(SCAQMD)Rule1166,VolatileOrganicCompoundEmissionsfromDecontaminationofSoil.TheSMPshallrequirethetimelytestingandsamplingofsoilssothatcontaminatedsoilscanbeseparatedfrominertsoilsforproperdisposal.TheSMPshallspecifythetestingparametersandsamplingfrequency.Anticipatedtestingincludestotalpetroleumhydrocarbons(TPH),volatileorganiccompounds(VOCs),andsemi‐volatileorganiccompounds(SVOCs).Duringexcavation,Rule1166requiresthatsoilsidentifiedascontaminatedshallbesprayedwithwateroranotherapprovedvaporsuppressant,orcoveredwithsheetingduringperiodsofinactivityofgreaterthananhour,topreventcontaminatedsoilsfrombecomingairborne.UnderRule1166,contaminatedsoilsshallbetransportedfromtheProjectSitebyalicensedtransporteranddisposedofatalicensedstorage/treatmentfacilitytopreventcontaminatedsoilsfrombecomingairborneorotherwisereleasedintotheenvironment.

Page 25: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐25

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

Priortothecommencementofgradingandexcavation,thefindingsofthePhaseIEnvironmentalSiteAssessment(ESA)fortheLUXECityCenterHotelandSummaryReportforLimitedSoilandSoilGasInvestigation,LuxeHotelshallbereportedtotheCountyofLosAngelesFireDepartmentHealthandHazardousMaterialsDivision(HHMD),SiteMitigationUnit(SMU)(323‐890‐4045)andtheCityofLosAngelesFireDepartment(LAFD)forreviewandcomment.TherecommendationsoftheHHMDandLAFDshallbeincorporatedintheSMP.

AqualifiedenvironmentalconsultantshallbepresentontheProjectSiteduringgradingandexcavationactivitiesintheknownorsuspectedlocationsofcontaminatedsoilsortheUST,andshallbeoncallatothertimesasnecessary,tomonitorcompliancewiththeSMPandtoactivelymonitorthesoilsandexcavationsforevidenceofcontamination.

Thedieselundergroundstoragetank(UST),transferpump,andapproximately200feetofpipingcurrentlyabandonedinplaceundertheexistinghoteldrivewayshallberemovedinaccordance

Page 26: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐26

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

withtheCovenantandAgreementdatedJune25,2013andLosAngelesMunicipalCode(LAMC)Section57.31.52(AbandonmentofUndergroundStorageTanks).AsrequiredbyLAMCSection57.31.52,theApplicantshallnotifytheLAFDpriortotankremoval,inert(removeorneutralizeanyflammablematerialsandvapors)theUSTpriortotransport,andestablishtothesatisfactionoftheLAFDthatnoreleaseofhazardousmaterialshasoccurred.TheUSTshallbeproperlydisposedofbyalicensedcontractorinaccordancewithapplicableregulations.

DuringtheProject’sexcavationphase,theProjectApplicantshallremoveandproperlydisposeofimpactedmaterialsinaccordancewiththeprovisionsoftheSMP.Ifsoilisstockpiledpriortodisposal,itwillbemanagedinaccordancewiththeProject’sStormWaterPollutionPreventionPlan,priortoitstransferfortreatmentand/ordisposal.AllimpactedsoilswouldbeproperlytreatedanddisposedofinaccordancewithSouthCoastAirQualityManagementDistrict(SCAQMD)Rule1166,VolatileOrganicCompoundEmissionsfromDecontaminationofSoil,aswellasapplicablerequirementsofthe

Page 27: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐27

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

CaliforniaDepartmentofToxicSubstances(DTSC),andLosAngelesRegionalWaterQualityControlBoard(LARWQCB).

MM‐HAZ‐2:HealthandSafetyPlan.GiventhepresenceofknownsoilcontaminationonatleastthenorthernportionoftheProjectSite,aHealthandSafetyPlanshallbepreparedincompliancewithOSHASafetyandHealthStandards(29CodeofFederalRegulations1910.120)andCal/OSHArequirements(CCRTitle8,GeneralIndustrySafetyOrdersandCaliforniaLaborCode,Division5,Part1,Sections6300‐6719)andsubmittedforreviewbytheDepartmentofBuildingandSafety.TheHealthandSafetyPlanwouldaddress,asappropriate,safetyrequirementsthatwouldservetoavoidsignificantimpactsorriskstoworkersorthepublicintheeventthatelevatedlevelsofsubsurfacegasesareencounteredduringgradingandexcavation.TheHealthandSafetyPlanwouldalsoaddresspotentialvaporencroachmentfromthesoilcontaminationfromtheformergasstationintothesubterraneanlevelsofthebuilding.Gasmonitoringdeviceswouldbeinplacetoalertworkersintheeventelevatedgasorothervaporconcentrationsoccurwhenbasementslabdemolitionorsoilexcavationisbeingperformed.Contingency

Page 28: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐28

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

procedureswouldbeinplaceintheeventelevatedgasconcentrationsaredetected,suchasthemandatoryuseofpersonalprotectiveequipment,evacuationofthearea,and/orincreasingventilationwithintheimmediateworkarea.Workerswouldbetrainedtoidentifyexposuresymptomsandimplementalarmresponse.ConstructionfencingwouldbeinstalledarounddevelopmentareastorestrictpublicaccessfromsurroundingpropertiesandotherPhasesoftheProjectSite,furtherreducethepotentialforcontaminatedsoilstobecomeairborne,andprovideadditionaldistancebetweenthepublicandexcavationactivitiestoallowforgasandvapordilution.TheHealthandSafetyPlanwouldhaveemergencycontactnumbers,mapstothenearesthospital,gasmonitoringactionlevels,gasresponseactions,allowableworkerexposuretimes,andmandatorypersonalprotectiveequipmentrequirements.TheHealthandSafetyPlanwouldbesignedbyallworkersinvolvedinthedemolitionandexcavationofon‐sitesoilstodemonstratetheirunderstandingoftherisksofexcavation.

MM‐HAZ‐3:AdditionalSiteTesting.TheApplicantshallconductadditionalsubsurfacesoilandasoilgassamplingandtestinginaccordancewiththe

Page 29: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐29

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

recommendationsofthe SummaryReportforLimitedSoilandSoilGasInvestigation,LuxeHotel,preparedbyTerra‐PetraanddatedJune27,2016.Theadditionalsitetestingshallbecompletedinthelocationofexistingon‐sitestructures,subsequenttotheirdemolitionandpriortotheexcavationofsoilsattheselocations.ThefindingsofthesoilandsoilgassamplingeffortshallbedocumentedinarevisedSoilandSoilGasInvestigationReport,whichshallbesubmittedtotheLosAngelesDepartmentofBuildingandSafetyandLosAngelesFireDepartmentpriortothecommencementofexcavationinthelocationoftheformerstructures.Anyadditionalrecommendationspertainingtoremediation,publichealth,andworkersafetyintherevisedSoilandSoilGasInvestigationReportshallbeincorporatedintoanupdatedSoilManagementPlanandHealthandSafetyPlan.

ImpactStatementHAZ‐2:ImpactsregardingdemolitionoftheLuxeHotelbuildingwouldbelessthansignificant.Theidentification,handling,removal,and/ordisposalofACMs,LBPandPCBswouldbecompletedincompliancewithregulatoryrequirements,andthereforeimpactswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 30: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐30

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

ImpactStatementHAZ‐3:TheProjectislocatedinLADBSdesignatedMethaneHazardArea(MethaneZone).Methanegasfoundinsoilsampleswasdeterminedtobeofmicrobialoriginandcausedbyanaerobicmicrobialdegradationofresidualgasolinedepositsinthesubsurfacesoil,andnotofthermogenicorigin.WithimplementationofamethanemitigationsystemdesignedinaccordancewithDivision71ofLAMCSection91.7104,impactswithregardtomethanewouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementHAZ‐4:Impactsregardingthehandlingandstorageofhazardousmaterialswouldbelessthansignificant.TheProjectwouldrequiretheuseofproductsforconstructionandoperationsthatareroutinelyusedinperformingeverydayhousehold,hotel,andretailactivitiesconsistentwithregulatoryrequirements;itwouldnotrequiretheuseofhazardousmaterialsbeyondtheseroutinelyusedproducts.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementHAZ‐5:TheProject’scumulativeimpacts,inclusiveofimpactsfromcumulativeprojects,wouldbelessthansignificant.TheProjectwouldnothavesignificantimpactsregardinghazardousmaterialswiththeimplementationofidentifiedmitigationmeasuresandwouldnot

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 31: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐31

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

contributetocumulativeimpacts.Implementationofnearbydevelopmentwouldbeincompliancewithregulatoryrequirementsthatwouldavoidsignificantimpactsforthoseprojects.

F.LANDUSEANDPLANNING ImpactStatementLU‐1:TheProject,withtheapprovaloftheproposedentitlements,wouldbesubstantiallyconsistentwithandwouldnotsubstantiallyimpedeimplementationofadoptedlanduseplans,policies,guidance,andregulationadoptedforthepurposeofavoidingormitigatinganenvironmentaleffect.Therefore,impactswithrespecttolanduseplans,policies,guidelines,andregulationswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

G.NOISEANDVIBRATION

ImpactStatementNOISE‐1:Constructionactivitieswouldincreasenoiselevelsatoff‐siteexistingandfuturenoise‐sensitivereceptorsintheProjectAreainexcessoftheapplicablethresholds.Impactsduetonoisefromon‐siteconstructionactivitywouldbepotentiallysignificantatoff‐sitesensitiveuselocations.Evenwithimplementationoftheprescribedmitigation,noiseimpactswouldexceedtheapplicablethresholds.Thus,constructionnoiseimpactswouldbesignificantandunavoidableattheadjacentnoisesensitiveresidentialuses.

PDF‐NOISE‐1:EquipmentNoiseControl:TheProjectcontractor(s)shallequipallconstructionequipment,fixedormobile,withproperlyoperatingandmaintainednoisemufflers,consistentwithmanufacturers’standards.

PDF‐NOISE‐3:EngineidlingfromconstructionequipmentsuchasbulldozersandhaultrucksshallbelimitednomorethanfiveminutesincompliancewithapplicableCaliforniaAirResourcesBoardregulations.

MM‐NOISE‐1:Temporarynoisebarriersshallbeusedtoblocktheline‐of‐sitebetweentheconstructionequipmentandthenoise‐sensitivereceptorsduringprojectconstruction,asfollows:

Provideatemporary15‐foottallconstructionfenceequippedwithnoiseblanketscapableofachievingsoundlevelreductionsofatleast14dBAbetweentheProjectconstructionsiteandresidentialuses(R3)acrossS.FlowerStreetduringConstructionPhase1.

SignificantandunavoidableconstructionnoiseimpactsatboththeProjectandcumulativelevel.

Page 32: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐32

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

ImpactStatementNOISE‐2:Projectoff‐siteconstructiontrafficwouldincreasenoiselevelsatnoise‐sensitiveusesintheProjectarea.However,increasestoambientnoiselevelsatresidentialusesalongthehaulroutewouldnotincreaseby5dBAormoreduetoconstructiontraffic.Becausethenoiselevelswouldnotexceedtheestablishedthresholds,constructiontrafficnoiseimpactswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementNOISE‐3:Projectoperationaltrafficwouldincreasenoiselevelsatoff‐sitenoise‐sensitiveusesintheProjectarea.However,increasesinambientnoiselevelsduetooperationaltrafficwouldnotexceedtheestablishedthresholds.Operationaltraffic‐relatednoiseimpactswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementNOISE‐4:Projectimplementationwouldincreasenoiselevelsatadjacentnoise‐sensitivereceptorsintheProjectvicinity.However,Project‐relatedoperationalnoiselevelswouldnotexceedestablishedthresholds;therefore,noiseimpactswouldbelessthansignificant.

PDF‐NOISE‐6:Airconditioners,fans,generators,andrelatedequipmentwillbedesignedtonottoexceedtheambientnoiselevelsbymorethanfive(5)dBAatoffsiteresidentialuses.

Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementNOISE‐5:Projectloadingarea,refusecollectionarea,andparkingactivitieswouldnotsubstantiallyincreaseexistingnoiselevelsatadjacentnoise‐sensitive

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 33: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐33

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

receptorsintheProjectarea.Therefore,impactsinthisregardwouldbelessthansignificant.

ImpactStatementNOISE‐6:Projectimpactstoon‐sitenoise‐sensitiveuseswouldbelessthansignificant.SoundlevelsforfutureProjectresidenceswouldfallwithintheresidentialdevelopmentstandardsestablishedbytheCityofLosAngeleswiththeincorporationofrequirednoiseinsulationfeatures.

PDF‐NOISE‐2:On‐siteconstructionequipmentstagingareashallbelocatedasfarasfeasiblefromon‐sitesensitiveuses.

PDF‐NOISE‐4:Effectivenoisebarrierswillbedesignedanderectedasneededtoshieldon‐siteusesfromexcessiveconstruction‐relatednoise.

PDF‐NOISE‐5:Futureon‐siteresidentswillbenotifiedpriortopurchase/leasethatconstructionisplannedwithincloseproximitytoon‐siteresidentialuses.

Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementNOISE‐7:Constructionactivitieswouldresultinsporadic,temporaryvibrationeffectswhichcouldadverselyaffectthePetroleumBuilding.Impactsduetovibrationfromon‐siteconstructionactivitywouldbepotentiallysignificantforthePetroleumBuilding;therefore,implementationofmitigationmeasuresisrequired.

NotApplicable MM‐NOISE‐2:ToavoidorminimizepotentialconstructionvibrationdamagetofinishmaterialsonthePetroleumBuilding,theconditionofsuchmaterialsshallbedocumentedbyaqualifiedpreservationconsultant,priortoinitiationofconstruction.Duringconstruction,thecontractorshallinstallandmaintainatleasttwocontinuouslyoperationalautomatedvibrationalmonitorsonthePetroleumBuilding.Themonitorsmustbecapableofbeingprogrammedwithtwopredeterminedvibratoryvelocitieslevels:afirst‐levelalarmequivalenttoa0.45inchespersecondatthefaceofthebuildingandaregulatoryalarmlevelequivalentto0.5inchesper

Significantandunavoidable,requirestheconsentofthepropertyownerofthePetroleumBuildingtoimplementtheproposedmitigation,whichisbeyondthecontroloftheApplicant.

Page 34: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐34

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

secondatthefaceofthebuilding.Themonitoringsystemmustproducereal‐timespecificalarms(viatextmessageand/oremailtoon‐sitepersonnel)whenvelocitiesexceedeitherofthepredeterminedlevels.Intheeventofafirst‐levelalarm,feasiblestepstoreducevibratorylevelsshallbeundertaken,includingbutnotlimitedtohalting/staggeringconcurrentactivitiesandutilizinglower‐vibratorytechniques.Intheeventofanexceedanceoftheregulatorylevel,workinthevicinityshallbehaltedandthePetroleumBuildingvisuallyinspectedfordamage.Resultsoftheinspectionmustbelogged.Intheeventdamageoccurstohistoricfinishmaterialsduetoconstructionvibration,suchmaterialsshallberepairedinconsultationwithaqualifiedpreservationconsultant,andifwarranted,inamannerthatmeetstheSecretaryoftheInterior’sStandards.

ImpactStatementNOISE‐8:Projectconstructionandoperationwouldnotgenerateexcessivevibrationlevelsatnearbysensitivereceptorlocations.Thus,temporaryconstruction‐relatedvibrationandlong‐termvibrationimpactswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 35: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐35

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

H.POPULATION,HOUSING,ANDEMPLOYMENT

ImpactStatementPH‐1:TheProject’sconstructionphasewouldhavenoimpactonthesupplyofhousingunitsorpopulationgrowth.Constructionactivitieswouldcreateworkforconstructionworkersthatwouldbedrawnfromanexistingregionalpoolofexistingworkers.Theshort‐termemploymentopportunitieswouldcontributetothelocalandregionaleconomy.Impactsfromconstructionactivitywouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementPH‐2:TheProjectwouldcreatenewhousingunitsandgeneratenewemploymentopportunities.TheProject’scontributionstohousing,populationandemploymentwouldbeconsistentwithSCAG’sshort‐termandlong‐termgrowthprojectionsfortheCommunityPlanareaandtheCityofLosAngeles,andwouldhelptheCitymeetorexceeditshousingobjectivespertheGeneralPlanHousingElement,andhousingallocationestablishedintheSCAGRHNA.ImpactsregardingtherelationshipoftheProjecttoSCAGgrowthprojectionswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementPH‐3:TheProjectrepresentsamixed‐usedevelopmentthatwouldaddresidential,hotelandcommercialusestothe

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 36: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐36

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

Downtown/SouthParkarea.Thetypesandamountsofdevelopmentwouldbeconsistentwiththoseanticipatedinapplicablepoliciesandgrowthprojections.

ImpactStatementPH‐4:TheProjectisaninfilldevelopmentinanurbanareawithanestablishedinfrastructuresystem.TheProjectwouldaddnonewinfrastructureotherthanthatneededtoservetheProjectSite.Impactsregardingunplannedgrowthduetotheprovisionofnewinfrastructurewouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementPH‐5:Cumulativegrowthwouldbeconsistentwithlong‐termplannedgrowthwithintheCentralCityCommunityPlanareaandlongertermSCAGgrowthprojectionsusedforplanningfutureservicesandinfrastructure.Thecumulativeprojectsconsideredintheanalysisofcumulativedevelopmentrepresentabroadarrayofresidential,hotel,retail,andentertainmentdevelopmentsthatsupportthepoliciesoftheCentralCityCommunityPlanandCentralCityRedevelopmentPlan.CumulativeimpactsregardingconsistencywithSCAGprojectionswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementPH‐6:Thecumulativedevelopmentwouldprovideamixofusesthatsupportsencouraged

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 37: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐37

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

growthintheDowntownareainabalancedmanner.ThedevelopmentwouldenhancetheDowntownareaasthehighdensity,focalcenterofLosAngelesbestservedbypublictransit.Itwouldprovideneededhousingandbringthejobs/housingratiointocloseralignmentwiththeregionaljobs/housingratioandreflectaregionaldevelopmentpatternthatsupportreductionsinvehiclemilestraveled.Thetypesandamountsofdevelopmentwouldbeconsistentwiththoseanticipatedinapplicablepoliciesandgrowthprojections.ThecumulativedevelopmentwouldinfilltheDowntownareautilizingexistinginfrastructure,improvedifneededtoaccommodatealreadyproposeddevelopment.

I.PUBLICSERVICES

1.FireProtection

ImpactStatementFIRE‐1:TheProjectwouldnotrequiretheadditionofanewfirestationortheexpansion,consolidation,orrelocationofanexistingfirestationtomaintainserviceduetocompliancewithStateandCityregulatoryrequirementsandguidelinesthataddressemergencyresponsetimes,emergencyaccess,fireflow,andfiresafetyaswellastheimplementationofProjectDesignFeaturerelatedtoconstructiontrafficmanagementandMitigationMeasureMM‐FIRE‐1related

SeePDF‐TRAF‐1 MM‐FIRE‐1: FireHydrant. Based onan assessment of LAFDrequirements,at leastonenewfirehydrant will be required to servethe Project. Prior to theconstruction of the Project, theApplicant shall provide the LAFDspecifications, including but notlimited to, the number andplacementoffirehydrantsforeachphase of the Project pursuant toDivision 9, Section 57.09.06 of theFire Code. The number, placement

LessthanSignificant

Page 38: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐38

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

toLAFDrequirementsforhydrantspecifications.Impactswouldbelessthansignificant.

of new hydrant(s), and associatedspecifications, shall be subject toLAFD review and approval, withinstallation of such improvementsundertaken by LADWP as part ofProjectSitepreparationactivities.

ImpactStatementFIRE‐2:TheProject’scontributiontoimpactsonfireserviceswouldnotbecumulativelyconsiderable.AswiththecumulativeprojectstheProjectwouldberequiredtomeetapplicableLAFDandFireCoderequirements,includingthoseassociatedwithfireflow,sitedesignandsiteaccess.Cumulativeimpactswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

2.PoliceProtection

ImpactStatementPOL‐1:Impactsonemergencyaccessandpoliceprotectionservicesduringconstructionwouldbelessthansignificant.Constructionactivitieswouldbecarriedoutpursuanttoaconstructionmanagementplanthatwouldaddressconstruction‐relatedtrafficandsecuritymeasureswouldbeincorporatedduringconstructionincludingcontrolledaccesstotheProjectSite,privatesecurity,andsecuritylighting.

SeePDF‐TRAF‐1 MM‐POL‐1:PriortotheoccupancyoftheProject,theApplicantshallprovidetheCentralAreaCommandingOfficerwithadiagramofeachportionoftheproperty,includingaccessroutes,andadditionalinformationtofacilitatepotentialLAPDresponses.

LessthanSignificant

ImpactStatementPOL‐2:TheProjectwouldaddSitepopulationandactivitiesthatcouldrequirepoliceresponses.However,Projectsecurityfeatures

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 39: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐39

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

including,amongotherprovisions,CloseCircuitTelevisionsystems(CCTV),restrictionofaccesstonon‐publicareasbyelectronicallycontrolledandlockingaccesscards,controlledaccesstoparkingstructures,and24‐houron‐sitesecurity,includingfourtofiveprivatesecuritystaff.ASitedesignintendedtoenhanceon‐sitesafety,wouldalsoreducetheneedforadditionalpoliceservicesortheprovisionofnewpolicefacilities.Impactsonpoliceprotectionserviceswouldbelessthansignificant.

ImpactStatementPOL‐3:Cumulativeprojectswouldcontributetothedemandforpoliceservices;althoughdemandwouldbereducedthroughprovisionofsecurityfeaturesonaproject‐by‐projectbasis,contributionstotheSouthParkBID,andrevenuestotheCityappliedtosupportpoliceservices.TheProjectwouldincrementallyincreasetheneedforpoliceservices,buteveninlightofcumulativeprojects,itisnotexpectedtorequireconstructionofanexpandedornewpolicestation,constructionofwhichwouldresultinsignificantimpactsontheenvironment.TheProject’sincrementalcontributiontodemandonpoliceserviceswouldnotbecumulativelyconsiderableandcumulativeimpactsassociatedwiththeProjectwouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 40: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐40

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

3.Libraries

ImpactStatementLIB‐1:Constructionworkerswouldcomefromanexistinglaborpoolandwouldnotrequirenotablerelocationofpopulationwithinthevicinityofanyonelibrary.TherearenolibrariesadjacenttotheProjectSitethatwouldbeimpactedbyProjectconstruction.ImpactsonlibraryservicesduetoProjectconstructionwouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementLIB‐2:TheProjectwouldincreasetheresidentialpopulationintheProjectarea,whichwouldincreasedemandforlibraryservices.However,thereissufficientcapacitytoaccommodatethatdemandthroughthelibrariesservingtheProject.Impactsonlibraryserviceswouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementLIB‐3:CumulativegrowthintheProjectareawouldincreasethenumberofpeopleutilizingthesixLAPLlibrariesservingtheProjectarea.However,evenifsignificantcumulativeimpactsweretooccur,theProject’scontributiontotheseimpactswouldnotbecumulativelyconsiderablebecausetheProject’snetnewresidentialpopulationwouldbeservedbytheCentralLibraryandPicoUnionBranchLibrarywhicharemostproximatetotheProjectSiteandhaveamplecapacitytoservetheProjectandcumulative

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 41: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐41

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

projects.Cumulativeimpactsonlibraryserviceswouldbelessthansignificant.

4.ParksandRecreation

ImpactStatementPRK‐1:Impactsduetoconstructionwouldbelessthansignificant.TherearenoparksinthevicinityoftheProjectSitethatwouldbeaffectedbyProjectconstruction.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementsPRK‐2:TheProjectwouldaddnewresidentialpopulationtotheProjectarea,whichwouldincreasethedemandforparkservices.TheProjectwouldincluderecreationamenitiesandopenspacethatwouldreducetheuseofparksbyresidents,butwouldnotmeettheCity’slong‐rangestandardoftenacresofparklandper1,000residentsortheshort‐rangestandardoftwoacresper1,000residents.However,throughcompliancewithapplicableregulatoryrequirementsoftheLAMC,impactsonparksandrecreationwouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

ImpactStatementPRK‐3:TheProjectwouldincludethedevelopmentofon‐siterecreationalamenitiesandopenspace.However,theserecreationalamenitiesandopenspacewouldbedevelopedonorwithintheproposedbuildingsoronthegroundlevelofthebetweentheproposedbuildingsandtheProjectSiteboundary.Impactswould

NotApplicable Nomitigationmeasuresarerequired. LessthanSignificant

Page 42: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐42

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

belessthansignificant.

J.TRANSPORTATIONANDTRAFFIC

ImpactStatementTRAF‐1:WiththeimplementationofPDF‐TRAF‐1,ConstructionManagementPlan,potentialconstructionimpactsassociatedwithhauling,deliveries,laneclosures,andworkervehicleswouldbereducedthroughscheduling,trafficcontrols,notification,andsafetyprocedurestoensurethattheProjectwouldnotresultin:substantialdisruptionoftrafficflow,intersectionoperationalimpacts,conflictswithpedestriansand/orbicyclists,thelossofon‐streetparking,orconflictswithconstructionofMyFigueroaProject,LosAngelesStreetcarProject,andexistingMetrooperations.Anytemporaryrelocationofbusstopswouldnotexceedone‐quartermiledistancefromtheProjectSite.Transportationandparkingimpactsrelatedtoconstructionwouldbelessthansignificant.

PDF‐TRAF‐1:ConstructionManagementPlan:PriortotheissuanceofabuildingpermitfortheProject,adetailedConstructionManagementPlanincludingstreetclosureinformation,adetourplan,haulroutes,andastagingplanwouldbepreparedandsubmittedtotheCityforreviewandapproval.TheConstructionManagementPlanwouldformalizehowconstructionwouldbecarriedoutandidentifyspecificactionsthatwouldberequiredtoreduceeffectsonthesurroundingcommunity.TheConstructionManagementPlanshallbebasedonthenatureandtimingofthespecificconstructionactivitiesandotherprojectsinthevicinityoftheProjectSite,andshallinclude,butnotbelimitedto,thefollowingelementsasappropriate:

Advance,bilingualnotificationofadjacentpropertyownersandoccupantsofupcomingconstructionactivities,includingdurationsanddailyhoursofoperation.

Prohibitionofconstructionworkerorequipmentparkingonadjacentstreets.

Temporarypedestrian,bicycle,andvehiculartrafficcontrolsduringallconstructionactivitiesadjacenttoFigueroaStreet,FlowerStreet,OlympicBoulevardand11thStreet,toensuretrafficsafetyonpublicrightsofway.

Nomitigationmeasuresarerequired. LessthansignificantProject‐relatedconstructiontrafficimpacts.

Significantandunavoidablecumulativeconstructiontrafficimpactsduetothenumberofcumulativeprojectsintheareaandthepotentialoverlapofdevelopment.

Page 43: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐43

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

Thesecontrolsshallinclude,butnotbelimitedto,flagpeopletrainedinpedestrianandbicyclesafetyattheProjectSite’sFigueroaStreet,FlowerStreet,andOlympicBoulevarddriveways.

Temporarytrafficcontrolduringallconstructionactivitiesadjacenttopublicrights‐of‐waytoimprovetrafficflowonpublicroadways(e.g.,flagmen).Schedulingofconstructionactivitiestoreducetheeffectontrafficflowonsurroundingarterialstreets.

PotentialsequencingofconstructionactivityforPhase1andPhase2oftheProjecttoreducetheamountofconstruction‐relatedtrafficonarterialstreets.

ContainconstructionactivitygenerallywithintheProjectSiteboundaries.

Construction‐relatedvehicles/equipmentshallnotparkonsurroundingpublicstreets.

CoordinationwithLADOTtoaddressanyoverlappingofconstructionwiththeMyFigueroaProjectandLosAngelesStreetcarProject.

CoordinationwithMetrotoaddressanyconstructionneartherailroadROW.

Safetyprecautionsforpedestriansandbicycliststhroughsuchmeasuresasalternateroutingonthesouthsideof

Page 44: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐44

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

11thStreet,thenorthsideofOlympicBoulevard,andeastsideofFlowerStreet,apedestriancanopyalongFigueroaStreet,andprotectionbarriers/fencingalongFigueroaStreet,11thStreet,FlowerStreet,andOlympicBoulevardshallbeimplementedasappropriate.

Schedulingofconstruction‐relateddeliveries,haultrips,etc.,soastooccuroutsidethecommuterpeakhourstotheextentfeasible.

ImpactStatementTRAF‐2:TheProjectwouldhavealessthansignificantimpactonstudyintersectionsunderExistingWithProjectConditions–Phase1.UnderExistingWithProjectConditions–FullBuildout,theProjectwouldhavesignificantimpactsattwostudyintersections(IntersectionNos.13and30)duringthePMpeakhours.UnderFutureWithProjectConditions(bothPhase1andFullBuildout)theProjectwouldhaveasignificantimpactatfourstudyintersections(intersectionNos.12,13,19,30)duringtheAMand/orPMpeakhours.

NotApplicable MM‐TRAF‐1:TheApplicantshallimplementacomprehensiveTransportationDemandManagement(TDM)Programtopromotenon‐autotravelandreducetheuseofsingle‐occupantvehicletrips.TheTDMProgramshallbesubjecttoreviewandapprovalbytheCityDepartmentofPlanningandLADOT.TheexactmeasurestobeimplementedshallbedeterminedwhentheProgramisprepared,priortoissuanceofafinalcertificateofoccupancyfortheProject.TheTDMProgramshallincludedesignfeatures,transportationservices,educationprograms,andincentiveprogramsintendedtoreducetheimpactoftrafficfromemployeesofandvisitorstotheProjectduringthemostcongestedtimeperiodsoftheday.ThestrategiesintheTDMProgramcaninclude,butarenotnecessarilylimitedtothefollowing:

SignificantandUnavoidableunderFuturewithProjectwithMitigationConditions(Year2020)andunderFuturewithProjectwithMitigationConditions(Year2023)atthreeintersections(intersectionNos.12,13,and19)duringtheAMand/orPMpeakhours.

Page 45: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐45

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

TransportationInformationCenter,educationalprograms,kiosksand/orothermeasures

Promotionandsupportofcarpoolsandrideshare

Bicycleamenitiessuchasracksandshowers

Guaranteedridehomeprogram

Flexibleoralternativeworkschedules

Incentivesforusingalternativetravelmodes

Parkingincentivesandadministrativesupportforformationofcarpools/vanpools

On‐SiteTDMCoordinator

ContributiontotheCity’sBicyclePlanTrustFundforimplementationofbicycleimprovementsintheProjectarea

Mobilityhubsupport

MM‐TRAF‐2: The Applicant shallimplement the following physicalroadwayimprovementthatcan beprovided within the existing right‐of‐way:

IntersectionNo.30,GrandAvenue/17thStreet/I‐10WestboundOn‐Ramp.Restripe

Page 46: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐46

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

along17thStreettoprovideanadditionalwestboundthroughlane.Theresultingwestboundapproachwouldconsistofonesharedleft‐throughlaneandtwothroughlanes.Thisimprovementwouldrequiretheremovaloffourunmeteredparkingspacesalongthesouthsideof17thStreet.

ImpactStatementTRAF‐3:TheProjectwouldnotmeettheminimumpeakhourtripnumbersattheCMParterialmonitoringstationandthereforewouldnotresultinanintersectionV/Cratioof0.02orgreater.AlthoughtheProjectwouldnotmeettheminimumpeakhourtripnumbersatfreewaymonitoringstations,additionalCMPanalysisdeterminedtheProjectwouldnotexceedtheV/Cratioof0.02atthefourfreewaymonitoringstations.Therefore,impactstoregionaltransportationsystemsareconsideredtobelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired LessthanSignificant

ImpactStatementTRAF‐4:Althoughthemaximumridershipmayexceedcapacityalongaspecificlocalroute(i.e.,MetroLocal66andLADOTDASHDandF)duringtheAMandPMpeakhours,transitridershipgeneratedbytheProjectwouldnotexceedtheresidualcapacityoftheProjectarea’stransitlinesunderPhase1(Year2020)orFullBuildout(Year2023)conditions.Therefore,impactswithrespectto

NotApplicable Nomitigationmeasuresarerequired LessthanSignificant

Page 47: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐47

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

regionaltransitcapacitywouldbelessthansignificant.TheProjectwouldnotconflictwithadoptedpolicies,plans,orprogramssupportingalternativetransportation,sincedevelopmentwouldbeconcentratedintheDowntownCenternearpublictransit,wouldprovidepedestrianandbicycleamenities,andwouldimplementaTransportationDemandManagementProgramasMitigationMeasureMM‐TRAF‐1.Therefore,impactsinthisregardwouldbelessthansignificant.

ImpactStatementTRAF‐5:Siteaccesswouldbeprovidedfrom11thStreet,FlowerStreet,andOlympicBoulevardthatwouldbedesignedbasedonLADOTstandardsthatwouldaccommodateright‐turn‐onlyingress/egressvehicularmovementsandnotimpedetrafficmovementsonCitystreets.Theexistingnetworkoftrafficlanes,publicsidewalksandpedestriancrosswalkswouldbemaintainedandsidewalksfrontingtheProjectSite,alongFigueroaStreet,11thStreet,FlowerStreet,andOlympicBoulevard,wouldbewidened.Furthermore,thepublicplazawouldenhancepedestrianaccesstotheSite.Inaddition,theProjectwouldprovideseparatedaccessforpedestrianandvehiculartrafficandnosafetyoroperationalimpactrelativetobicycletrafficisanticipated.Therefore,impactswithrespecttovehicular,pedestrian,

NotApplicable Nomitigationmeasuresarerequired LessthanSignificant

Page 48: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐48

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

andbicycleaccesswouldbelessthansignificant.

Impact Statement TRAF‐6: Pursuantto SB 743 (CEQA Statute Section21099(d)(1)), parking impacts of amixed‐useresidentialproject inaninfilltransit priority area are not consideredsignificant. However, theProjectwouldprovide vehicle and bicycle parkingsufficient to meet LAMC requirementsand would not result in signficantenvironmetal effects related to parking.Therefore, impacts related to parkingwould be considered less thansignificant notwithstanding theprovisionsofSB743.

NotApplicable Nomitigationmeasuresarerequired LessthanSignificant

I.UTILITIESANDSERVICESYSTEMS

1.WaterSupply

ImpactStatementWS‐1:Constructionimpactsregardingtheconsumptionofwaterresourceswouldbelessthansignificant.Projectconstructionwouldrequireonlyintermittentuseofwaterresourcesoveralimitedtimeduration.

NotApplicable Nomitigationmeasuresarerequired LessthanSignificant

ImpactStatementWS‐2:ImpactsofProjectoperationsonthesupplyofwaterwouldbelessthansignificant.TheProjectincludesalargenumberofwaterconservationfeaturesthatwouldreducethedemandforwaterresources.TheuseofwaterforProjectactivitiesisaccountedforwithintheLADWP’swater

PDF‐WS‐1:WaterConservationFeatures:TheProjectshallprovidethefollowingspecificwaterefficiencyfeatures:

HighEfficiencyToiletswithflushvolumeof1.0gallonsofwaterperflush

HighEfficiencyClothesWashers(Residential)–watersavingsfactorof4.0

Nomitigationmeasuresarerequired LessthanSignificant

Page 49: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐49

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

demandprojectionsandtheirWSAfindingthattherewouldbesufficientwatersuppliestoservetheProjectpursuanttotheUWMP.SufficientwaterinfrastructuretoservetheProjectisavailablewithintheroadwayright‐of‐waysadjacenttotheProjectSite.

orless

LavatoryFaucetwithflowrateof1.2gallonsperminuteorlessforResidentialUnitsandHotelRooms

KitchenFaucetswithflowrateof1.5gallonsperminuteorlessforResidentialUnits,HotelRooms,andRetail/Commercial

Showerheadswithflowrateof1.5gallonsperminuteorless

Showerheads–nomorethanoneshowerheadperstall

EfficientRotorSprinklerNozzlesforLandscapeIrrigation–<1.0gallonsperminute

WeatherBasedIrrigationController

DroughtTolerantPlants–70%oftotallandscaping

HighEfficiencyClothesWashers(Commercial)–watersavingsfactorof7.5orless

DomesticWaterHeatingSystemlocatedcloseproximitytopoint(s)ofuse

CoolingTowerConductivityControllersorCoolingTowerpHConductivityControllers

Water‐SavingPoolFilter

Drip/SubsurfaceIrrigation

Page 50: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

Executive Summary    September 2016 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐50

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

ProperHydro‐zoning/(groupsplantswithsimilarwaterrequirementstogether)

LandscapingContouringtominimizeprecipitationrunoff

ArtificialTurf

WaterConservingTurfCynodonDactylon(Tifgreen)

RainwaterHarvesting

2.Wastewater ImpactStatementWW‐1A:TheProjectwouldgenerateanegligibleamountofwastewaterduringconstruction.Therefore,constructionimpactsonwastewaterwouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired LessthanSignificant

ImpactStatementWW‐1B:TheProjectwouldgenerateanincreaseinwastewaterthatcouldbeaccommodatedintheexistingsystem.TheexistingwastewatersystemisnotconstrainedoratcapacityandthereissufficientcapacitytoaccommodatetheProject.Therefore,impactsonwastewaterduringoperationwouldbelessthansignificant.

NotApplicable Nomitigationmeasuresarerequired LessthanSignificant

ImpactStatementWW‐2:TheProjectwouldnotgeneratewastewaterflowsinanamountthatwouldsubstantiallyorincrementallyexceedthefuture

NotApplicable Nomitigationmeasuresarerequired LessthanSignificant

Page 51: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC

September 2016    Executive Summary 

 Table ES‐1 (Continued) 

 Summary of Project Impacts, Project Design Features, and Mitigation Measures 

CityofLosAngeles 1020S.FigueroaStreetProjectSCHNo.2016021013 ES‐51

Environmental Impacts  Project Design Features (PDF‐)  Mitigation Measures (MM‐)  Level of Significance 

scheduledcapacityofthesystem.Therefore,wastewaterimpactsduringoperationwouldbelessthansignificant.

Page 52: 0. Exec Summary - LA City Planning · Executive Summary September 2016 City of Los Angeles 1020 S. Figueroa Street Project SCH No. 2016021013 ES‐4 Vesting Tentative Tract Map (LAMC