RAJASTHAN RAJAY VIDYUT PRASARAN NIGAM LTD
STATEMENT SHOWING IDC WORKED OUT ON EHV WORKS
AS-16 for the year 2014-2015
NAME OF WORKS Name of Circle/Office
23134 Phagi CIVIL WORKS TCC I, JAIPUR
###532.02
3134 Phagi 132kv/33kv, 20/25MVA S/s PHAGI TCC I, JAIPUR 657.83
3
3139 Samrathpura LAND TCC VI, ALWAR
###
5.60
3139 Samrathpura Boundry Wall TCC VI, ALWAR 6.99
3139 Samrathpura CIVIL WORKS TCC VI, ALWAR 146.50
3139 Samrathpura CIVIL WORKS (qtrs) TCC VI, ALWAR 68.78
3139 SamrathpuraTCC VI, ALWAR 164.85
3139 Samrathpura 132 kv S/C Line BASERI to SAMARATHPURATCC VI, ALWAR 410.57
4
3143 Dhod CIVIL WORKS TCC III, AJMER###
14.21 0.003143 Dhod 132 kv S/C Line DHOD to Losal TCC III, AJMER 177.683143 Dhod 132 kv S/C Line DHOD to Kachhawa TCC III, AJMER 245.593144 Baroli TRANSFORMER FOUNDATION BAROLI TCC V, KOTA
###
217.46 0.003144 Baroli 132kv/33kv, 20/25MVA S/s BAROLI TCC V, KOTA 400.43 0.003144 Baroli 132kv/33kv, 20/25MVA S/s BAROLI TCC V, KOTA3144 Baroli TCC V, KOTA 216.34 0.003145 Talera Capicitor bank TCC V, KOTA
###
24.323145 Talera CIVIL WORKS TCC V, KOTA 195.24 0.003145 Talera ROADS TALERA TCC V, KOTA 0.00 0.003145 Talera CABLE TRENCH TALERA TCC V, KOTA 0.51 0.003145 Talera STRUCTURE FOUNDATION TALEDA TCC V, KOTA 157.13 0.003145 Talera 132kv/33kv, 20/25MVA S/s TALERA TCC V, KOTA 0.00 22.953145 Talera 132kv/33kv, 20/25MVA S/s TALERA TCC V, KOTA 421.52 0.00
3145 Talera 132 kv D/C Line Bundi-Kota line to TALERATCC V, KOTA 16.09
3161 Roopwas CIVIL WORKS TCC VI, ALWAR###
409.663161 Roopwas 132kv/33kv, 20/25MVA S/s ROOPWAS TCC VI, ALWAR 481.74 4.693161 Roopwas 132 kv S/C Line DHOLPUR to ROOPWAS TCC VI, ALWAR 510.42
3533 BanswaraTCC IV, JODHPUR
###106.81 0.00
3533 BanswaraTCC III, AJMER 2158.52
3533 Banswara Ext. Bay 400 kv Bhilwara TCC III, AJMER 2.26
3535 Suratgarh STPS 220 kv DC line I/C JJN ZC TCC III, AJMER
###
175.17
3535 Suratgarh STPS Civil Works for JJN TCC III, AJMER 271.50
3535 Suratgarh STPS Civil Works for JJN TCC III, AJMER 9.84
3535 Suratgarh STPS Civil Works for JJN TCC III, AJMER 9.62
3535 Suratgarh STPS Civil Works for JJN TCC III, AJMER 5.823536 Chabra Kalisindh 765 kv line 2xSC Dhara (Anta)to Phagi QBC TCC V, KOTA
###
39991.75 0.003536 Chabra Kalisindh TCC V, KOTA 18005.52 0.003536 Chabra Kalisindh 765 kv Anta - Phagi line TCC I, JAIPUR 41973.253536 Chabra Kalisindh 220 kv DC line Kalisindgh to Jhalawar ZC TCC V, KOTA 1.75 0.003536 Chabra Kalisindh 220 kv DC line Ajmer-Bewar to Ajmer ZC TCC III, AJMER 0.00 821.043536 Chabra Kalisindh TCC III, AJMER 0.00 247.353536 Chabra Kalisindh BOUNDARY WALL BATAWADA TCC V, KOTA 0.00 269.80
S.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
132kv/33kv, 20/25MVA S/s SAMARATHPURA
132 kv S/C Line Hindaun-Gangapur line to BAROLI
CONST. OF B/W FENCING AT 400KVGSS KAKANI
Terminal 400 kV Bays at existing 400kV Substation Bhilwara
400 kv DC line Kalisindh to Dhara ( Anta)QMC
220 kv DC line Ajmer-KIshangarh to Ajmer ZC
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
3536 Chabra Kalisindh Civil Works for Ajmer TCC III, AJMER
###
26.64
3536 Chabra Kalisindh Civil Works for Ajmer TCC III, AJMER 6.95
4181 DechuTCC IV, JODHPUR
###63.39 0.00
4181 DechuTCC IV, JODHPUR 0.00 6517.01
4480 Jaipur III Preliminary Work TCC I, JAIPUR
###
29.364480 Jaipur III Civil Works for Sitapura (New) TCC I, JAIPUR4480 Jaipur III Const of 220 kv gss SITAPURA TCC I, JAIPUR 1291.804480 Jaipur III Furniture TCC I, JAIPUR
4480 Jaipur III
TCC I, JAIPUR
4480 Jaipur III
TCC I, JAIPUR 630.80
4480 Jaipur III
TCC I, JAIPUR 1889.11 0.00
4480 Jaipur III
TCC I, JAIPUR 174.374480 Jaipur III (i) 132 kV GIS Substation at MNIT (Jaipur) TCC I, JAIPUR 1190.974480 Jaipur III (i) 132 kV GIS Substation at MNIT (Jaipur) TCC I, JAIPUR 1190.974480 Jaipur III Gantry Structure work at both 132/33 kv Trf. At MNIT TCC I, JAIPUR 0.00
4480 Jaipur IIITCC I, JAIPUR 3825.62
4480 Jaipur III
TCC I, JAIPUR
4876 BarliTCC IV, JODHPUR
###
0.00 0.004876 Barli JUNGLE CLEARANCE AT 220KVGSS BARLI TCC IV, JODHPUR 0.00 1.05
4876 BarliTCC IV, JODHPUR 23.03
4876 BarliTCC IV, JODHPUR 39.66
4876 Barli CONST. OF GUARD HUT AT 220KVGSS BARLITCC IV, JODHPUR 3.85
4876 BarliTCC IV, JODHPUR 73.49 0.00
4876 BarliTCC IV, JODHPUR 0.00 23.12
4876 Barli CONST. OF ROAD AT 220KVGSS BARLI TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR###
1960.78
4878 KharwadTCC IV, JODHPUR
###
0.00 44.71
CONST. OF 220KV D/C DECHU-PHALODI LINECONST. OF 220KV D/C RAMGARH-DEHCU LINE
Aug of 40/50 mva 132/33 kv Trf. In place of 20/25 mva 132/33 kv Trf at 132 kv Sitapura
Const of 132 kv S/c Sanganer-sitapura line and 132 kv S/c sitapura-Sanganer line into 220 kv D/c line on Narrow base tower
Upgradation of 132 kv S/c Sanganer Chaksu line to 220 kv D/c line for future connectivity of 400 kv gss Jaipur (PGCIL) Chaksu
Const of 2 Nos 220 kv feeder bays for 220 kv gss Sitapura & Chaksu from 220 kv gss Sanganer
(ii) 132 kV S/C Cable system between 220 kV IGN and 132 kV MNIT
(a) 220 kV S/C Tapping Line on Tubular Pole/Narrow base Tower (1.5 Km), 220 kV D/C Composite Portion on Tubular Pole/ Narrow base Tower (2 Km) by conversion of existing 132 kV S/C Heerapura-Sanganer Line & 220 kV XLPE Cable S/C (2.5 Km) from Tapping Point to proposed S/S at 220 kv GIS,S/S Mansarover
CONST. OF SEPRATION OF WALL IN YARD AT 220KVGSS BARLI
CONST. OF YARD FOUNDATION AT 220KV GSS BARLI
CONST. OF BOUNDARY WALL AT 220 KV GSS BARLI
CONST. OF CONTROL ROOM BUILDING AT 220 KV GSS BARLI
CONST. OF RESIDENTIAL BUILDING AT 220KVGSS BARLI
4877 Jhalmabad & Bhadwasia
CONST. WORK OF 220KV D/C AAU-BHAITHWASIYA LINE
CONST. OF APPROACH ROAD AT 220KV GSS BHAWAD
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
4878 Kharwad
TCC IV, JODHPUR###
0.00 0.264878 Kharwad CONST. OF 220KV GSS BHAWAD TCC IV, JODHPUR 1505.39 0.00
4878 KharwadTCC IV, JODHPUR 13.27 0.00
4878 KharwadTCC IV, JODHPUR 0.00 2973.30
TCC IV, JODHPUR
###
0.00 1001.37
TCC IV, JODHPUR 0.00 1985.63
TCC IV, JODHPUR 0.00 0.03
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 2788.50 0.00
4880 Pratap Nagar
TCC IV, JODHPUR###
0.00 2212.44
4880 Pratap Nagar
TCC IV, JODHPUR 0.00 2831.84
TCC IV, JODHPUR
###
0.00 3159.77
4883 OPH JodhpurTCC IV, JODHPUR
###
0.00 0.00
4883 OPH JodhpurTCC IV, JODHPUR 0.00 0.00
4883 OPH JodhpurTCC IV, JODHPUR 3684.95 0.00
4884 Aspur LAND for Aspur TCC VII, UDAIPUR
###
118.464884 Aspur B/W AT ASPUR TCC VII, UDAIPUR 36.994884 Aspur chittorgarh TCC VII, UDAIPUR 1935.59
204884 Aspur
TCC VII, UDAIPUR 321.10
4884 AspurTCC VII, UDAIPUR 79.66
4884 Aspur 132 kv Salumber-Sagwara GSS at Aspur TCC VII, UDAIPUR 166.42
4884 Aspur 132 kv Salumber-Dhariyawad GSS at AspurTCC VII, UDAIPUR 160.38
4887 Bundi CONTROL ROOM 220 BUNDI TCC V, KOTA
###
0.004887 Bundi BOUNDARY WALL AT BUNDI TCC V, KOTA 42.88
4887 BundiTCC V, KOTA 42.97
P&F PLACE & DIRECTION IDENTIFICATION SIGN BOARD AT 220KVGSS BHAWAD
132KV D/C LILO JODHPUR-BAORI LINE FOR 220KVGSS BHAWAD
CONST. OF 220KV D/C SURPURA-BHAWAD-BHOPALGARH LINE
4879 Kuri Bhagtasani & chopsani
CONST. OF 132KV TERMINAL HYBRID GIS BAYS AT 132KV GSS CHB
4879 Kuri Bhagtasani & chopsani
132KV D/C CABLE SYSTEM FOR LILO OF EXSTING 132KV S/C PS-VIII JODHPUR LINE AT CHB GSS
4879 Kuri Bhagtasani & chopsani
CONST. OF 132KV S/C LINE ALONG BY PASS ROAD TO INTER-CONNECT 132KV LINE EMANATING FORM 220KV GSS JODHPUR FORWAD PALI & PS-VIII
4879 Kuri Bhagtasani & chopsani
CONST. OF SUMP WITH PUMP AT 132KVGSS KURI BHAGATASANI
4879 Kuri Bhagtasani & chopsani
P/F ALMIRAH STORE SHELVE & SHUTTER AT 132KVGSS KURI BHAGATASANI
4879 Kuri Bhagtasani & chopsani
ESTABLISHMENT OF 2X50MVA, 132/33KV POWER TRANSFORMER AT 132KV GSS KURI
132KV D/C CABLE SYSTEM B/W 132KV GSS CHB AND 132KV PRATAP NAGAR 6KM
CONST. WORK OF 132/33KV 2X50MVA HYBRID GIS SUB STATION AT PRATAP NAGAR & ACCOCIATED WORK
4882 Eng. Colg Jodhpur
CONST. OF 132KV XLPE CABLE OPH TO MBM ENGINEERING COLLAGE & ENGINEERING COLLAGE TO NPH
CONST. OF SUMP WIM PUMP AT 132KVGSS OPHP/F ALMIRAH STORE SHELVE & SHUTTER AT 132KVGSS OPHSUPLLY & SERVICE OF 132KV GIS OPH JODHPUR
220 kv D/C Line Banswara-Debari line from debari to Salumber
220 kv D/C Line Banswara-Debari line at Aspur
TRANSFORMER FOUNDATION AT 220 BUNDI
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
4887 Bundi ROADS AT 220 BUNDI TCC V, KOTA
###
53.30 0.004887 Bundi SWITCHYARD FENCING 220 BUNDI TCC V, KOTA 0.06 0.004887 Bundi STRUCTURE FOUNDATIONS 220 BUNDI TCC V, KOTA 134.22 0.004887 Bundi CABLE TRENCH AT 220 BUNDI TCC V, KOTA 45.36 0.00
4887 BundiTCC V, KOTA 127.13 0.00
4887 Bundi 220 /132kv, 1x100 S/s at Bundi TCC V, KOTA 860.304887 Bundi 220 /132kv, 1x100 S/s at Bundi TCC V, KOTA 0.00 89.04
22 4887 Bundi 220 kv S/C KTPS-Beawar line GSS Bundi TCC V, KOTA 282.134887 Bundi 132 kv S/C Talera-Bundi line Bundi TCC V, KOTA 134.094887 Bundi 132 kv S/S Bundi(220) GSS Bundi TCC V, KOTA 176.534887 Bundi PLCC & TELEPHONE TCC V, KOTA 32.56
4888 Gangapurcity CIVIL WORKS at Gangapurcity TCC II, JAIPUR
###
89.01
4888 Gangapurcity Ext. Bay at Gangapurcity TCC II, JAIPUR 123.77 0.00
4888 Gangapurcity Ext. Bay at Sapotra TCC II, JAIPUR 42.75 0.00
23 4888 Gangapurcity Ext. Bay at S. Mahaveer ji TCC II, JAIPUR 28.44 0.00
4888 GangapurcityTCC II, JAIPUR 79.19 0.00
4888 Gangapurcity 132 kv S/C Gangapurcity(220) to SapotraTCC II, JAIPUR 340.54 0.00
4888 GangapurcityTCC II, JAIPUR 95.61 0.00
4889 Manoharpur LAND for Manoharpur TCC II, JAIPUR
###
64.20 0.00
4889 Manoharpur CIVIL WORKS at Manoharpur TCC II, JAIPUR 224.10 7.95
4889 Manoharpur 220 /132kv, 1x100 S/s at Manoharpur TCC II, JAIPUR 1465.67 0.00
4889 Manoharpur Ext. Bay at Shahpura TCC II, JAIPUR 4.29 0.00
4889 Manoharpur 220 kv D/C Kotputli GSS to ManoharpurTCC II, JAIPUR 2487.78 0.00
4889 Manoharpur 132 kv S/C Manoharpur to Shahpura TCC II, JAIPUR 107.08 0.00
4889 Manoharpur 132 kv S/C Manoharpur to Ajeetgarh TCC II, JAIPUR 350.57 0.004890 Gajner LAND for Gajner TCC IX, BIKANER
###
21.53 0.004890 Gajner Boundary Wall TCC IX, BIKANER 63.06 0.004890 Gajner Control Room TCC IX, BIKANER 78.84 0.004890 Gajner Control Room TCC IX, BIKANER 1.15 0.004890 Gajner Water Supply System TCC IX, BIKANER 10.83 0.004890 Gajner Development of Colony Work TCC IX, BIKANER 0.00 0.004890 Gajner Store Shed TCC IX, BIKANER 10.87 0.004890 Gajner Other Civil Work TCC IX, BIKANER 1.89 0.004890 Gajner Culvert ,Drains & Cow Catcher Gates etc TCC IX, BIKANER 6.99 0.004890 Gajner Road TCC IX, BIKANER 1.09 0.004890 Gajner Plant & Machinery (Civil) TCC IX, BIKANER 253.97 0.004890 Gajner Furniture & Fixture TCC IX, BIKANER 4.61 0.004890 Gajner Furniture & Fixture TCC IX, BIKANER 0.64 0.004890 Gajner Furniture & Fixture TCC IX, BIKANER 2.22 0.004890 Gajner Furniture & Fixture TCC IX, BIKANER 0.15 0.004890 Gajner 220 /132kv, 1x100 S/s at Gajner TCC IX, BIKANER 1341.92 0.004890 Gajner 220 kv D/C Bikaner GSS to Gajner TCC IX, BIKANER 1916.35 0.004890 Gajner 132 kv S/C LILO Pugal Rd. to Gajner TCC IX, BIKANER 249.85 0.004890 Gajner 132 kv S/C LILO Bhinasar to Kolayat TCC IX, BIKANER 317.68 0.004890 Gajner PLCC & TELEPHONE at Gajner TCC IX, BIKANER 40.76 0.004891 Padampur Boundary Wall TCC IX, BIKANER
###
0.00 32.96
DEVELOPMENT WORKS OF YARD AT 220 BUNDI
132 kv D/C Gangapurcity(220 kv) to Gangapurcity(132 kv)
132 kv S/C Gangapurcity(220) to S. Mahaveer ji
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
4891 Padampur Control Room TCC IX, BIKANER
###
65.20 0.004891 Padampur Rain Water Harvesting System TCC IX, BIKANER 4.62 0.004891 Padampur Development of Colony Work TCC IX, BIKANER 6.87 0.004891 Padampur Other Civil Work TCC IX, BIKANER 0.89 0.004891 Padampur Other Civil Work TCC IX, BIKANER 0.06 0.004891 Padampur Plant & Machinery (Development Work) TCC IX, BIKANER 3.80 0.004891 Padampur Plant & Machinery (Civil) TCC IX, BIKANER 127.86 0.004891 Padampur 220 /132kv, 1x100 S/s at Padampur TCC IX, BIKANER 418.48 0.00
264891 Padampur
TCC IX, BIKANER 166.03 0.004891 Padampur 220 kv S/C Suratgarh to Padampur TCC IX, BIKANER 978.92 0.004891 Padampur 220 kv S/C Padampur to Udyog Vihar TCC IX, BIKANER 699.84 0.004891 Padampur 220 kv S/C Udyog Vihar to HNG TCC IX, BIKANER 892.39 0.004891 Padampur PLCC & TELEPHONE at Padampur TCC IX, BIKANER 62.58 0.004952 Pushkar CIVIL WORKS at Pushkar TCC III, AJMER
###
314.1928 4952 Pushkar PLCC EQUIP. at Pushkar TCC III, AJMER 0.00
4952 Pushkar CIVIL WORKS at Pushkar TCC III, AJMER 1.684952 Pushkar CIVIL WORKS at Pushkar TCC III, AJMER 1.404952 Pushkar CIVIL WORKS at Pushkar TCC III, AJMER 1.824952 Pushkar CIVIL WORKS at Pushkar TCC III, AJMER 10.204952 Pushkar CIVIL WORKS at Pushkar TCC III, AJMER 6.804952 Pushkar CIVIL WORKS at Pushkar TCC III, AJMER 314.194952 Pushkar CIVIL WORKS at Pushkar TCC III, AJMER 8.264952 Pushkar 132kv/33kv, 20/25MVA S/s Pushkar TCC III, AJMER 361.19
4952 Pushkar 132 kv S/C Line MDSU-Behrunda to PushkarTCC III, AJMER 383.78
TCC IV, JODHPUR
###
0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.314955 Sedwa CIVIL WORKS at Sedwa TCC IV, JODHPUR
###
220.12
4955 SedwaTCC IV, JODHPUR 0.00 0.00
4955 Sedwa CONST. OF 132KVGSS SEDWA TCC IV, JODHPUR 347.23 0.004956 Jhajpur CIVIL WORKS at Jhajpur TCC III, AJMER
###254.03
4956 Jhajpur 132kv/33kv, 20/25MVA S/s Jhajpur TCC III, AJMER 397.084956 Jhajpur 132 kv S/C Line Deoli to Jhajpur TCC III, AJMER 231.794957 Kachola CIVIL WORKS at Kachola TCC III, AJMER
###
168.164957 Kachola CIVIL WORKS at Kachola TCC III, AJMER 0.864957 Kachola 132/33kv, 20/25 MVA S/s at Kachola TCC III, AJMER 2.14
33 4957 Kachola 132/33kv, 20/25 MVA S/s at Kachola TCC III, AJMER 620.114957 Kachola 132 kv S/C Begod to Kachola TCC III, AJMER 3.11
4959 RIICO Bhilwara CIVIL WORKS at RIICO Bhilwara TCC III, AJMER
###
97.09
344959 RIICO Bhilwara 132/33kv, 20/25 MVA S/s at RIICO Bhilwara
TCC III, AJMER 487.11
4959 RIICO Bhilwara 132/33kv, 20/25 MVA S/s at RIICO BhilwaraTCC III, AJMER 1.91
4960 Upani LAND for Upani TCC IX, BIKANER
###
4.87 0.004960 Upani Boundary Wall TCC IX, BIKANER 0.00 11.324960 Upani Control Room TCC IX, BIKANER 57.44 0.004960 Upani Rain Water Harvesting System TCC IX, BIKANER 10.81 0.004960 Upani Residential Colony TCC IX, BIKANER 47.54 0.00
Ext. Bay at Suratgarh,Udyog Vihar, Hanumangarh
4954 Junameetha Khera
CONST. OF PLINTH PROTECTION FOR RESIDENTIAL QUARTER AT 132KVGSS JMK
4954 Junameetha Khera
CONST. OF SUMP & PUMP FOR RESIDENTIAL QUARTER AT 132KVGSS JMK
4954 Junameetha Khera
CONST. OF BASE FORM COLONY ROAD AT 132KVGSS JUNA MITHA KHERA
CONST. OF RESIDENTIAL QTR. AT 132KV GSS SEDWA
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
4960 Upani Water Supply System TCC IX, BIKANER
###
17.92 0.004960 Upani Water Supply System TCC IX, BIKANER 1.00 0.004960 Upani Store Shed TCC IX, BIKANER 6.61 0.004960 Upani Guard hut TCC IX, BIKANER 2.29 0.004960 Upani Guard hut TCC IX, BIKANER 0.44 0.004960 Upani Other Civil Work TCC IX, BIKANER 0.07 0.004960 Upani Road TCC IX, BIKANER 8.33 0.004960 Upani Plant & Machinery (Civil) TCC IX, BIKANER 76.78 0.004960 Upani Furniture & Fixture TCC IX, BIKANER 0.15 0.00
35 4960 Upani PLCC EQUIP. at Upani TCC IX, BIKANER 6.01 0.004960 Upani 132kv/33kv, 20/25MVA S/s Upani TCC IX, BIKANER 373.05 0.004960 Upani 132 kv S/C Line Riri to Upani TCC IX, BIKANER 179.48 0.00
36 4961 Bassi 132/33kv, 20/25 MVA S/s at Bassi TCC VII, UDAIPUR###
451.754961 Bassi 132 kv S/C Ajolia Ka Khera to Bassi TCC VII, UDAIPUR 410.01
4963 Daula Kunwa CIVIL WORKS at Daula Kunwa TCC II, JAIPUR ### 614.09 0.004964 Mahuwa CIVIL WORKS at Mahuwa TCC II, JAIPUR
###
153.53 0.004964 Mahuwa 132kv/33kv, 20/25MVA S/s Mahuwa TCC II, JAIPUR 601.20 0.00
4964 MahuwaTCC II, JAIPUR 44.96 0.00
4965 Patlisar Fanta LAND for Patlisar Fanta TCC IX, BIKANER
###
11.50
4965 Patlisar Fanta Boundary Wall TCC IX, BIKANER 63.76
4965 Patlisar Fanta Control Room TCC IX, BIKANER 52.32
4965 Patlisar Fanta Rain Water Harvesting System TCC IX, BIKANER 8.85
4965 Patlisar Fanta Residential Colony TCC IX, BIKANER 49.98
4965 Patlisar Fanta Water Supply System TCC IX, BIKANER 12.54
4965 Patlisar Fanta Store Shed TCC IX, BIKANER 9.31
4965 Patlisar Fanta Other Civil Work TCC IX, BIKANER 10.34
4965 Patlisar Fanta Road TCC IX, BIKANER 15.71
4965 Patlisar Fanta Plant & Machinery (Civil) TCC IX, BIKANER 64.52
4965 Patlisar Fanta Furniture & Fixture TCC IX, BIKANER 0.58
4965 Patlisar Fanta Furniture & Fixture TCC IX, BIKANER 0.10
39 4965 Patlisar Fanta PLCC EQUIP. at Patlisar Fanta TCC IX, BIKANER 14.444965 Patlisar Fanta 132kv/33kv, 20/25MVA S/s Patlisar Fanta TCC IX, BIKANER 399.98
4965 Patlisar Fanta 132 KV S/C Momasar -Patlisar Phanta Line TCC IX, BIKANER 162.284966 Sikrai CIVIL WORKS at Sikrai TCC II, JAIPUR
###422.70 0.00
4966 Sikrai 132kv/33kv, 20/25MVA S/s Sikrai TCC II, JAIPUR 405.63 0.004967 Andhi 132kv/33kv, 20/25MVA S/s Andhi TCC II, JAIPUR
###665.05 0.00
4967 AndhiTCC II, JAIPUR 2.27 0.00
4969 Paladar CIVIL WORKS at Paladar TCC-VIII SIROHI
###
54.56 54.564969 Paladar CIVIL WORKS at Paladar TCC-VIII SIROHI 0.00 0.00
42 4969 Paladar 132/33kv, 20/25 MVA S/s at Paladar TCC-VIII SIROHI 756.20 0.004969 Paladar 132 kv S/C Sanchore(220) to Paladar TCC-VIII SIROHI 240.18 0.004973 Kailadevi CIVIL WORKS at Kaila Devi TCC II, JAIPUR ### 493.36 0.00
4975 Nangal Sherpur CONTROL ROOM NANGAL SHERPUR TCC V, KOTA
###
23.43 0.00
132 kv S/C Line Hindaun-Todabhimi to Mahuwa
132 kv S/C Line Jamwa Ramgarh-rajgarh to Andhi
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
4975 Nangal SherpurTCC V, KOTA
###4.98 0.00
4975 Nangal Sherpur CABLE TRENCH NAGAL SHERPUR TCC V, KOTA 19.66 0.00
4976 sapol 132 kv S/C Kankroli to Sapol at Sapol TCC VII, UDAIPUR###
4977 Kamipura Boundary Wall TCC IX, BIKANER
###
0.00 42.904977 Kamipura Control Room TCC IX, BIKANER 74.13 0.004977 Kamipura Rain Water Harvesting System TCC IX, BIKANER 4.91 0.004977 Kamipura Residential Colony TCC IX, BIKANER 60.32 0.004977 Kamipura Water Supply System TCC IX, BIKANER 3.41 0.004977 Kamipura Water Supply System TCC IX, BIKANER 4.03 0.004977 Kamipura Store Shed TCC IX, BIKANER 12.83 0.004977 Kamipura Guard hut TCC IX, BIKANER 3.20 0.004977 Kamipura Plant & Machinery (Civil) TCC IX, BIKANER 102.48 0.00
474977 Kamipura 132/33kv, 20/25 MVA S/s at Kaminpura TCC IX, BIKANER 370.21
4977 Kamipura 132 kv S/C Shri Karanpur to Kaminpura TCC IX, BIKANER 245.784981 Sanwad LILO 132 kv S/C Mavli to Sanwad TCC VII, UDAIPUR ###
07203035
TCC I, JAIPUR 8529.4607203036
TCC VII, UDAIPUR 3203.2907203040
TCC VII, UDAIPUR 337.3607203042
TCC I, JAIPUR 2838.3507203043
TCC VII, UDAIPUR### 562.48
07203044 TCC IV, JODHPUR 0.00 0.00
07203044 TCC IV, JODHPUR 0.00 0.00
07203044 TCC IV, JODHPUR 86.48 0.00
07203044 TCC IV, JODHPUR 0.00 0.00
07203044TCC IV, JODHPUR 0.00 0.00
07203044 TCC IV, JODHPUR 0.00 4.36
07203044 TCC IV, JODHPUR 0.00 9.07
07203044 TCC IV, JODHPUR 1192.51 0.00
07203045 TCC III, AJMER 100.98
07203045 TCC III, AJMER
STRUCTURE FOUNDATION NAGAL SHERPUR
Up-gradation of existing 132 kV (S/C & D/C Sections) Line to 220 kV D/C Line Between 220 kV Heerapura to 220 kV Nallah Power House
220 KV S/C Debari Banswara Line with 220/132KV,2x100 MVA S/S at Madri and associated line
For stringing of 220 KV Banswara Debari Line 2nd ckt. Line alongwith its connectivity to 132 KV S/S Salumber in Rajasthan
220 KV Bassi-Phulera Line at Mahindra’sSpecial Economic ZONEConstruction of 20/25 MVA,132/33 Kv S/S at Rasoolpur and associated transmission line in Chitorgarh-Nimbahera
CONST. OF SEPRATION OF WALL IN YARD AT 220KVGSS BAITHWASIACONST. OF TOE WALL IN YARD AT 220KVGSS BAITHWASIACONST. OF C/R BUILDING AT 220KV GSS BAITHWASIACONST. OF WATER HARVESTING SYSTEM AT 220KVGSS BAITHWASIACONST. OF RESIDENTIAL BUILDING COLONY AT 220KV GSS BAITHWASIA
CONST. OF GUARD HUT AT 220KVGSS BAITHWASIACONST. OF STORE SHED AT 220KVGSS BAITHWAISACONST. OF 220KV D/C BHAWAD-BHAITHWASIYA LINE132kV GSS at Subhash Nagar, Ajmer(Ajmeri)LILO 132kV Ajmer-Saradhna line at Subhash Nagar, Ajmer
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
07203045 TCC III, AJMER 12.08
07203045 132kV GSS at Sawalpura Tanwaran (Sikar)TCC III, AJMER 733.60 28.47
07203045 TCC III, AJMER 0.0007203045 BOUNDARY WALL MANGROL TCC V, KOTA 51.14 0.0007203045 INSEPECTION PATH MANGROL TCC V, KOTA 0.00 0.0007203045 ROADS MANGROL TCC V, KOTA 0.00 0.0007203045 CABLE TRENCH MANGROL TCC V, KOTA 15.80 0.00
07203045 STRUCTURE FOUNDATION MANGROLTCC V, KOTA 63.95 0.00
07203045 DAHRA- SULTANPUR LINE TCC V, KOTA 0.00 18.19
07203045 TCC IV, JODHPUR 0.00 24.03
07203045 TCC IV, JODHPUR 0.00 0.00
07203045 TCC IV, JODHPUR 0.00 35.84
07203045 TCC IV, JODHPUR 0.00 0.00
07203045 TCC IV, JODHPUR 0.00 6.60
07203045 TCC IV, JODHPUR 0.00 0.00
07203045 TCC IV, JODHPUR 0.00 14.59
07203045TCC IV, JODHPUR 0.00 6.86
07203045 TCC IV, JODHPUR 242644.00 0.00
07203045TCC IV, JODHPUR 0.00 14.60
07203045 TCC IV, JODHPUR 0.00 56.17
07203045 TCC IV, JODHPUR 0.00 0.00
07203045 TCC IV, JODHPUR 0.00 0.0007203046 132 KV GSS RAIPUR TCC III, AJMER 329.1607203046 132kV GSS at RIICO, Reengus TCC III, AJMER 139.9107203046 132kV GSS at Partappura TCC III, AJMER07203046 132kV GSS at Raipur TCC III, AJMER07203046 132kV S/C line from Gangapur to Raipur TCC III, AJMER 484.9607203046 132kV GSS at Dayalpura TCC III, AJMER 286.8007203046 132kV GSS at Dayalpura TCC III, AJMER 18.8207203046 132kV S/C line from Dhod to Dayalpura TCC III, AJMER 480.8107203046 132 KV GSS PRATAPURA TCC III, AJMER 74.57
07203046 TCC III, AJMER 114.89
07203046 TCC III, AJMER
07203046 TCC III, AJMER 1.13
LILO 132kV Ajmer-Saradhna line at Subhash Nagar, Ajmer
132kV S/C Ajeetgarh -Sawalpura Tanwaran line
CONST. OF C/R BUILDING AT 132KVGSS HATUNDICONST. OF WATER HARVESTING AT 132KVGSS HATUNDICONST. OF RESIDENTIAL BUILDING AT 132KVGSS HATUNDICONST. OF SUMP & PUMP AND P/F PIPE LINE AT 132KVGSS HATUNDICONST. OF TUBE WELL AT 132KV GSS HATUNDICONST. OF CEMENT ROAD AT 132KVGSS HATUNDICONST. OF RESIDENTIAL BUILDING AT 132KV GSS KHETUSARCONST. OF TUBE WELL & P/F SUBMERSSIBLE PUMPSET AT 132KVGSS KHETUSARCOSNT. OF GUARD HUT AT 132KVGSS KHETUSARCONST. OF BOUNDARY WALL & FENCING AT 132 KV GSS KIRMASARIYACONST. OF C/R BUILDING AT 132KVGSS KIRMASARIYACONST. OF SUMP & PIPE LINE AT 132KVGSS KIRMASARIYACONST. OF RAOD AT 132KVGSS KIRMASARIYA
LILO of 220 kV S/C Ratangarh-Reengus line at proposed 220 kV GSS LaxmaLILO of 220 kV S/C Ratangarh-Reengus line at proposed 220 kV GSS Laxma67. Construction of 1 No. 33 kV bay at 132 kV GSS RIICO Reengus for Ai
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
07203046 TCC III, AJMER 636.89
07203046 TCC III, AJMER 182.6707203046 LAND for Lalamdesar TCC IX, BIKANER 1.75 0.0007203046 Boundary Wall TCC IX, BIKANER 49.11 0.0007203046 Boundary Wall TCC IX, BIKANER 0.00 3.1307203046 Control Room TCC IX, BIKANER 80.24 0.0007203046 Control Room TCC IX, BIKANER 10.86 0.0007203046 Rain Water Harvesting System TCC IX, BIKANER 7.89 0.0007203046 Residential Colony TCC IX, BIKANER 49.93 0.0007203046 Water Supply System TCC IX, BIKANER 12.07 0.0007203046 Development work TCC IX, BIKANER 6.12 0.0007203046 Store Shed TCC IX, BIKANER 10.68 0.0007203046 Guard hut TCC IX, BIKANER 4.15 0.0007203046 Other Civil Work TCC IX, BIKANER 0.31 0.0007203046 Road TCC IX, BIKANER 14.45 0.0007203046 Road TCC IX, BIKANER 0.00 0.0007203046 Plant & Machinery (Civil) TCC IX, BIKANER 123.96 0.0007203046 Furniture & Fixture TCC IX, BIKANER 0.10 0.0007203046 132/33kv, 20/25 MVA S/s at Lalamdesar TCC IX, BIKANER 248.28 0.00
07203046 TCC IX, BIKANER 78.32 0.0007203046 PLCC & TELEPHONE at Lalamdesar TCC IX, BIKANER 0.00 6.7507203046 Boundary Wall TCC IX, BIKANER 50.85 0.0007203046 Control Room TCC IX, BIKANER 74.12 0.0007203046 Control Room TCC IX, BIKANER 0.00 0.0007203046 Rain Water Harvesting System TCC IX, BIKANER 0.00 7.0207203046 Water Supply System TCC IX, BIKANER 11.19 0.0007203046 Water Supply System TCC IX, BIKANER 3.82 0.0007203046 Development work TCC IX, BIKANER 0.00 0.0007203046 Guard hut TCC IX, BIKANER 3.90 0.0007203046 Other Civil Work TCC IX, BIKANER 0.71 0.0007203046 Road TCC IX, BIKANER 0.00 15.9007203046 Plant & Machinery (Civil) TCC IX, BIKANER 82.92 0.0007203046 Furniture & Fixture TCC IX, BIKANER 0.10 0.0007203046 132/33kv, 20/25 MVA S/s at Moondsar TCC IX, BIKANER 269.44 0.0007203046 LILO of Badnu - Napasar line for 132 KV GSS MoonTCC IX, BIKANER 75.36 0.0007203046 PLCC & TELEPHONE at Moondsar TCC IX, BIKANER 0.00 6.0707203046 132 KV GSS RIICO (Abu Road) (GSS) TCC-VIII SIROHI 814.85 0.0007203046 132 KV GSS RIICO (Abu Road) (Line) TCC-VIII SIROHI 48.25 0.0007203046 132 KV GSS RIICO (Civil work) TCC-VIII SIROHI 0.00 0.0007203046 132 KV GSS RIICO (Civil work) TCC-VIII SIROHI 0.00 0.0007203046 132 KV GSS RIICO (Civil work) TCC-VIII SIROHI 0.00 0.00
07203047 TCC III, AJMER 19.4607203047 Boundary Wall TCC IX, BIKANER 59.52 0.0007203047 Control Room TCC IX, BIKANER 48.35 0.0007203047 Rain TCC IX, BIKANER 10.33 0.0007203047 Residential Colony TCC IX, BIKANER 35.33 0.00
401322/(+) 2x160 MVA, (-)2x100MVA,220/132 at 220 kV GSS Reengus(+)1x20/25 MVA,132/33 kV at 132 kV GSS Reengus
132 KV D/C LILO Badnu -Jasrasar line for 132KV GSS Lalamdesar
LILO 132 kV Mandalgarh-Begun line at 220 kV GSS Mandalgarh
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
07203047 Water Supply System TCC IX, BIKANER 7.06 0.0007203047 Store Shed TCC IX, BIKANER 7.72 0.0007203047 Furniture TCC IX, BIKANER 0.10 0.0007203047 Other Civil Work TCC IX, BIKANER 0.25 0.0007203047 Road TCC IX, BIKANER 20.92 0.0007203047 Plant & Machinery (Civil) TCC IX, BIKANER 0.00 198.4507203047 132/33kv, 20/25 MVA S/s at Badnu TCC IX, BIKANER 0.00 1064.86
07203047 TCC IX, BIKANER 0.00 865.0407203047 LAND for Tehendesar TCC IX, BIKANER 19.50 0.0007203047 Boundary Wall TCC IX, BIKANER 38.43 0.0007203047 Boundary Wall TCC IX, BIKANER 17.27 0.0007203047 Control Room TCC IX, BIKANER 31.07 0.0007203047 Control Room TCC IX, BIKANER 0.62 0.0007203047 Rain TCC IX, BIKANER 7.60 0.0007203047 Residential Colony TCC IX, BIKANER 0.00 62.6107203047 Water Supply System TCC IX, BIKANER 14.12 0.0007203047 Store Shed TCC IX, BIKANER 6.88 0.0007203047 Furniture TCC IX, BIKANER 0.10 0.0007203047 Other Civil Work TCC IX, BIKANER 2.69 0.0007203047 Road TCC IX, BIKANER 12.80 0.0007203047 Plant & Machinery (Civil) TCC IX, BIKANER 0.00 92.4107203047 Plant & Machinery ( Transformer) TCC IX, BIKANER 0.00 473.73
07203047TCC IX, BIKANER 16.76 0.00
07203047 PLCC Equipment at 220 KV GSS Tehendesar for 220 KTCC IX, BIKANER 0.00 0.00
07203047TCC IX, BIKANER 7.23 0.00
07203047 PLCC Equipment at 220 KV GSS Tehendesar for 220 KTCC IX, BIKANER 0.00 0.00
07203047TCC IX, BIKANER 3.74 0.00
07203047 Const of 220 KV S/C Sujangarh- Tehendesar TCC IX, BIKANER 0.00 981.95
07203047 Const of 132 KV S/C Tehendesar - ParewaraTCC IX, BIKANER 0.00 332.28
TCC III, AJMER 844.27
TCC III, AJMER 169.57
TCC III, AJMER 38.38
TCC III, AJMER 0.40
TCC III, AJMER 5.99
TCC III, AJMER 7.61
LILO 220 K RTGH- Bikaner at Proposed 220 KV GSS Badnu
PLCC Equipment at 220 KV GSS Tehendesar for 220 KV Sujangarh - Tehendesar tr line
PLCC Equipment at 220 KV GSS Tehendesar for 220 KV Parewara - Tehendesar tr line
PLCC Equipment at 220 KV GSS Tehendesar for 220 KV Sujangarh - Tehendesar tr line
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Hamirgarh
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Danta Ramgarh
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Danta Ramgarh
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Danta Ramgarh
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Danta Ramgarh
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Danta Ramgarh
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC III, AJMER 0.82
TCC III, AJMER 0.32
TCC III, AJMER 49.66
TCC III, AJMER 0.91
TCC III, AJMER 12.13
TCC I, JAIPUR 191.29
TCC I, JAIPUR 1308.23
TCC I, JAIPUR
TCC I, JAIPUR 1249.74
Ganor (Dist.Jaipur) TCC II, JAIPUR 0.00 116.60
TCC III, AJMER 19.04
TCC III, AJMER 581.02
TCC V, KOTA 10251.15132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 497.33 0.00132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 36.51132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 1.27132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 8.99132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 1.06132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 3.03132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 7.12132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 10.95132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 9.28132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 0.70132 KV GSS at Masuda Dist Ajmer
TCC III, AJMER 3.58
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Danta Ramgarh
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Danta Ramgarh
Loan of Rs.481.54 Crore 220kv/132kv, 1X100 MVA GSS at
Danta Ramgarh Loan of Rs.481.54 Crore
220kv/132kv, 1X100 MVA GSS at Danta Ramgarh
Loan of Rs.481.54 Crore Capacitor bank inst. at 132 kV GSS
Hamirgrah(55x5.43)
Loan of Rs.481.54 Crore
(iii) LILO of 220kV S/C KTPS- Sanganer line at proposed 220kV Vatika.
Loan of Rs.481.54 Crore
Const of 220 kv D/c line LILO of 220 kv Duni-Sez-I line at 400 kv gss Chaksu - Power grid (approx 28 km D/c length)
Loan of Rs.481.54 Crore Const of 220 kv gss CHAKSU (UP gradation
work)
Loan of Rs.481.54 Crore
Const of 220 kv D/c Jaipur (south PG) Vatika at proposed 220 kv gss Vatika (approx 30 km D/c length)
Loan of Rs.481.54 Crore
Loan of Rs.481.54 Crore
LILO of 220 kV S/C Bhilwara-Chittorgarh line at proposed 220 kV GSS Hamirgarh
Loan of Rs.481.54 Crore 1. [(+)1x160 MVA,220/132 kV at 220 kV
GSS Hamirgarh]
Loan of Rs.481.54 Crore (i) 400 kV D/C (Quad Moose) Kawai
SCTPS-765/400 kV Anta (Baran) lineLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 Crore
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
132 KV GSS at Masuda Dist AjmerTCC III, AJMER 0.89
132 KV GSS at Masuda Dist AjmerTCC III, AJMER 2.32
132 KV GSS at Masuda Dist AjmerTCC III, AJMER 1.97
132 KV GSS at Masuda Dist AjmerTCC III, AJMER 1.26
LAND for ShareraTCC IX, BIKANER 0.15 0.00
220KV GSS HAMIRGARHTCC III, AJMER 26.31
220KV GSS HAMIRGARHTCC III, AJMER 19.30
220KV GSS HAMIRGARHTCC III, AJMER 37.59
220KV GSS HAMIRGARHTCC III, AJMER 16.04
220KV GSS HAMIRGARHTCC III, AJMER 25.83
220KV GSS HAMIRGARHTCC III, AJMER 9.96
220KV GSS HAMIRGARHTCC III, AJMER 1.50
TCC VI, ALWAR 619.94
TCC VI, ALWAR 60.70
TCC VI, ALWAR 71.23
TCC VI, ALWAR 0.00LAND for Panchu
TCC IX, BIKANER 2.42 0.00Boundary Wall
TCC IX, BIKANER 40.15 0.00Boundary Wall
TCC IX, BIKANER 0.00 0.00Water Supply System
TCC IX, BIKANER 11.89 0.00Store Shed
TCC IX, BIKANER 9.63 0.00Guard hut
TCC IX, BIKANER 4.67 0.00Other Civil Work
TCC IX, BIKANER 0.49 0.00
TCC IX, BIKANER 0.00 28.73
TCC VI, ALWAR 110.56
BOUNDARY WALL G.CITY TCC V, KOTA 14.96 0.00
CONTROL ROOM G.CITY TCC V, KOTA 37.49 0.00
WATER SUPPLY G.CITY TCC V, KOTA 6.84 0.00
CABLE TRENCH G.CITY TCC V, KOTA 33.26 0.00
Loan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 Crore
132 KV GSS at Narainpur Dist Alwar (47/2012-13)
Loan of Rs. 164.62 Crore
132 KV GSS at Narainpur Dist Alwar (47/2012-13) (Civil work)
Loan of Rs. 164.62 Crore
Const. of 132 KV LILO Narainpur Line for existing 132 KV S/C Bansur- Thanagazi line (03/2013-14)
Loan of Rs. 164.62 Crore
Const. of 132 KV LILO Narainpur Line for existing 132 KV S/C Bansur- Thanagazi line (03/2013-14)
Loan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 CroreLoan of Rs. 164.62 Crore
Const of 1 Nos 132KV Bay for Panchu GSS at 132 KV GSS Deshnok
Loan of Rs. 164.62 Crore
132 KV GSS at Pahari Dist Bharatpur (Land)
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC V, KOTA 35.04 0.00
DEVELOPMENT OF YARD G.CITY TCC V, KOTA 53.60 0.00
SWITCHYARD FENCING AT G.CITY TCC V, KOTA 8.26 0.00
TRANSFORMER FOUNDATION G.CITY TCC V, KOTA 99.80 0.00
STRUCTURE FOUNDATION G.CITY TCC V, KOTA 115.27 0.00
TCC V, KOTA 1121.47 0.00BOUNDRY WALL AT KELADEVI
TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00R-5 TYPE QTR KELA DEVI
TCC V, KOTA 442.79 0.00
TCC V, KOTA 0.00 0.00C/ROOM 132 KV SULTANPUR
TCC V, KOTA 22.17 0.00
TCC V, KOTA 0.00 3.47R-3 TYPE QTR. SULTANPUR
TCC V, KOTA 0.00 1.15R-4 TYPE QTR. SULTANPUR
TCC V, KOTA 0.00 1.59R-5 TYPE QTR. SULTANPUR
TCC V, KOTA 0.00 17.55ROADS AT SULTANPUR
TCC V, KOTA 31.66 0.00
TCC V, KOTA 0.00 0.00
TCC V, KOTA 54.34 0.00
TCC V, KOTA 13.82 0.00
TCC V, KOTA 21.31 0.00CONST. OF 132 KV GSS SULTANPUR
TCC V, KOTA 0.00 306.11132 KV GSS BASSI
TCC VII, UDAIPUR132 KV GSS SAPOL
TCC VII, UDAIPUR 0.04132 KV GSS SANWAD
TCC VII, UDAIPUR 11.50132 KV GSS DAKAN KOTDA
TCC VII, UDAIPUR220KV GSS DHIGARIA BHIM
TCC II, JAIPUR 983.61 0.00220KV GSS LALSOT
TCC II, JAIPUR 925.08 0.00220KV GSS KUNDA KI DHANI
TCC II, JAIPUR 429.69 0.00
TCC VI, ALWAR 821.26
TCC VI, ALWAR 49.18
Term Loan of Rs. 64 Crore
LEVELLING DRESSING & GRAVELLING AT 220 G.CITY
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore
CONST. OF 220 KV GSS GANGAPUR CITY
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore
DEVELOPMENT OF COLONY KELADEVI
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore
LEVELLING DRESSING & GRAVELLING KELA DEVI
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore
RAIN WATER HARVESTING SULTANPUR
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore
CULVERT DRAIN ETC. AT 220 SULTANPUR
Term Loan of Rs. 64 Crore
STRUCTURE FOUNDATION SULTANPUR
Term Loan of Rs. 64 Crore
LEVLIND,DRESSING &GRAVLING SULTANPUR
Term Loan of Rs. 64 Crore
DEVLOPMENT OF YARD 132 KV SULTANPUR
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore
(i) 220/132kV GSS at Nadbai (Upgradation) (Distt. Bhartpur)
Term Loan of Rs. 64 Crore
(ii) 220/132kV GSS at Nadbai (Upgradation) CIVIL WORK
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC VI, ALWAR 271.44
TCC VI, ALWAR 715.08
TCC VI, ALWAR 79.84LAND for 132 KV GSS Goluwala
TCC IX, BIKANER 8.69 0.00Boundary Wall
TCC IX, BIKANER 59.76 0.00Control Room
TCC IX, BIKANER 59.66 0.00Rain Water Harvesting
TCC IX, BIKANER 4.34 0.00Water Supply System
TCC IX, BIKANER 2.57 0.00Water Supply System
TCC IX, BIKANER 4.19 0.00Store Shed
TCC IX, BIKANER 7.55 0.00Other Civil Work
TCC IX, BIKANER 2.95 0.00Road
TCC IX, BIKANER 8.92 0.00Plant & Machinery (Civil)
TCC IX, BIKANER 111.61 0.00132/33KV ,20/25MVA S/S Goluwala
TCC IX, BIKANER 401.99 0.00
TCC IX, BIKANER 13.22 0.00132KV S/C Line HMH - Goluwlala Tr Line
TCC IX, BIKANER 366.51 0.00
TCC IV, JODHPUR 1528.01 0.00
TCC IV, JODHPUR 163.34 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 64.89
TCC IV, JODHPUR 0.00 66.46
TCC IV, JODHPUR 0.00 30.49
TCC IV, JODHPUR 0.00 8.07
TCC IV, JODHPUR 0.00 2.45
Term Loan of Rs. 64 Crore
(iii) LILO of existing 220kV S/C Mandawar-Bharatpur line at 220kV GSS Nadbai
Term Loan of Rs. 64 Crore
Crection of 132/33 KV grid sub station at Pinan
Term Loan of Rs. 64 Crore
Crection of 132/33 KV grid sub station at Pinan (Civil work)
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore
PLCC & TELEPHONE at 132 KV GSS Goluwala
Term Loan of Rs. 64 Crore
Term Loan of Rs. 64 Crore
AUG. OF 400KVGSS AKAL BY INSTALLATION OF 400/220KV, 1X315MVA TRF. ALONG WITH 400KV 2X80MVAR SHUNT REACTOR (LINE TYPE) FOR PROPOSED 400KV AKAL-JODHPUR (NEW LINE)
Term Loan of Rs. 64 Crore
CIVIL FOUNDATION FOR AUG. OF 400KVGSS AKAL BY INSTALLATION OF 400/220KV, 1X315MVA TRF. ALONG WITH 400KV 2X80MVAR SHUNT REACTOR (LINE TYPE) FOR PROPOSED 400KV AKAL-JODHPUR (NEW LINE)
Term Loan of Rs. 64 Crore
CONST. OF FENCING WALL FOR 220/132KV YARD AT 400 KV GSS BHADLA
Term Loan of Rs. 64 Crore
CONST. OF RETAINING WALL AND STONE PITICHING AT 400KVGSS BADALA
Term Loan of Rs. 64 Crore
CONST. OF CONTROL ROOM BUILDING AT 400KV GSS BHADLA
Term Loan of Rs. 64 Crore
CONST. OF KIOSK BUILDING AT 400KVGSS BHADLA
Term Loan of Rs. 64 Crore
CONST. OF TUBE WELL AT 400KV GSS BHADLA
Term Loan of Rs. 64 Crore
CONST. OF GURAD HUT AT 400KVGSS BHADLA
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC IV, JODHPUR 0.00 7.56
TCC IV, JODHPUR 0.00 1.68
TCC IV, JODHPUR 0.00 15.41TCC IV, JODHPUR 20.69 0.00
TCC IV, JODHPUR 0.00 0.00CONST. OF B/W AT 220KV GSS NPH TCC IV, JODHPUR 0.00 5.11
TCC IV, JODHPUR 0.00 82.36
TCC-VIII SIROHI 1507.20 0.00
TCC-VIII SIROHI 164.24 0.00132 KV GSS Tagore Nagar (GSS) TCC-VIII SIROHI 520.28 0.00132 KV GSS Tagore Nagar (Line) TCC-VIII SIROHI 53.35 0.00
TCC-VIII SIROHI 0.00 18.19
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 11.03 0.00Aug work 132 KV GSS Reodar 50/13.03.2013 TCC-VIII SIROHI 153.00 0.00Aug work 100 MVA Transfor. at Bali TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 16.01 0.00Aug work Abu Raod 36/18.02.05 TCC-VIII SIROHI 0.00 22.45Aug work 220 KV GSS Pali TCC-VIII SIROHI 1.33 0.00Aug work 132 KV GSS Pali TCC-VIII SIROHI 0.04 0.00Aug work 132 KV GSS Sojat City TCC-VIII SIROHI 0.19 0.00Aug work Jojawar TCC-VIII SIROHI 0.00 0.00Aug work Jaitaran TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 26.51 0.00
TCC-VIII SIROHI 0.00 0.00Renovation of dranige in yard at Ramseen TCC-VIII SIROHI 0.00 0.00Const of foundation as per R-8 at Bali TCC-VIII SIROHI 0.00 33.24P&F of Submisibale pupm at Bali TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 33.12Const of Guard Hut at Bhinmal TCC-VIII SIROHI 0.00 4.86
TCC-VIII SIROHI 12.68 0.00
TCC-VIII SIROHI 0.00 4.06
Term Loan of Rs. 64 Crore
CONST. OF STORE SHED AT 400KVGSS BHADLA
Term Loan of Rs. 64 Crore
CONST. OF 220 KV GSS BHADLA FOR BASE COURSE ROAD WORK AT 400 KV BHADLA
Term Loan of Rs. 64 Crore
CONST. OF UPPER SIDE SUB BASE FOR ROAD AT 400KVGSS BHADLA
Term Loan of Rs. 64 Crore CONST. OF KIOSK BUILDING AT
400KVGSS RAMGARHTerm Loan of Rs. 64 Crore
CONST. OF ROAD AT 400KVGSS RAMGARH
Term Loan of Rs. 64 CroreTerm Loan of Rs. 64 Crore CONST. OF C/R BUILDING AT 220KV
GSS NPH JODHPURConst. of 220 KV Bhinmal-Sanchore line under PGCIL for 220 KV Sanchore
132 KV S/C line Sawa-Sata with 132 KV S/S Sata
Const. of 132 KV GSS Ahore (Civil work)Const. of 132 KV GSS Sorda (Civil work)33 KV Khimada bay at Jojawar 03/03.07.13
Aug work of 2 nos bay at Rani (Solar) 05/05.09.13
Aug work 20/25 MVA T/F at Tagore Nagar 17/22.10.111 nos 33 bay for Bhagli feedar at Bagra 15 / 21.01.14 Aug. work 132/33 20/25 MVA T/F Bagra 25/08.11.121 nos 33 bay for Kavrada feedar at Umaidpur 13 / 24.01.14 1 nos 33 bay for Teja ki beri feedar at Jeewana 16 / 24.01.14 Aug of 132/33 12.5 MVA T/F at Sata 20/21.11.11Const of Br. Foudation for new T/F (20/25) at Reodar
Const of B/Wal for additional land at Bhinmal
Const of Service Road in yard at PindwaraCasting of Br foudnaiton (separation) at Abu Road
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC-VIII SIROHI 0.00 0.00
Const of B/Wall at 132 KV GSS Sayla TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00Const. of Guard Hut at Bagra TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 0.00
P/F MS Chequred plat in C/R at Paladar TCC-VIII SIROHI 0.00 0.00
TCC-VIII SIROHI 0.00 5.56
TCC-VIII SIROHI 0.00 5.64
TCC I, JAIPUR 0.00
TCC I, JAIPUR 14.76
TCC I, JAIPUR 6790.80
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
(i) 132 kV GSS at at Jatawali (Distt.Jaipur) TCC I, JAIPUR 480.60
(ii) 1 No. 132kV bay at 220kV GSS Chomu TCC I, JAIPUR 17.72
TCC I, JAIPUR 92.08
Const. of 220 KV GSS, Indira Gandhi Nagar TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 17.85
Cosnt. of B/Wall at 132 KV GSS Sojat City
Levelling & dressing in 33 KV Bay ar 220 JaloreCasting of Civil Foundation for 33 KV Bay at 132 UmedpurCasting of civil foundation for 33KV bay(Teja ki beri) at 132KV GSS, Jeewana
Const. of store shed at 132 KV GSS BagraCasting of civil foundation for 33KV bay(for bhagli-II) at 132KV GSS, Bagra P/F of Chequred tiles in ramp at back of CR at Paladar
Modi. Track croessing Swarg. Banas 01/30.05.12Modi. Track croessing Abu Pindwara 02/30.05.12765 kV, 1 X S/C Phagi(Jaipur South)- Anta ckt -II765 kV, 1 X S/C Phagi(Jaipur South)- Anta ckt -II
220/132kV, 2x160 MVA capacity GIS Substation at Mansarovar (Jaipur) and allied works
220/132kV, 2x160 MVA capacity GIS Substation at Mansarovar (Jaipur) and allied works220 kV GIS substation at existing 132 kV Nallah Power House, Jaipur 220 kV GIS substation at existing 132 kV Nallah Power House, Jaipur
(iii) 132kV S/C Chomu-Jatawali line from 220kVGSS Choumu
Strengthing of 33KV main bus & replacement of conductor of 33 KV 1/C of both the 132/33 KV, 40/50 MVA transformers by twin Zebra conductor at 132 KVGSS Vaishali Nagar
Diversion of 132 kv Over head trans line infringing with Jaipur Metro Corridor (Deposit work of Jaipur Metro Rs. 3869976.00 deposited)
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
PHED Deposit work at 132 kv gss Balawala TCC I, JAIPUR 0.94
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
Const. of 33 kv bay for M/S Ratnawali (D/W) TCC I, JAIPUR 4.33
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 5.83
TCC I, JAIPUR 3.05
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00Aug. work at 132 Kv Gss Mansarover TCC I, JAIPUR 2.39
Raising the height of 440 kv S/c HPR-Merta line between loc 142C +3 to 143 D+3 due to DFCCI for proper clearance chainage in case of detour 28360 (km.564) (D.W. of DFCCIL for Rs. 39082922.00 vide A9 1958/12, dt. 03.05.2012 out of total Rs. 79393378.00)
Shifting of 132 kv S/c Phulera-Dudu line between existing Railway Km/DFC Chainage in case of detour 30300-30400 (approx 1.156 kms) (D.W. of M/s DFCCIL for Rs. 8780000.00 vide A9 1958/12, dt. 03.05.12 out of the total amt of Rs. 79393378.00)
Shifting of 132 kv S/c Phulera-Sirsi line between existing Railway Km/DFC Chainage in case of detour 31860-31900 (approx. 1.220 kms) ((D.W. of M/s DFCCIL for Rs.7214907.00 vide A9 1958/12, dt. 03.05.12 out of the total amt of Rs. 79393378.00)
Shifting of 132 kv S/c Phulera-Jobner line between existing Railway Km/DFC Chainage in case of detour 31400-31500 (approx. 0.334 kms) ((D.W. of M/s DFCCIL for Rs. 4316422.00 vide A9 1958/12, dt. 03.05.12 out of the total amt of Rs. 79393378.00)
One No.33 Kv feeder bays at 132 kv gss Chambal for ESI Model Hospital,Ajmer Road Jaipur under "Deposit Work"
One No.33 Kv Feeder Bays & extension of main bus through jack bus at 220 kv gss Mansarover to M/S Adinath Buildcom Pvt. Ltd. New Atish Market Jaipur under (Deposit Work)
Construction of 1 No. 33KV Bay at 132 KVGSS Phagi for M/s Indian Oil Corporation Ltd., Jaipur. (Deposit Work)
Const of 1 no. 33 kv bay at 220 kv gss bagru for m/s mangla ispat & rolling pvt. Ltd Const. of 1*33 kv bay at 132 kv Phagi for 765 kv gss
Aug. of 20/25 MVA 132/33 Kv Trf. In place of 10/12.5 MVA 132/33 at 132 kv Gss newai
132/33 Kv 20/25 MVA transformer in place of 132/33 Kv,10/12.5 MVA tranformer at 132 Kv Gss Hingonia under Augmentation Prog.2013-14 (budget-18924975/-)
132/33 KV,40/50 mVA Trf. In place of 132/33 Kv,20/25 MVA Transformer at 132 KV gss Govindgarh under Aug.
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 153.11
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00Const. of 220 KV LILO I.G. NAGAR LINE TCC I, JAIPUR 0.00132 kV GSS at Dudu (Jaipur) TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 22.01
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00
TCC I, JAIPUR 0.00Retrofiting work of 132 Kv Gss VKIA Jpr. TCC I, JAIPUR 5.85Retrofiting work at 132 Kv Gss Malpura TCC I, JAIPUR 16.24
TCC I, JAIPUR 30.20
TCC I, JAIPUR 18.59
TCC I, JAIPUR 27.28
TCC I, JAIPUR 22.33
TCC I, JAIPUR 8.20
TCC I, JAIPUR 42.96
Augmentation of 20/25 MVA,132/33KV transformer in place of 10/12.5 MVA 132/33 KV transformer at 220 Kv gss Chaksu
Erection of 132/33KV, 40/50MVA Transformer in place of 132/33 KV, 10/12.5 MVA Transformer at 132KVGSS Tonk under "Augmentation work"
Aug. work of 132kv/33kv, 20/25 MVAR transformer at 132 Kv Gss CHAMPAPURA
33 Kv bay at 220 kv gss dooni to connect 33/11 kv S/S Dooni & Dhuwa KALAN of JVVNL under Aug.Extension of Control Room at 132 Kv Gss Bhankrota
LILO of 220 kv S/c Bassi -Phulera line with 220 Kv Gss Bagru 40/50 MVA Transformer work at 132 KV GSS Mansarover
(i) LILO of existing 132 kV S/C Puranaghat-Sitapura line at 220 kV Indira Gandhi Nagar GSS
Replacement of 3 Nos 132 kv ABCB Breakers by SF6 Breakers at 220kv Sanganer under RMU scheme Phase I & Phase IIInstt. Of 2x160 mva, 220/132 kv Trf at 220 kv VKIA
Replacement under RMU scheme (Stage III) for the yr. 2012-12 at 132 kv gss Bhankrota
Replacement under RMU scheme (Stage III) for the yr. 2012-12 at 132 kv gss BagruReplacement of equip at 132 kv Mansarover under RMU(Stage -III)Inst of 5.43 MVAR 33 kv Capacitor Bankl at 132 kv ChaksuGantry Structure work at both 220/132 kv Trf at NPH JaipurAutomation/Scada Solution/ RTU at 220 Kv Gss VKIA
Automation/Scada Solution RTU at 220 Kv Gss DooniAutomation /Scada work for 2012-13 at 132 KV Gss MarkhiAutomation /Scada work for 2012-13 at 132 KV Gss Renwal
Automation /Scada work for 2012-13 at 132 KV Gss Govindgarh under TN 272 Of SE (400 KV Design)
Retrofiting of Proction Rellays work at 132 Kv Gss Govindgarh under SE (400 KV Design)TN 235Automation /Scada Solution/RTU at 220 Kv Gss SEZ
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC I, JAIPUR 13.24
TCC I, JAIPUR 28.17Retrofiting work at 132 KV Sitapura TCC I, JAIPUR 0.28
SCADA SYSTEM work at 132 KV Balawala TCC I, JAIPUR 2.80Resid. Colony at VKIA TCC I, JAIPUR 15.29Const. of 132 Kv Gss Thadoli TCC I, JAIPUR 0.00Office Equipment TCC I, JAIPUR 0.00Testing equipment (14.685) TCC I, JAIPUR 0.00const. of building at 220 kv sez TCC I, JAIPUR 2.20
TCC VI, ALWAR 1.60
TCC VI, ALWAR
TCC VI, ALWAR 259.03
TCC VI, ALWAR 222.15
TCC VI, ALWAR 36.12
TCC VI, ALWAR 0.01
TCC VI, ALWAR 0.01
TCC VI, ALWAR 125.46
TCC VI, ALWAR 11.44
TCC VI, ALWAR
TCC VI, ALWAR 0.00
TCC VI, ALWAR 87.43
TCC VI, ALWAR 258.20
TCC VI, ALWAR 38.72 0.00
Retrofiting of Protection relay under RMU scheme Stag-II (phase-i&II) at 132 Kv Gss Bagru
Automation/Scada plan work at 220 kV Gss Bagru under TH-272 Of SE (400 Kv Design)
i) LILO of existing 220 kV S/C Badarpur - Alwar line at proposed 220 kV GSS MIA Alwar
(i) 220/132kV, 1x100 MVA GSS at Chonkarwada (Distt. Bharatpur) (05/2014-15) (foundation work)Const. of LILO of 220 KV Dausa- Alwar line at 400 KV GSS, Alwar (38/2012-13)
LILO of 220 kV S/C Mandawar - Alwar (MIA) line at proposed 400 kV Alwar GSS (37/2012-13)
Replacement of all tension tower disk insulators of 220 KV Bharatpur- Dholpur (CKT-Ist) Line (51/2012-13)
LILO of existing 220 KV S/C Dausa- Alwar line at proposed 400 KV GSS, MIA (41/2013-14)
LILO of existing 220 KV S/C Mandawar- MIA (Alwar) line at proposed 400 KV GSS, MIA (42/2013-14)Const. work of 132 KV GSS, Maniya (WIM No. 12/2012-13)
Const. of 1 no. 132 KV feeder bay at 132 KV GSS Mandawar to proposed 220 KV GSS, Bansur (19/2012-13)
Const. work of 2 nos. 33 KV Bairer & Deira Bay at 132 KV GSS, Pinan with extension of 33 KV main and auxiliary bay
Construction of 1 no. 33 KV bay at 132 KV GSS, Bhiwadi for M/s Continental Engines (P) Ltd., I/A Bhiwadi (Deposit Work) (23/2014-15)
Const. of 132 kv Line (02 conductor ) on D/C towr from 132 kv GSS ,Ramgarh to railway sub sattion Ramgarh ( Deposit Work) WIM No. 04/2012-13)
Const. of 132 KV S/C line from 132 KV GSS, Tizara in favour of M/s Kajaria Ceramics Ltd., vill. Gailpur, Tehsil- Tizara, Alwar (Deposit Work) (31/2012-13)
Const. of 1 no. 312 KV feeder bay in favour of M/s Kajaria Ceramics Ltd., vill. Gailpur, Tehsil- Tizara, Alwar (Deposit Work) (31/2012-13)
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC VI, ALWAR 118.95
TCC VI, ALWAR 230.49
TCC VI, ALWAR 0.00
TCC VI, ALWAR 0.00132 KV GSS Deeg (civil work) TCC VI, ALWAR 0.00
TCC VI, ALWAR 0.00
Const. of tube well at 132KV GSS Ramgarh TCC VI, ALWARConst. of GLR at 132 KV GSS, Bhiwadi TCC VI, ALWAR
TCC VI, ALWAR
Const. of tube well at 132KV GSS Malakhera TCC VI, ALWAR
TCC VI, ALWAR 23.36
TCC VI, ALWAR 15.51
TCC VI, ALWAR 0.00
TCC VI, ALWAR
TCC VI, ALWAR
TCC VI, ALWAR 0.00220 KV GSS Alwar (Building work) TCC VI, ALWAR220 KV GSS Khushkhera TCC VI, ALWAR
220 KV GSS MIA Alwar (foundation work) TCC VI, ALWAR 0.00
TCC VI, ALWAR 0.00
TCC VI, ALWAR 21.63
TCC VI, ALWAR 32.96
Re-routing & dismentaling of 220 KV D/C Alwar- Bhiwadi and Bhiwadi (PGCIL) Bhiwadi line in the premises of RIICO I/A Bhiwadi (Deposit work) (42/2012-13)
Const. of 132 KV D/C line from 220 KV GSS, Bhiwadi to M/s Strids Auto Parts Ltd., Bhiwadi (12/2013-14)
Const. of 1 no. 132 KV bay at 220 KV GSS, Bhiwadi for M/s OCL Iron & Steel Ltd., I/A, Karhani, Bhiwadi (Depo. Work) (06/2013-14)132 kv gss, Bharatpur (yard foundation work)
P&F main gate, yard gate & other civil works at 132 KV GSS, Bayana
Const. of yard fancing at 132 KV GSS Bhiwadi
Installation of 10/12.5 MVA ,132/33 KV Transformer at 132 KV GSS Thanagazi alongwith extension of 132 KV Main Bus Bar and 132 KV Aux. Bus Bar and 33 KV Aux. Bus Bar under Augmentation (43/2012-13)
Instt. Of 20/ 25 MVA 132/ 33 KV Trf. At 132 KV GSS, Pinan (43/2013-14) K.G. BasInstt. Of 20/ 25 MVA 132/ 33 KV Trf. At 132 KV GSS, Pinan (43/2013-14) Pinan
Augmentation of 132/ 33 KV 40/ 50 MVA transformer in place of 132/ 33 KV, 20/ 25 MVA transformer at 132 KV GSS, Bayana (01/2014-15)
Installation of 20/25 MVA, 132/33 KV transformer in place of 10/12.5 MVA, 132/33 KV trf. At 132 KV GSS, Rajakhera under Augmentation Programme 2013-14 (40/2013-14)Aug. work at 220 kv gss, Bhiwadi (foundation work)
Aug. work of 220/132 KV 160 MVA Trf. Work at 220 KV GSS, Bhiwadi (07/2013-14)
Aug. work replacement of 20/25 MVA, 132/33 KV Trf. NGEF make with 132 KV trf. At 220 KV GSS, Alwar (45/2012-13)
1 no. 220/ 132 KV, 160 MVA trf. In place of 100 MVA at 220 KV GSS, Alwar under Aug. (02/2013-14)
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC VI, ALWAR 23.58
TCC VI, ALWAR 16.61
TCC VI, ALWAR 13.93
TCC VI, ALWAR
TCC VI, ALWAR
TCC VI, ALWAR 1.91
Instt. Of cap. Bank at Tizara (26/2012-13) TCC VI, ALWAR 4.63RMU Scheme at 220 KV Alwar TCC VI, ALWAR 170.25
TCC VI, ALWAR 5.21
TCC VI, ALWAR 8.21
TCC VI, ALWAR 0.93400KV GSS CHITTORGARH TCC VII, UDAIPUR 6983.93 0.00220KV GSS BAMANTUKRA TCC VII, UDAIPUR 0.00 1844.18132KV GSS KHERWARA TCC VII, UDAIPUR 0.00 0.00132KV GSS DAKANKOTRA TCC VII, UDAIPUR 478.67 0.00132KV GSS SANWAD TCC VII, UDAIPUR 583.01 0.00132KV GSS SAPOL TCC VII, UDAIPUR 60.75 0.00132KV GSS PARTAPUR TCC VII, UDAIPUR 99.55 0.00132KV GSS KUSHALGARH TCC VII, UDAIPUR 0.00 178.12CONST OF CAP BANK AT AMET 5.43 MVAR TCC VII, UDAIPUR 47.82 0.00
TCC VII, UDAIPUR 0.17 0.00
TCC VII, UDAIPUR 2.94 0.00CONST OF CAP BANK AT BASSI 5.43MVAR TCC VII, UDAIPUR 48.93 0.00
TCC VII, UDAIPUR 32.11 0.00CONST OF CAP.BANK AT RHB 5.43MVAR TCC VII, UDAIPUR 0.00 0.04CONST OF CAP.BANK AT KAPASAN II 5.43MVAR TCC VII, UDAIPUR 0.40 0.00
TCC VII, UDAIPUR 0.38 0.00
TCC VII, UDAIPUR 10.50 0.00
TCC VII, UDAIPUR 31.92 0.00
TCC VII, UDAIPUR 13.71 0.00
Providing 220 KV Bus sectionlizer on 220 KV Main bus II at 220 KV GSS, Alwar under the head “Augmentation” (35/2013-14)
Shifting of 132 KV Alwar bay equipments and one no. 132 KV isolator at 132 KV Aux. bus at 220 KV GSS, Alwar under the head “Augmentation” (36/2013-14)
Const. of 2 no. 33 KV bays at 220 KV GSS, Alwar for 33 KV bays at 220 KV GSS, Alwar for 33 KV sub-station Power House and Diesel power house under the head “Augmentation” (34/2013-14)
Construction of 1 no. 33 KV O/G bay for Rathi-II at 220 KV GSS, Khushkhera (Augmentation) (50/2013-14)
Augmentation of 132/ 33 KV 20/ 25 MVA transformer in place of 132/ 33 KV, 12.5/ 7.5/ 5 MVA transformer at 220 KV GSS, Nadbai, Distt. Bharatpur (24/2014-15)
Const. of 2 no. O/G bay at 132 KV GSS, Laxmangarh for 33 KV Harsana & Govindgarh feeder (26/2013-14)
RMU Scheme at 220 KV GSS, Dholpur (14/2013-14)RMU Scheme stage III at 220 KV GSS, K.G. Bas (43/2011-12)RMU PLCC Stage I 220 KV GSS, BTP (24/2013-14)
CONST OF CAP.BANK AT 132KV GSS Senthi 5.43MVARCONST OF CAP.BANK AT 132KV GSS MOKHAMPURA 5.43MVAR
CONST OF 220 KV CAP.BANK AT ASPUR 5.43MVAR
CONST OF CAP.BANK AT RASOOLPUR 5.43MVARCONST OF CAP.BANK AT SALUMBER (33KV) 5.43MVARCONST OF CAP.BANK AT RISHABHDEO (33KV) 5.43MVARCONST OF CAP.BANK AT DARIBA (33 KV) 5.43MVAR
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC VII, UDAIPUR 23.96 0.00
TCC VII, UDAIPUR 34.89 0.00132KV S/C BAGIDORA-KUSHALGARH LINE TCC VII, UDAIPUR 0.00 260.18400/220 KV D/C LILO CHR-DEBARI LINE TCC VII, UDAIPUR 120.59 0.00220KV DC LILO BAMANTUKDA FROM KNK-BALI TCC VII, UDAIPUR 180.09 0.00220KV S/C LILO BHIL-BALI LINE TCC VII, UDAIPUR 0.00 572.18II CKT 220 KV DBR BANSWARA LINR TCC VII, UDAIPUR 3.62 0.00132KV MADRI-DAKANKOTRA TCC VII, UDAIPUR 0.00 379.93
TCC VII, UDAIPUR 4.43 0.00132 KV D/C LILO RISH-DUNGARPUR LINE TCC VII, UDAIPUR 0.00 0.00132KV Kankroli-Sapol line TCC VII, UDAIPUR 301.00 0.00132KV Mavli-Sanwad line TCC VII, UDAIPUR 345.09 0.00132 kv s/c lafarge line TCC VII, UDAIPUR 6.10 0.00220KV GSS BANSWARA TCC VII, UDAIPUR 2.27 0.00220KV GSS DEBARI 160 mva TCC VII, UDAIPUR 508.02 0.00132KV GSS SAGWARA 20/25 MVA TCC VII, UDAIPUR 223.94 0.00132KV GSS DHARIYAWAD 20/25MVA TCC VII, UDAIPUR 89.33 0.00220KV GSS SAWA 100MVA / 160MVA TCC VII, UDAIPUR 458.21 0.00132KV GSS BEGUN TCC VII, UDAIPUR 166.81 0.00
132KV GSS BAROLI 10./12.5MVA TCC VII, UDAIPUR 5.25 0.00132KV GSS AJ.KA KHERA 10/12.5MVA TCC VII, UDAIPUR 4.80 0.00132KV GSS BHATEWAR 20/25MVA TCC VII, UDAIPUR 0.00 5.70132KV GSS KANKROLI 40/50MVA TCC VII, UDAIPUR 385.65 0.00132KV GSS DEOGARH 10/12.5 MVA TCC VII, UDAIPUR 62.08 0.00132KV GSS CHH.SADRI 20/25 MVA TCC VII, UDAIPUR 76.99 0.00132KV GSS MANGALWAR 20/25 MVA TCC VII, UDAIPUR 174.01 0.00132KV GSS PRATAPGARH(BAY SEPERATION WORK) TCC VII, UDAIPUR 39.49 0.00132KV GSS SUKHER 40/50 mva TCC VII, UDAIPUR 15.20 0.00132KV GSS SISARMA 40/50 MVA TCC VII, UDAIPUR 21.82 0.00132KV GSS DARIBA 20/25MVA TCC VII, UDAIPUR 0.00 6.93132LV GSS BHADESAR 20/25MVA TCC VII, UDAIPUR 1.97 0.00C/R BUILD SAPOL TCC VII, UDAIPUR 15.32 0.00C/R BUILDING AT 132KV RASOOLPURA TCC VII, UDAIPUR 13.07 0.00C/R BUILDING AT PARTAPUR TCC VII, UDAIPUR 0.95 0.00B/W 220KV MADRI TCC VII, UDAIPUR 2.27 0.00B/W AT BAMANTUKDA TCC VII, UDAIPUR 56.06 0.00B/W AT MENAR TCC VII, UDAIPUR 20.05 0.00DOORMATORY AT SAPOL TCC VII, UDAIPUR 0.00 0.00GUARD HUT AT DEBARI TCC VII, UDAIPUR 3.20 0.00GUARD HUT AT BAMANTUKDA TCC VII, UDAIPUR 0.00 0.00GUARD HUT AT 132 Sukher TCC VII, UDAIPUR 2.86 0.00WATER SUPPLY AT ASPUR TCC VII, UDAIPUR 0.00 2.82WATER SUPPLY AT GLR SAWA TCC VII, UDAIPUR 0.00 0.96STORE SHED AT DAKANKOTRA TCC VII, UDAIPUR 5.26 0.00STORE SHED AT KHERWARA TCC VII, UDAIPUR 0.00 0.00water supply at BAMANTUKDA TCC VII, UDAIPUR 0.00 2.61
TCC VII, UDAIPUR 0.00 19.27
TCC VII, UDAIPUR 0.00 10.47
RENOVATION OF 132 KV S/C DBR UCW LINE TCC VII, UDAIPUR 1.02 0.00
TCC VII, UDAIPUR 22.76 0.00
CONST OF CAP.BANK AT SAGWARA (33 KV) 5.43MVARCONST OF CAP.BANK AT BAGIDORA (33 KV) 5.43MVAR
132KV LILO LINE FOR PRATAPUR GSS(BSW-SGW line)
132KV S/C LINE FROM 220KV GSS CHITTOR FOR CHITTOR-HZL CPP PROJECT CHENDERIYA FOR HZL
132KV BAY AT 220KV GSS CHITTOR FOR CHITTOR-HZL CPP PROJECT CHENDERIYA LINE OF HZL
RENOVATION OF 132 KV BAY FOR UCW LINE AT DEBARI
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC VII, UDAIPUR
TCC VII, UDAIPUR 0.00 1.29Sanwar Bay at 132KV GSS Mavli TCC VII, UDAIPUR 8.97 0.00
TCC VII, UDAIPUR 27.40 0.00
TCC VII, UDAIPUR 0.00 0.00RMU AT 132KV GSS BANAR TCC IV, JODHPUR 0.00 0.00RMU OF 132KVGSS BARMER TCC IV, JODHPUR 0.00 7.50RMU AT 132KV GSS BHOPALGARH TCC IV, JODHPUR 0.00 9.99
TCC IV, JODHPUR 0.00 190.68
TCC IV, JODHPUR 0.00 5.30
TCC IV, JODHPUR 0.00 0.00RMU AT 132KVGSS DECHU TCC IV, JODHPUR 0.00 0.00RMU PLCC AT 132KVGSS JAISALMER TCC IV, JODHPUR 0.00 0.65
TCC IV, JODHPUR 0.00 0.00RMU AT 132KV GSS JAISALMER TCC IV, JODHPUR 0.00 19.13
TCC IV, JODHPUR 0.00 0.89
TCC IV, JODHPUR 0.00 81.59
TCC IV, JODHPUR 0.00 2.96
TCC IV, JODHPUR 0.00 0.00
CONST. OF STORE SHED AT 220KVGSS AAU TCC IV, JODHPUR 0.00 0.00
COSNT. OF GUARD HUT AT 220KVGSS AAU TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00CONST. OF B/W AT 220/132KV GSS BAP TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00G.I. PIPE LINE AT 220KVGSS BAP TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
CONST. OF GUARD HUT AT 220KVGSS BAP TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00RMU OF 220KV GSS BHOPALGARH TCC IV, JODHPUR 0.00 7.52
TCC IV, JODHPUR 0.00 8.06
33 KV BAT AT PTG FOR M/S WELSPUN PVT.LTD. DEP.WORK132KV FEEDER BAY AT 132KV RASOOLPUR FOR J.K.CEMENT
33 KV BAYAT 132 KV GSS DALOT OF BADI SAKHTALI132 KV BAT AT PTG FOR M/S WELSPUN PVT.LTD.
AUG. WORK OF INSTALLATION of 132/33 KV, 20/25 MVA TRANSFORMER AT 132KVGSS DECHUCONST. OF 20/25 MVT TRF. BAY FOUNDATION AT 132KVGSS DECHU
CONST. OF CABLE TREAENCH & GREVELLING WORK FOR 20/25MVA TRF. BAY AT 132KVGSS DECHU
AUG. OF 132/33KV, 40/50MVA TRF. (SR. NO. 5217/3-BBL MAKE) AT 132KVGSS JAISALMER (DOC-27.04.2011)
RMU OF PLCC EQUIPMENT AT 132KVGSS NPHCONST. OF BOUNDARY WALL AT 220 KV GSS AAUCONST. OF RETAINING WALL AND FANCING AT 220KV GSS AAUP&F GI PIPE LINE AND PUMP AT 220KVGSS AAU
AUG. OF 132/33KV 20/25MVA TRF. AT 220KVGS AAU
CONST. OF CONTROL ROOM BUILDING AT 220 KV GSS BAPCONST. OF KIOSK BUILDING AT 220 KV GSS BAPCONST. OF RESIDENTIAL QUARTERS AT 220KVGSS BAPCOSNT. OF MANHOLE & SEFTIC TANK AT 220KVGSS BAP
WORK FOR P&F SEVERAGE LINE AT 220KVGSS BAP
COSNT. OF SERVICE ROAD AT 220KVGSS BAP
LEVELLING, DRESSING & GREVELLING WORK AT 220KVGSS BHOPALGARH (DOC-23.02.2012)
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 3.17
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00RMU AT 220KVGSS JODHPUR TCC IV, JODHPUR 0.00 0.00RMU OF PLCC AT 400KV GSS BARMER TCC IV, JODHPUR 0.00 1.72
TCC IV, JODHPUR 0.00 5.87
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 1096.26
TCC IV, JODHPUR 0.00 33.92
TCC IV, JODHPUR 0.00 921.48
TCC IV, JODHPUR 0.00 469.62
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 20.10
TCC IV, JODHPUR 0.00 75.49LIGHTING OF ACOS (T&C) JODHPUR TCC IV, JODHPUR 0.00 2.55CONST. OF B/W AT 132KVGSS AJASAR TCC IV, JODHPUR 0.00 33.65
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 6.79
TCC IV, JODHPUR 0.00 2.00
TCC IV, JODHPUR 0.00 4.65
TCC IV, JODHPUR 0.00 604.18
TCC IV, JODHPUR 0.00 18.02CONST. OF B/W AT 220KVGSS BADISID TCC IV, JODHPUR 0.00 42.01
TCC IV, JODHPUR 0.00 18.01
TCC IV, JODHPUR 0.00 0.00
CONST. OF 2NOS. BAY AT 220KV GSS DECHUGROUTING WORK IN RAMGARH/DECHU BAY AT 220KVGSS DECHU
CONST. OF BREAKER FOUNDATION FOR 220KV PALI BAY AT 220KVGSS JODHPUR UNDER RMU
REPLACEMENT OF 01 NO. 245KV CIRCUIT BREAKERS AT 220KVGSS JODHPUR UNDER RMUAUG. WORK OF 160MVA TRF. AT 220KV GSS JODHPUR
CONST. OF ROAD FOR COLONY AT 400KV GSS AKAL
CIVIL FOUNDATION FOR INSTALLATION OF 400/220KV, 315 MVA TRANSFORMER & ASSOCIATED BAY WORK AT 400KV GSS JAISALMER
INSTALLATION OF 400/220KV, 315 MVA TRANSFORMER & ASSOCIATED BAY WORK AT 400KV GSS JAISALMERCONST. WORK OF 400KV GSS AKAL, JAISALMER (DOC-11.08.2010)
REPLACEMENT OF 315MVA, 400/220 KV POWER TRANSFORMER AT 400 KV GSS JODHPUR (UNDER AUG. WORK)220KV BAY WORK AT 400KV GSS JODHPUR UNDER TN-294
CONST. OF 400KV, 50MVAR SHUNT REACTOR & 400KV BAY WORK AT 400KVGSS JODHPUR (DOC-22.02.2013)
CONST. OF RAJWEST & JAISALMER BAY FOUNDATION AT 400KV GSS SURPURA, JODHPUR (DOC-22.02.2013)
LILO OF EXISTING 132KV S/C AAU-PHALODI LINE AT PROPOSED 220KVGSS AAU
CONST. OF TUBE WALL AT 132KVGSS AJASARCONST. OF STORE SHED AND GUARD HUT 132KVGSS AJASARCONST. OF SUB BASE FOR APPROACH ROAD AT 132KVGSS AJASARCONST. OF C/R BUILDING AT 220KVGSS AMARSAGAR
REPLACEMENT OF 100MVA, 220/132KV POWER TRF. BY NEW 160MVA 220/132KV POWER TRF. AT 220KV GSS AMARSAGARREPLACEMENT AT 220KV GSS AMARSAGAR UNDER RMU SCHEME
CONST. OF CONTROL ROOM BUILDING AT 220KV GSS BADISIDCONST. OF DRAIN DISPOSAL OF RAIN WATER AT 220KVGSS BADISID
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC IV, JODHPUR 0.00 0.13
TCC IV, JODHPUR 0.00 0.01
TCC IV, JODHPUR 0.00 0.00RMU OF PLCC AT 220KV GSS BALOTRA TCC IV, JODHPUR 0.00 5.93RMU OF 220 KV GSS BALOTRA TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 140.40RMU AT 132KVGSS BAORI TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 78.41CONST. OF 220KV D/C BAP-BHADLA LINE TCC IV, JODHPUR 1868.07 0.00
TCC IV, JODHPUR 0.00 21.340 TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 13.14RMU WORK AT 220KVGSS BILARA TCC IV, JODHPUR 0.00 25.62
TCC IV, JODHPUR 0.00 0.00RMU AT 132KVGSS BORUNDA TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 292.12
TCC IV, JODHPUR 0.00 8.23
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 3.38
TCC IV, JODHPUR 0.00 52.05
TCC IV, JODHPUR 0.00 0.21
TCC IV, JODHPUR 0.00 1.05RMU AT 132KVGSS GADRAROAD TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.42RMU OF PLCC AT 132KVGSS GIRAL TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 2.44
CONST. WORK OF 02 NOS. 220KV BAY AT 220KV GSS BHAITHWASIYA FOR 220KV AAU-BHAITHWASIYA LINE
AUG. OF 3 NOS. 33KV BAYS NAMELY SAMDARI JASOL FANTA & JASOL VILLAGE AT 220KV GSS BALOTRA
CIVIL FOUNDATION FOR AUG. OF 3 NOS. 33KV BAYS NAMELY SAMDARI JASOL FANTA & JASOL VILLAGE AT 220KV GSS BALOTRA
AUG. OF 132/33KV, 20/25MVA TRF. AT 132KV GSS BAORI
LILO OF ONE CIRCUIT OF 220KV D/C BAP-BHADLA LINE AT BADISID (12KM)
INSTALLATION OF PLCC EQUIPMENT AT LILO OF 220KV S/C BARSINGSHAR-PHALODI LINE AT 220KV GSS BAP
CONDUCTING SBC OF SOIL AT 400KVGSS BHANSADA, JAISALMERCONDUCTING SURVEY WORK AT 400KVGSS BHANSDA, JAISALMER-2RETROFITTING OF RELAY AT 220KV GSS BILARA
CONST. OF 220KVGSS BORANADA (DOC-31.03.2010)
AUG. WORK OF 40/50MVA 132/33KV TRF. AT 132KV GSS CHANDANCASTING OF C/F TRF. BAY AT 132 KV GSS CHANDANCASTING OF SURVEY WORK AT 220KVGSS CHHATRAIL, JAISALMERCONDUCTING SBC OF SOIL AT 220KVGSS CHATRAIL, JAISALMERJUNGLE CLEARANCE AT 220KVGSS CHHATRAIL, JAISALMERCONST. OF 132KV S/C DECHU-SANWREEJ LINEAUG WORK OF 132KV BAY FOUNDATION AT 132KV GADRA ROADAUG. OF 1X10/12.5 MVA, 132/33KVTRF. AT 132KV GSS GADRA ROAD
CONST. OF BREAKER FOUNDATION & GROUNDING WORK AT 132KVGSS GADRA ROADCONST. OF C/F WORK AT 132KVGSS GADRA ROAD
PLCC WORK ON LILO OF 132KV S/C GADRAROAD-BARMER LINE AT 220KV GSS BARMER
RMU OF PLCC EQUIPMENTS AT 132KV GSS GUDAMALANI
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.03
TCC IV, JODHPUR 0.00 10.14RMU AT 132KVGSS OSIAN TCC IV, JODHPUR 0.00 2.29
TCC IV, JODHPUR 0.00 2.43
TCC IV, JODHPUR 0.00 1.00
TCC IV, JODHPUR 0.00 0.46
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00RMU PLCC AT 132KVGSS POKRAN TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00INSPECTION SURVEY AT 132KVGSS PS-II TCC IV, JODHPUR 0.00 0.14
TCC IV, JODHPUR 10.28 0.00
CONST. OF STORE SHED AT 132KVGSS PS-2 TCC IV, JODHPUR 0.00 2.95UPGRADATION OF 132KV GSS PS-2 TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 13.24
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 6.61
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
CONST. OF GUARD HUT AT 132KVGSS PS-3 TCC IV, JODHPUR 0.00 0.00
CONST. OF STORE SHED AT 132KVGSS PS-3 TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
INSTALLATION OF 132/33KV 20/25MVA TRANSFORMER AT 132KVGSS JUNAMEETA KHERACONST. OF 400KV D/C JODHPUR-JAISALMER LINE CONST. OF OUTER APPROCH ROAD AT 220KVGSS KANASARCONST. OF SUMP FOR 40/50MVA TRF. AT 132KVGSS LOHAWAT
INSTALLATION OF 132/33KV 1X40/50MVA TRANSFORMER IN PLACE OF EXISTING 132/33KV 1X20/25MVA TRANSFORMER AT 132KVGSS LOHAWAT (UNDER AUG. WORK.)CONST. OF 132KV S/C LOHAWAT-MATORA LINE
EXTENSION OF C/R BUILDING AT 220KVGSS PHALODI
CASTING OF MODIFICATION OF MAIN GATE & TRF. TRACK AT 220KVGSS PHALODIAUG. WORK OF132 KV GSS PIPAR CITY PLCC WORKS
C/F FOR CONST. OF 01 NO. 33KV BAY AT 132KVGSS POKRAN FOR PALI MARWAR (DERARTMENTAL WORK)
CONST. OF 01 NO. 33KV BAY AT 132KVGSS POKRAN FOR PALI MARWAR (DERARTMENTAL WORK)
CONST. OF LILO 132KV POKRAN-ASKANDRA LINECONST. OF TOE WALL, BOUNDARY WALL & FENCING WALL AT 132KVGSS PS-2
CONST. OF CONTROL ROOM BUILDING AT 132KV GSS PS-2
LEVELLING, DRESSING & GREVELLING WORK AT 132KV GSS PS-2S/F FERRO CEMENT COVER AT 132KVGSS PS-2CONST. OF TOE WALL & FENCING AT 132KVGSS PS-3CONST. OF CONTROL ROOM BUILDING AT 132KVGSS PS-3CONST. OF RESIDENTIAL BUIDLING AT 132KVGSS PS-3CONST. OF SUMP WITH PIPE LINE AT 132KVGSS PS-3S&F G.I. PIPE LINE FOR COLONY AT 132KVGSS PS-3
COSNT. OF SERVICE ROAD AT 132KVGSS PS-3
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
CONST. OF C/F AT 132KVGSS PS-3 TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 4.60
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
CONST. OF GUARD HUT AT 132KVGSS PS-4 TCC IV, JODHPUR 0.00 0.00
CONST. OF STORE SHED AT 132KV GSS PS-4 TCC IV, JODHPUR 0.00 3.46
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00RMU AT 132KVGSS PS-V PHALODI TCC IV, JODHPUR 0.00 0.00RMU AT 132KVGSS PS-8, NARWA TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 5.01RMU PLCC AT GTTP RAMGARH TCC IV, JODHPUR 0.00 1.68
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00RMU AT 132KVGSS RANASAR TCC IV, JODHPUR 0.00 0.00RMU OF PLCC AT 132KVGSS SAWA TCC IV, JODHPUR 0.00 0.00RMU AT 132KVGSS SAWA TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00RMU OF PLCC AT 132KVGSS SHEO TCC IV, JODHPUR 0.00 0.00RMU AT 132KVGSS SHEO TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00RMU AT 132KVGSS SINDHARI TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 22.02 0.00
S/F FERRO CEMENT COVER AT 132KVGSS PS-3CONST. OF TOE WALL & FENCING WALL AT 132 KV GSS PS IVCONST. OF CONTROL ROOM BUILDING AT 132KV GSS PS-4CONST. OF SUMP WITH P/L OF PIPE LINE AT 132KVGSS PS-4
CONST. OF CABLE TRENCHES AT 132KVGSS PS-IV CONST. OF DEVELOPMENT WORK AT 132KVGSS PS-4LEVELLING, DRESSING & GRAVELLING WORK AT 132KVGSS PS-4S/F FERRO CEMENT COVER AT 132KVGSS PS-4RMU OF PLCC EQUIPMENT AT 132KVGSS PS-5, PHALODI
PLCC WORK AT 400KV D/C RAJWEST-JODHPUR LINE AT 400KV JODHPUR
AUG. OF 132/33KV 1X10/12.5MVA TRF. AT 132KV GSS RANASARCONST. OF APPROACH ROAD AT 132KVGSS RANASAR
CASTING OF C/F FOR 04 NOS. 33KV BAYS (NAMELY LAKHA , HADVECHA, JORANADA & NAND FEEDER) AT 132KVGSS SHEO
CONST. OF 04 NOS. 33KV BAYS (NAMELY LAKHA , HADVECHA, JORANADA & NAND FEEDER) AT 132KVGSS SHEO
C/F FOR CONST. OF 02 NOS. 33KV BAY WORK AT 132KVGSS SHEO AS A DEPARTMENTAL WORK FOR PROVIDING GIRD CONNCTIVITY FOR 40MW WIND POWER PROJECT OF M/S GAMESHA WIND TURBINES PVT. LTD.
CONST. OF 02 NOS. 33KV BAY WORK AT 132KVGSS SHEO AS A DEPARTMENTAL WORK FOR PROVIDING GIRD CONNCTIVITY FOR 40MW WIND POWER PROJECT OF M/S GAMESHA WIND TURBINES PVT. LTD.
CASTING OF TRF. BAY FOUNDATION AT 132KVGSS SINDHARI (DOC-31.01.2011)
CONST. WORK OF SEPRATION OF GROUP CONTROL OF TRF. 132/33KV, 2X10/12.5 MVA TRF. AT 132KV GSS SIWANA
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
RMU AT 132KVGSS SOYALA TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00RMU AT 220KVGSS TINWARI TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 4.63
TCC IV, JODHPUR 0.00 120.29
TCC IV, JODHPUR 0.00 6.59
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 757.61
TCC IV, JODHPUR 0.00 7.01
TCC IV, JODHPUR 0.00 9.34
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 45.21
TCC IV, JODHPUR 0.00 0.00
TCC IV, JODHPUR 0.00 1.62
TCC IV, JODHPUR 0.00 32.13
TCC V, KOTA 0.37
TCC V, KOTA 0.00STRUCTURE FOUNDATION Lakheri TCC V, KOTA 0.00
CONST. OF SUMP FOR 160MVA TRF. FIRE FIGHTING SYSTEM AT 220KVGSS TINWARI
CONST. OF 1 NOS. 22KV BAY AT 220KV GSS JODHPUR FOR LUCID (DEPOSIT WORK)
CONST. OF 01 NO. 220KV BAY AT 400KVGSS BARMER FOR MPT OF M/S CAIRN INDIA LIMITED AT NAGANA VILLAGE IN BARMER DISTRICT
CONST. OF 1 NO. 33KV BAY AT 400KV GSS BARMER FOR M/S MES JALIPA (DEPOSIT WORK)
CONST. OF 02 NOS. 33KV BAY AT 220KVGSS AMARSAGAR FOR M/S RAJWEST
CONST. OF 220 KV S/C LINE FROM 400KV GSS BARMER (30KM WITH 3KM D/C TOWER AT BOTH END) TO MPT OF M/S CAIRN INDIA LIMITED AT NAGANA VILLAGE IN BARMER DISTRICT
INSTALLATION OF PLCC EQUIPMENTS FOR 220KV S/C BARMER-MPT NAGANA AT S/C 400KV BARMER & 220KV NAGANA (DEPOSIT WORK OF M/S CAIRN INDIA LTD.
CONST. OF 1NO 33KV BAY AT 220KVGSS BORANADA FOR M/S SHREE NATH AGRO INDUSTRIES BORANADA
CONST. OF 1NO 33KV BAY AT 220KVGSS BORANADA FOR M/S CHEMICALS & MINERALS INDUSTRIES PVT. LTD. BORANADA
CONST. OF 132KV BAY WORK AT 132KVGSS BORUNDA FOR DEPOSIT WORK OF M/S SIDHI VINAYAKCONST. OF 132KV S/C BORUNDA-NIMBOL LINECONST. OF 01 NO. 33KV BAY AT 132KVGSS CHANDAN FOR M/S RAJWESTMODIFICATION OF 132KV JODHPUR-BILARA & 132KV JODHPUR-PALI LINE
CONST. OF 33KV POKARAN-NACHNA FANTA (RD-1251) LINE ON 132KV TOWER WITH ACSR PANTHER CONDUCTOR (DEPOSIT WORK)CONST. OF 01 NO. 33KV BAY AT 132KVGSS SHEO FOR M/S RAJWEST
SHIFTING OF 220KV D/C SURPURA-BHAWAD LINE FOR M/S SHREE SHUBHAM LOGISTICS, JODHPUR
CONST. OF 2 NOS. 33 KV FEEDER BAY AT 132 KV GSS AKLERA FO 33 KV S/C GULENDI DAM & CHHAPI DAM (DEPOSIT WORK OF PHED)
Construction work of 33 KV Bay at 132 Lakheri deposit work of Raj. Housing Board
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC V, KOTA 0.00
TCC V, KOTA 3.20
TCC V, KOTA 0.00
TCC V, KOTA 0.00 0.00
TCC V, KOTA 91.80 0.00
220 KV S/C CHABRA JHALAWAR LINE TCC V, KOTA 0.00 0.00REPCEMENT OF PLCC EQUIP AT JALAWAR TCC V, KOTA 0.00 7.96REPCEMENT OF PLCC EQUIP AT JALAWAR TCC V, KOTA 0.00 4.13REPCEMENT OF PLCC EQUIP AT JALAWAR TCC V, KOTA 0.00 0.84STRUCTURE FOUNDATION MORAK TCC V, KOTA 0.00 0.00
REPCEMENT OF PLCC EQUIP AT 220 MODAK TCC V, KOTA 0.00 0.83
REPCEMENT OF PLCC EQUIP AT 220 MODAK TCC V, KOTA 0.00 0.00TRANSFORMER FOUNDATION DUG TCC V, KOTA 20.71 0.00STRUCTURE FOUNDATION DUG TCC V, KOTA 0.00 0.00
REPCEMENT OF PLCC EQUIP AT 220 Dahra TCC V, KOTA 0.00 0.00
REPCEMENT OF PLCC EQUIP AT 132 ANTA TCC V, KOTA 0.00 0.76
TCC V, KOTA 0.00 0.00STRUCTURE FOUNDATION BARAN TCC V, KOTA 0.00 0.00220 KV GSS BARAN Contruction of GSS TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 3.13CONTROL ROOM BAPAWAR TCC V, KOTA 0.00 0.00DEVELOPMENT OF COLONY AT BAPAWAR TCC V, KOTA 24.39 0.00EARTHMAT BAPAWAR TCC V, KOTA 0.00 7.10CONST. OF132 KV GSS BAPAWAR(c&m) TCC V, KOTA 0.00 0.00DEVELOPMENT OF YARD AT KAWAI TCC V, KOTA 0.00 0.00CONST. OF 132 KV S/C KAWAI-ATRU LINE TCC V, KOTA 0.00 0.00R3 TYPE QUARTER 220 KOTA TCC V, KOTA 0.00 0.00R4 TYPE QUARTER 220 KOTA TCC V, KOTA 0.00 0.00R5 TYPE QUARTER 220 KOTA TCC V, KOTA 0.00 0.00TRANSFORMER FOUNDATION 220 KOTA TCC V, KOTA 0.00 0.00STRUCTURE FOUNDATION 220 KOTA TCC V, KOTA 0.00 0.00LEVELING & DRESSING AT 220 KOTA TCC V, KOTA 0.00 0.00
REPCEMENT OF PLCC EQUIP AT 220 KOTA TCC V, KOTA 0.00 4.13
REPCEMENT OF PLCC EQUIP AT 220 KOTA TCC V, KOTA 0.00 1.31BOUNDRY WALL AT I/A TCC V, KOTA 0.00 0.00ROADS AT I/A TCC V, KOTA 0.00 0.00INSEPECTION PATH I/A TCC V, KOTA 0.00 0.00DEVELOPEMENTOF YARD M.N. TCC V, KOTA 0.00 0.00INSEPECTION PATH M.N. TCC V, KOTA 0.00 0.00
CONST. OF 1 NO. 33 KV FEEDER BAY AT 132 KV GSS BHADOTI FOR M/S BHARAT PETROLIUM CORPORATION LTD.
SHIFTING WORK OF 132 KV S/C BUNDI-HINDOLI LINE NEAR DEPOSIT WORK OF NHAI132 KV S/C BWM-DUG-HEMDA LINE PIPLAD
CONST. WORK OF 400 KV D/C ACSR LINE FROM KAWAI - TPS TO PROPOSED 765 KV S/S ANTA TN-293
SHIFTING OF 132 KV S/C ANTA-BARAN LINE (1.5 KM APPROX) FROM PRAPOSED 765/400 KV GSS ANTA (BARAN), LOWERING DOWN OF EXISTING 220 KV S/C BARAN-DAHRA LINE
REPCEMENT OF OLD PLCC EQUIP AT 132 ANTA
REPCEMENT OF PLCC EQUIP AT 132 SANGODREPCEMENT OF PLCC EQUIP AT 132 SANGOD
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
STRUCTURE FOUNDATION M.N. TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.77GUARD HUT GOPAL MILL TCC V, KOTA 0.00 0.00INSEPECTION PATH GOPAL MILL TCC V, KOTA 0.00 0.00DEVELOPMENT OF YARD G.M. TCC V, KOTA 0.00 0.00CONTROL ROOM AT 132 BUNDI TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00132 KV GSS TALERA TCC V, KOTA 0.00 0.00CONST. OF 220 KV GSS BUNDI TCC V, KOTA 0.00 0.00STRUCTURE FOUNDATION SWM TCC V, KOTA 0.00 0.00
REPCEMENT OF PLCC EQUIP AT 220 SWM TCC V, KOTA 0.00 0.76
TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.32132 KV GSS ITAWA (CIVIL) TCC V, KOTA 0.00 0.00ROADS KAHANDAR TCC V, KOTA 0.00 0.00BOUNDARY WALL Khandar TCC V, KOTA 0.00 0.00STURCTURE FOUNDATION KHANDAR TCC V, KOTA 0.00 0.00LEVELING & DRESSING KHANDAR TCC V, KOTA 0.00 0.00CABLE TRENCH KHANDAR TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00ROADS AT BHADOTI TCC V, KOTA 0.00 0.00BOUNDARY WALL BHADOTI TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00132 KV S/C LALSOT - BHADOTI LINE TCC V, KOTA 0.00 0.00BOUNDARY WALL BATODA TCC V, KOTA 0.00 0.00CONTROL ROOM BATODA TCC V, KOTA 0.00 4.02STORE SHED BATODA TCC V, KOTA 0.00 0.00RAIN WATER HARVESTING BATODA TCC V, KOTA 0.00 0.00Guard Hut at Batoda TCC V, KOTA 0.00 0.00BOUNDRY WALL KOLUKHERI TCC V, KOTA 0.00 5.28CONTROL ROOM KOLUKHERI TCC V, KOTA 0.00 21.05STORE SHED AT KOLULKHERI TCC V, KOTA 0.00 0.00GUARD HUT KOLUKHERI TCC V, KOTA 0.00 0.00ROADS AT KOLUKHERI TCC V, KOTA 0.00 19.29BOUNDRY WALL CHOUTH KA BARWADA TCC V, KOTA 0.00 15.19BOUNDRY WALL BAMANWAS TCC V, KOTA 24.27 0.00BOUNDRY WALL ROOPARAIL TCC V, KOTA 0.00 10.77BOUNDRY WALL BONLI TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00
TCC V, KOTA 0.00 0.00CONST. OF220 D/C HINDON-G.CITY LINE TCC V, KOTA 0.00 0.00CONST. OF G.CITY SH. MAHAVEER LINE TCC V, KOTA 0.00 511.43
REPCEMENT OF PLCC EQUIP AT 132 M. NAGAR
CONST OF 132 KV LILO MANDANA from 132 KV Kota-Modak LINE
REPCEMENT OF PLCC EQUIP AT 220 KV Gss Sawai MadhopurRAISING HEIGHT OF 132 KV D/C KOTA-LAKHERI
CONST. OF 132 KV LILO FROM SWM - SHEOPUR D/C LINE FOR 132 KV GSS KHANDAR
LEVELLING DRESSING GRAVELLING BHADOTICONST. OF 132 KV S/C SWM - BHADOTI LINE
REPCEMENT OF OLD PLCC EQUIP AT 132 Kv GssGandhi SagarSAGARREPCEMENT OF OLD PLCC EQUIP AT 132 RPS Gen.REPCEMENT OF OLD PLCC EQUIP AT 132 Kv GssJAWAHAR SAGARREPCEMENT OF OLD PLCC EQUIP AT 132 Kv Gss RAPP I & IIREPCEMENT OF OLD PLCC EQUIP AT 132 Kv Gss RAPP III & IV
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC V, KOTA 145.31TRANSFORMER FOUNDATION AKLERA TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00STRUCTURE FOUNDATION ANTA TCC V, KOTA 0.00
TCC V, KOTA 0.00STRUCTURE FOUNDATION BARAN TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00TRANSFORMER FOUNDATION G.M. TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00STRUCTURE FOUNDATIONS AT D.M TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
AUG. OF 40/50MVA TRANSFORMER AT 132 AKLERA
INSTALLATION OF 33 KV 5.43 MVAR CAPACITOR BANK OF 132 KV GSS AKLERATRANSFORMER AUG. WORK OF 20/25, 132/33 KV AT 132 KV GSS BAKANI
INSTALLATION OF 33 KV 5.43 MVAR CAPACITOR BANK-II OF 132 KV GSS KANWARI
TRANSFORMER AUG. WORK OF (+) 1*20/25 MVA, (-) 1*10/12.5 MVA, 132/33KV AT 132 KV GSS BHAWANI MANDI
INSTALLATION OF 33 KV 1 X 5.43 MVAR CAPACITOR BANK-II AT 132 KV GSS MAYALA (RGM)220 KV GSS DAHRA (132/33KV,20/25 MVA Transformer)INSTALLATION OF 33 KV 5.43 MVAR CAPACITOR BANK-II OF 132 KV GSS ANTAAUG. OF 132/33KV 20/25 MVA TRANSFORMER AT 132 ANTA
TRANSFORMER AUG. WORK OF 1*40/50 MVA, (-) 1*15/20 MVA, 132/33KV AT 132 KV GSS BARAN
TRANSFORMER AUG. WORK OF 1 X 50/20 MVA , 132/33 KV AT 132 KV GSS KELWARAAUG. OF 132/33 KV 20/25 MVA TRANSFORMER AT 220 KV GSS KAWAI33 KV , 5.43 MVAR CAP. BANK-I AT 132 KV GSS CHHIPABARODINSTALLATION OF 33 KV 5.43 MVAR CAPACITOR BANK OF 132 KV GSS ATRU33 KV , 5.43 MVAR CAP. BANK-I AT 132 KV GSS ATRUAUG. OF 220/132 KV 160 MVA TRANSFORMER AT 220 KOTAAUG. OF 132/33KV 40/50 MVA TRANSFORMER AT 132 Gopal Mill
Aug. of 132/33 KV 10/12.5 MVA Transformer Deoli Manjhi33 KV , 5.43 MVAR CAP. BANK-I AT 132 KV GSS DEOLI MANJHI
INSTALLATION OF 33 KV 5.43 MVAR CAPACITOR BANK OF 132 KV GSS HINDOLI33 KV , 5.43 MVAR CAP. BANK-I AT 132 KV GSS HINDOLI33 KV , 5.43 MVAR CAP. BANK-I AT 132 KV GSS MANDANA33 KV , 5.43 MVAR CAP. BANK-I AT 132 KV GSS TALERA
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC V, KOTA 0.00
TCC V, KOTA 25.64TRANSFORMER FOUNDATION NAINWA TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00CONST. OF 3 NO. 33 KV BAY AT KHANDAR TCC V, KOTA 11.13
TCC V, KOTA 0.00RMU SCHEME STAGE-3 AT 132 BARAN TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00
TCC V, KOTA 0.00RMU SCHEME STAGE-3 AT 132 KV BUNDI TCC V, KOTA 0.00
TCC V, KOTA 0.00LAND for Bhasina TCC IX, BIKANER 5.61 0.00Boundary Wall TCC IX, BIKANER 0.00 0.00Other Civil Work TCC IX, BIKANER 0.00 0.26LAND for 132 KV GSS Chhattargarh TCC IX, BIKANER 0.00 0.00Const of 132 KV GSS Khajuwala TCC IX, BIKANER 0.00 0.00LAND for 220 KV GSS Kolayat TCC IX, BIKANER 0.00 0.00Const of 132 KV GSS Jasrasar TCC IX, BIKANER 0.00 0.00Const. of 132 KV GSS, Rawatsar TCC IX, BIKANER 0.00 0.00Const of 132 KV GSS Parewara TCC IX, BIKANER 0.00 0.00Const of 220 KV GSS Sridungargarh TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER
TCC IX, BIKANER 0.00 6.07
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TRANSFORMER AUG. WORK OF 40/50 MVA, 132/33 KV TRANSFORMER IN PLACE OF 20/25 MVA, 132/33 KV TRANSFORMER AT 220 KV SWMAUG. OF 132/33 KV 10/12.5 MVA TRANSFORMER AT 132 KV GSS NAINWA
INSTALLATION OF 33 KV 5.43 MVAR CAPACITOR BANK OF 132 KV GSS NAINWA
AUG. OF 132/33 KV 10/12.5 MVATRANSFORMER AT132 KV GSS KHANDARINSTALLATION OF 33KV 1*5.43 MVAR CAP. AT KHANDAR
AUG. OF 132/33 KV 10/12.5 MVATRANSFORMER AT 132 KV GSS BHADOTIINSTALLATION OF 33KV 1*5.43 MVAR CAP. AT BAROLIAUG. OF132/33KV10/12.5 MVA TRANSFORMER AT ITAWACONST. OF 132 KV FEEDER BAY AT 220 KV GSS DAHRACONST. OF 132 KV FEEDER BAY AT 132 KV GSS BUNDI
CONST. OF I. NO. 132 KV BAY AT 132 KV GSS BHADOTI
RMU SCHEME STAGE-3 AT 220 KV GSS SAKATPURAREPLACEMENT OF EQUIPMENT UNDER RMU SCHEME AT 132 KV GSS I/A KOTA RMU SCHEME STAGE-3 AT 220 KV GSS MAHAVEER NAGAR
RMU SCHEME STAGE-3 AT SWM (132 KV SF6 CIRCUIT BREAKER, 5A 110 V DC)
Const of 132 KV GSS Srivijaynagar (Water Supply System)
Const of 01 Nos Bay at 132KV GSS Kolayat for M/S Topas Investment (P) Ltd.
Const of 1 No 33KV Bay at 220KV GSS Gajner for 11MW Solar Power Project of M/S Rays Power Experts (P) Ltd.Const. of 400KV and 220KV Bays at existing 400KV GSS Bikaner
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 1.80
TCC IX, BIKANER 0.00 5.46
TCC IX, BIKANER 0.00 4.39
TCC IX, BIKANER 0.00 113.69
TCC IX, BIKANER 0.00 26.40
TCC IX, BIKANER 0.00 29.66
TCC IX, BIKANER 0.00 6.97
TCC IX, BIKANER 0.00 16.18
TCC IX, BIKANER 0.00 0.00
Const 132KV D/C Nokha Jasrasar Tr. Line TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 4.75 0.00Aug work at 132KV GSS Bhinasar TCC IX, BIKANER 0.00 57.87
TCC IX, BIKANER 0.00 37.97
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00Aug of TRF-II at 132 KV GSS Jasrasar TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 65.22 0.00
TCC IX, BIKANER 0.00 142.64
TCC IX, BIKANER 0.00 42.76
TCC IX, BIKANER 0.00 451.33
TCC IX, BIKANER 144.82 0.00
TCC IX, BIKANER 65.59 0.00
Const of 01 Nos 33KV Bay at 132 KV GSS Nokha Daiya for 9MW Solar Power Project of M/S Trimex Sands Private Limited as Department WorkConst of 1 No. 33 KV Bay at 220 KV GSS Gajner for M/S Rishabh Renergy Pvt Ltdconst. of 33 KV bay at 132 KV GSS , HanumangarhConst of 1 Nos 33 KV Bay for Lakhuwali Hydale at 132 KV GSS Rawatsar
Const of 2 Nos 33 KV Bay at 132KV GSS Sangeria for 33KV Mandi Sangeria and Dhaban FeedersConst.of 220KV Tehendeshar bay at 220KV GSS Sujangarh
Const. of 33KV Bay at 132KV GSS Sardarshahar for Phogun Bharthari & Shimla feedersConst. of 132KV bay for Tehendesar at 132KV GSS Parewara
Const of 2 Nos. 33KV Bay at 220 KV /132KV Gajner for Common Pooling Station Development by M/S Rajasthan Patrika Pvt Ltd.& M/s Rays Power Expert Pvt Ltd.
Const of 3 Nos 33KV Bay namely KD Jatan I&II, Surpura and Jaglu at 132K GSS DeshnokConst of 132KV S/C Gharsana - Khajuwala Tr. Line
Const of 132KVS/C Sujangarh - Parewara tr line
LILO of 132KV RTGH-SDGH Line between location no. 193A & 194 B for 132 KV GSS SDGH
Instt. Of 132/33KV , 20/25 MVA TRF at 132 KV GSS Kolayat
Instt of 220/132KV ,160 MVA TRF for Replacement of 100MVA TRF at 220KV GSS NokhaConst of Leftover work at 132KV GSS LoonkaransarAug work of 100 MVA TRF at 220 KV GSS Sridungargarh
Aug of TRF-II at 132 KV GSS Nokha Daiya (Gajner)Instt. Of 220/132KV 50MVA Power Transf. at 220KV GSS BhadraSeprete Control of 10/12.5 MVA 132/33 KV power transf. at 132 KV GSS , Bhadra
Instt of 220/132KV,160MVA TRF in place of esisiting, 220/132KV ,100MVA TRF-II at 220 KV HanumangarhAug. work of 220 KV B/C & 132 KV B/C & Aux. Bus at 220 KV GSS , HanumangarhInstt of 132/33KV ,10/12.5MVA Transf. at 132KV GSS Rawatsar
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC IX, BIKANER 0.00 0.00Aug work of 132 KV GSS Gharsana TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 213.29
TCC IX, BIKANER 0.00 15.99Aug work of TRF at 132 KV GSS Ladnu TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 749.94
TCC IX, BIKANER 195.82 0.00
TCC IX, BIKANER 0.00 0.00Cap Bank at 132KV GSS Patlisar Phanta TCC IX, BIKANER 0.00 0.00Cap Bank at 132KV GSS Sadulpur TCC IX, BIKANER 0.00 0.00Cap Bank at 220KV GSS Ratangarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Kolayat TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Kolayat TCC IX, BIKANER 0.00 0.00RTU Scheme at 220 KV GSS Gajner TCC IX, BIKANER 25.48 0.00RMU Scheme at 132 KV GSS Kolayat TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00RTU Scheme at 220 KV GSS Gajner TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Bajju TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Anoopgarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Anoopgarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Gharsana TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Ladnu TCC IX, BIKANER 0.00 1.06
TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Ratangarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Ratangarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Ratangarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Sujangarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Parewara TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Churu TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Ratangarh TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
RMU Scheme at 220 KV GSS Sriganganagar TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Karanpur TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS HMH TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Goluwala TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS HMH TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS HMH TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS HMH TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Goluwala TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Pilibanga TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Nohar TCC IX, BIKANER 0.00 5.88
Instt of 132/33KV ,20/25MVA TRF in placement of 132/33KV 10/12.5 MVA TRF at 132KV GSS Sangeria
Aug of 132KV B/C & I/C at 132 KV GSS Sangeria
Instt of 1Nos. Additional 132/33KV ,20/25MVA Transf. at 132KV GSS Patlisar Phanta
Instt.of 20/25MVA ,132/33 additional Transformer at 132KV GSS SardarShahar
Instt of 220/132 KV 160MVA & 132/33MVA additional TRF at 220KV GSS GajnerInstt of 132/33KV ,20/25MVA TRF -III at 132KV GSS DeshnokInstt of 01 Nos 33KV ,5.43 MVAR Cap Bank-II at 132KV GSS Jasrasar
RMU Scheme at 132 KV GSS Nokha Daiya (Gajner)
Electrical Meters at XEN-I C&M TCC-IX Bikaner DOC 13.08.2014
Testing Equipment (Garmin Make GPS Instrument) XEN 400 RTGH DOC.14.06.2014
Testing Equipment (Garmin Make GPS Instrument) XEN 400 BKN DOC.26.06.2014
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
RMU Scheme at 132KV GSS Bhadra TCC IX, BIKANER 0.00 0.00RTU Scheme at 220 KV GSS Bhadra TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 38.72
TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Badnu TCC IX, BIKANER 0.00 0.00
RMU Scheme at 132 KV GSS Sridungargarh TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 28.61RMU Scheme at 132 KV GSS Deshnok TCC IX, BIKANER 0.00 0.00RMU Scheme at 220 KV GSS Nokha TCC IX, BIKANER 0.00 0.00RMU Scheme at 220 KV GSS Nokha TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Jasrasar TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Deshnok TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Deshnok TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Deshnok TCC IX, BIKANER 0.00 0.00RMU Scheme at 132KV GSS Rajiasar TCC IX, BIKANER 0.00 7.49RMU Scheme at 220KV GSS Suratgarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Padampur TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Padampur TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Suratgarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Suratgarh TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 42.65RMU Scheme at 220KV GSS Bikaner TCC IX, BIKANER 0.00 55.55RMU Scheme at 220KV GSS Bikaner 24 TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Bikaner 73 TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Bikaner 67 TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00RMU Scheme at 220KV GSS Bikaner 74 TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Bhinasar TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Dulchasar TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 1.42RMU Scheme at 132 KV GSS Gharsana TCC IX, BIKANER 0.00 0.00RMU Scheme at 220 KV GSS STPS TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Pugal Road TCC IX, BIKANER 0.00 0.00
RMU Scheme at 132 KV GSS Sridungargarh TCC IX, BIKANER 0.00 0.00RMU Scheme at 132 KV GSS Anoopgarh TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
RTU Scheme at 220KV GSS SDGH (Honeywell Automation India Pvt. LTD.)Testing Equipment (Garmin Make GPS Instrument) DOC.
RTU Scheme at 220KV GSS Nokha (Honeywell Automation India Pvt. LTD.)
RTU Scheme at 220KV GSS Bikaner (Honeywell Automation India Pvt. LTD.)
RMU Scheme at 132KV GSS Pugal Road Bikaner
Numerical Bus Bar Scheme at 220 KV GSS Bikaner
Installation of 220/132KV PLCC Equip. for 220KV SGNR-Suratgarh line
Instt of 220/132 PLCC Equipment for 220 KV GSS SGNR - Suratgarh linePurchase of AC for SE(TCC-IX) Bikaner DOC 19.07.2014Purchase of Water Purifire (DOC 23.03.2015 )Purchase for Water Cooler (XEN (Civil-Tr) Bikaner DOC 31.03.2015Purchase of Furniture for XEN Prot Bikaner (DOC 06.01.2015)Furniture & Fixture for XEN 400KV GSS RTGH (DOC 04.12.2014)Furiniture & Fixture for XEN (220 KV GSS) Bikaner (DOC 24.03.2015)Furniture Fixture for XEN (220KV GSS) HMH DOC 28.02.2015
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 0.00 0.00
TCC IX, BIKANER 20.63 0.00
TCC IX, BIKANER 0.00 28.69
TCC IX, BIKANER
TCC II, JAIPUR 5.94 0.00
Const. of Boundarywall at Guda Chanderji TCC II, JAIPUR 37.78 0.00Const. of 132 kv Gudhachandraji TCC II, JAIPUR 0.00 191.66Fundation at Guda Chandarji TCC II, JAIPUR 0.00 34.91Const. of 132 kv GSS Nangalpyariwas TCC II, JAIPUR 0.00 337.39Civil work ( foundation ) TCC II, JAIPUR 0.00 59.82Land at Nangalpyariwas TCC II, JAIPUR 40.60 0.00Boundarywall at Nangalpyariwas TCC II, JAIPUR 50.37 0.00Store shed at Nangalpyariwas TCC II, JAIPUR 4.24 0.00
Const. of store shed at 132 KV GSS Bagadi TCC II, JAIPUR 0.00 0.00
Const. of Yard foundation at 132 KV Bagadi TCC II, JAIPUR 0.00 45.97
TCC II, JAIPUR 29.78 0.00Const. of 132 kv Bagadi () TCC II, JAIPUR 0.00 180.86 132 kV GSS at Nangal Sherpur (Karauli) TCC II, JAIPUR 209.59 0.00Const. of Store Shed at Nangal pyariwas TCC II, JAIPUR 0.00 0.00Const. of 132 kv Nangal sherpur TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 24.49Const. of Roads at Mandrayal TCC II, JAIPUR 0.00 0.00Const. of store shed at mandrayal TCC II, JAIPUR 0.00 3.95Const 132 KV GSS Bilwari(Viratnagar) TCC II, JAIPUR 772.83 0.00
Const. of resid.building at 132 kv gss bilwari TCC II, JAIPUR 0.00 35.30Const. of Roads at 132 KV GSS Bilwari TCC II, JAIPUR 824.77 0.00
Const. of Boundarywall at 132 KV Bilwari TCC II, JAIPUR 37.79 0.00
Const. of Store shed at 132 KV GSS Bilwari TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 13.66 0.00
Const. of Store shed at 220 KV GSS Behror TCC II, JAIPUR 0.00 0.00
SE(400 KV GSS) Bikaner (D.O.C......................................)XEN(220 KV GSS) GAJNER (DOC 31.03.2014) WATER COOLEROffice Equiment for AEN (P-Cell) Bikaner (DOC 29.09.2014)Purchase of Office Equipment for XEN (Civil-Tr) Bikaner (DOC 31.03.2015)Office Eqiupment at XEN(220 KV GSS) SDGH (DOC 29.09.2014) Office Eqiupment at XEN(220 KV GSS) HMH (DOC 29.09.2014) Office Eqiupment at XEN(220 KV GSS) SGNR (DOC 29.09.2014) Office Eqiupment at XEN(220 KV GSS) GAJNER (DOC 29.09.2014) Raising height of 132KV S/C Bhadra-Rajgarh +L at 132 KV Track crossing at TP no 138/15 and 139/1 between Sidmukh and Anupshahar Railway Station.Raising height of Churu-Bissu line ( Deposit work RUIDP )Raising height of 132 KV Hissar - Sadulpur Tr LineConst. of Guard Hut at 132 KV GSS Gudhachandraji
Const. of Boundry wall at 132 kv GSS Bagdi (Lalsot)
Const. of Boundarywall at 132 KV Mandrayal
Const. of Control Room at 132 KV GSS Bilwari Const of 132 kv gss Keshwana (PLCC line works)
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 122.44
TCC II, JAIPUR 56.44 0.00
TCC II, JAIPUR 442.34 0.00Dausa - Anta Line TCC II, JAIPUR 729.47 0.00Lalsot-Bhadoti line TCC II, JAIPUR 0.00 161.79
TCC II, JAIPUR 1511.18 0.00
TCC II, JAIPUR 2456.67 0.00
TCC II, JAIPUR 241.56 0.00
TCC II, JAIPUR 157.80 0.00
TCC II, JAIPUR 76.55 0.00
TCC II, JAIPUR 0.00 444.21
TCC II, JAIPUR 343.84 0.00
TCC II, JAIPUR 204.37 0.00
TCC II, JAIPUR 476.11 0.00
TCC II, JAIPUR 19.91 0.00400 kv S/C Dholpur- heerapura line TCC II, JAIPUR 42.88 0.00
TCC II, JAIPUR 0.00 79.29Const. of 132 KV D/C Bagdi line TCC II, JAIPUR 0.00 54.37
Const. of 132 KV S/C Jakarana-Mandan line TCC II, JAIPUR 18.02 0.00
TCC II, JAIPUR 0.00 191.19
TCC II, JAIPUR 0.00 0.00
Const of 132 kv main bus-II at 220 hindaun TCC II, JAIPUR 50.94 0.00
TCC II, JAIPUR -31.88 0.00
TCC II, JAIPUR 35.89 0.00AUG. OF 100 mva Transformer at sikrai TCC II, JAIPUR 70.27 0.00
TCC II, JAIPUR -0.04 0.00
TCC II, JAIPUR 8.28 0.00
TCC II, JAIPUR 4.60 0.00
TCC II, JAIPUR 225.78 0.00
Const. of Residentail Building at 220 KV GSS BansurConst. of 132 KV S/C Gudhachandrji-Nangalsherpur lineConst. 132 Kv LILO Shahpura-Manoharpur EHV lineLILO of 220 kv Dausa-Hindaun for 220 kv Sikrai
220 kV D/C Neemrana - Kotputli line (Turnkey)
220 kV D/C line to connect the LILO of 220 kV S/C Heerapura-Khetri line(second ckt.) to LILO of one ckt. of 220 kV D/C Neemrana- Kotputli line
133 kV S/C Shri Mahaveerji GSS-Nangal Sherpur line with 132 kV GSS at Nangal Sherpur (Karauli)Const. of LILO of D/C Bassi Kukas line for 220 KV Kunda Ki DhaniLILO 132 Mandawar Bandikui line for Dhigaria BhimConst. of 132 kv S/c Bansur-Mundawar Line for 220 kv BansurConst. of 220 KV Khuskhera-Neemrana Line at PGCIL 400/220 KV NeemranaLILO of 132vKv S/c Shahpura -Paota line for 132 Bhiwadi (Viratnagar)
Const. of 132 Kv S/c Jakharana-Mandan line installtiom of 220 kv plcc equipment of 220 d/c ktp-neemrana line
Const. of 132 KV D/C LILO of Dausa-Lalsot line for 132 KV Nangalpyariwas
Const. of LILO of one Ckt. Of 220 KV D/C Kotputli-Manoharur line to PGCIL 400/220 KV GSS Kotputli(PG)Const.of extension os Ist floor in R.Type Qtrs.at Chambal Colony
Aug 132/33 kv Tr at 132 kv gss Jamwa RamgarhAug 132/33 kv Tr at 132 kv gss Jamwa Ramgarh
Aug of 220/132 1x50 MVA Tr. At 220 kv HindaunAug of 132/33 kv 20/25 - 10/12.5 MVA Tr at 132 BassiAug of 132/33 kv (40/50-16/20) MVA Power Tr. At 132 kv gss Toonga
Const of 2 Nos 220kv bays and bus ext at 220 Kotputli to connect Kotputli-Neemrana line
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC II, JAIPUR 554.03 0.00Aug. at 220 Kotputli TCC II, JAIPUR 548.05 0.00resi. Building TCC II, JAIPUR 0.12 0.00
TCC II, JAIPUR 709.63 0.00
Aug.1 No. 10/12.5 MVA at 132 kv Sapotra TCC II, JAIPUR 0.07 0.00
TCC II, JAIPUR 0.00 0.00
Aug. of 20/25 MVA transformer at Mandan TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 60.12 0.00
TCC II, JAIPUR 24.96 0.00
TCC II, JAIPUR 19.93 0.00
TCC II, JAIPUR 176.06 0.00
TCC II, JAIPUR 132.67 0.00
TCC II, JAIPUR 618.04 0.00
TCC II, JAIPUR 2.42 0.00
TCC II, JAIPUR 165.27 0.00
TCC II, JAIPUR 56.83 0.00
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 140.55 0.00
TCC II, JAIPUR 0.56 0.00
TCC II, JAIPUR 57.48 0.00
TCC II, JAIPUR 40.94 0.00
TCC II, JAIPUR 12.98 0.00
TCC II, JAIPUR 23.15 0.00
TCC II, JAIPUR 21.79 0.00
TCC II, JAIPUR 11.71 0.00
TCC II, JAIPUR 10.27 0.00Cap. Bank at 132 Kv Gss Sikrai TCC II, JAIPUR 26.17 0.00Cap. Bank at 132 Keshwana TCC II, JAIPUR 27.13 0.00Cap. Bank at 132 Kv Gss Mahuwa TCC II, JAIPUR 33.15 0.00Cap. Bank at 132 Kv Gss Dhola Kuwan TCC II, JAIPUR 30.88 0.00Cap. Bank at 132 Kv Gss Sikandra TCC II, JAIPUR 26.88 0.00Cap. Bank at 132 Kv Gss Toonga TCC II, JAIPUR 1.19 0.00Cap. Bank at 132 Paota TCC II, JAIPUR 34.23 0.00
Providing 1 No. of 220/132kv 100 MVA power Trf. At 220 kv Neemrana
Aug. of 1 No. 160 MVA, 220/132 kv Trf. at 220 Dausa
Const. of Fire wall in between 100MVA&50MVA trasformer at 220 KV GSS Hindaun
Aug. of 10/12.5 MVA 132/33 KV tr.at 132 SIKANDRA
Annual Planof RVPN under 400kv Design circle S.No. XV IIitemno2 automation scada Project
Aug. work of 40/50MVA Transformer by replacing of 10/12.5 MVA Transformer at 132 KV GSS BansurAug. of 20/25 MVA Transformer at 132 KV GSS ToongaAugumentaion of 100 MVA Trans.at 220 kV LalsotAug. of 100 MVA Transformer at 220 KV GSS ManoharpurConst. of GLR at 132 KV GSS Bassi ( Water supply )Aug. of 20/25 MVA transformer at 220 KV GSS KotputliAug.of 20/25 MVA 132/33 TR. AT 132 PAOTAAug. of 20/25 MVA transformer at 132 KV GSS KarauliConst.of 220KV Bay at kotpputli for 220 KV D/C KTP.-Manoharpur line Const.of 132 feeder bay for Nangal Sherpur at 132 KV MahaveerjiConst. of 01 No 132 KV feeder bay for Jakrana-mandan line at MandanConst. of 132 KV feeder Bay for Jakrana-Mandanline at 132 KV GSS JakranaConst. of 33 KV Bay for Nanagwas at MandanConst of 3 Nos bay at Sapotra(jadoli,amarwad,bhar)
const of 2 nos 33 bays at 132 kv gss lalsot for 33 kv koliwada and deedwana feederunder plan work of 33 kv separate bay for jvvnlConst. of 1Nos 33 KV Bay at 132 KV GSS Toonga for Soned-Bidharkha feeder
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
Cap. Bank at 132 kv GSS Sapotara TCC II, JAIPUR 37.82 0.00Cap. Bank at 132 kv GSS Kaila Devi TCC II, JAIPUR 28.23 0.00
TCC II, JAIPUR 1.32 0.00
TCC II, JAIPUR 0.07 0.00
TCC II, JAIPUR 0.07 0.00
TCC II, JAIPUR 0.04 0.00
TCC II, JAIPUR 0.06 0.00
TCC II, JAIPUR 136.37 0.00
TCC II, JAIPUR 41.62 0.00
TCC II, JAIPUR 21.09 0.00
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 12.12 0.00
TCC II, JAIPUR 9.52 0.00
TCC II, JAIPUR 10.98 0.00
TCC II, JAIPUR 0.00 0.70
TCC II, JAIPUR 0.00 0.70
TCC II, JAIPUR 0.00 0.70
TCC II, JAIPUR 17.70 0.00
TCC II, JAIPUR 10.74 0.00
TCC II, JAIPUR 8.63 0.00
TCC II, JAIPUR 0.00 8.13
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 0.00
TCC II, JAIPUR 0.00 0.00
Pro 33 kv & 5 MVAR Cap Bank at 132 kv gss SH. MAHAVEERJIPro 33 kv & 5 MVAR Cap Bank at 132 kv gss KARAULIProviding 1*33 Kv 5.43 MVAR cap.Bank at 132 SAPOTRA Const. of 33 Kv Cap.Bank at 132 Kv Gss MandanConst. of 33 Kv Cap.Bank at 132 Kv Gss JAKHRANAConst. of 132 KV SC Line from 220 KV Neemrana to M/s SEL Ltd.
Realignment of 132 s/c Dausa-Lalsot linefor new Dausa G.P.City Rly Deposit work Realignment of 132 KV Dausa-Llasot line (Lco.101-102)Realignment of 132 KV Dausa-Llasot line (Lco.101-102)
Const. of 33 kv bay at 220 kv gss neemrana for providing to m/s hitachi chemical ltd. (deposit work)Seprate bay at 132 kv KESHWANA for m/s barmalt (ind) pvt. (deposit work)
Provinding 1 No.33 KV seprate Bay from 220 KV GSS Neemrana for M/S Hero moto corp. ltdConst. of Founf. For 33 KV Bay at NMR for M/s ELDECO Ltd(Deposit wrok)Const. of Founf. For 33 KV Bay at NMR for M/s Nachi KG ( Deposit work )Const. of Founf. For 33 KV Bay at NMR for Taiyo India ( Deposit work)
Shifting of 132 S/C Behror-Neemrana line beetween loc no.39 a 40 d(Deposit wrok of Neveen Gaur)
Const of 33 KV Feeder bay at 220 kv neemrana for Sanjo Forge IndiaLtd( Deposit Work)
Const. of 33 KV Bay at 220 KV Neemrana for Tokai Rubber Indust.( Deposit work )
Const. of 33 KV Bay at 220 KV Neemrana for Dakin air India.( Deposit work )Const. of 33 KV Bay at 220 KV Neemrana for NIIT (Deposit)Raising the Height of 132 KV S/C HPR-VKAI Line(Deposit)Raising the Height of 132 KV S/C HPR-NPH Line(Deposit)Const. of 33 KV Bay at 220 KV Neemrana for Nissin Break (Deposit)Const. of 33 KV Bay at Neemrana for Nippon steel (Deposit)Const. of 33 KV Bay at Manoharpur for Adhinath( Deposit)Const. Of 33 KV Bay at Andhi for Gopi minirail (deposit work
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
RMU Scheme at Bassi TCC II, JAIPUR 12.47 0.00
TCC II, JAIPUR 13.92 0.00RMU Scheme at 132 kv Bansur TCC II, JAIPUR 42.59 0.00
TCC II, JAIPUR 46.91 0.00Replacement of Equip. at 132 kv P. Ghat TCC II, JAIPUR 2.14 0.00RMU scheme at 220 kv gss Hindaun TCC II, JAIPUR 40.28 0.00
RMU Schemes at 132kv gss Gangapurcity TCC II, JAIPUR 37.64 0.00RMU PLCC Stage-I at 132 KV GSS Andhi TCC II, JAIPUR 1.99 0.00RMU scheme at 220 kv gss DAUSA TCC II, JAIPUR 18.25 0.00RMU scheme at 132 kv gss Karauli TCC II, JAIPUR 49.59 0.00
TCC II, JAIPUR 1.88 0.00
TCC II, JAIPUR 7.42 0.00
TCC II, JAIPUR 4.07 0.00
TCC III, AJMER 16.59
TCC III, AJMER -0.03
TCC III, AJMER 1.75
TCC III, AJMER 3.91LILO Asind-Beawer line TCC III, AJMER 0.00132kV bay at 132kV GSS Ajeetgarh TCC III, AJMER 0.00
TCC III, AJMER 105.16
TCC III, AJMER -0.80
TCC III, AJMER 17.96
TCC III, AJMER 0.00
TCC III, AJMER 26.97
TCC III, AJMER 26.27
TCC III, AJMER 21.40132 kV GSS at Sawar (Distt.Ajmer) TCC III, AJMER 409.10 55.83LILO of 132kV Kekri-Deoli line TCC III, AJMER 169.77132 kV GSS at Mehara TCC III, AJMER 839.00 75.16
TCC III, AJMER 41.49
TCC III, AJMER1. 220kV GSS at Jethana (Distt. Ajmer) TCC III, AJMER 48.37 12.63
TCC III, AJMER 35.20
TCC III, AJMER 28.34
TCC III, AJMER 291.64
Replacement of Equip. at 220 kv Mandawar under RMU
RMU scheme (Replacement of Old Equip.) at 132 kv KKD
Replacement of Equip. at 220 kv Dausa under RMUReplacement of Equipment at 132 KV Jamwa ramgarhReplacement of Equipment at 132 KV GSS, Behror under RMURAISING OF BOUNDARY WALL AT 132 KV GSS NAWALGARH220/130kv, 1X160 MVA & 132/33kv, 1X40/50 MVA GSS at one No. 33kV Bay at 132kV GSS, Losal for Rampura Talai
2 Nos. 33kV Bays at 132kV GSS, Laxmangarh for Doodwa and Laxmangarh fe
17.132kV S/C line from 132kV GSS Jayal to 5 MW Solar Project of M/s11. 1 No. 33kV Bay at 132kV GSS, Jayal for M/s Azure Power (Rajasthan)18.Modification of 132kV S/C Renwal-Khachariyawas line (Deposit work o
LILO of 220 kV S/C Bhilwara-Chittorgarh line at proposed 220 kV GSS Hamirgarh5. Unidentified EHV GSS under SE TCC-III (Rasidpura)5. Unidentified EHV GSS under SE TCC-III (Chandpura)23. Unidentified EHV GSS under SE (400 kV GSS), Merta (132 kv gss GOGELAW)
LILO of 132kV Khetri Nagar-Babai line (For Mehara)LILO of 132kV Khetri Nagar-Babai line (For Mehara)
4. LILO of 220 kV S/C Ras-Merta line at proposed 220 kV GSS Jethana6. LILO of 132 kV S/C Beawar-Mertacity line at proposed 220 kV GSS Jet
8. 132 kV S/C line from proposed 220 kV GSS Jethana to 132 kV GSS Saradhana
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC III, AJMER 27.59
TCC III, AJMER 45.41LILO 132kV Beawar-Gulabpura line TCC III, AJMER 259.30132kV GSS at Parbatsar (Nagaur) TCC III, AJMER 7.29132kV GSS at Parbatsar (Nagaur) TCC III, AJMER 8.37
TCC III, AJMER 415.66 107.01132 kV S/C Mahapalwas-Dulaniya line TCC III, AJMER 41.05
TCC III, AJMERLILO of 132kV Silora-Malpura line TCC III, AJMER 50.14
TCC III, AJMER
TCC III, AJMER130502/LILO 132kV Nagaur-Ladnu line TCC III, AJMER
TCC III, AJMER
TCC III, AJMER -30.25
TCC III, AJMER
TCC III, AJMER
Capacitor bank inst. at 220 kV GSS Khinvsar TCC III, AJMER 0.00
Capacitor bank inst. at 132 kV GSS Koodan TCC III, AJMER 0.00
Capacitor bank inst. at 132 kV GSS Losal TCC III, AJMER 0.04
Capacitor bank inst. at 132 kV GSS Mundwa TCC III, AJMER 0.64
TCC III, AJMER 29.31
Capacitor bank inst. at 132 kV GSS Chirawa TCC III, AJMER 25.14
Capacitor bank inst. at 132 kV GSS Pilani TCC III, AJMER 20.23
Capacitor bank inst. at 132 kV GSS Jayal TCC III, AJMER 0.00
Capacitor bank inst. at 132 kV GSS Piprali TCC III, AJMER 0.00
TCC III, AJMER 0.00
TCC III, AJMER 0.09
TCC III, AJMER 56.53
TCC III, AJMER 1.44
TCC III, AJMER 0.00
TCC III, AJMER 1.32
2. Mod. of exis. 132kV S/C Beawar-Merta line for raising of height for220 kv D/C Line Hisar-Khetri line to CHIRAWA
220/132kV, 1x100 MVA GSS at Laxmangarh (Up-gradation) (Distt. Sikar)
(i) 132 kV GSS Arain, Tehsil-Kishangarh (Ajmer)
17. 2 Nos. 33kV Bays at 220 kV GSS Beawar for 33 kV Gaddi Thoriyan and132/33kV, 20/25MVA GSS at Deh (Distt. Nagaur)
1. [(+)1x160 MVA,220/132 kV at 220 kV GSS Hamirgarh]28. [(+)1x20/25 MVA,132/33 kV at 132 kV GSS Nangli]8 Construction of 1 no. 33 kV bay at 132 kV GSS Gangapur for common po
32. 1 no. 33 kV bay at 132 kV GSS Shahpura for providing connectivity to 10 MW Solar Power Project of M/s RDA Energy Pvt. Ltd. At village Nimbahera, Shahpura, Distt. Bhilwara
Capacitor bank inst. at 132 kV GSS Gudha Gorji
Capacitor bank inst. at 132 kV GSS Dulaniya (55x5.43)Capacitor bank inst. at 132 kV GSS Babai (55x5.43)Capacitor bank inst. at 132 kV GSS Narwa (2012-13) (66x5.43 MVAR)222201/Capacitor bank inst. at 132 kV GSS Pushker Road (66x5.43 MVAR)Capacitor bank inst. at 132 kV GSS Malsisar (2012-13) (66x5.43 MVAR)222601/Capacitor bank inst. at 132 kV GSS Pushker (66x5.43 MVAR)
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC III, AJMER 29.36RMU at 132kV GSS Buhana TCC III, AJMERRMU at 220kV GSS Ajmer TCC III, AJMER 0.06RMU at 220kV GSS Nagaur TCC III, AJMER 0.131. RMU-PLCC at 400kV GSS Merta TCC III, AJMER7. RMU-PLCC at 220kV GSS Khetri TCC III, AJMER9. RMU-PLCC at 220kV GSS Jhunjhunu TCC III, AJMER
TCC III, AJMER 0.1244. RMU-PLCC at 132kV GSS Nasirabad TCC III, AJMER
TCC III, AJMER
46. RMU-PLCC at 132kV GSS Lamba- Jatan TCC III, AJMER47. RMU-PLCC at 132kV GSS Jhunjhunu TCC III, AJMER
TCC III, AJMER 0.00
TCC III, AJMER
TCC III, AJMER
TCC III, AJMER
TCC III, AJMER 6.03
TCC III, AJMER
TCC III, AJMER 0.00
TCC III, AJMER
TCC III, AJMER 0.00
TCC III, AJMER 105.31
TCC III, AJMER 0.00
TCC III, AJMER 0.00
(+)1x20/25 MVA,132/33 kV, Khatushyamji TCC III, AJMER
TCC III, AJMER
TCC III, AJMER 0.00
TCC III, AJMER 0.00
(+)1x20/25,132/33 kV at 132 kV GSS Piparali TCC III, AJMER 0.00
TCC III, AJMER 0.00
Capacitor bank inst. at 132 kV GSS RIICO Bhilwara (66x5.43 MVAR)
14. RMU-PLCC at 132kV GSS Chirawa(now 220kV)
45. RMU-PLCC at 132kV GSS MDS University
(+)1x315 MVA, 400/220 kV at 400 kV GSS Bhilwara
(+)1x100MVA(220/132) and (+)1x20/25MVA(132/33kV)(-)1X10/12.5MVA,220KVGSS NAGAUR(+)1x20/25 MVA and (-) 2x12.5/7.5/5 MVA, 132/33/11 kV at 132 kV GSS Gu(+)1x20/25 MVA and (-) 2x12.5/7.5/5 MVA, 132/33/11 kV at 132 kV GSS Gu(+)1x20/25 MVA and (-) 1x10/12.5 MVA, 132/33 kV at 132 kV GSS Kishanga
(+) 1x40/50MVA,132/33KV ,(-) 1x10/12.5MVA(132/33 kV),132 KV GSS KUCHERAaddition of 1x10/12.5 MVA(132/33 kV) AT 132 KV GSS MANDAWA
(+) 2x160 MVA,(220/132), (-)2x100MVA,(+)1X40/50MVA 132/33kV,220KV GSS AJMER
(+)1x100 MVA,220/132 kV and (+)1x40/50 MVA, 132/33 kV and (-)1x10/25MVA AT 220 KV GSS DHOD
(+)2x160 MVA,220/132 kV and (-)3x100 MVA,220/132 kV and (+)1x40/50 MV at 220 kv gss Sikar(+)1x40/50 MVA and (-)1x10/12.5 MVA,132/33 kV at 220 kV GSS Chirawa
(+)1x20/25 MVA,132/33 kV and (-)1x10/12.5 MVA,132/33 kV at 132 kv gss Fatehpur
(+)1x40/50 MVA and (-)1x20/25 MVA, 132/33 kV at 132 kV GSS Nawalgarh
(+)1x20/25 MVA,132/33 kV and (-)1x10/12.5 MVA, 132/33 kV at 132 kV GSS CHIRAWA
(+)1x40/50,132/33 kV and (-)1x20/25 kV, 132/33 kV at 132 kV GSS Neem Ka Thana
(+)1x40/50,132/33 kV and (-)1x10/12.5 kV, 132/33 kV at 132 kV GSS Suwa
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
TCC III, AJMER 0.00
TCC III, AJMER 82.61CIVIL WORKS (danta) TCC III, AJMER 0.00
TCC III, AJMER 0.00132kv/33kv, 20/25MVA S/s DULANYIA TCC III, AJMER 0.00
TCC III, AJMER 309.85132kv/33kv, 20/25MVA S/s KARERA TCC III, AJMER 0.00
TCC III, AJMER 194.08
TCC III, AJMER 0.00
TCC III, AJMER 0.00
TCC III, AJMER 215.65
TCC III, AJMER 0.00
TCC III, AJMER 314.21
TCC III, AJMER 55.17132 kV S/S at Shahpura ( Bhilwara) TCC III, AJMER220kV S/C Merta-Makrana-Kuchaman TCC III, AJMER 0.00
TCC III, AJMER 0.00
TCC III, AJMER 1.10220kV GSS at Gulabpura TCC III, AJMER 0.96
TCC III, AJMER 0.00220kv S/c Bhadra to Chirawa TCC III, AJMER 0.00132kV S/C Dod-Losal TCC III, AJMER 0.00132kV S/C Ranoli -Khandela Mod line TCC III, AJMER132kV GSS at Patan (Sikar) TCC III, AJMER 7.24
TCC III, AJMER 60.38
TCC III, AJMER
132kV GSS at Bherunda Kalan (Jhunjhunu) TCC III, AJMER132kV S/C Buhana-Mahapalwas TCC III, AJMER 271.11132 kv S/C Line SURAJGARH to DULANYIA TCC III, AJMER 0.00132 kV GSS at Roopangarh (Ajmer) TCC III, AJMER
TCC III, AJMER 0.00
TCC III, AJMER
2 nos.132kV bays at 132kV GSS Deedwana TCC III, AJMER 73.82
TCC III, AJMER
TCC III, AJMER 0.001 No.132kV bay at 132kV GSS Ajeetgarh TCC III, AJMER
TCC III, AJMER 0.00132kV GSS at Babai TCC III, AJMER
(+)1x40/50 MVA and (-)1x10/12.5 MVA, 132/33 kV at 132 kV GSS Gotan(+)1x20/25 MVA,132/33 kV at 132 kV GSS Bissau
(+)1x20/25 MVA,132/33 kV at 132 kV GSS Dulania
(+)1x20/25 MVA,132/33 kV at 132 kV GSS Jayal
132kv/33kv, 20/25MVA S/s NARWA HANUMANGAR(+)1x20/25 MVA,132/33 kV at 132 kV GSS Roopangarh(+)1x20/25 MVA , 132/33 kV at 132 kV GSS Mandrella(+)1x20/25 MVA and (-) 1x10/12.5 MVA, 132/33 kV at 132 kV GSS Asind(+)1x40/50 MVA and (-)2x10/12.5 MVA, 132/33 kV at 132 kV GSS Mertacity(+)1x20/25 MVA,132/33 kV at 132 kV GSS Pushkar RoadConstruction of 132 kV line at 132 kV GSS Danta for M/s Kanchan Ind
132 KV S/C line from 220 KV GSS Nagaur-JayalLILO of 220kV S/C Ajmer-Beawer line at 400kV GSS Ajmer
LILO of 220kV S/C Hissar-Khetri line at proposed 220kV Chirawa.
132kV Saradhna-Pushkar Road- MDS University132kV Saradhna-Pushkar Road- MDS University
132 kv S/C Line KHINWSASR-SOYLA LINE to NARWA HANUMANGAR132 kV GSS at Narwa (Hanuman Nagar) (Nagaur)
One no. 220 kV bay at 220 kV GSS Jhunjhunu for termination of Nawalgar2 No. 33kV bay at 132kV GSS Baggar for Lamba and Bas Budana
Terminal 400 kV Bays at existing 400kV Substation Bhilwara
NAME OF WORKS Name of Circle/OfficeS.No.
Code No. & Name of Scheme
Project/EHV
Scheme
Code No.
S. Amt.
Exp. On completed works upto 31.3.2014
Exp. Incurred
as on 1.04.14
132kV GSS at Bandanwara TCC III, AJMER 24.49132kV GSS at Thoi TCC III, AJMER 1.15Shri Madhopur-Thoi TCC III, AJMER -3.91132kV GSS at Malsisar TCC III, AJMER 25.24
TCC III, AJMER 0.00132kV GSS at Antroli TCC III, AJMER 0.00LILO Laxmangarh-Fatehpur line TCC III, AJMER 0.00
Capacitor bank at 400 KV GSS MERTA CITY TCC III, AJMER 2.63132 KV BAY AT 220 JJN TCC III, AJMER 0.00132 KV BHRD KLN BAY AT SULTANA TCC III, AJMER 0.00132 KV GSS BIGOD TCC III, AJMER 4.08132 KV GSS UDAIPURWATI TCC III, AJMER 0.00220 KV GSS KHETRI NAGAR TCC III, AJMER 1.16AUTOMOTION TCC III, AJMER
TCC III, AJMER 11.83
TCC III, AJMER 56.21
TCC III, AJMER 91.78
TCC III, AJMER 42.51
TCC III, AJMER 4.85
TCC III, AJMER
TCC III, AJMER 178.70
TCC III, AJMER 40.05
TCC III, AJMER 44.76
464682.37 71765.10
Jhunjhunu-Malsisar (from 220kV GSS Jhunjhunu)
BAY AT 132 KV GSS LAXMANGARH (11/2012-2013)52. Modification (raising the height at Railwary crossing) of 220kV D/ (Kota Beawar Line for HZL D/W)
63. Modification of 220kV S/C Khetri-Jaipur-II line -Deposit work of M/s DFCC1.Mod. of exis. 220kV S/C Beawar-Merta line for raising of height for4. Modification of existing 132kV S/C Sikar-Nawalgarh line line for r
79. Construction of 1 No. 33 kV bay at 132 kV GSS Neem Ka Thana for M/s L&T constructions jaipur
(+)1x100MVA,(+)2x160MVA ,(-)2x100MVA(220/132kV),220KV GSS BHILWARAConstruction of 132 kV feeder bay at 132 kV GSS Mundwa for M/s AmbujaConstruction of 132 kV bays at 132 kV GSSfor M/s Kanchan India Ltd.,
165008.96
100000 03/31/14
IDC Capitalised No of days0.00 532.02 0.00 08/02/13 0.000.00 657.83 0.00 07/05/10 0.00
0.00 5.60 0.00 08/31/12 0.00
0.00 6.99 0.00 01/03/14 0.00
0.00 146.50 0.00 08/31/12 0.00
0.00 68.78 0.00 02/01/14 0.00
0.00 164.85 0.00 08/31/12 0.00
0.00 410.57 0.00 08/31/12 0.000.00 0.00 14.21 0.00 03/26/10 0.000.00 0.00 177.68 0.00 06/15/11 0.00
0.00 245.59 0.00 06/15/11 0.001.32 1.32 218.78 0.00 01/27/12 0.000.00 0.00 400.43 0.00 01/27/12 0.00
51.04 51.04 51.04 0.00 11/21/14 235 0.000.86 0.86 217.20 0.00 01/11/12 0.00
0.00 24.32 0.00 12/03/12 0.000.00 0.00 195.24 0.00 09/17/11 0.005.22 5.22 5.22 0.70 03/26/15 360 70254.561.01 1.01 1.52 0.00 04/11/11 0.000.02 0.02 157.15 0.00 11/10/12 0.00
175.15 198.10 198.10 17.76 11/26/14 240 1776345.810.00 0.00 421.52 0.00 06/09/11 0.00
0.00 16.09 0.00 03/26/11 0.000.00 409.66 0.00 02/04/11 0.00
-4.69 0.00 481.74 0.00 02/04/11 0.000.00 510.42 0.00 03/16/11 0.00
4.42 4.42 111.23 0.00 08/05/13 0.00
0.00 2158.52 0.00 05/06/13 0.000.00 2.26 0.00 05/29/12 0.00
34.76 34.76 209.93 0.00 10/31/13 0.00
271.50 271.50 17.58 02/26/15 332 1757895.68
9.84 9.84 0.00 11/11/13 0.00
9.62 9.62 0.20 07/14/14 105 19708.95
5.82 5.82 0.40 03/22/15 356 40422.561514.86 1514.86 41506.61 0.00 01/31/14 0.00
623.96 623.96 18629.49 0.00 03/26/14 0.000.00 41973.25 0.00 03/25/14 0.00
13.36 13.36 15.11 0.00 03/31/12 0.0096.62 917.66 917.66 14.28 06/29/14 90 1427627.17
-14.50 232.85 232.85 11.71 01/16/15 291 1171269.8438.60 308.39 308.39 12.95 11/29/14 243 1295404.08
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
26.64 26.64 0.25 05/25/14 55 25331.77
6.95 6.95 0.17 08/20/14 142 17048.56
8.30 8.30 71.69 0.00 08/18/12 0.00
842.28 7359.29 7359.29 30.33 12/27/14 271 3033124.6552.20 81.56 81.56 0.66 03/31/15 365 65903.17
0.53 0.53 0.53 0.00 03/31/15 365 426.78407.67 1699.47 1699.47 13.73 03/31/15 365 1373219.96
3.14 3.14 3.14 0.00 04/03/14 3 0.00
36.28 36.28 36.28 0.00 03/31/13 0.00
105.90 736.70 736.70 5.95 03/31/15 365 595278.37
0.00 0.00 1889.11 0.00 10/24/13 0.00
15.50 189.88 189.88 1.53 03/31/15 365 153425.97124.67 1315.64 1315.64 0.06 04/02/14 2 5825.08124.66 1315.63 1315.63 8.18 01/06/15 281 818417.28
84.75 84.75 84.75 0.00 03/11/13 0.00
303.21 4128.83 4128.83 0.18 04/02/14 2 18280.64
0.03 0.03 0.03 0.00 08/17/13 0.00
12.55 12.55 12.55 0.00 02/05/14 0.00
0.07 1.12 1.12 0.00 06/28/11 0.00
0.00 23.03 0.00 01/08/12 0.00
0.00 39.66 0.00 08/19/12 0.00
0.00 3.85 0.00 12/31/12 0.00
3.11 3.11 76.60 0.00 09/16/12 0.00
33.93 57.05 57.05 1.11 09/09/14 162 110666.6012.68 12.68 12.68 0.31 10/23/14 206 31279.51
-0.37 1960.41 1960.41 35.34 06/27/14 88 3534476.12
26.47 71.17 71.17 0.00 10/15/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.01 0.27 0.27 0.00 11/25/12 0.000.38 0.38 1505.77 0.00 03/28/13 0.00
2.01 2.01 15.28 0.00 03/04/13 0.00
238.02 3211.32 3211.32 123.18 09/25/14 178 12318312.36
-74.35 927.02 927.02 1.35 06/11/14 72 135069.28
337.96 2323.59 2323.59 3.39 06/11/14 72 338553.73
49.29 49.32 49.32 0.33 02/21/15 327 32635.79
0.78 0.78 0.78 0.00 09/15/14 168 264.02
0.88 0.88 0.88 0.00 08/15/14 137 242.63
3.77 3.77 2792.27 0.00 10/31/12 0.00
252.46 2464.90 2464.90 3.22 06/11/14 72 322413.44
55.46 2887.30 2887.30 3.83 06/12/14 73 382908.60
99.06 3258.83 3258.83 21.86 03/30/15 364 2186496.09
0.90 0.90 0.90 0.01 09/15/14 168 515.91
0.91 0.91 0.91 0.00 08/15/14 137 426.49
8.54 8.54 3693.49 0.00 03/28/13 0.000.00 118.46 0.00 07/20/10 0.000.00 36.99 0.00 02/10/12 0.000.00 1935.59 0.00 03/20/12 0.00
0.00 321.10 0.00 02/16/10 0.00
0.00 79.66 0.00 03/03/12 0.00152.13 318.55 318.55 4.71 05/30/14 60 470907.13
12.19 12.19 172.57 0.00 03/13/13 0.00-5.86 -5.86 -5.86 0.00 01/19/13 0.00
42.88 0.00 12/30/12 0.00
42.97 0.00 11/06/12 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
4.13 4.13 57.43 0.00 01/17/13 0.003.80 3.80 3.86 0.00 11/06/12 0.000.61 0.61 134.84 0.00 10/03/12 0.001.24 1.24 46.60 0.00 11/06/12 0.00
3.94 3.94 131.07 0.00 02/13/14 0.00860.30 0.00 11/06/12 0.00
16.93 105.98 105.98 0.09 04/02/14 2 8520.120.00 282.13 0.00 06/30/12 0.000.00 134.09 0.00 07/10/12 0.000.00 176.53 0.00 02/18/12 0.000.00 32.56 0.00 06/11/12 0.00
0.00 89.01 0.00 02/15/12 0.00
0.00 0.00 123.77 0.00 08/17/12 0.00
0.00 0.00 42.75 0.00 07/06/12 0.00
0.00 0.00 28.44 0.00 02/02/13 0.00
0.00 0.00 79.19 0.00 07/31/12 0.00
0.00 0.00 340.54 0.00 06/07/12 0.00
0.00 0.00 95.61 0.00 07/31/12 0.00
0.00 0.00 64.20 0.00 11/29/12 0.00
2.76 10.71 234.81 0.00 05/03/13 0.00
3.18 3.18 1468.85 0.00 09/25/12 0.00
0.00 0.00 4.29 0.00 01/23/13 0.00
47.97 47.97 2535.75 0.00 02/26/14 0.00
1.42 1.42 108.50 0.00 07/08/13 0.00
-0.02 -0.02 350.55 0.00 05/01/13 0.000.00 0.00 21.53 0.00 08/13/10 0.00
15.42 15.42 78.47 0.00 01/30/13 0.000.00 0.00 78.84 0.00 10/01/13 0.000.00 0.00 1.15 0.00 08/20/13 0.000.00 0.00 10.83 0.00 04/08/12 0.001.06 1.06 1.06 0.09 12/31/14 275 8569.120.00 0.00 10.87 0.00 04/28/11 0.000.00 0.00 1.89 0.00 04/15/12 0.000.00 0.00 6.99 0.00 04/19/13 0.000.00 0.00 1.09 0.00 01/10/12 0.000.00 0.00 253.97 0.00 12/08/12 0.000.00 0.00 4.61 0.00 09/08/11 0.000.00 0.00 0.64 0.00 10/22/11 0.000.00 0.00 2.22 0.00 12/08/12 0.000.00 0.00 0.15 0.00 11/28/13 0.00
-0.46 -0.46 1341.46 0.00 12/08/12 0.00-11.25 -11.25 1905.10 0.00 01/22/13 0.00
0.00 0.00 249.85 0.00 04/05/13 0.000.00 0.00 317.68 0.00 07/09/12 0.000.00 0.00 40.76 0.00 06/06/13 0.00
15.37 48.32 48.32 0.00 03/26/14 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 0.00 65.20 0.00 04/22/12 0.000.00 0.00 4.62 0.00 06/20/12 0.000.00 0.00 6.87 0.00 03/26/12 0.000.00 0.00 0.89 0.00 09/01/13 0.000.00 0.00 0.06 0.00 03/26/12 0.000.00 0.00 3.80 0.00 09/06/13 0.000.00 0.00 127.86 0.00 03/26/12 0.00
-1.19 -1.19 417.30 0.00 03/26/12 0.00
0.00 0.00 166.03 0.00 02/10/12 0.000.25 0.25 979.18 0.00 08/27/12 0.001.52 1.52 701.35 0.00 02/22/12 0.002.89 2.89 895.27 0.00 09/02/12 0.000.00 0.00 62.58 0.00 10/26/13 0.00
0.00 314.19 0.00 04/11/12 0.002.14 2.14 2.14 0.00 04/11/12 0.00
1.68 1.68 0.01 05/02/14 32 1236.571.40 1.40 0.00 12/06/13 0.001.82 1.82 0.00 12/06/13 0.00
10.20 10.20 0.09 05/07/14 37 8675.806.80 6.80 0.18 07/23/14 114 17812.64
314.19 0.00 04/11/12 0.008.26 8.26 0.25 08/09/14 131 24873.320.00 361.19 0.00 04/11/12 0.00
0.00 383.78 0.00 03/30/12 0.00
7.75 7.75 7.75 3.74 08/07/14 129 373723.71
0.99 0.99 0.99 0.07 04/19/14 19 7062.87
0.02 0.33 0.33 0.00 05/06/13 0.000.00 220.12 0.00 01/28/13 0.00
5.77 5.77 5.77 0.29 07/07/14 98 28872.190.36 0.36 347.59 0.00 03/06/13 0.00
0.00 254.03 0.00 06/30/11 0.000.00 397.08 0.00 06/30/11 0.000.00 231.79 0.00 06/30/11 0.000.00 168.16 0.00 01/17/13 0.000.86 0.86 0.05 09/03/14 156 5427.242.14 2.14 0.00 01/17/13 0.000.00 620.11 0.00 01/17/13 0.000.00 3.11 0.00 01/10/13 0.00
0.00 97.09 0.00 06/30/12 0.00
0.00 487.11 0.00 06/30/12 0.00
1.91 1.91 0.00 06/30/12 0.000.00 0.00 4.87 0.00 07/27/10 0.00
16.55 27.87 27.87 1.35 07/27/14 118 134983.510.00 0.00 57.44 0.00 04/15/12 0.000.00 0.00 10.81 0.00 06/20/12 0.000.00 0.00 47.54 0.00 12/09/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 0.00 17.92 0.00 04/27/12 0.000.00 0.00 1.00 0.00 03/30/14 0.000.00 0.00 6.61 0.00 09/10/11 0.000.00 0.00 2.29 0.00 10/30/11 0.000.00 0.00 0.44 0.00 12/20/11 0.000.00 0.00 0.07 0.00 08/11/11 0.000.00 0.00 8.33 0.00 05/15/13 0.000.00 0.00 76.78 0.00 08/11/11 0.000.00 0.00 0.15 0.00 11/27/13 0.000.00 0.00 6.01 0.00 03/15/12 0.000.00 0.00 373.05 0.00 08/11/11 0.000.00 0.00 179.48 0.00 07/29/11 0.00
0.00 451.75 0.00 07/30/13 0.0011.10 11.10 421.11 0.00 07/27/13 0.00
2.75 2.75 616.83 0.00 07/20/11 0.000.00 0.00 153.53 0.00 09/03/13 0.003.87 3.87 605.08 0.00 01/19/12 0.00
0.00 0.00 44.96 0.00 02/22/11 0.00
0.00 0.00 11.50 0.00 08/10/10 0.00
0.00 0.00 63.76 0.00 03/08/13 0.00
0.00 0.00 52.32 0.00 02/25/12 0.00
0.00 0.00 8.85 0.00 07/12/13 0.00
0.00 0.00 49.98 0.00 12/09/12 0.00
0.00 0.00 12.54 0.00 01/07/12 0.00
0.00 0.00 9.31 0.00 08/03/11 0.00
0.00 0.00 10.34 0.00 07/09/11 0.00
0.00 0.00 15.71 0.00 05/16/13 0.00
0.00 0.00 64.52 0.00 07/09/11 0.00
0.00 0.00 0.58 0.00 01/13/12 0.00
0.00 0.00 0.10 0.00 12/11/13 0.00
0.00 0.00 14.44 0.00 12/31/11 0.00
0.24 0.24 400.23 0.00 07/09/11 0.00
0.00 0.00 162.28 0.00 07/02/11 0.0013.47 13.47 436.17 0.00 09/15/13 0.00
5.00 5.00 410.64 0.00 10/16/12 0.000.00 0.00 665.05 0.00 09/12/11 0.00
0.00 0.00 2.27 0.00 09/12/11 0.0011.05 65.61 120.18 0.00 08/23/13 0.00
1.03 1.03 1.03 0.00 02/21/14 0.0019.54 19.54 775.74 0.00 08/23/13 0.0024.77 24.77 264.96 0.00 08/21/13 0.00
4.28 4.28 497.64 0.00 06/30/12 0.00
2.42 2.42 25.85 0.00 05/15/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.27 0.27 5.25 0.00 02/17/13 0.00
-1.76 -1.76 17.90 0.00 04/12/13 0.00
16.04 16.04 16.04 0.19 04/07/14 7 18986.3011.10 53.99 53.99 0.10 06/03/14 64 9747.16
0.00 0.00 74.13 0.00 06/27/12 0.000.00 0.00 4.91 0.00 06/05/12 0.00
-0.59 -0.59 59.73 0.00 08/01/13 0.000.00 0.00 3.41 0.00 06/25/12 0.000.00 0.00 4.03 0.00 03/10/12 0.000.00 0.00 12.83 0.00 04/12/12 0.000.00 0.00 3.20 0.00 04/03/12 0.000.00 0.00 102.48 0.00 12/30/12 0.00
3.29 3.29 373.51 0.00 12/30/12 0.00
3.07 3.07 248.85 0.00 08/07/12 0.0024.60 24.60 24.60 0.00 07/06/13 0.00
1021.90 9551.36 9551.36 2217.14 03/18/15 352 221713713.45
377.01 3580.30 3580.30 17.97 04/21/14 21 1797099.74
0.00 337.36 0.00 07/27/13 0.00
0.00 2838.35 0.00 04/01/11 0.00
0.00 562.48 0.00 05/09/12 0.00
3.75 3.75 3.75 0.00 03/25/14 0.00
2.45 2.45 2.45 0.03 10/01/14 184 3065.15
4.29 4.29 90.77 0.00 11/25/13 0.00
6.43 6.43 6.43 0.13 01/22/15 297 12973.01
96.77 96.77 96.77 2.20 02/28/15 334 219704.93
0.32 4.68 4.68 0.00 08/05/13 0.00
0.68 9.75 9.75 0.00 01/12/14 0.00
6.60 6.60 1199.11 0.00 11/28/13 0.00
466.80 567.78 567.78 0.00 03/28/13 0.00
40.54 40.54 40.54 0.00 07/27/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 12.08 0.00 07/27/13 0.00
72.88 101.34 834.94 0.00 03/15/14 0.00
4.62 4.62 4.62 0.00 03/15/13 0.0040.27 40.27 91.40 0.00 05/20/13 0.00
1.42 1.42 1.42 0.00 03/25/15 359 157.3719.76 19.76 19.76 0.02 03/13/15 347 2114.48
9.05 9.05 24.85 0.00 12/05/13 0.00
9.68 9.68 73.63 0.00 09/21/13 0.00429.79 447.98 447.98 0.48 03/11/15 345 47665.24
13.61 37.64 37.64 0.03 12/29/14 273 3169.29
11.42 11.42 11.42 0.01 02/06/15 312 1098.57
30.76 66.61 66.61 0.03 09/04/14 157 3225.02
3.04 3.04 3.04 0.00 10/12/14 195 182.71
4.64 11.24 11.24 0.00 05/20/13 0.00
44.75 44.75 44.75 0.04 01/30/15 305 4209.52
61.61 76.21 76.21 0.06 12/28/14 272 6392.70
8.88 15.74 15.74 0.00 03/03/14 0.00
2.82 2.82 242646.82 0.00 09/22/13 0.00
4.21 18.81 18.81 0.02 03/09/15 343 1989.85
19.14 75.31 75.31 0.01 04/25/14 25 580.68
4.04 4.04 4.04 0.00 01/24/15 299 372.43
18.90 18.90 18.90 0.02 03/11/15 345 2011.310.00 0.00 329.16 0.00 04/22/13 0.008.91 148.82 148.82 0.00 09/23/11 0.002.14 2.14 2.14 0.00 12/28/12 0.00
21.05 21.05 21.05 0.00 04/22/13 0.008.07 8.07 493.03 0.00 04/22/13 0.000.00 0.00 286.80 0.00 07/24/13 0.00
12.18 31.00 31.00 0.00 07/24/13 0.000.79 0.79 481.60 0.00 06/11/13 0.000.00 0.00 74.57 0.00 12/28/12 0.00
0.00 114.89 0.00 09/29/13 0.00
23.40 23.40 23.40 0.00 09/29/13 0.00
0.00 0.00 1.13 0.00 07/11/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 636.89 0.00 11/26/13 0.00
13.74 196.40 196.40 2.27 05/08/14 38 227254.900.00 0.00 1.75 0.00 04/25/11 0.000.00 0.00 49.11 0.00 08/22/12 0.004.55 7.68 7.68 0.27 07/23/14 114 26647.670.00 0.00 80.24 0.00 07/29/12 0.000.00 0.00 10.86 0.00 09/29/13 0.000.00 0.00 7.89 0.00 05/03/13 0.000.00 0.00 49.93 0.00 02/07/14 0.000.00 0.00 12.07 0.00 05/07/12 0.000.00 0.00 6.12 0.00 12/05/13 0.000.00 0.00 10.68 0.00 01/31/12 0.000.00 0.00 4.15 0.00 03/29/12 0.000.00 0.00 0.31 0.00 07/27/11 0.000.00 0.00 14.45 0.00 12/10/13 0.001.03 1.03 1.03 0.02 05/24/14 54 1698.750.00 0.00 123.96 0.00 04/03/13 0.000.00 0.00 0.10 0.00 11/28/13 0.001.17 1.17 249.46 0.00 04/03/13 0.00
0.00 0.00 78.32 0.00 04/03/13 0.007.25 14.00 14.00 1.36 02/12/15 318 135522.190.00 0.00 50.85 0.00 05/27/13 0.000.00 0.00 74.12 0.00 08/07/13 0.000.92 0.92 0.92 0.09 01/27/15 302 8502.421.22 8.25 8.25 0.00 10/27/13 0.000.00 0.00 11.19 0.00 08/23/12 0.000.00 0.00 3.82 0.00 06/12/13 0.009.88 9.88 9.88 0.34 07/23/14 114 34282.500.00 0.00 3.90 0.00 10/07/12 0.000.00 0.00 0.71 0.00 02/01/12 0.004.13 20.03 20.03 1.16 10/07/14 190 115868.29
11.71 11.71 94.63 0.00 10/21/13 0.000.00 0.00 0.10 0.00 11/27/13 0.001.57 1.57 271.01 0.00 10/21/13 0.000.00 0.00 75.36 0.00 10/21/13 0.007.53 13.60 13.60 1.32 02/12/15 318 131727.022.37 2.37 817.22 0.00 04/06/13 0.000.00 0.00 48.25 0.00 04/06/13 0.005.34 5.34 5.34 0.29 09/26/14 179 29116.470.12 0.12 0.12 0.00 04/06/14 6 21.38
16.57 16.57 16.57 0.00 03/26/14 0.00
2.55 22.01 22.01 0.62 12/30/14 274 62024.670.00 0.00 59.52 0.00 06/12/13 0.000.00 0.00 48.35 0.00 02/27/13 0.000.00 0.00 10.33 0.00 05/15/12 0.000.00 0.00 35.33 0.00 06/15/12 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 0.00 7.06 0.00 09/10/11 0.000.00 0.00 7.72 0.00 12/08/11 0.000.00 0.00 0.10 0.00 11/27/13 0.000.00 0.00 0.25 0.00 03/24/11 0.000.00 0.00 20.92 0.00 04/04/13 0.00
52.73 251.18 251.18 0.93 05/06/14 36 92991.6130.68 1095.54 1095.54 4.06 05/06/14 36 405588.07
73.20 938.24 938.24 3.47 05/06/14 36 347353.260.00 0.00 19.50 0.00 12/15/11 0.000.00 0.00 38.43 0.00 04/02/12 0.002.34 2.34 19.61 0.00 11/28/13 0.000.00 0.00 31.07 0.00 05/29/12 0.000.00 0.00 0.62 0.00 04/08/13 0.000.00 0.00 7.60 0.00 08/13/13 0.002.96 65.56 65.56 0.00 05/13/13 0.000.00 0.00 14.12 0.00 04/11/12 0.000.00 0.00 6.88 0.00 01/17/12 0.000.00 0.00 0.10 0.00 12/11/13 0.000.00 0.00 2.69 0.00 06/23/11 0.000.00 0.00 12.80 0.00 10/13/13 0.00
43.58 135.99 135.99 5.09 03/30/15 364 509041.888.34 482.07 482.07 18.05 03/30/15 364 1804538.98
0.00 0.00 16.76 0.00 03/31/13 0.000.88 0.88 0.88 0.03 03/19/15 353 3177.11
0.00 0.00 7.23 0.00 06/20/13 0.004.39 4.39 4.39 0.16 03/31/15 365 16474.37
0.00 0.00 3.74 0.00 07/29/13 0.00224.76 1206.71 1206.71 44.80 03/27/15 361 4479874.44
3.01 335.29 335.29 2.62 06/15/14 76 262053.18
0.00 844.27 0.00 03/31/13 0.00
0.00 169.57 0.00 08/08/13 0.00
38.38 38.38 0.00 09/05/13 0.00
0.40 0.40 0.00 08/26/12 0.00
5.99 5.99 0.23 08/08/14 130 22508.57
7.61 7.61 0.46 10/26/14 209 45959.47
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.82 0.82 0.09 03/25/15 359 8523.55
0.32 0.32 0.03 03/24/15 358 3316.27
49.66 49.66 1.85 08/07/14 129 185020.02
0.91 0.91 0.01 04/22/14 22 581.11
0.39 12.52 12.52 0.00 12/31/12 0.00
91.10 282.39 282.39 23.49 01/13/15 288 2349120.22
167.24 1475.47 1475.47 84.81 10/16/14 199 8481009.22
417.11 417.11 417.11 1.20 04/10/14 10 120479.92
74.16 1323.90 1323.90 75.33 10/14/14 197 7533307.15
70.55 187.15 187.15 11.46 10/29/14 212 1146040.84
0.00 19.04 0.00 03/31/13 0.00
0.00 581.02 0.00 11/30/13 0.00
0.00 10251.15 0.00 01/04/14 0.00
0.00 0.00 497.33 0.00 03/28/14 0.00
36.51 36.51 0.00 03/28/14 0.00
1.27 1.27 0.00 05/20/14 50 77.96
8.99 8.99 0.00 03/01/14 0.00
1.06 1.06 0.00 05/25/14 55 71.26
3.03 3.03 0.00 05/30/14 60 222.71
7.12 7.12 0.00 03/02/14 0.00
10.95 10.95 0.00 04/02/14 2 26.85
9.28 9.28 0.01 07/14/14 105 1194.49
0.70 0.70 0.00 06/05/14 66 56.36
3.58 3.58 0.00 05/25/14 55 241.67
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.89 0.89 0.00 10/20/14 203 221.82
2.32 2.32 0.01 12/28/14 272 772.37
1.97 1.97 0.01 01/05/15 280 677.25
1.26 1.26 0.00 12/05/14 249 384.81
1.90 1.90 2.05 0.00 02/26/13 0.00
26.31 26.31 0.00 03/31/13 0.00
19.30 19.30 0.01 05/25/14 55 1301.47
37.59 37.59 0.05 07/27/14 118 5438.58
16.04 16.04 0.01 05/24/14 54 1061.74
25.83 25.83 0.07 10/30/14 213 6745.06
9.96 9.96 0.03 10/30/14 213 2600.82
1.50 1.50 0.01 01/04/15 279 512.29
0.00 619.94 0.00 02/09/14 0.00
31.64 92.34 92.34 0.37 02/19/15 325 36797.54
0.00 71.23 0.00 02/21/14 0.00
17.02 17.02 17.02 0.00 02/21/14 0.00
0.00 0.00 2.42 0.00 03/22/13 0.00
0.00 0.00 40.15 0.00 11/10/13 0.00
20.18 20.18 20.18 0.02 06/28/14 89 2201.86
0.00 0.00 11.89 0.00 12/16/13 0.00
0.68 0.68 10.31 0.00 01/09/14 0.00
0.00 0.00 4.67 0.00 12/20/13 0.00
0.00 0.00 0.49 0.00 03/31/14 0 0.00
6.05 34.77 34.77 0.02 05/27/14 57 2430.10
-69.31 41.25 41.25 0.03 05/25/14 55 2781.46
2.31 2.31 17.27 0.00 10/18/12 0.00
1.20 1.20 38.68 0.00 11/09/12 0.00
4.85 4.85 11.68 0.00 04/20/13 0.00
10.47 10.47 43.73 0.00 11/29/12 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
8.27 8.27 43.30 0.00 01/25/14 0.00
10.05 10.05 63.65 0.00 01/25/14 0.00
1.31 1.31 9.57 0.00 09/22/13 0.00
3.38 3.38 103.18 0.00 07/24/13 0.00
7.59 7.59 122.86 0.00 10/27/12 0.00
-83.16 -83.16 1038.31 0.00 03/07/14 0.00
-0.99 -0.99 -0.99 0.00 03/31/13 0.00
-3.02 -3.02 -3.02 0.00 01/11/14 0.00
-0.08 -0.08 442.71 0.00 03/04/14 0.00
-10.54 -10.54 -10.54 0.00 09/08/13 0.00
1.01 1.01 23.19 0.00 01/30/13 0.00
0.22 3.70 3.70 0.03 02/20/15 326 2656.63
1.99 3.14 3.14 0.01 08/01/14 123 850.63
0.10 1.69 1.69 0.00 08/01/14 123 459.06
28.97 46.52 46.52 0.13 08/01/14 123 12610.90
16.88 16.88 48.54 0.00 11/12/13 0.00
35.76 35.76 35.76 0.00 08/10/12 0.00
3.44 3.44 57.78 0.00 09/22/12 0.00
-0.06 -0.06 13.76 0.00 11/12/13 0.00
6.49 6.49 27.80 0.00 11/22/12 0.00
201.47 507.59 507.59 4.02 03/25/15 359 401573.68
4.86 4.86 4.86 0.00 07/30/13 0.00
10.87 10.91 10.91 0.00 02/14/13 0.00
43.05 54.55 54.55 0.00 06/07/13 0.00
50.84 50.84 50.84 0.00 10/31/13 0.00
0.38 0.38 983.99 0.00 01/15/14 0.00
44.65 44.65 969.73 0.00 01/11/14 0.00
14.38 14.38 444.07 0.00 03/24/12 0.00
0.00 821.26 0.00 11/25/12 0.00
-36.39 12.79 12.79 0.10 03/26/15 360 10147.36
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 271.44 0.00 11/25/12 0.00
0.00 715.08 0.00 03/31/12 0.00
-68.19 11.65 11.65 0.03 07/25/14 116 2978.70
0.00 0.00 8.69 0.00 06/10/10 0.00
0.00 0.00 59.76 0.00 11/10/12 0.00
0.00 0.00 59.66 0.00 09/11/13 0.00
0.00 0.00 4.34 0.00 05/22/12 0.00
0.00 0.00 2.57 0.00 05/26/12 0.00
0.00 0.00 4.19 0.00 08/23/11 0.00
0.00 0.00 7.55 0.00 06/24/12 0.00
0.00 0.00 2.95 0.00 06/06/13 0.00
0.00 0.00 8.92 0.00 12/25/13 0.00
0.00 0.00 111.61 0.00 07/27/12 0.00
3.07 3.07 405.06 0.00 07/27/12 0.00
0.00 0.00 13.22 0.00 07/28/12 0.00
0.00 0.00 366.51 0.00 01/25/12 0.00
22.71 22.71 1550.72 0.00 01/17/14 0.00
21.89 21.89 185.23 0.00 01/17/14 0.00
25.07 25.07 25.07 0.17 02/05/15 311 17183.91
30.01 94.90 94.90 0.14 06/07/14 68 14221.30
25.87 92.33 92.33 0.30 08/26/14 148 30113.58
41.94 72.43 72.43 0.14 06/27/14 88 14047.26
0.57 8.64 8.64 0.00 03/23/13 0.00
2.72 5.17 5.17 0.00 03/30/14 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
3.63 11.19 11.19 0.01 04/29/14 29 715.17
0.12 1.80 1.80 0.00 09/25/13 0.00
1.09 16.50 16.50 0.00 09/20/13 0.001.19 1.19 21.89 0.00 01/24/14 0.00
4.91 4.91 4.91 0.01 06/12/14 73 789.300.36 5.47 5.47 0.00 01/06/14 0.00
57.97 140.33 140.33 1.08 03/15/15 349 107926.15
2.14 2.14 1509.34 0.00 02/15/11 0.00
1.11 1.11 165.34 0.00 01/07/11 0.000.10 0.10 520.38 0.00 08/25/10 0.000.00 0.00 53.35 0.00 08/15/10 0.00
3.61 21.80 21.80 0.05 04/16/14 16 5137.48
31.42 31.42 31.42 0.33 06/10/14 71 32856.41
0.03 0.03 11.06 0.00 10/14/13 0.0014.44 14.44 167.44 0.00 02/11/14 0.00
0.85 0.85 0.85 0.00 12/27/12 0.00
1.61 1.61 17.61 0.00 09/27/13 0.001.75 24.21 24.21 0.02 04/07/14 7 2495.530.37 0.37 1.70 0.00 11/15/11 0.000.31 0.31 0.35 0.00 09/28/09 0.001.65 1.65 1.84 0.00 12/07/12 0.000.03 0.03 0.03 0.00 03/14/12 0.000.01 0.01 0.01 0.00 12/11/12 0.00
0.02 0.02 0.02 0.00 10/09/12 0.00
9.60 9.60 9.60 0.44 02/07/15 313 44272.16
0.15 0.15 0.15 0.00 07/18/13 0.00
14.41 14.41 14.41 0.66 02/07/15 313 66404.35
7.91 7.91 7.91 0.32 12/30/14 274 31918.20
2.98 2.98 29.49 0.00 10/24/13 0.00
0.56 0.56 0.56 0.01 08/05/14 127 1048.863.54 3.54 3.54 0.09 09/22/14 175 9111.592.48 35.72 35.72 0.00 03/12/14 0.001.27 1.27 1.27 0.03 08/20/14 142 2658.69
10.73 43.85 43.85 0.43 06/05/14 66 42623.720.48 5.34 5.34 0.03 05/05/14 35 2754.00
19.28 19.28 31.96 0.00 12/01/13 0.00
0.32 4.38 4.38 0.00 03/30/14 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
22.54 22.54 22.54 0.99 01/24/15 299 99261.28
1.47 1.47 1.47 0.00 03/09/98 0.00
0.02 0.02 0.02 0.00 07/06/06 0.00
3.69 3.69 3.69 0.05 06/28/14 89 4830.36
3.23 3.23 3.23 0.03 06/04/14 65 3088.305.96 5.96 5.96 0.19 11/03/14 217 19053.36
7.36 7.36 7.36 0.24 11/03/14 217 23533.54
4.09 4.09 4.09 0.06 07/05/14 96 5783.31
0.95 0.95 0.95 0.00 02/21/14 0.00
0.76 0.76 0.76 0.00 04/07/12 0.00
33.56 39.12 39.12 0.00 10/13/14 196 0.00
17.67 23.32 23.32 0.00 10/19/14 202 0.00
0.00 0.00 0.00 03/25/14 0.00
197.38 212.14 212.14 8.72 01/04/15 279 871689.11
0.00 6790.80 0.00 11/22/12 0.00
2.71 2.71 2.71 0.00 11/22/12 0.00
0.00 0.00 0.00 01/01/14 0.00
89.06 89.06 89.06 4.75 03/28/15 362 474838.80
80.76 561.36 561.36 23.40 01/08/15 283 2339746.46
64.10 81.81 81.81 2.72 11/12/14 226 272307.32
202.51 294.59 294.59 9.81 11/12/14 226 980539.43
5.74 5.74 5.74 0.00 02/25/11 0.00
0.03 0.03 0.03 0.00 03/18/15 352 156.30
0.00 17.85 17.85 0.00 10/31/12 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
17.57 17.57 17.57 0.00 11/29/13 0.00
1.08 1.08 1.08 0.00 03/01/14 0.00
0.66 0.66 0.66 0.00 03/27/14 0.00
6.13 6.13 6.13 0.00 02/15/14 0.00
3.57 4.51 4.51 0.00 09/07/11 0.00
4.40 4.40 4.40 0.00 01/27/15 302 0.00
8.47 8.47 8.47 0.00 08/02/14 124 0.00
2.84 7.17 7.17 0.00 06/20/14 81 0.00
6.11 6.11 6.11 0.00 12/18/14 262 0.00
0.51 0.51 0.51 0.00 12/23/13 0.00
6.10 11.92 11.92 0.00 06/20/14 81 0.00
150.32 153.37 153.37 0.20 04/09/14 9 20328.89
158.20 158.20 158.20 1.86 06/19/14 80 186398.51
6.66 6.66 6.66 0.07 06/07/14 68 6669.880.00 2.39 2.39 0.06 09/26/14 179 6303.96
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
173.80 173.80 173.80 3.58 08/18/14 140 358352.17
240.81 240.81 240.81 6.14 09/20/14 173 613551.62
22.89 176.00 176.00 6.64 12/12/14 256 663557.85
17.70 17.70 17.70 0.95 03/31/15 365 95124.55
1.79 1.79 1.79 0.00 02/25/13 0.001.49 1.49 1.49 0.00 08/12/09 0.009.14 9.14 9.14 0.00 03/26/11 0.00
0.90 0.90 0.90 0.00 05/15/10 0.00
37.11 37.11 37.11 0.00 05/25/09 0.00
121.60 121.60 121.60 0.00 09/29/12 0.00
1.55 23.56 23.56 0.19 05/24/14 54 18734.04
3.49 3.49 3.49 0.00 08/20/11 0.00
0.12 0.12 0.12 0.00 05/01/12 0.00
5.51 5.51 5.51 0.08 07/04/14 95 7711.13
0.01 0.01 0.01 0.00 07/27/12 0.00
0.01 0.01 0.01 0.00 01/17/13 0.00
1.79 1.79 1.79 0.00 11/07/13 0.00
0.07 0.07 0.07 0.00 09/04/13 0.000.41 6.27 6.27 0.07 06/16/14 77 7105.541.23 17.47 17.47 0.12 05/15/14 45 11576.58
2.20 32.40 32.40 0.21 05/13/14 43 20520.39
1.31 19.90 19.90 0.52 09/23/14 176 51576.27
2.00 29.28 29.28 0.13 04/29/14 29 12505.08
1.65 23.98 23.98 0.58 09/11/14 164 57919.77
0.58 8.78 8.78 0.06 05/13/14 43 5560.82
7.08 50.04 50.04 1.66 11/11/14 225 165829.57
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.93 14.18 14.18 0.08 05/08/14 38 7934.18
2.06 30.22 30.22 1.11 12/05/14 249 110836.180.02 0.30 0.30 0.01 12/24/14 268 1189.80
0.20 3.00 3.00 0.06 08/12/14 134 5912.3811.13 26.41 26.41 0.09 04/23/14 23 8947.09
0.20 0.20 0.20 0.00 12/27/08 0.000.68 0.68 0.68 0.00 10/15/14 198 0.001.10 1.10 1.10 0.02 07/04/14 95 1534.160.16 2.35 2.35 0.00 01/28/13 0.00
0.14 1.73 1.73 0.00 02/08/11 0.00
1.02 1.02 1.02 0.05 01/29/15 304 4585.82
107.57 366.60 366.60 8.10 08/28/14 150 809887.76
-177.34 44.81 44.81 0.89 08/13/14 135 89086.09
3.08 39.20 39.20 0.00 05/24/13 0.00
33.00 33.01 33.01 0.73 08/28/14 150 72922.56
29.22 29.23 29.23 0.65 08/28/14 150 64564.57
8.38 133.85 133.85 6.27 02/12/15 318 626859.74
55.36 66.80 66.80 2.85 01/15/15 290 285297.86
24.97 24.97 24.97 0.45 07/30/14 121 44502.10
17.09 17.09 17.09 0.00 03/15/15 349 0.00
10.80 98.22 98.22 0.00 03/14/15 348 0.00
132.72 390.92 390.92 0.00 01/30/15 305 0.00
5.39 5.39 44.11 0.00 08/14/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
10.11 129.06 129.06 0.00 09/03/14 156 0.00
34.12 264.61 264.61 0.00 06/10/14 71 0.00
1.91 1.91 1.91 0.00 02/26/14 0.00
2.07 2.07 2.07 0.06 10/09/14 192 5844.141.56 1.56 1.56 0.05 10/24/14 207 4764.95
6.78 6.78 6.78 0.19 10/07/14 190 18974.88
6.48 6.48 6.48 0.35 03/28/15 362 34565.232.21 2.21 2.21 0.11 02/17/15 323 10535.06
3.09 3.09 3.09 0.16 03/20/15 354 16109.06
6.28 6.28 6.28 0.32 03/13/15 347 32109.02
86.43 109.78 109.78 1.67 07/12/14 103 166539.17
173.81 189.32 189.32 0.00 02/06/14 0.00
46.98 46.98 46.98 0.35 05/21/14 51 35284.66
473.32 473.32 473.32 3.28 05/17/14 47 327634.72
2.42 2.42 2.42 0.03 06/27/14 88 3139.08
5.11 5.11 5.11 0.05 06/05/14 66 4966.0825.36 25.36 25.36 1.36 03/31/15 365 136326.70
0.80 0.80 0.80 0.03 12/10/14 254 2986.31
6.77 6.77 6.77 0.05 05/17/14 47 4688.41
59.26 59.26 59.26 0.00 03/23/14 0.00
313.54 335.16 335.16 0.00 03/11/13 0.00
-32.96 0.00 0.00 0.00 06/13/14 74 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
-0.88 22.70 22.70 0.25 06/13/14 74 24743.13
-0.66 15.96 15.96 0.17 06/13/14 74 17392.86
5.59 19.52 19.52 0.03 04/12/14 12 3449.91
13.42 13.42 13.42 0.50 12/10/14 254 50189.15
198.63 198.63 198.63 7.58 12/15/14 259 757679.31
17.47 19.38 19.38 0.33 07/26/14 117 33393.90
0.36 4.99 4.99 0.00 12/12/12 0.00-110.47 59.78 59.78 0.00 08/01/12 0.00
-3.23 1.98 1.98 0.04 08/28/14 150 4377.45
24.35 32.56 32.56 0.00 12/20/12 0.00
4.01 4.93 4.93 0.17 11/19/14 233 16929.900.00 0.00 6983.93 0.00 09/13/13 0.00
260.28 2104.47 2104.47 106.00 03/08/15 342 10600004.04366.78 366.78 366.78 18.04 02/28/15 334 1804230.20
0.00 478.67 0.00 10/31/13 0.000.00 583.01 0.00 06/07/13 0.000.00 60.75 0.00 02/14/13 0.00
2.94 2.94 102.49 0.00 12/05/12 0.00386.90 565.02 565.02 29.62 03/22/15 356 2962452.38
1.52 1.52 49.34 0.00 05/17/13 0.00
0.00 0.17 0.00 03/30/13 0.00
0.00 2.94 0.00 09/15/11 0.000.00 48.93 0.00 09/25/13 0.00
0.00 32.11 0.00 05/29/13 0.000.56 0.60 0.60 0.00 04/22/13 0.001.83 1.83 2.23 0.00 07/05/13 0.00
0.00 0.38 0.00 02/28/13 0.00
0.00 10.50 0.00 01/15/13 0.00
0.00 31.92 0.00 04/22/13 0.00
0.00 13.71 0.00 03/28/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.64 0.64 24.60 0.00 07/07/13 0.00
0.26 0.26 35.14 0.00 08/16/13 0.00356.29 616.47 616.47 30.32 02/28/15 334 3032458.81
0.00 120.59 0.00 07/24/13 0.0052.45 52.45 232.54 0.00 09/06/13 0.00
184.73 756.91 756.91 7.02 06/02/14 63 702294.74219.92 219.92 223.54 0.00 07/27/13 0.00
76.38 456.31 456.31 12.90 10/09/14 192 1290315.43
0.00 4.43 0.00 12/05/12 0.0094.27 94.27 94.27 4.64 02/28/15 334 463716.94
0.00 301.00 0.00 11/06/12 0.000.00 345.09 0.00 07/06/13 0.000.00 6.10 0.00 02/19/13 0.00
0.00 0.00 2.27 0.00 10/30/12 0.000.00 508.02 0.00 08/27/13 0.00
10.83 10.83 234.76 0.00 02/05/14 0.001.51 1.51 90.84 0.00 08/12/13 0.00
0.00 458.21 0.00 02/03/14 0.000.00 166.81 0.00 01/17/14 0.00
0.62 0.62 5.87 0.00 09/12/12 0.000.00 4.80 0.00 02/16/13 0.00
173.03 178.74 178.74 2.26 06/25/14 86 226384.8945.34 45.34 430.99 0.00 06/24/13 0.00
6.40 6.39 68.47 0.00 03/31/14 0 0.000.00 76.99 0.00 10/18/13 0.00
0.80 0.80 174.81 0.00 12/23/13 0.0028.79 28.79 68.28 0.00 03/31/13 0.00
0.72 0.72 15.92 0.00 10/16/12 0.004.19 4.19 26.01 0.00 01/10/13 0.00
168.32 175.25 175.25 3.36 08/08/14 130 335535.930.00 1.97 0.00 08/29/12 0.00
0.69 0.69 16.01 0.00 02/14/13 0.000.00 13.07 0.00 05/09/12 0.000.00 0.95 0.00 12/05/13 0.000.00 2.27 0.00 04/24/13 0.000.00 56.06 0.00 01/27/13 0.000.00 20.05 0.00 09/01/13 0.00
12.91 12.91 12.91 0.05 04/26/14 26 4944.690.00 3.20 0.00 12/07/13 0.00
3.74 3.74 3.74 0.08 08/18/14 140 7714.620.00 2.86 0.00 07/26/13 0.00
0.20 3.02 3.02 0.00 12/16/13 0.000.07 1.03 1.03 0.00 10/22/13 0.00
0.00 5.26 0.00 04/30/13 0.009.47 9.47 9.47 0.14 07/11/14 102 14226.580.18 2.80 2.80 0.05 08/08/14 130 5356.95
19.27 19.27 0.00 04/24/14 24 0.00
10.47 10.47 0.00 04/24/14 24 0.00
0.00 1.02 0.00 05/16/13 0.00
0.00 22.76 0.00 05/16/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
22.14 22.14 22.14 0.00 03/31/15 365 0.00
42.97 44.27 44.27 0.00 03/30/15 364 0.000.00 8.97 0.00 06/07/13 0.00
0.00 27.40 0.00 12/19/13 0.00
29.17 29.17 29.17 0.00 03/31/15 365 0.000.77 0.77 0.77 0.02 10/16/14 199 2244.610.53 8.03 8.03 0.41 03/15/15 349 41278.460.82 10.81 10.81 0.00 02/12/14 0.00
24.74 215.42 215.42 3.93 08/02/14 124 393408.94
0.37 5.67 5.67 0.10 08/02/14 124 10363.53
2.32 2.32 2.32 0.07 10/23/14 206 7044.5011.06 11.06 11.06 0.56 03/09/15 343 55887.17
1.55 2.20 2.20 0.01 05/06/14 36 1165.71
8.71 8.71 8.71 0.00 04/27/11 0.00-8.98 10.15 10.15 0.51 03/05/15 339 50685.43
0.88 1.77 1.77 0.09 03/30/15 364 9486.19
17.33 98.92 98.92 0.07 04/05/14 5 7284.53
0.21 3.17 3.17 0.00 10/27/13 0.00
1.06 1.06 1.06 0.03 10/06/14 189 2942.49
10.10 10.10 10.10 0.13 06/28/14 89 13232.32
4.68 4.68 4.68 0.06 06/28/14 89 6128.95
198.17 198.17 198.17 8.00 12/30/14 274 799707.8115.93 15.93 15.93 0.00 03/31/12 0.00
1.33 1.33 1.33 0.00 08/29/12 0.00
0.24 0.24 0.24 0.00 03/13/13 0.00
111.74 111.74 111.74 3.93 11/25/14 239 393328.05
1.05 1.05 1.05 0.00 08/10/13 0.001.00 1.00 1.00 0.03 09/23/14 176 2584.50
1.05 1.05 1.05 0.03 10/26/14 209 3229.77
0.14 0.14 0.14 0.00 03/28/12 0.00
24.15 24.15 24.15 0.14 05/08/14 38 13516.37-0.78 6.74 6.74 0.00 07/24/13 0.00
0.57 8.63 8.63 0.00 03/23/12 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
1.81 1.81 1.81 0.00 02/15/13 0.00
0.22 3.39 3.39 0.02 05/08/14 38 1898.44
0.83 0.83 0.83 0.04 01/20/15 295 3619.70
14.24 14.24 14.24 0.62 01/20/15 295 61882.53
0.60 0.60 0.60 0.00 08/09/12 0.002.64 2.64 2.64 0.09 11/11/14 225 8740.640.96 2.68 2.68 0.14 03/29/15 363 14327.95
6.13 12.01 12.01 0.00 10/02/10 0.00
72.80 72.80 72.80 3.63 03/05/15 339 363482.73
857.31 1953.57 1953.57 97.54 03/05/15 339 9753619.96
2.39 36.31 36.31 0.00 08/11/10 0.00
73.22 994.71 994.71 6.59 05/15/14 45 659242.94
58.32 527.94 527.94 11.43 08/25/14 147 1142986.48
13.56 13.56 13.56 0.00 02/22/13 0.00
1.42 21.52 21.52 0.00 02/22/13 0.00
-34.73 40.76 40.76 0.73 07/31/14 122 73233.800.18 2.73 2.73 0.02 05/30/14 60 2416.28
18.69 52.34 52.34 0.37 05/18/14 48 37000.67
8.66 8.66 8.66 0.37 01/12/15 287 36584.61
4.20 10.99 10.99 0.12 06/16/14 77 12461.09
1.46 3.46 3.46 0.00 02/15/14 0.00
5.82 10.47 10.47 0.10 06/03/14 64 9868.13
44.58 648.76 648.76 3.34 05/05/14 35 334417.09
-8.34 9.68 9.68 0.51 03/22/15 356 50738.5312.46 54.46 54.46 0.87 07/18/14 109 87433.75
59.84 77.85 77.85 3.12 12/28/14 272 311844.62
0.21 0.21 0.21 0.01 09/24/14 177 539.48
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
142.26 142.39 142.39 7.55 03/26/15 360 754940.37
22.17 22.18 22.18 0.57 09/22/14 175 57163.63
5.56 5.56 5.56 0.14 09/22/14 175 14335.572.54 8.48 8.48 0.45 03/26/15 360 44946.835.99 5.99 5.99 0.31 03/16/15 350 30865.66
20.76 161.16 161.16 0.00 02/07/14 0.005.61 5.61 5.61 0.28 03/01/15 335 27662.19
513.22 591.64 591.64 30.06 03/11/15 345 3006154.38127.70 127.70 1995.77 0.00 03/31/14 0 0.00
1.50 22.85 22.85 1.17 03/13/15 347 116767.781.80 1.80 1.80 0.00 08/20/13 0.00
0.32 0.32 0.32 0.00 04/15/14 15 70.02
0.21 0.21 0.21 0.00 03/14/14 0.00
0.93 14.07 14.07 0.00 03/13/12 0.007.95 33.57 33.57 1.80 03/31/15 365 180451.48
0.13 0.13 0.13 0.00 03/31/10 0.002.39 2.39 2.39 0.03 07/02/14 93 3278.87
16.61 308.73 308.73 0.00 10/18/13 0.00
0.58 8.81 8.81 0.00 10/18/13 0.00
0.17 0.17 0.17 0.00 07/30/14 121 301.88
0.32 0.32 0.32 0.00 04/15/14 15 70.02
1.13 1.13 1.13 0.01 05/28/14 58 962.18
0.79 0.79 0.79 0.00 03/14/11 0.00
0.24 3.62 3.62 0.11 10/19/14 202 10764.70
-3.38 48.67 48.67 1.45 10/19/14 202 144788.39
0.02 0.23 0.23 0.01 10/19/14 202 684.46
0.07 1.12 1.12 0.03 10/19/14 202 3332.945.45 5.45 5.45 0.25 02/09/15 315 25282.58
0.03 0.45 0.45 0.00 04/30/14 30 200.962.32 2.32 2.32 0.07 10/17/14 200 6841.76
0.98 3.42 3.42 0.06 08/06/14 128 6454.12
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
152.31 152.31 152.31 1.03 05/16/14 46 103186.50
79.66 79.66 79.66 0.00 11/26/11 0.00
5.84 5.84 5.84 0.11 08/02/14 124 10674.26
0.89 0.89 0.89 0.01 07/13/14 104 1359.10
249.16 249.19 249.19 1.06 04/29/14 29 106429.59
-8.83 1.31 1.31 0.00 11/24/08 0.000.16 2.45 2.45 0.00 12/15/12 0.00
0.17 2.61 2.61 0.00 03/21/12 0.00
0.07 1.07 1.07 0.00 01/11/14 0.00
0.03 0.49 0.49 0.00 05/02/14 32 230.74
0.72 0.72 0.72 0.04 03/31/15 365 3854.07
6.25 6.25 6.25 0.34 03/31/15 365 33593.410.83 0.83 0.83 0.04 02/05/15 311 3782.12
39.86 39.86 39.86 1.15 10/13/14 196 115058.58
12.86 12.86 12.86 0.31 09/10/14 163 30862.200.01 0.15 0.15 0.00 02/11/12 0.00
20.96 20.96 31.24 0.00 07/15/13 0.00
6.94 9.89 9.89 0.35 11/26/14 240 34963.236.38 6.38 6.38 0.00 03/09/13 0.00
0.93 14.17 14.17 0.00 11/09/13 0.00
4.49 4.49 4.49 0.02 04/30/14 30 1982.55
0.48 7.09 7.09 0.17 09/10/14 163 17024.04
17.33 17.33 17.33 0.79 02/03/15 309 78869.30
3.80 3.80 3.80 0.00 07/26/13 0.00
2.98 2.98 2.98 0.00 01/03/14 0.00
1.06 1.06 1.06 0.03 10/12/14 195 3048.51
4.99 4.99 4.99 0.03 05/06/14 36 2645.59
9.66 9.66 9.66 0.16 07/23/14 114 16211.15
17.17 17.17 17.17 0.63 12/06/14 250 63210.03
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
2.99 2.99 2.99 0.00 01/11/13 0.00
4.31 4.31 4.31 0.02 05/05/14 35 2221.94
9.65 14.25 14.25 0.00 03/20/14 0.00
23.88 23.88 23.88 0.20 05/27/14 57 20048.93
3.09 3.09 3.09 0.05 07/08/14 99 4510.54
6.02 6.02 6.02 0.12 08/13/14 135 11979.18
6.92 10.38 10.38 0.00 01/06/14 0.00
1.45 1.45 1.45 0.00 02/27/13 0.00
5.72 5.72 5.72 0.00 02/24/14 0.00
9.43 9.43 9.43 0.46 02/23/15 329 45706.51
4.19 4.19 4.19 0.04 06/05/14 66 4071.00
0.82 0.82 0.82 0.04 03/30/15 364 4403.939.58 9.58 9.58 0.45 02/10/15 316 44564.351.90 1.90 1.90 0.10 03/31/15 365 10239.01
0.35 5.37 5.37 0.03 05/12/14 42 3319.110.94 2.62 2.62 0.01 05/05/14 35 1351.20
0.86 0.86 0.86 0.00 03/20/13 0.00
0.46 0.46 0.46 0.00 11/30/11 0.000.54 0.54 0.54 0.03 03/09/15 343 2706.290.42 0.42 0.42 0.02 03/25/15 359 2212.800.54 0.54 0.54 0.03 03/09/15 343 2706.29
16.25 16.25 16.25 0.87 03/31/15 365 87328.54
34.77 34.77 34.77 1.87 03/31/15 365 186905.95
2.23 2.23 2.23 0.10 01/26/15 301 9864.90
17.63 17.63 17.63 0.78 01/26/15 301 78173.080.81 0.81 0.81 0.04 01/30/15 305 3634.821.61 1.61 1.61 0.03 08/22/14 144 3413.36
1.00 1.00 1.00 0.00 01/31/11 0.002.76 2.76 2.76 0.09 11/15/14 229 9303.62
0.04 0.04 22.06 0.00 10/21/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
2.83 2.83 2.83 0.03 06/09/14 70 2913.16
0.66 0.66 0.66 0.00 04/09/14 9 87.465.72 5.72 5.72 0.30 03/17/15 351 29593.76
3.02 7.65 7.65 0.00 04/11/14 11 0.00
19.20 139.49 139.49 0.00 08/02/14 124 0.00
4.18 10.77 10.77 0.00 07/26/14 117 0.00
19.65 19.65 19.65 0.00 09/11/14 164 0.00
-27.95 729.67 729.67 0.00 08/02/14 124 0.00
45.36 52.37 52.37 0.00 08/02/14 124 0.00
-0.75 8.59 8.59 0.00 09/20/14 173 0.00
9.67 9.67 9.67 0.00 03/10/15 344 0.00
0.98 0.98 0.98 0.00 01/28/14 0.00
6.56 6.56 6.56 0.00 01/28/14 0.00
8.78 8.78 8.78 0.00 07/28/14 119 0.00
33.23 78.44 78.44 0.00 06/30/14 91 0.00
94.33 94.33 94.33 0.00 11/15/13 0.00
15.09 16.71 16.71 0.00 08/22/14 144 0.00
41.55 73.68 73.68 0.00 08/12/14 134 0.00
0.00 0.37 0.37 0.00 03/30/13 0.00
10.94 10.94 10.94 0.00 12/15/14 259 0.005.58 5.58 5.58 0.00 12/15/14 259 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.71 0.71 0.71 0.00 02/25/13 0.00
2.99 6.19 6.19 0.00 09/16/14 169 0.00
-2.06 -2.06 -2.06 0.00 12/11/13 0.00
3.75 3.75 3.75 0.00 01/04/14 0.00
0.04 0.04 91.83 0.00 10/06/13 0.00
43.91 43.91 43.91 0.00 07/25/11 0.000.56 8.52 8.52 0.20 09/06/14 159 19955.020.29 4.42 4.42 0.16 11/25/14 239 15550.380.07 0.92 0.92 0.01 06/04/14 65 880.203.54 3.54 3.54 0.00 07/01/11 0.00
0.06 0.89 0.89 0.01 06/04/14 65 848.74
1.81 1.81 1.81 0.05 10/14/14 197 5248.6412.70 12.70 33.41 0.00 07/13/13 0.00
0.00 0.00 0.00 0.00 07/03/13 0.00
1.87 1.87 1.87 0.05 10/14/14 197 5435.96
0.05 0.82 0.82 0.01 07/07/14 98 1177.18
0.82 0.82 0.82 0.02 08/22/14 144 1742.473.20 3.20 3.20 0.00 02/13/12 0.000.06 0.06 0.06 0.00 05/26/09 0.00
0.02 0.02 0.02 0.00 09/16/14 169 49.78
0.22 3.35 3.35 0.12 11/29/14 243 11979.510.83 0.83 0.83 0.00 01/18/13 0.000.94 0.94 25.33 0.00 01/25/14 0.000.52 7.62 7.62 0.00 11/05/12 0.00
-0.27 -0.27 -0.27 0.00 11/05/12 0.001.35 1.35 1.35 0.00 12/02/11 0.00
-9.02 -9.02 -9.02 0.00 12/14/10 0.000.26 0.26 0.26 0.01 03/31/15 365 1396.790.52 0.52 0.52 0.03 03/31/15 365 2793.641.04 1.04 1.04 0.06 03/31/15 365 5587.29
11.34 11.34 11.34 0.00 04/10/11 0.002.38 2.38 2.38 0.00 11/20/12 0.006.42 6.42 6.42 0.32 03/02/15 336 31747.48
0.29 4.42 4.42 0.04 06/04/14 65 4229.18
0.09 1.40 1.40 0.01 05/06/14 36 740.980.60 0.60 0.60 0.03 03/31/15 365 3228.203.15 3.15 3.15 0.00 06/08/10 0.00
10.68 10.68 10.68 0.57 03/26/15 360 56613.324.72 4.72 4.72 0.00 04/22/10 0.001.11 1.11 1.11 0.06 03/23/15 357 5822.84
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
9.36 9.36 9.36 0.00 03/23/13 0.00
0.05 0.83 0.83 0.02 08/04/14 126 1533.394.89 4.89 4.89 0.26 03/25/15 359 25871.955.11 5.11 5.11 0.23 02/02/15 308 23157.275.11 5.11 5.11 0.00 02/08/11 0.000.00 0.00 0.00 0.00 01/19/13 0.00
0.86 0.86 0.86 0.00 03/27/11 0.000.02 0.02 0.02 0.00 06/09/11 0.00
10.45 10.45 10.45 0.00 11/06/12 0.002.80 2.80 2.80 0.00 01/01/12 0.00
0.05 0.81 0.81 0.00 03/31/14 0 0.00
0.84 0.84 0.84 0.04 01/21/15 296 3651.50
9.85 10.17 10.17 0.08 05/26/14 56 8383.893.07 3.07 3.07 0.05 07/19/14 110 4975.11
-2.93 -2.93 -2.93 0.00 12/30/09 0.00-0.45 -0.45 -0.45 0.00 12/30/09 0.001.09 1.09 1.09 0.04 12/15/14 259 4158.572.90 2.90 2.90 0.11 12/15/14 259 11049.951.60 1.60 1.60 0.00 08/20/08 0.00
-8.20 -8.20 -8.20 0.00 12/27/08 0.00-2.42 -2.42 -2.42 0.00 12/27/09 0.00
-18.79 -18.79 -18.79 0.00 03/27/09 0.00
1.26 1.26 1.26 0.00 12/27/09 0.00
-29.15 -29.15 -29.15 0.00 03/24/10 0.0029.01 29.01 29.01 1.17 12/31/14 275 117497.3620.55 20.55 20.55 0.00 11/21/13 0.0067.15 71.17 71.17 0.64 05/31/14 61 63939.43
6.32 6.32 6.32 0.00 02/06/14 0.004.61 4.61 4.61 0.08 07/22/14 113 7674.414.53 4.53 4.53 0.00 01/04/14 0.00
61.69 66.97 66.97 1.17 07/28/14 119 117377.2336.00 57.05 57.05 0.97 07/25/14 116 97459.8210.01 10.01 10.01 0.22 08/28/14 150 22111.78
5.02 5.02 5.02 0.11 08/24/14 146 10799.5232.00 51.29 51.29 0.00 02/20/14 0.00
7.40 22.59 22.59 0.03 04/08/14 8 2661.760.00 0.00 24.27 0.00 03/11/14 0.00
12.74 23.51 23.51 0.29 06/24/14 85 29433.704.58 4.58 4.58 0.01 04/22/14 22 1482.83
0.82 0.82 0.82 0.02 08/25/14 147 1778.77
0.82 0.82 0.82 0.02 08/23/14 145 1754.57
0.82 0.82 0.82 0.02 08/24/14 146 1766.67
0.82 0.82 0.82 0.02 08/26/14 148 1790.87
0.82 0.82 0.82 0.02 08/21/14 143 1730.37-37.09 -37.09 -37.09 0.00 08/17/13 0.00112.17 623.61 623.61 25.99 01/08/15 283 2599166.80
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
28.30 173.61 173.61 2.91 07/23/14 114 291487.846.24 6.24 6.24 0.10 07/23/14 114 10474.42
-0.03 -0.03 -0.03 0.00 04/27/12 0.00
10.50 10.50 10.50 0.00 02/17/14 0.00
-0.03 -0.03 -0.03 0.00 04/24/12 0.00
-0.01 -0.01 -0.01 0.00 01/02/14 0.00
0.03 0.03 0.03 0.00 01/03/13 0.00
0.37 0.37 0.37 0.00 02/15/12 0.00
-0.03 -0.03 -0.03 0.00 05/12/12 0.00
150.72 150.72 150.72 2.51 07/22/14 113 250841.192.01 2.01 2.01 0.03 07/22/14 113 3353.01
-0.32 -0.32 -0.32 0.00 03/21/13 0.001.73 1.73 1.73 0.00 03/27/13 0.00
0.94 0.94 0.94 0.00 12/18/13 0.00
-0.32 -0.32 -0.32 0.00 10/31/08 0.00
-0.01 -0.01 -0.01 0.00 12/12/12 0.00
-0.03 -0.03 -0.03 0.00 05/07/12 0.00
0.22 0.22 0.22 0.00 11/30/12 0.00
5.87 5.87 5.87 0.00 01/31/14 0.00
222.79 222.79 222.79 11.06 03/03/15 337 1105789.573.36 3.36 3.36 0.17 03/03/15 337 16652.49
-0.32 -0.32 -0.32 0.00 03/17/11 0.00
0.03 0.03 0.03 0.00 12/24/12 0.000.82 0.82 0.82 0.00 12/24/12 0.00
-0.03 -0.03 -0.03 0.00 03/28/12 0.00
0.03 0.03 0.03 0.00 11/30/12 0.00
0.03 0.03 0.03 0.00 12/11/12 0.00
0.03 0.03 0.03 0.00 11/10/12 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
-0.32 -0.32 -0.32 0.00 11/01/12 0.00
160.56 186.21 186.21 6.09 11/08/14 222 608817.571.50 1.50 1.50 0.00 04/20/13 0.00
-0.03 -0.03 -0.03 0.00 03/22/12 0.00
6.47 6.47 6.47 0.00 09/20/12 0.00
1.07 1.07 1.07 0.00 04/30/12 0.00
13.71 13.71 13.71 0.00 12/29/12 0.00
2.80 2.80 2.80 0.00 01/27/12 0.00
2.06 2.06 2.06 0.00 05/10/11 0.00
0.01 0.01 0.01 0.00 07/01/13 0.00
-0.08 -0.08 -0.08 0.00 01/13/13 0.008.10 19.24 19.24 0.73 12/15/14 259 73377.66
8.95 8.95 8.95 0.00 01/13/14 0.000.01 0.01 0.01 0.00 03/21/13 0.00
58.09 58.09 58.09 0.00 01/31/13 0.00
8.96 8.96 8.96 0.00 02/29/12 0.00
3.23 3.23 3.23 0.00 09/07/12 0.007.68 7.68 7.68 0.00 02/18/13 0.00
7.64 7.64 7.64 0.00 01/05/13 0.000.37 0.37 5.97 0.00 09/21/13 0.00
45.54 45.54 45.54 1.48 11/07/14 221 148217.18-0.26 0.00 0.00 0.00 07/16/14 107 0.005.66 5.66 5.66 0.09 07/11/14 102 8503.40
12.40 12.40 12.40 0.00 06/10/08 0.0032.73 32.73 32.73 0.00 07/14/14 105 0.00-0.55 -0.55 -0.55 0.00 02/28/10 0.00-0.44 -0.44 -0.44 0.00 03/23/10 0.0011.24 11.24 11.24 0.00 03/14/09 0.00-7.51 -7.51 -7.51 0.00 03/18/08 0.00
7.90 7.90 7.90 0.00 03/30/13 0.00
2.34 8.41 8.41 0.00 04/02/14 2 0.00
8.90 8.90 8.90 0.00 09/30/14 183 0.00
472.11 472.11 472.11 0.00 03/21/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
10.02 10.02 10.02 0.00 09/30/14 183 0.00
7.31 7.31 7.31 0.00 03/24/15 358 0.00
3.38 5.18 5.18 0.03 05/08/14 38 2899.11
1.70 7.16 7.16 0.04 05/08/14 38 4005.45
17.45 21.84 21.84 0.23 06/11/14 72 23164.39
8.01 121.70 121.70 6.47 03/27/15 361 647041.23
1.86 28.26 28.26 0.00 07/19/12 0.00
7.06 36.72 36.72 0.41 06/15/14 76 41104.02
15.11 22.07 22.07 0.00 09/28/13 0.00
12.65 28.84 28.84 0.64 08/29/14 151 64126.75
20.37 20.37 20.37 0.00 06/10/08 0.00
-6.35 -6.35 -6.35 0.00 08/09/11 0.00
-1.92 -1.92 -1.92 0.00 02/14/09 0.00
0.17 0.17 4.91 0.00 03/31/14 0 0.00157.54 215.41 215.41 1.27 05/10/14 40 126898.01
166.39 204.37 204.37 1.63 05/24/14 54 162531.67
4.55 4.55 4.55 0.04 05/30/14 60 4018.69
4.01 4.01 4.01 0.22 03/31/15 365 21545.19
-0.03 -0.03 -0.03 0.00 01/29/10 0.00-0.70 -0.70 -0.70 0.00 01/25/12 0.00
-1.00 -1.00 64.22 0.00 05/06/13 0.00
20.37 163.01 163.01 3.82 09/06/14 159 381719.06
6.49 49.24 49.24 0.31 05/13/14 43 31186.37
51.62 502.95 502.95 2.81 05/08/14 38 281476.41
0.04 0.04 144.85 0.00 03/31/14 0 0.00
3.34 3.34 68.93 0.00 10/14/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
144.92 144.92 144.92 4.27 10/17/14 200 426869.360.00 0.00 0.00 0.00 03/14/13 0.00
1.53 1.53 1.53 0.00 03/31/12 0.00
37.51 250.81 250.81 1.51 05/11/14 41 151446.98
192.86 208.86 208.86 0.74 04/24/14 24 73824.53147.01 147.01 147.01 0.06 04/03/14 3 6495.44
37.86 787.80 787.80 27.15 11/20/14 234 2714986.74
2.85 2.85 198.67 0.00 02/10/14 0.00
-0.22 -0.22 -0.22 0.00 07/15/11 0.00-0.04 -0.04 -0.04 0.00 04/26/12 0.00-0.04 -0.04 -0.04 0.00 05/09/12 0.00-0.04 -0.04 -0.04 0.00 04/27/12 0.002.09 2.09 2.09 0.02 05/25/14 55 1695.970.85 0.85 0.85 0.01 07/05/14 96 1197.870.30 0.30 25.78 0.00 02/27/14 0.000.77 0.77 0.77 0.02 10/06/14 189 2145.40
1.64 1.64 1.64 0.09 03/31/15 365 8798.620.00 0.00 0.00 0.00 02/27/14 0.001.94 1.94 1.94 0.07 12/03/14 247 7061.74
9.88 9.88 9.88 0.20 08/13/14 135 19639.170.55 0.55 0.55 0.01 06/24/14 85 683.742.35 2.35 2.35 0.00 12/23/04 0.002.92 2.92 2.92 0.14 02/28/15 334 14352.950.07 1.13 1.13 0.00 04/02/14 2 33.33
0.53 0.53 0.53 0.01 06/14/14 75 579.918.06 8.06 8.06 0.25 10/29/14 212 25163.821.85 1.85 1.85 0.05 10/19/14 202 5495.301.74 1.74 1.74 0.09 03/19/15 353 9036.881.99 1.99 1.99 0.05 09/09/14 162 4741.510.87 0.87 0.87 0.01 06/10/14 71 909.153.58 3.58 3.58 0.19 03/26/15 360 18969.692.17 2.17 2.17 0.11 03/19/15 353 11297.39
0.45 0.45 0.45 0.01 06/26/14 87 578.51
8.01 8.01 8.01 0.14 07/28/14 119 14044.022.35 2.35 2.35 0.09 12/19/14 263 9119.420.55 0.55 0.55 0.01 07/31/14 122 979.530.55 0.55 0.55 0.01 06/27/14 88 706.552.37 2.37 2.37 0.04 07/31/14 122 4255.590.07 0.07 0.07 0.00 03/31/15 365 357.770.10 0.10 0.10 0.01 03/31/15 365 524.710.99 0.99 0.99 0.04 11/29/14 243 3528.927.12 7.12 7.12 0.25 11/20/14 234 24522.360.41 6.29 6.29 0.10 07/14/14 105 9726.35
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.24 0.24 0.24 0.01 11/10/14 224 805.350.08 0.08 0.08 0.00 08/31/14 153 175.40
3.03 41.75 41.75 0.00 09/27/14 180 0.00
1.50 1.50 1.50 0.02 06/25/14 86 1893.800.77 0.77 0.77 0.01 08/06/14 128 1452.97
0.55 0.55 0.55 0.01 06/26/14 87 698.52
2.09 30.70 30.70 0.00 04/20/14 20 0.000.90 0.90 0.90 0.02 07/30/14 121 1610.551.80 1.80 1.80 0.01 05/16/14 46 1222.391.63 1.63 1.63 0.03 07/25/14 116 2779.541.50 1.50 1.50 0.04 09/11/14 164 3621.440.91 0.91 0.91 0.03 12/02/14 246 3306.722.13 2.13 2.13 0.08 12/06/14 250 7837.722.56 2.56 2.56 0.13 03/19/15 353 13294.770.53 8.02 8.02 0.02 04/18/14 18 2125.993.78 3.78 3.78 0.03 05/28/14 58 3226.590.55 0.55 0.55 0.01 07/08/14 99 794.862.02 2.02 2.02 0.10 03/10/15 344 10211.390.50 0.50 0.50 0.01 09/22/14 175 1276.508.55 8.55 8.55 0.43 03/11/15 345 43456.40
3.08 45.73 45.73 0.00 11/11/14 225 0.003.92 59.46 59.46 2.24 12/12/14 256 224196.571.58 1.58 1.58 0.05 10/15/14 198 4600.286.04 6.04 6.04 0.18 10/16/14 199 17716.591.71 1.71 1.71 0.06 11/12/14 226 5679.13
0.99 0.99 0.99 0.05 03/31/15 365 5300.647.82 7.82 7.82 0.37 02/11/15 317 36514.04
1.67 1.67 1.67 0.07 01/14/15 289 7124.750.54 0.54 0.54 0.01 06/30/14 91 724.880.58 0.58 0.58 0.01 06/13/14 74 634.90
0.10 1.53 1.53 0.02 07/12/14 103 2313.762.28 2.28 2.28 0.03 06/30/14 91 3058.271.54 1.54 1.54 0.02 07/12/14 103 2337.830.65 0.65 0.65 0.01 07/31/14 122 1161.33
0.65 0.65 0.65 0.01 06/30/14 91 866.241.64 1.64 1.64 0.02 06/30/14 91 2192.04
2.53 2.53 2.53 0.04 07/12/14 103 3839.38
0.42 0.42 0.42 0.00 07/19/14 110 0.00
0.32 0.32 0.32 0.00 03/23/15 357 0.00
0.29 0.29 0.29 0.00 03/31/15 365 0.00
0.87 0.87 0.87 0.00 01/06/15 281 0.00
0.32 0.32 0.32 0.00 12/04/14 248 0.00
0.80 0.80 0.80 0.00 03/24/15 358 0.00
0.46 0.46 0.46 0.00 02/28/15 334 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.10 0.10 0.10 0.01 03/31/15 365 537.03
0.26 0.26 0.26 0.00 03/31/14 0 0.00
0.82 0.82 0.82 0.00 09/29/14 182 0.00
0.44 0.44 0.44 0.00 03/31/15 365 0.00
1.00 1.00 1.00 0.00 09/29/14 182 0.00
0.91 0.91 0.91 0.00 09/29/14 182 0.00
0.91 0.91 0.91 0.00 09/29/14 182 0.00
0.91 0.91 0.91 0.00 09/29/14 182 0.00
0.42 0.42 21.05 0.00 08/23/13 0.00
0.00 28.69 28.69 0.00 04/26/13 0.00
4.15 4.15 4.15 03/21/10 0.00
4.02 4.02 9.96 0.00 02/23/14 0.00
6.75 6.75 44.53 0.00 02/24/14 0.00199.15 390.81 390.81 21.01 03/31/15 365 2100877.37164.48 199.39 199.39 10.72 03/31/15 365 1071867.88169.75 507.15 507.15 22.71 01/29/15 304 2270625.97106.70 166.53 166.53 7.46 01/29/15 304 745581.70
0.00 0.00 40.60 0.00 03/01/12 0.0032.99 32.99 83.36 0.00 08/03/13 0.00
7.05 7.05 11.29 0.00 03/05/14 0.00
8.11 8.11 8.11 0.01 04/05/14 5 597.51
136.85 182.82 182.82 7.40 12/31/14 275 740462.85
32.82 32.82 62.60 0.00 08/03/13 0.00326.80 507.66 507.66 20.56 12/31/14 275 2056092.87
0.00 0.00 209.59 0.00 02/22/13 0.001.84 1.84 1.84 0.00 10/29/12 0.002.56 2.56 2.56 0.00 02/22/13 0.00
27.10 51.59 51.59 0.62 06/20/14 81 61545.219.57 9.57 9.57 0.30 10/28/14 211 29738.189.39 13.34 13.34 0.05 04/25/14 25 4909.96
83.35 83.35 856.18 0.00 03/14/14 0.00
39.55 74.85 74.85 1.69 08/31/14 153 168655.2729.16 29.16 853.93 0.00 11/09/13 0.00
18.47 18.47 56.26 0.00 07/08/13 0.00
15.25 15.25 15.25 0.22 07/09/14 100 22453.02
45.80 45.80 45.80 0.27 05/10/14 40 26981.59
0.00 0.00 13.66 0.00 06/18/10 0.00
11.44 11.44 11.44 0.53 02/10/15 316 53244.71
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
7.11 7.11 7.11 0.29 01/04/15 279 29219.79
319.76 442.20 442.20 23.77 03/31/15 365 2377120.92
0.00 0.00 56.44 0.00 07/08/13 0.00
10.23 10.23 452.57 0.00 12/09/12 0.007.54 7.54 737.01 0.00 11/13/13 0.00
-161.79 0.00 0.00 0.00 12/31/14 275 0.00
0.00 0.00 1511.18 0.00 07/09/11 0.00
-0.07 -0.07 2456.60 0.00 07/15/13 0.00
0.00 0.00 241.56 0.00 02/15/13 0.00
-0.21 -0.21 157.59 0.00 03/24/12 0.00
1.17 1.17 77.73 0.00 07/02/13 0.00
251.83 696.04 696.04 34.55 03/03/15 337 3454636.95
0.00 0.00 343.84 0.00 07/23/12 0.00
1.14 1.14 205.52 0.00 01/22/14 0.00
10.64 10.64 486.75 0.00 11/14/13 0.00
0.00 0.00 19.91 0.00 02/26/14 0.000.00 0.00 42.88 0.00 11/03/09 0.00
8.47 87.76 87.76 3.93 01/29/15 304 392908.634.38 58.75 58.75 2.38 12/31/14 275 237937.66
0.00 0.00 18.02 0.00 11/14/13 0.00
315.14 506.33 506.33 27.22 03/31/15 365 2721852.78
11.69 11.69 11.69 0.29 09/13/14 166 28591.16
2.06 2.06 53.00 0.00 10/29/13 0.00
0.00 0.00 -31.88 0.00 04/04/09 0.00
-0.03 -0.03 35.86 0.00 12/31/13 0.003.36 3.36 73.64 0.00 02/10/14 0.00
0.00 0.00 -0.04 0.00 01/30/11 0.00
0.00 0.00 8.28 0.00 10/21/08 0.00
0.00 0.00 4.60 0.00 10/15/09 0.00
0.00 0.00 225.78 0.00 07/09/11 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 0.00 554.03 0.00 11/10/12 0.000.00 0.00 548.05 0.00 01/11/11 0.000.00 0.00 0.12 0.00 04/30/13 0.00
-1.55 -1.55 708.08 0.00 08/20/11 0.00
3.01 3.01 3.08 0.00 01/24/12 0.00
8.10 8.10 8.10 0.18 08/30/14 152 18125.16
167.88 167.88 167.88 1.61 06/04/14 65 160710.42
0.00 0.00 60.12 0.00 10/25/11 0.00
0.00 0.00 24.96 0.00 12/24/12 0.00
3.31 3.31 23.25 0.00 03/28/13 0.00
0.00 0.00 176.06 0.00 12/19/13 0.00
8.52 8.52 141.19 0.00 03/31/14 0 0.00
0.00 0.00 618.04 0.00 03/06/14 0.00
0.00 0.00 2.42 0.00 04/02/13 0.00
12.08 12.08 177.35 0.00 01/11/14 0.00
0.00 0.00 56.83 0.00 10/11/11 0.00
277.39 277.39 277.39 7.39 09/28/14 181 739459.00
9.97 9.97 150.52 0.00 02/26/14 0.00
0.00 0.00 0.56 0.00 01/23/13 0.00
2.89 2.89 60.37 0.00 01/16/14 0.00
4.63 4.63 45.57 0.00 11/14/13 0.00
0.00 0.00 12.98 0.00 01/16/14 0.00
0.61 0.61 23.76 0.00 08/22/13 0.00
0.00 0.00 21.79 0.00 08/06/13 0.00
0.00 0.00 11.71 0.00 04/28/13 0.00
0.00 0.00 10.27 0.00 08/24/13 0.00-0.03 -0.03 26.15 0.00 01/21/13 0.00-0.03 -0.03 27.11 0.00 01/19/13 0.00-0.03 -0.03 33.12 0.00 04/15/13 0.00-0.03 -0.03 30.85 0.00 04/15/13 0.005.07 5.07 31.95 0.00 02/21/13 0.00
-0.03 -0.03 1.17 0.00 05/02/13 0.00-0.03 -0.03 34.20 0.00 01/22/13 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 0.00 37.82 0.00 01/09/13 0.000.00 0.00 28.23 0.00 04/15/13 0.00
0.00 0.00 1.32 0.00 11/28/11 0.00
0.00 0.00 0.07 0.00 04/29/11 0.00
0.00 0.00 0.07 0.00 07/15/11 0.00
-0.03 -0.03 0.01 0.00 01/19/13 0.00
-0.03 -0.03 0.03 0.00 01/18/13 0.00
0.00 0.00 136.37 0.00 08/25/12 0.00
0.00 0.00 41.62 0.00 06/28/13 0.00
0.00 0.00 21.09 0.00 10/31/13 0.00
12.96 12.96 12.96 0.00 06/22/14 83 0.00
0.00 0.00 12.12 0.00 01/21/13 0.00
5.83 5.83 15.35 0.00 03/31/13 0.00
0.00 0.00 10.98 0.00 03/07/13 0.00
10.47 11.17 11.17 0.00 07/26/14 117 0.00
10.69 11.39 11.39 0.00 06/08/14 69 0.00
10.73 11.42 11.42 0.00 07/26/14 117 0.00
0.32 0.32 18.02 0.00 10/08/13 0.00
0.00 0.00 10.74 0.00 04/17/13 0.00
0.00 0.00 8.63 0.00 11/21/13 0.00
3.66 11.79 11.79 0.00 05/22/14 52 0.00
11.58 11.58 11.58 0.00 07/26/14 117 0.00
213.89 213.89 213.89 0.00 10/07/14 190 0.00
159.42 159.42 159.42 0.00 09/29/14 182 0.00
10.06 10.06 10.06 0.00 07/26/14 117 0.00
12.44 12.44 12.44 0.00 02/03/15 309 0.00
12.79 12.79 12.79 0.00 01/16/15 291 0.00
12.16 12.16 12.16 0.00 01/18/15 293 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
1.01 1.01 13.48 0.00 10/27/12 0.00
0.00 0.00 13.92 0.00 10/26/13 0.000.00 0.00 42.59 0.00 09/30/13 0.00
0.00 0.00 46.91 0.00 10/22/13 0.002.16 2.16 4.30 0.00 10/30/13 0.000.00 0.00 40.28 0.00 04/09/13 0.00
0.11 0.11 37.75 0.00 04/17/13 0.000.00 0.00 1.99 0.00 03/13/14 0.000.00 0.00 18.25 0.00 03/07/14 0.000.00 0.00 49.59 0.00 10/28/13 0.00
0.63 0.63 2.51 0.00 03/07/14 0.00
0.00 0.00 7.42 0.00 12/21/13 0.00
0.00 0.00 4.07 0.00 01/17/14 0.00
0.00 0.00 16.59 0.00 06/24/13 0.00
-3.36 -3.36 -3.39 0.00 07/15/11 0.00
0.00 0.00 1.75 0.00 12/21/13 0.00
0.00 0.00 3.91 0.00 03/24/14 0.0010.98 10.98 10.98 0.00 12/26/12 0.00
0.02 0.02 0.02 0.00 03/15/14 0.00
0.00 0.00 105.16 0.00 04/10/13 0.00
0.00 0.00 -0.80 0.00 04/10/13 0.00
0.00 0.00 17.96 0.00 07/19/13 0.00
2.25 2.25 2.25 0.00 03/31/13 0.00
0.00 0.00 26.97 0.00 09/02/13 0.00
0.00 0.00 26.27 0.00 11/03/13 0.00
0.00 0.00 21.40 0.00 07/20/13 0.000.00 55.83 464.93 0.00 09/30/13 0.001.25 1.25 171.02 0.00 04/11/13 0.00
68.05 143.21 982.20 0.00 02/22/14 0.00
0.00 41.49 0.00 10/12/13 0.00
50.58 50.58 50.58 0.00 10/12/13 0.000.00 12.63 61.00 0.00 10/17/13 0.00
799.19 834.39 834.39 38.22 02/05/15 311 3821812.07
416.77 445.12 445.12 16.59 12/09/14 253 1658559.09
37.34 328.98 328.98 3.59 06/13/14 74 358536.29
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
1.88 1.88 29.47 0.00 12/03/13 0.00
3.24 3.24 48.65 0.00 01/20/14 0.000.60 0.60 259.90 0.00 07/29/13 0.00
7.29 7.29 0.14 08/08/14 130 13965.598.37 8.37 0.19 09/05/14 158 19473.18
210.70 317.72 733.37 0.00 03/04/14 0.00318.57 359.63 359.63 17.48 02/24/15 330 1747852.66
0.94 0.94 0.94 0.04 02/05/15 311 4325.45183.55 233.68 233.68 4.06 07/27/14 118 406109.19
13.42 13.42 13.42 0.57 01/12/15 287 56745.52
10.21 10.21 10.21 0.53 03/18/15 352 52951.4818.23 18.23 18.23 0.89 02/25/15 331 88871.79
0.70 0.70 0.70 0.00 11/30/13 0.00
207.52 177.27 177.27 2.11 06/20/14 81 211477.73
9.91 9.91 9.91 0.48 02/20/15 326 47591.12
11.88 11.88 11.88 0.00 03/13/15 347 0.00
0.08 0.08 0.08 0.00 07/25/11 0.00
-0.15 -0.15 -0.15 0.00 01/28/13 0.00
0.00 0.05 0.05 0.00 11/30/10 0.00
0.05 0.69 0.69 0.00 03/11/13 0.00
2.07 31.37 31.37 0.00 06/20/10 0.00
1.77 26.91 26.91 0.00 03/31/10 0.00
1.43 21.66 21.66 0.00 03/31/10 0.00
0.00 0.00 0.00 0.00 02/22/13 0.00
0.00 0.00 0.00 0.00 01/31/13 0.00
0.00 0.00 0.00 0.00 10/15/12 0.00
2.27 2.36 2.36 0.00 03/23/12 0.00
0.00 0.00 56.53 0.00 08/29/13 0.00
0.10 1.54 1.54 0.00 12/05/12 0.00
0.00 0.00 0.00 0.00 02/28/13 0.00
0.09 1.41 1.41 0.00 12/24/12 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 0.00 29.36 0.00 07/09/13 0.000.33 0.33 0.33 0.02 02/23/15 329 1611.98
0.06 0.06 0.00 02/26/15 332 271.350.13 0.13 0.01 03/24/15 358 690.14
0.85 0.85 0.85 0.04 03/25/15 359 4476.372.48 2.48 2.48 0.03 06/20/14 81 2961.710.21 0.21 0.21 0.01 03/31/15 365 1153.79
1.71 1.83 1.83 0.02 06/27/14 88 2366.980.40 0.40 0.40 0.02 03/21/15 355 2072.52
1.38 1.38 1.38 0.07 03/21/15 355 7190.77
0.69 0.69 0.69 0.04 03/13/15 347 3511.690.69 0.69 0.69 0.03 01/07/15 282 2853.88
0.00 0.00 0.00 0.00 05/06/13 0.00
3.69 3.69 3.69 0.00 06/21/12 0.00
172.90 172.90 172.90 5.17 10/20/14 203 516922.71
31.55 31.55 31.55 0.99 10/30/14 213 98985.71
151.66 157.69 157.69 4.55 10/13/14 196 455196.67
-0.08 -0.08 -0.08 0.00 03/31/11 0.00
0.00 0.00 0.00 0.00 06/06/11 0.00
2.97 2.97 2.97 0.00 05/09/12 0.00
-0.24 -0.24 -0.24 0.00 03/26/10 0.00
422.12 527.43 527.43 14.37 10/02/14 185 1437047.49
0.00 0.00 0.00 0.00 09/21/12 0.00
0.41 0.41 0.41 0.00 01/24/12 0.00
0.94 0.94 0.94 0.00 01/20/14 0.00
272.86 272.86 272.86 3.38 06/23/14 84 337569.41
0.00 0.00 0.00 0.00 10/25/12 0.00
0.00 0.00 0.00 0.00 06/19/11 0.00
0.00 0.00 0.00 0.00 09/01/11 0.00
0.00 0.00 0.00 0.00 03/12/11 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.32 0.32 0.32 0.00 06/30/11 0.00
-0.06 -0.06 82.56 0.00 02/03/14 0.00-0.48 -0.48 -0.48 0.00 06/04/12 0.00
0.00 0.00 0.00 0.00 12/21/12 0.000.00 0.00 0.00 0.00 12/21/12 0.00
-1.82 -1.82 308.04 0.00 07/10/13 0.000.08 0.08 0.08 0.00 10/19/12 0.00
38.83 232.92 232.92 3.19 07/02/14 93 319023.13
170.84 170.84 170.84 0.00 03/23/12 0.00
0.00 0.00 0.00 0.00 03/29/12 0.00
13.75 13.75 229.41 0.00 03/25/14 0.00
0.00 0.00 0.00 0.00 11/13/12 0.00
-2.06 -2.06 312.16 0.00 02/12/14 0.00
0.00 0.00 55.17 0.00 09/15/13 0.00-0.55 -0.55 -0.55 0.00 10/30/14 213 0.000.00 0.00 0.00 0.00 11/24/10 0.00
4.60 4.60 4.60 0.00 02/09/13 0.00
2.87 3.97 3.97 0.05 06/29/14 90 5258.890.96 0.96 0.00 05/01/14 31 438.34
-0.35 -0.35 -0.35 0.00 06/02/09 0.00-28.93 -28.93 -28.93 0.00 08/25/11 0.00
1.60 1.60 1.60 0.00 06/15/11 0.00-3.05 -3.05 -3.05 0.00 03/24/11 0.00
7.24 7.24 0.00 03/07/14 0.00
-0.52 -0.52 59.86 0.00 04/12/13 0.00
-14.94 -14.94 -14.94 0.00 04/12/13 0.00
3.04 3.04 3.04 0.00 03/30/10 0.00-29.69 -29.69 241.41 0.00 10/15/13 0.00
-3.55 -3.55 -3.55 0.00 01/09/11 0.00-0.02 -0.02 -0.02 0.00 07/22/10 0.00
-1.35 -1.35 -1.35 0.00 12/07/10 0.00
-1.51 -1.51 -1.51 0.00 08/06/11 0.00
9.30 83.12 83.12 0.37 04/30/14 30 36723.12
22.19 22.19 22.19 1.11 03/05/15 339 110793.38
0.00 0.00 0.00 0.00 04/05/11 0.00-0.04 -0.04 -0.04 0.00 03/15/14 0.00
0.00 0.00 0.00 0.00 05/06/13 0.00-0.58 -0.58 -0.58 0.00 03/18/11 0.00
IDC Capitalised No of days
Expenditure during the
year 2014-15
Total Expenses up to year 31.03.15
Total Expenses 31.03.15
Date of commissioning / completion
IDC Transfer to fixed assets
0.00 0.00 24.49 0.00 05/07/13 0.000.00 1.15 1.15 0.00 09/03/12 0.004.13 4.13 0.23 0.00 09/16/13 0.000.00 25.24 25.24 0.00 03/30/12 0.00
-13.62 -13.62 -13.62 0.00 02/01/12 0.000.00 0.00 0.00 0.00 04/06/11 0.002.22 2.22 2.22 0.00 07/13/12 0.00
0.19 2.82 2.82 0.00 05/18/12 0.000.00 0.00 0.00 0.00 12/24/11 0.000.00 0.00 0.00 0.00 07/27/12 0.000.00 0.00 4.08 0.00 05/24/13 0.000.49 0.50 0.50 0.01 07/03/14 94 686.524.55 5.71 5.71 0.30 03/17/15 351 29509.80
33.47 33.47 33.47 0.74 08/29/14 151 74434.11
0.00 0.00 11.83 0.00 03/24/14 0.00
0.15 0.15 56.36 0.00 09/15/13 0.00
5.81 97.59 97.59 0.00 08/07/14 129 0.00
9.66 9.66 52.17 0.00 03/08/14 0.00
36.60 41.45 41.45 0.00 08/08/14 130 0.00
13.68 13.68 13.68 0.00 12/04/14 248 0.00
178.70 178.70 0.00 05/17/14 47 0.00
4.20 4.20 44.25 0.00 07/10/13 0.00
0.00 44.76 0.00 09/15/13 0.00
30817.44 102582.53 567264.91 3837.19 383718532.90
3837.19
3.74%0
0.000.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.00
0.000.000.000.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.00
IDC Transfer to WIP
IDC Transfer to WIP
0.00
0.00
0.00
0.000.000.000.000.00
0.00
0.00
0.00
0.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
IDC Transfer to WIP
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.00
0.00
0.000.00
0.000.000.00
0.00
IDC Transfer to WIP
0.000.000.000.00
0.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
IDC Transfer to WIP
0.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.00
0.000.00
0.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.000.000.000.000.000.00
IDC Transfer to WIP
0.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.00
0.000.000.000.000.000.00
0.00
IDC Transfer to WIP
0.00
0.00
0.000.000.000.000.000.000.000.000.000.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.000.000.000.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.00
IDC Transfer to WIP
0.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.00
0.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.000.00
0.000.000.00
0.00
0.000.000.00
0.00
0.00
0.000.000.00
0.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.00
0.000.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.000.00
0.000.000.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.000.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.00
0.00
0.000.00
0.000.000.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.000.00
0.00
0.000.000.000.00
0.00
0.00
0.000.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.000.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.000.000.00
0.000.00
0.000.00
0.000.00
0.00
0.00
0.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.000.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.000.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.000.00
0.00
0.000.000.000.00
0.00
0.00
0.00
0.000.000.00
0.000.00
0.00
IDC Transfer to WIP
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.00
0.00
0.000.000.00
0.00
0.00
0.000.000.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.00
0.00
0.000.000.000.000.000.00
IDC Transfer to WIP
0.00
0.000.000.000.000.00
0.000.000.000.00
0.00
0.00
0.000.000.000.000.000.000.00
0.000.000.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
0.000.000.00
IDC Transfer to WIP
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.000.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.000.00
0.00
0.00
0.000.00
0.000.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.000.00
0.00
0.00
0.000.00
0.00
0.00
0.000.000.000.000.000.000.000.00
0.000.000.00
0.000.000.000.000.00
0.000.000.000.000.000.000.000.00
0.00
0.000.000.000.000.000.000.000.000.000.00
IDC Transfer to WIP
0.000.00
0.00
0.000.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.00
0.000.00
0.000.000.00
0.000.000.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.00
0.00
0.00
0.000.000.000.000.00
0.000.000.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.00
0.00
0.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.00
IDC Transfer to WIP
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.000.00
0.000.000.00
0.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.00
0.00
0.000.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.000.000.000.00
0.000.00
0.000.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.000.000.000.000.000.000.00
0.000.00
0.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
IDC Transfer to WIP
0.00
0.000.00
0.000.00
0.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.00
0.000.00
0.000.000.000.000.00
0.00
0.00
0.000.000.000.00
0.00
0.00
0.00
0.00
0.000.00
0.000.00
IDC Transfer to WIP
0.000.000.000.00
0.000.000.00
0.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5236089.771331
Office of the Chief Accounts Officer (PPM&RE) AS-16 for the year 2014-2015 ( Rs. In Lakhs)
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.
F.11
(121
)PRELIMANRY WORK
1264.57 1038.53 0.00 1038.53
10.5
0 to
12.
25%
127.19 1.04 0.00 1038.53
LANDCIVIL WORKSPLCC EQUIP. at BHADESAR132kv/33kv, 20/25MVA S/s BHADESAR
Vehicle
3134 Phagi
F.11
(121
)
PRELIMANRY WORK
1255.05 1250.25 0.00 1250.25
10.5
0 to
12.
25%
147.30 1.22 125.02 1125.23
LANDCIVIL WORKSPLCC EQUIP. at PHAGI132kv/33kv, 20/25MVA S/s PHAGI132 kv S/C Line BALAWALA to PHAGIVehicle
F.11
(121
)
PRELIMANRY WORK
1449.15 1148.64 0.00 1148.64
10.5
0 to
12.
25%
140.51 1.15 0.00 1148.64
LANDCIVIL WORKSPLCC EQUIP. at SAMARATHPURA132kv/33kv, 20/25MVA S/s SAMARATHPURA132 kv S/C Line BASERI to SAMARATHPURAVehicle
3143 Dhod
F.11
(121
)
PRELIMANRY WORK
1175.13 2444.62 0.00 2444.62
10.5
0 to
12.
25%
299.00 2.44 0.00 2444.62
PRELIMANRY WORKLANDCIVIL WORKSPLCC EQUIP. at DHOD220 kv/132kv, 1x100MVA S/s DHOD
132 kv S/C Line DHOD to Losal
Code No. & Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
3122 Bhadesar
132 kv S/C Line Nimbhahera-Sawa line to BHADESAR
3139 Samrathpura
220 kv D/C Line Sikar-Kuchamancity line to DHOD
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
3143 Dhod
F.11
(121
)
132 kv S/C Line DHOD to Kachhawa
1175.13 2444.62 0.00 2444.62
10.5
0 to
12.
25%
299.00 2.44 0.00 2444.62
Vehicle
3144 Baroli
PRELIMANRY WORK
1175.13 979.05 0.00 979.05
10.5
0 to
12.
25%
117.25 0.95 97.90 881.15
LANDCIVIL WORKSPLCC EQUIP. at BAROLI132kv/33kv, 20/25MVA S/s BAROLI
Vehicle
3145 Talera
F.11
(121
)
PRELIMANRY WORK
1175.13 1158.33 1158.33
10.5
0 to
12.
25%
138.40 1.13 115.83 1042.50
LANDCIVIL WORKSPLCC EQUIP. at TALERA132kv/33kv, 20/25MVA S/s TALERA132 kv D/C Line Bundi-Kota line to TALERAVehicle
F.11
(121
)
PRELIMANRY WORK
1643.25 1404.54 0.00 1404.54
10.5
0 to
12.
25%
168.27 1.37 140.45 1264.09
LANDCIVIL WORKSPLCC EQUIP. at ROOPWAS132kv/33kv, 20/25MVA S/s ROOPWAS132 kv S/C Line DHOLPUR to ROOPWASVehicle
F.11
(75)
400 kv DC line Banswara to Udaipur (QMC)
162950.98 13051.55 3060.45 16112.00 11.75 to 12 1779.47 128.18 0.00 16112.00
400 kv DC line Banswara to Chittorgarh (QMC)400 kv DC line Udaipur to Jodhpur(New)TMC400 kv SC line Chittorgarh to Bhilwara TMC
400 kv DC line Ajmer to Bhilwara (TMC)400 kv DC line I/C Jodhpur(New) TMC
220 KV D/C I/C Line Udaipur ZC220 KV D/C I/C Line Chittorgarh ZC220 KV D/C I/C Line Jodhpur(new) ZC
F.11
(121
)
132 kv S/C Line Hindaun-Gangapur line to BAROLI
3161 Roopwas
3533 Banswara
220 KV D/C Line Banswara to Banswara S/S I/C ZC
400/220kv 2x315 mva at Udaipur with line Reactor
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(75)
Land Cost for Udaipur 162950.98 13051.55 3060.45 16112.00 11.75 to 12 1779.47 128.18 0.00 16112.00
Civil Work AT UdaipurWorkShop & Lab Test at Udaipur
Land Cost for Jodhpur(New)Civil Work at Jodhpur(New)WorkShop & Lab Test at Jodhpur(New)
Land Cost for ChittorgarhCivil Work at ChittorgarhWorkShop & Lab Test at ChittorgarhExt. Bay 400 kv Bhilwara400 kv DC line Suratgarh to JJN QMC
1018174.14 26765.23 12597.65 39362.88 11.75 to 12 3286.61 299.15 0.00 39362.88
F.11
(146
)
400 kv DC line JJN to JPR (N) TMC
400 kv DC line Suratgarh to BKN TMC400 kv SC line BKN to Merta TMC220 kv DC line I/C JJN ZC220 kv DC line I/C JPR(N) ZC
Land for JhnujhnuCivil Works for JJNWork Shop & Lab. At JJN
Land for JPR(N)Civil Works for JPR(N)Work Shop & Lab. At JPR(N)Ext. Bay 400 kv BikanerExt. Bay 400 kv MERTAExt. Bay for line termination
F.11
(134
)
765 kv line 2xSC Dhara to Phagi QBC
274462.03 100233.71 20753.97 120987.68 11.75 to 12 13166.46 1110.75 0.00 120987.68
400 kv DC line Kalisindh to Dhara QMC
400 kv DC line Chabra to Dhara QMC400 kv DC line Phagi to Ajmer TMC
3533 Banswara
400/220kv 2x315 mva at Jodhpur(new) with line Reactor
400/220kv 2x315 mva at Chittorgarh with line Reactor
3535 Suratgarh
STPS
400/220kv 2x315 mva at JJN with line Reactor
400/220kv 2x315 mva at JPR(N) with line Reactor
3536 Chabra Kalisindh
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(134
)
400 kv DC line Phagi to Heerapura TMC
274462.03 100233.71 20753.97 120987.68 11.75 to 12 13166.46 1110.75 0.00 120987.68
220 kv DC line Kalisindgh to Jhalawar ZC220 kv DC line Ajmer-Bewar to Ajmer ZC
220 kv DC line Ajmer-KIshangarh to Ajmer ZC
Land for DharaCivil Works for DharaWork Shop & Lab. At Dhara
Land for PhagiCivil Works for PhagiWork Shop & Lab. At Phagi400/220kv 2x315 mva at AjmerLand for AjmerCivil Works for AjmerWork Shop & Lab. At AjmerExt. Bay 400 kv HeerapuraExt. Bay 220 kv JhalawarPLCC
4181 Dechu
F.11
(150
)BU
D201
1
Preliminary Work
13110.88 0.00 499.92 499.92 12 38.13 3.12 0.00 499.92
LandCivil WorksPLCC -220 Kv Ramgarh-Dechu linePLCC -220 Kv Dechu-TinwariPLCC -220 Kv Dechu-PhalodiPLCC -132 Kv Dechu-Pokaran
Ext. Bay at 220 Dechu S/sExt. Bay at 220 Phalodi S/sExt. Bay at 220 Amarsagar S/s220 kv DC line Ramgarh to Dechu220 kv SC line Dechu to Tinwari220 kv DC line Dechu to Phalodi132 kv SC line Dechu to Pokran
3536 Chabra Kalisindh
400/765kv 2x1500 mva at Dhara with line Reactor
765/400kv 2x1500 mva at Phagi with Bus Reactor
220/132 kv S/s 2x100 MVA Dechu
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
4181 Dechu
F.11
(150
)BUD
2011
132 kv SC line Dechu to Phalodi
13110.88 0.00 499.92 499.92 12 38.13 3.12 0.00 499.92
Vehicle
F.11
(171
)/FD
/BU
D201
3Preliminary Work
26220.38 0.00 1170.00 1170.00 12 89.24 7.31 0.00 1170.00
Civil Works for Sitapura (New)
220 kv DC line Sanganer-Sitapura to Sitapura UG220 kv DC line I.G Ngr to Sitapura UG220 kv DC I.C Sitapura to Sitapura 220 kv DC line Sanganer to Chaksu VehiclePreliminary WorkCivil Works for Kunda Ki Dhani
220 kv DC Bassi -Kukas line to KKD220 kv DC line Purana Ghat to Bassi UGVehiclePreliminary WorkCivil Works for MNIT JPR
132 kv S/C cable sys b/w 220KV IGN and 132KV MNIT VehiclePreliminary Work220 Kv S/C XLPE cable Heerapura to NPH
4876 Barli
F.11
(149
)
PRELIMANRY WORK at Barli
5201.36 780.21 0.00 780.21 12.25 95.56 6.83 0.00 780.21
LAND for BarliCIVIL WORKS at Barli
132 kv D/C Line Jodhpur-PS8 to Barli132 kv D/C Line CHB-Soorsagar to Barli132 kv D/C Line Tinwari-Soorgar to BarliPLCC at 220 kv BarliPLCC at 132 kv BarliOptical F. CableVehicle
4480 Jaipur III
220/132kv 1x160 mva at Sitapura (New)
220/132kv 1x160 mva at KKD UG
132/33kv 2x50 MVA at MNIT(JPR)
220 /132kv, 2x100 & 132/33kv 2x50 MVA S/s Barli220 kv D/C Line Jodhpur (400) toJodhpur (220) I/C-II for Barli
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(149
)
PRELIMANRY WORK at Jhalamand
8407.05 1261.06 0.00 1261.06 12.25 154.46 11.03 0.00 1261.06
LAND for JhalamandCIVIL WORKS at Jhalamand
132 kv D/C Line Jodhpur(400) Bhadwasia132 kv D/C Line Jodhpur-PS8 at JhalamandPLCC at 220 kv JhalamandPLCC at 132 kv JhalamandOptical F. Cable
F.11
(149
)
PRELIMANRY WORK at Kharwad
6451.92 3228.70 0.00 3228.70 12 to 12.25 391.76 28.25 0.00 3228.70
LAND for KharwadCIVIL WORKS at Kharwad
132 kv D/C Line Jodhpur(220) Kharwad
PLCC at 220 kv KharwadPLCC at 132 kv KharwadOptical F. CableVechile
F.11
(149
)
PRELIMANRY WORK at Kuri Bhagtasani
8314.22 0.00 560.00 560.00 12 42.71 3.50 0.00 560.00
CIVIL WORKS at Kuri Bhagtasani
132kv/33kv, Hybrid GIS S/s Kuri Bhagtasani
132 kv D/C XLPE cable Jd-PS8 to CHB
132 kv S/C Line by pass Rd. -Pali & PS-8 Vehicle for Kuri Bhagatasani
4877 Jhalmabad & Bhadwasia
220 /132kv, 2x100 & 132/33kv 2x50 MVA S/s Jhalamand220 kv D/C Line Jodhpur (400) toJodhpur (220) at Jhalamand
4878 Kharwad
220 /132kv, 2x100 & 132/33kv 2x50 MVA S/s Kharwad220 kv D/C Line Jodhpur (400) to Kharwad/Bhawad at Kharwad
132 kv S/C Line Jhakamand-Baori line at Kharwad
4879 Kuri Bhagtasani &
chopsani
220 kv D/C Narrow Base Tower Jd-CHB-Soorsagar
132 kv S/C Cable (und)Jd-Banar to KURI Bhagtasani
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(149
)
PRELIMANRY WORK
6459.03 0.00 430.00 430.00 12 32.80 2.69 0.00 430.00CIVIL WORKS132kv/33kv, 2x50 MVA GIS Pratp Ngr.132 kv D/C Cable CHB and PratapnagarVehicle
F.11
(149
)
PRELIMANRY WORK
8613.27 0.00 580.00 580.00 12 44.24 3.62 0.00 580.00
CIVIL WORKS
132 kv D/C Cable NPH to Eng. College Jdh.
132 kv S/C Cable OPH to Eng. College Jdh.
Vehicle
F.11
(149
)
PRELIMANRY WORK
8297.05 0.00 560.00 560.00 12 42.71 3.50 0.00 560.00
CIVIL WORKS
Ext. Bay at Banar132 kv D/C XLPE Cable Banar to OPH Jd.Vehicle
F.11
(149
)
PRELIMANRY WORK at Aspur
4147.65 2052.74 0.00 2052.74 12 to 12.25 248.39 17.96 0.00 2052.74
LAND for AspurCIVIL WORKS at Aspur
220 kv Feeder Bay at 220kv GSS Padampur220 kv Feeder Bay at 220kv GSS Padampur
220 kv D/C Line Banswara-Debari line at Aspur
132 kv Salumber-Sagwara GSS at Aspur132 kv Salumber-Dhariyawad GSS at AspurPLCC & TELEPHONEVechile
F.11
(149
)
PRELIMANRY WORK at Kuchera
3198.01 639.60 0.00 639.60 12.25 78.34 5.60 0.00 639.60
LAND for KucheraCIVIL WORKS at Kuchera
4880 Pratap Nagar
4882 Eng. Colg Jodhpur
132kv/33kv, 2x50 MVA S/s Eng. College Jdh.
4883 OPH Jodhpur
132kv/33kv, 2x50 MVA S/s Old Ph. House Jd
4884 Aspur
220 /132kv, 2x100 & 132/33kv 2x50 MVA S/s Aspur
220 kv D/C Line Banswara-Debari line from debari to Salumber
4885 Kuchera
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(149
)3198.01 639.60 0.00 639.60 12.25 78.34 5.60 0.00 639.60
132 kv Kuchera-Sanjoo line at KucheraPLCC & TELEPHONEVechile
F.11
(149
)
PRELIMANRY WORK at Bundi
3173.80 2363.65 0.00 2363.65 12.25 289.32 20.68 0.00 2363.65
LAND for BundiCIVIL WORKS at Bundi220 /132kv, 1x100 S/s at Bundi220 kv S/C KTPS-Beawar line GSS Bundi132 kv S/C Talera-Bundi line Bundi132 kv S/S Bundi(220) GSS BundiPLCC & TELEPHONEVechile
F.11
(149
)
PRELIMANRY WORK at Gangapurcity
5382.84 2325.52 0.00 2325.52 12 to12.25 282.77 20.35 0.00 2325.52
LAND for GangapurcityCIVIL WORKS at Gangapurcity220 /132kv, 1x100 S/s at GangapurcityExt. Bay at HindaunExt. Bay at GangapurcityExt. Bay at SapotraExt. Bay at S. Mahaveer ji220 kv D/C Hindaun GSS to Gangapurcity
132 kv S/C Gangapurcity(220) to Sapotra
132 kv S/C Gangapurcity(220) to S. Mahaveer ji
PLCC & TELEPHONE at GangapurcityVechile for Gangapurcity GSS
F.11
(149
)
PRELIMANRY WORK at Manoharpur
4665.15 1669.11 0.00 1669.11 12 to 12.25 202.61 14.60 0.00 1669.11
LAND for ManoharpurCIVIL WORKS at Manoharpur
4885 Kuchera
220 /132kv, 2x100 & 132/33kv 2x50 MVA S/s Kuchera220 kv S/C Line Naguar-Merta line GSS at Kuchera132 kv D/C Line Kuchera-Mundwada line at Kuchera
4887 Bundi
4888 Gangapurcity
132 kv D/C Gangapurcity(220 kv) to Gangapurcity(132 kv)
4889 Manoharpur
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(149
)
220 /132kv, 1x100 S/s at Manoharpur
4665.15 1669.11 0.00 1669.11 12 to 12.25 202.61 14.60 0.00 1669.11
Ext. Bay at KotputliExt. Bay at ShahpuraExt. Bay at Ajeetgarh220 kv D/C Kotputli GSS to Manoharpur132 kv S/C Manoharpur to Shahpura132 kv S/C Manoharpur to AjeetgarhPLCC & TELEPHONE at ManoharpurVechile for Manoharpur GSS
F.11
(149
)
PRELIMANRY WORK at Gajner
4852.54 3619.33 0.00 3619.33 12 to 12.25 439.64 31.67 0.00 3619.33
LAND for GajnerCIVIL WORKS at Gajner220 /132kv, 1x100 S/s at GajnerExt. Bay at Bikaner220 kv D/C Bikaner GSS to Gajner132 kv S/C LILO Pugal Rd. to Gajner132 kv S/C LILO Bhinasar to KolayatPLCC & TELEPHONE at GajnerVechile for Gajner GSS
F.11
(149
)
PRELIMANRY WORK at Padampur
4973.88 3545.95 0.00 3545.95 12 to 12.25 432.65 31.03 0.00 3545.95
LAND for PadampurCIVIL WORKS at Padampur220 /132kv, 1x100 S/s at Padampur
Ext. Bay at Suratgarh,Udyog Vihar, Hanumangarh
220 kv S/C Suratgarh to Padampur220 kv S/C Padampur to Udyog Vihar220 kv S/C Udyog Vihar to HNGPLCC & TELEPHONE at PadampurVechile for Padampur GSS
F.11
(149
)
PRELIMANRY WORK at Kharwa
1261.49 252.30 252.30 12.25 30.90 2.21 0.00 252.30
LAND for KharwaCIVIL WORKS at Kharwa132/33kv, 20/25 MVA S/s at Kharwa132 kv S/C Bewar-Nasirabad Line to KharwaPLCC & TELEPHONE at KharwaVechile for Kharwa GSS
4889 Manoharpur
4890 Gajner
4891 Padampur
4945 Kharwa
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(149
)
PRELIMANRY WORK at Pushkar
1315.73 933.57 0.00 933.57 12.25 114.30 8.17 0.00 933.57
LAND for PushkarCIVIL WORKS at PushkarPLCC EQUIP. at Pushkar132kv/33kv, 20/25MVA S/s Pushkar132 kv S/C Line MDSU-Behrunda to PushkarVehicle for Pushkar GSS
F.11
(149
)
PRELIMANRY WORK at Partapur
1369.97 120.00 120.00 12 9.15 0.75 0.00 120.00
LAND for PartapurCIVIL WORKS at PartapurPLCC EQUIP. at Partapur132kv/33kv, 20/25MVA S/s Partapur
Vehicle for Partapur GSS
F.11
(149
)
PRELIMANRY WORK at Junameetha Khera
1710.68 150.00 150.00 12 11.44 0.94 0.00 150.00
LAND for Junameetha KheraCIVIL WORKS at Junameetha KheraPLCC EQUIP. at Junameetha Khera132kv/33kv, 20/25MVA S/s Junameetha Khera
Vehicle for Junameetha Khera GSS
4955 Sedwa
F.11
(149
)
PRELIMANRY WORK at Sedwa
1207.25 826.00 0.00 826.00 12 to 12.25 99.72 7.23 0.00 826.00
LAND for SedwaCIVIL WORKS at Sedwa132/33kv, 20/25 MVA S/s at Sedwa132 kv S/C Sawa-Sata Line to SedwaPLCC & TELEPHONE at SedwaVechile for Sedwa GSS
4956 Jhajpur
F.11
(149
)
PRELIMANRY WORK at Jhajpur
1385.67 964.66 0.00 964.66 12.25 118.17 8.44 0.00 964.66
LAND for JhajpurCIVIL WORKS at JhajpurPLCC EQUIP. at Jhajpur132kv/33kv, 20/25MVA S/s Jhajpur132 kv S/C Line Deoli to JhajpurVehicle for Jhajpur GSS
4952 Pushkar
4953 PratapNagar.
LILO 132 kv S/C Line Banswara-Sagwara to Partapur
4954 Junameetha
Khera
LILO 132 kv S/C Line Padroo-sindhri to Junameetha Khera
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(149
)
PRELIMANRY WORK at Kachola
1385.67 968.49 0.00 968.49 12.25 116.91 8.47 0.00 968.49
LAND for KacholaCIVIL WORKS at Kachola132/33kv, 20/25 MVA S/s at Kachola132 kv S/C Begod to KacholaPLCC & TELEPHONE at KacholaVechile for Kachola GSS
F.11
(149
)
PRELIMANRY WORK at RIICO Bhilwara
1333.81 799.85 0.00 799.85 12.25 96.65 7.00 0.00 799.85
LAND for RIICO BhilwaraCIVIL WORKS at RIICO Bhilwara132/33kv, 20/25 MVA S/s at RIICO Bhilwara
PLCC & TELEPHONE at RIICO BhilwaraVechile for RIICO Bhilwara GSS
4960 Upani
F.11
(149
)
PRELIMANRY WORK at Upani
1310.57 931.69 0.00 931.69 12.25 114.06 8.15 0.00 931.69
LAND for UpaniCIVIL WORKS at UpaniPLCC EQUIP. at Upani132kv/33kv, 20/25MVA S/s Upani132 kv S/C Line Riri to UpaniVehicle for Upani GSS
4961 Bassi
F.11
(149
)
PRELIMANRY WORK at Bassi
1364.22 957.42 0.00 957.42 12.25 115.57 8.38 0.00 957.42
LAND for BassiCIVIL WORKS at Bassi132/33kv, 20/25 MVA S/s at Bassi132 kv S/C Ajolia Ka Khera to BassiPLCC & TELEPHONE at BassiVechile for Bassi GSS
F.11
(149
)
PRELIMANRY WORK at Daula Kunwa
1180.14 100.00 100.00 12 7.63 0.62 0.00 100.00
LAND for Daula KunwaCIVIL WORKS at Daula KunwaPLCC EQUIP. at Daula Kunwa132kv/33kv, 20/25MVA S/s Daula Kunwa
Vehicle for Daula Kunwa GSS
4957 Kachola
4959 RIICO Bhilwara 132 kv D/C Bhilwara-Hameergarh to RIICO
Bhilwara
4963 Daula Kunwa
132 kv S/C Line Hindaun-Todabhimi to Daula Kunwa
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(149
)
PRELIMANRY WORK at Mahuwa
1315.73 871.20 0.00 871.20 12.25 106.67 7.62 0.00 871.20
LAND for MahuwaCIVIL WORKS at MahuwaPLCC EQUIP. at Mahuwa132kv/33kv, 20/25MVA S/s Mahuwa
132 kv S/C Line Hindaun-Todabhimi to Mahuwa
Vehicle for Mahuwa GSS
F.11
(149
)
PRELIMANRY WORK at Patlisar Fanta
1332.03 905.96 0.00 905.96 12.25 110.98 7.93 0.00 905.96
LAND for Patlisar FantaCIVIL WORKS at Patlisar FantaPLCC EQUIP. at Patlisar Fanta132kv/33kv, 20/25MVA S/s Patlisar Fanta
Vehicle for Patlisar Fanta GSS
4966 Sikrai
F.11
(149
)
PRELIMANRY WORK at Sikrai
1225.33 825.89 0.00 825.89 12.25 101.12 7.23 0.00 825.89
LAND for SikraiCIVIL WORKS at SikraiPLCC EQUIP. at Sikrai132kv/33kv, 20/25MVA S/s Sikrai132 kv S/C Line Todabhimi to SikraiVehicle for Sikrai GSS
4967 Andhi
F.11
(149
)
PRELIMANRY WORK at Andhi
1225.33 824.68 0.00 824.68 12.25 100.96 7.22 0.00 824.68
LAND for AndhiCIVIL WORKS at AndhiPLCC EQUIP. at Andhi132kv/33kv, 20/25MVA S/s Andhi132 kv S/C Line Jamwa Ramgarh-rajgarh to Andhi
Vehicle for Andhi GSS
F.11
(149
)
PRELIMANRY WORK at Sarna Doongar
1207.25 241.45 0.00 241.45 12.25 29.57 2.11 0.00 241.45
LAND for Sarna DoongarCIVIL WORKS at Sarna Doongar132/33kv, 20/25 MVA S/s at Sarna Doongar
PLCC & TELEPHONE at Sarna Doongar
4964 Mahuwa
4965 Patlisar Fanta
132 kv S/C Line Hindaun-Todabhimi to Patlisar Fanta
4968 Sarna Doongar 132 kv D/C Heerapur-VKIA to Rampura Dabri for
Sarna Doongar
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
F.11
(149
)
Vechile for Sarna Doongar GSS
1207.25 241.45 0.00 241.45 12.25 29.57 2.11 0.00 241.45
F.11
(149
)
PRELIMANRY WORK at Paladar
1332.03 110.00 110.00 12 8.39 0.69 0.00 110.00
LAND for PaladarCIVIL WORKS at Paladar132/33kv, 20/25 MVA S/s at Paladar132 kv S/C Sanchore(220) to PaladarPLCC & TELEPHONE at PaladarVechile for Paladar GSS
4971 Malsisar
F.11
(149
)
PRELIMANRY WORK at Malsisar
1492.97 130.00 130.00 12 9.92 0.81 0.00 130.00
LAND for MalsisarCIVIL WORKS at MalsisarPLCC EQUIP. at Malsisar132kv/33kv, 20/25MVA S/s Malsisar
132 kv S/C Line Jhunjhunu(220) to Malsisar
Vehicle for Malsisar GSS
F.11
(149
)
PRELIMANRY WORK at Kaila Devi
1439.32 120.00 120.00 12 9.15 0.75 0.00 120.00
LAND for Kaila DeviCIVIL WORKS at Kaila Devi132/33kv, 20/25 MVA S/s at Kaila Devi 132 kv S/C Karauli to Kaila DeviPLCC & TELEPHONE at Kaila DeviVechile for Kaila Devi GSS
F.11
(149
)
PRELIMANRY WORK at Nangal Sherpur
1385.67 120.00 120.00 12 9.15 0.75 0.00 120.00
LAND for Nangal SherpurCIVIL WORKS at Nangal Sherpur
132/33kv, 20/25 MVA S/s at Nangal Sherpur
PLCC & TELEPHONE at Nangal SherpurVechile for Nangal Sherpur GSS
4976 sapol
F.11
(149
)
PRELIMANRY WORK at Sapol
1396.40 120.00 120.00 12 9.15 0.75 0.00 120.00
LAND for SapolCIVIL WORKS at Sapol132/33kv, 20/25 MVA S/s at Sapol 132 kv S/C Kankroli to Sapol at Sapol
4968 Sarna Doongar
4969 Paladar
4973 Kailadevi
4975 Nangal Sherpur
132 kv S/C Shri Mahaveerji to Nangal Sherpur
Gura
ntee
No.
NAME OF WORKS S. Amt. Rate of Intt.Code No. &
Name of Scheme
O/S as on 31.3.2014
Loan received during the
yearLoan received upto 31.3.15
Intt. Accured 01-04-14 to 31-
03-15
Govt. Guarantee
Commission Due During
2014-15
Repayment during 14-15
O/S as on 31.3.2015
4976 sapol
F.11
(149
)
PLCC & TELEPHONE at Sapol
1396.40 120.00 120.00 12 9.15 0.75 0.00 120.00
Vechile for Sapol GSS
F.11
(149
)PRELIMANRY WORK at Kaminpura
1439.32 120.00 120.00 12 9.15 0.75 0.00 120.00
LAND for KaminpuraCIVIL WORKS at Kaminpura132/33kv, 20/25 MVA S/s at Kaminpura 132 kv S/C Shri Karanpur to KaminpuraPLCC & TELEPHONE at KaminpuraVechile for Kaminpura GSS
4979 Antroli
F.11
(149
)
PRELIMANRY WORK at Antroli
1388.05 120.00 120.00 12 9.15 0.75 0.00 120.00
LAND for AntroliCIVIL WORKS at AntroliPLCC EQUIP. at Antroli132kv/33kv, 20/25MVA S/s Antroli132 kv S/C Line Jhunjhunu(220) to AntroliVehicle for Antroli GSS
4980 Thoi
F.11
(149
)
PRELIMANRY WORK at Thoi
1396.40 120.00 120.00 12 9.15 0.75 0.00 120.00
LAND for ThoiCIVIL WORKS at Thoi132/33kv, 20/25 MVA S/s at ThoiLILO 132 kv D/C Shri Madhopur to ThoiPLCC & TELEPHONE at ThoiVechile for Thoi GSS
F.11
(149
)
PRELIMANRY WORK at Sanwad
1385.67 120.00 120.00 12 9.15 0.75 0.00 120.00
LAND for SanwadCIVIL WORKS at Sanwad132/33kv, 20/25 MVA S/s at SanwadLILO 132 kv S/C Mavli to SanwadPLCC & TELEPHONE at SanwadVechile for Sanwad GSS
TOTAL 181263.48 41661.98 222925.47 412.00 23641.94 1858.34 479.20 222446.27
4977 Kamipura
4981 Sanwad
128.23
148.52
141.66
301.44
Total Intt and
gaurantee comm 2014-
15
Total Intt and
gaurantee comm 2014-
15
301.44
118.20
139.53
169.64
1907.65
Total Intt and
gaurantee comm 2014-
15
1907.65
3585.76
14277.21
Total Intt and
gaurantee comm 2014-
15
14277.21
41.25
Total Intt and
gaurantee comm 2014-
15
41.25
96.55
102.39
Total Intt and
gaurantee comm 2014-
15
165.49
420.01
46.21
Total Intt and
gaurantee comm 2014-
15
35.49
47.86
46.21
266.35
83.94
Total Intt and
gaurantee comm 2014-
15
83.94
310.00
303.12
217.21
Total Intt and
gaurantee comm 2014-
15
217.21
471.31
463.68
33.11
Total Intt and
gaurantee comm 2014-
15
122.47
9.90
12.38
106.95
126.61
Total Intt and
gaurantee comm 2014-
15
125.38
103.65
122.21
123.95
8.25
Total Intt and
gaurantee comm 2014-
15
114.29
118.91
108.35
108.18
31.68
Total Intt and
gaurantee comm 2014-
15
31.68
9.08
10.73
9.90
9.90
9.90
Total Intt and
gaurantee comm 2014-
159.90
9.90
9.90
9.90
9.90
25500.28
RAJASTHAN RAJAY VIDYUT PRASARAN NIGAM LTD.Statement Showing the position of Plan Provisions and Expenditure on
EHV on-going/New Schemes (Line & Sub - Station) for the Year 2014-15 (Upto the month March 2015)
Scheme PFC information 14-15 Fina
nced
by
1 2 3 4 5 6 6 7 8 9 101 07203035 Jaipur City EHV Network Strengthening Schemes - I 22508.00
PFC
,Ltd
.New
Del
hi
1789685703.000.000 214881428.00 15020576.00 229902004.00
2 07203036 SE (TCC-VII) Udaipur 3413.00237760036.00
4615186.00 29197419.00 2037886.00 31235305.00
3 07203040 SE (TCC-VII) Udaipur 1253.0073830000.00
0.00 12.50 8758794.00 69817.00 8828611.00
4 07203042 SE (TCC-II) Jaipur 2979.00
240360397.00
0.00
12.25
29175261.00 230000.00 29405261.00
SE (TCC-II) Jaipur 1175.00 0.00
5 07203043 SE(TCC-VII) Udaipur 1322.7788308302.00
12.50 10592720.00 742247.00 11334967.00
07203044 7191.00 96529813.00 12.50 9090992.00 844638.00 9935630.00
6 07203045 CE (T&C) Ajmer / Jodhpur 123.17
94687355.00
147316805.00 12.50 25709933.00 2117535.00 27827468.00
7 07203046 CE (T&C) Ajmer / Jodhpur 135.11
517580232.00
27512184.00 12.50 67288574.00 4769555.00 72058129.00
8 07203047 228.61
226514768.00
491210.00 12.50 28360608.00 1986303.00 30346911.00
9 07005012 BBMB 7454.00
357612385.00
59741660.00 12.50 49772104.00 49772104.00
Total 47782.660 3626339178.00 336206858.00 472827833.00 27818557.00 500646390.00
S.No.
Loan No. A
nnua
l Pla
n20
14-1
5 Pr
opos
ed
EstimatedCost (Rs. in Lacs) O
peni
ng B
al. a
s on
1.4
.201
4 Loanreceivedduring
the year
Rateof
interest in %
(Gross) Total Interest
accrued for 14-15 Guarantee
commission
Total Interest + Guarantee
Com.
SE (TCC- I) /SE( 400 KV Design)Jaipur
12.25 to 12.50
220 KV S/C Debari Banswara Line with 220/132KV,2x100 MVA S/S at Madri and associated line
12.25 to 12.50
For stringing of 220 KV Banswara Debari Line 2nd ckt. Line alongwith its connectivity to 132 KV S/S Salumber in Rajasthan
220 KV Bassi-Phulera Line at Mahindra’sSpecial Economic ZONE132 KV D/c Line from 220 KV SEZ-I to 132 KV SEZ-Iwith 132 KV GSS at SEZ-I(Phase-I) Mahindra’s Special Economic ZONEConstruction of 20/25 MVA,132/33 Kv S/S at Rasoolpur and associated transmission line in Chitorgarh-Nimbahera
Construction of 220/132 KV GSS at Baithwasia (Jodhpur) & 220 kv interconnections at 400/220 Kv S/S Kotputli(PGCIL)
SE (TCC-II) Jaipur &SE (TCC-IV) Jodhpur
Consruction of 132 KV S/S ( 8 nos) and associated transmission line ( Sultanpur/Mangrol / Khetusar / Hatundi / Kirmarsariya / Anandpur Kaloo / Subhash Nagar / Sawalpura)
Consrtruction of Nine nos.20/25 MVA, 132/33KV, S/S and associated transmissionline ( Reengus / Partappura / Raipur /Dayalpura /Aburoad / Lalamdesar Bada/ Moondsar/ Bapawar/ Dhigaria Bhim)
Establishment of 220 kv s/s at Mandalgarh & Chonkarwada and upgradation of existing 132 kv s/s at Nadbai,Tehandesar,Badnu & Sikrai and associated transmission line in Raj.
Renovation, Modernization and Upratingof Bhakra Left Bank Power Hounse of BBMB
Loan document execute by
GOR
RAJASTHAN RAJAY VIDYUT PRASARAN NIGAM LTD.Statement Showing the position of Plan Provisions and Expenditure on EHV on-going/New Schemes (Line & Sub - Station) for the Year 2014-15 (Upto the month March 2015)
Name of Scheme Name of Works Financed by1 2 3 4 5 6 7 8 9
1 Power Evacuation System from Wind Power Project in Banswaraand Pratapgarh Areas NABARD 1,050,000,000 1,653,000,000 11.25% 195,693,112 15,934,281 211,627,393
220kv/132kv, 1X100 MVA GSS at Hamirgarh(Dist. Bhilwara) (Upgradation)
220kv/132kv, 1X100 MVA GSS at Danta Ramgarh(Dist. Sikar) (Upgradation)
220kv/132kv, 1X100 MVA & 132/33kv, 1X20/25 MVA GSS at Amberi (Dist. Udaipur)
Power Evacuation System for Kawai Super Critical TPS
220kv/132kv, 1X160 MVA & 132/33kv, 1X40/50 MVA GSS at Vatika (Dist. Jaipur)
220/130kv, 1X160 MVA & 132/33kv, 1X40/50 MVA GSS at Ganor (Dist.Jaipur)
2 220 KV GSS at Niwana Dist. Jaipur NABARD 0 300,000,000 10.85% 1,783,623 375,000 2,158,623132 KV GSS at Masuda Dist Ajmer132 KV GSS at Ghatol Dist Banswara132 KV GSS at Kanera Dist. Chittorgarh132 KV GSS at Parbatsar Dist Nagaur132 KV GSS at Sherera Dist Bikaner132 KV GSS at Tibbi Dist Hanumangarh132 KV GSS at Ajasar Dist Jaisalmer132 KV GSS at Narainpur Dist Alwar132 KV GSS at Bhanwargarh Dist Baran132 KV GSS at Batoda Dist Sawaimadhopur132 KV GSS at Panchu Dist Bikaner132 KV GSS at Nagal Pyariwas Dist Dausa132 KV GSS at Pahari Dist Bharatpur
1,050,000,000 1,953,000,000 197,476,735 16,309,281 213,786,016
S.No.
Loan No.
Name ofCircle /Office
Annual Plan
2014-15Proposed Prov.
Annual Paln
2014-15 proposed prov.
Outstanding as 31.03.2014
Loanreceivedduring
the yearRate of
Intt.
Interestaccrued
01-04-14 to 31-03-15
Guarantee commission
2014-15
Total Interst + Guarantee Commission
Loan of Rs.481.54
Crore
To Provide connectivity with PGCILs 400/220kv GSS Jaipur (South)
Loan of Rs. 164.62
Crore
TERM LOAN FROM HUDCO FOR CIVIL WORKSDETAILS OF EXPENDITURE INCURRED ON RESIDENTIAL BUILDING REST HOUSE AT VARIOUS GSS
Name of Scheme Name of Works Financed by1 2 3 4 5 6 7 8 9
1 220KV GSS GANGAPURCITY HUDCO 0 215,441,000 10.75% 12,195,491 1,104,534 13,300,0252 132 KV GSS MANDANA3 132 KV GSS BAPAWADA KOTA4 132 KV GSS KAILA DEVI5 132 KV GSS SULTANPUR
6 132 KV GSS RASHMI7 132 KV GSS BASSI8 132 KV GSS SAPOL UDAIPUR9 132 KV GSS SANWAD
10 132 KV GSS DAKAN KOTDA
11 132 KV GSS PUSHKAR12 132 KV GSS PRATAPURA13 400 KV GEGAL AJMER14 220KV GSS HAMIRGARH15 132 KV GSS RAIPUR
16 132 KV GSS KACHOLA17 220KV GSS DHIGARIA BHIM
JAIPUR-I18 220KV GSS LALSOT19 220KV GSS SIKARI
20 400KV GSS BABAI21 220KV GSS MANOHARPURA22 220KV GSS KUNDA KI DHANI23 132 KV GSS THOI24 132 KV GSS NANGLI25 132 KV GSS MALISAR26 132 KV GSS RIICO REENGUS
27 220 KV GSS NADBI28 132 KV GSS SARMATHPURA29 132 KV GSS PINAN30 132 KV GSS DHOLA KUWA
31 132 KV GSS BADAON32 400 KV GSS AKAL33 220 KV GSS DECHU34 132 KV GSS SANWREJ JODHPUR35 400 KV GSS BHADALA36 400KV GSS RAMGARH37 220 KV GSS NPH
38 132 KV GSS NAWA39 220 KV GSS GAJNER40 132 KV GSS PATLISAR FANTA41 220 KV GSS PADAMPUR BIAKNER42 132 KV GSS GOLUWALA43 220 KV GSS KAMINPURA44 132 KV GSS DAYALPURA
S.No.
Name ofCircle /Office
Annual Plan
2014-15Proposed Prov.
Annual Paln
2014-15 proposed prov.
Outstanding as 31.03.2014
Loanreceivedduring
the yearRate of
Intt.
Interestaccrued
01-04-14 to 31-03-15
Guarantee commission
2014-15
Total Interst + Guarantee
Commission
Term Loan of Rs. 64
Crore
XEN (CIVIL- TR.II),
JAIPUR
XEN (CIVIL-TR.),
ALWAR
Term Loan of Rs. 64
Crore
RAJASTHAN RAJAY VIDYUT PRASARAN NIGAM LTD.Statement Showing the position of IDC work out on EHV expenditure on
on-going/New Schemes (Line & Sub - Station) for the Year 2014-15
Name of Scheme Name of Works Financed by
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 349.81 349.81 349.81 9.63% 467453693.00 349811.00 467803504.00
2 399.95 399.95 399.95 10.47% 536073639.00 34995599.00 571069238.00
3
395.50 395.50 395.50 9.74% 385217000.0039375000.00 476421500.00
54.50 54.50 54.50 9.51% 51829500.00
257.40 257.40 257.40 9.30% 239382000.0048125000.00 562551000.00
292.60 292.60 292.60 9.40% 275044000.00
4 750.00
200.00 200.00 9.07% 181400000.00
65625000.00 808511000.00323.60 323.60 10.25% 331690000.00
226.40 226.40 10.15% 229796000.00
5 700.00300.30 300.30 8.65% 61203608.00
8750000.00 78518139.00399.70 399.70 8.69% 8564531.00
812654139.00 74375000.00 887029139.00
S.No.
Loan No.
Name ofCircle /Office
Project/EHV
SchemeCode No.
Annual Paln
2014-15 proposed
prov.
Outstanding as
31.03.2014(` in Crore)
Loanreceivedduring
the year(` in Crore)
Loan Outstanding
as on 31.03.15
(` in Crore)
Rate of Intt.
Interestaccrued
01-04-14 to 31-03-15
(Amt in `)
Govt.Guarantee commission
Due2014-15
(Amt. in `)
Total Interest &GuaranteeComm.2014-15
RVPN Bonds2010-11
PrivatePlacement
RVPN Bonds2011-12
PrivatePlacement
RVPN Bonds2012-13
PrivatePlacement
RVPN Bonds2013-14
PrivatePlacement
RVPN Bonds2014-15
PrivatePlacement
Rs. in lacs
S.N. ParticularTotal (4+5)
Statement of IDC Capitalised for thr year 2013-141 2 3 4 5 6
0 TCC OP. BAL CLO. BAL Code No. Head FIXED ASSETS IDC 1 REC 181263.48 41661.98 222925.47 23641.94 1858.34 25500.28 I 62457.54 60271.57 DONE ADDITION 2013-14 CAPITALISED2 NABARD 10500.00 19530.00 30030.00 1974.77 163.09 2137.86 II 9365.91 14383.29 DONE3 HUDCO 0 2154.41 2154.41 121.95 11.05 133.00 III 34238.14 53471.54 10.207 Building #DIV/0!4 ADB 0.00 IV 54281.85 50524.63 DONE5 HUDCO 0 425.26 425.26 0.65 0.00 0.65 V 42386.39 61925.86 DONE 10.401 Other civil works #DIV/0!6 CBI 0.00 VI 5669.29 5660.53 DONE4 PFC 32687.27 2764.65 35451.92 4230.56 278.19 4508.74 VII 12400.02 11317.18 DONE 10.542 Plannt & machinary #DIV/0!5 Bond 75000.00 70000.00 145000.00 8126.54 743.75 8870.29 VIII 5224.15 9410.87 DONE
TOTAL 299450.75 136536.31 435987.06 38096.40 3054.42 41150.82 IX 48636.03 71244.20 DONE 10.601 Line #DIV/0!PFC(BBMB) 3576.12 597.42 4173.54 497.72 0.00 497.72 Total 274659.30 338209.68G.TOTAL 303026.87 137133.72 440160.60 38594.12 3054.42 41648.54 Total Assets 0 0 841678598
*** PFC(Total) 36263.39 3362.07 39625.46 4728.28 278.19 5006.46 14.000 WIP 0 20278008.41IDC 24225.95 TOTAL 0 861956606FA 3865.85WIP 20360.10P&L 16924.87
Status Of IDC AS-16 100000
TCC
Status
OP CL
I Received done 62457.54 23228.07 85652.50 62457.54 60304.68 0.00 33.11II Received done 9365.91 10606.85 20081.97 9365.91 14341.81 0.00 -41.49III Received done 34238.14 27441.52 61662.18 34238.14 53432.65 0.00 -38.89IV Received done 54281.85 30949.70 85199.57 54281.85 50535.61 0.00 10.98V Received done 42386.39 25518.34 67899.07 42386.39 61931.52 0.00 5.66VI Received done 5669.29 3507.09 9160.62 5669.29 5676.29 0.00 15.76VII Received done 12400.01 8913.83 21223.56 12400.01 11377.39 0.00 60.21VIII Received done 5224.15 4780.39 9920.41 5224.15 9507.58 0.00 96.71IX Received 48636.03 31384.09 79972.33 48636.03 71256.85 0.00 12.65
TOTAL 274659.30 166329.87 440772.20 274659.30 338364.37
Work in progress upto the year 31-3-2014(Rs in Lacs)
S.N. Name of circle IDC DIFF
1 2 3 4 5 6 7 8 9 10 11 12 13(4+5+6) (8+9) (3+7-10)
1 TCC I 80584.04 43177.79 60.00 43237.79 61304.28 60.00 61364.28 62457.54 62457.54 0.002 TCC II 10940.30 9193.31 20.67 9213.98 10767.70 20.67 10788.37 9365.91 9365.91 0.003 TCC III 28509.31 21111.41 18.59 21130.00 15382.58 18.59 15401.17 34238.14 34238.14 0.004 TCC IV 33326.53 34014.41 61.92 34076.32 13059.09 61.92 13121.01 54281.85 54281.85 0.005 TCC V 93408.47 25082.70 9.19 25091.89 76104.78 9.19 76113.97 42386.39 42386.39 0.006 TCC VI 1818.26 6616.28 3.76 6620.04 2765.24 3.76 2769.00 5669.30 5669.29 0.007 TCC VII 14956.97 10699.73 92.34 10792.07 13256.69 92.34 13349.03 12400.01 12400.01 0.008 TCC VIII 3031.85 4605.30 9.01 4614.32 2413.01 9.01 2422.02 5224.15 5224.15 0.009 TCC IX 24662.63 27760.74 0.00 27760.74 3787.35 0.00 3787.35 48636.03 48636.03 0.00
10 RPS&JS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0011 EA-CASH 0.00 71.44 71.44 0.00 71.44 71.44 0.00 0.00 0.0012 S&I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0013 SLDC 45.20 240.29 1.49 241.77 65.05 1.49 66.54 220.44 220.44 0.0014 MM 0.00 2.59 2.59 0.00 2.59 2.59 0.00 0.00 0.0015 CPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0016 HO(IDC) 17107.61 -17107.61 1.11 26664.43 9557.92 8415.68 1.11 8416.79 18248.75 18248.75 0.00
ISM 8366.91 995.68 0.00 995.68 202.78 0.00 202.78 9159.81 9159.81 0.00Total 316758.08 166390.04 352.09 26664.43 193406.56 207524.24 352.09 207876.33 302288.30 302288.32 0.02
302288.30 Clossing WIP207876.35 Assets510164.64 Total316758.08 Opening WIP193406.56 Capital Expenditure
during the year 2013-14 2,846,447,119 Inventory Adj 2,755,329,094 91,118,025 911.180247800002
192495.38 Capital Expenditureduring the year 2013-14
Loan received as on 1-04-2014 Loan received during the
year2014-15
Total Loan received as at 31-
03-2015Intt. Accured 01-04-
14 to 31-03-15.G.commission Accrued 2014-
15
Exp. Incurred as on 1.04.14
Expenditure during the
year 2014-15
Total Expenses up
to year 31.03.15
Exp. Incurred as on 1.04.13
Expenditure during the year 2013-14
Adj/Direct Booked to
Assets
Total Expenses during the
year 31.03.13
Transfer from WIP to Fixed Assets
Adj/Direct Booked to
AssetsTotal Fixed
AssetsClossing Blances
AS PER BALANCE
SHEET
NAME OF WORKS
Fian
caed
by
TCC V, KOTAREC
39991.75 0.00 1514.86 1514.86 41506.61
765 kv Anta - Phagi line TCC I, JAIPUR REC 41973.25 0.00 41973.25
TCC I, JAIPUR REC34508.61 15356.77 49865.38 49865.38
Civil Works for Phagi TCC I, JAIPUR REC 192.80 192.80 192.8081965.00 34701.41 16871.63 51573.03 133538.03
Code No. & Name of Scheme
Name of Circle/Office
Exp. On completed works
upto 31.3.2014
Exp. Incurred
as on 1.04.14
Expenditure
during the year 2014-15
Total Expenses up to year
31.03.15
Total Expens
es 31.03.1
53536 Chabra Kalisindh
765 kv line 2xSC Dhara (Anta)to Phagi QBC
3536 Chabra Kalisindh
3536 Chabra Kalisindh
765/400kv 2x1500 mva at Phagi with Bus Reactor
3536 Chabra Kalisindh