81
Cleveland Division of Air Quality Title V Permit Preparation Manual Kramer Procedure Contents Purpose: To develop Terms and Conditions for Title V permits for major sources of air pollution regulated by the State of Ohio. . 4 Scope: The District Office or local air agency (DO/LAA) is designated as the resource responsible for preparing permit recommendations for major air pollution sources that have applied for Title V operating permits under Chapter 3745-77 of the Ohio Administrative Code (OAC). ..................................... 4 Purpose and Use of this document: .............................. 4 What is Title V and who is subject to the requirements? ........ 4 Very high level overview of how a Title V facility gets permitted ............................................................... 5 Processing time frames and stages .............................. 6 Who participates in the permitting process ..................... 8 Overview of the business workflow for permitting a Title V facility ....................................................... 9 Receipt of Application. .................................... 11 10 Preliminary Completeness Review performed by DO/LAA Permit Writer. .................................................... 12 10 Technical Review performed by DO/LAA Permit Writer. ........ 13 12 File review. ............................................. 13 12 Application review. ...................................... 13 12 Site visit. .............................................. 15 13 Contact CO Reviewer. ....................................... 16 15 Permit Preparation performed by DO/LAA Permit Writer. ...... 18 17 Develop a listing of applicable rules for each emissions unit* using the following resources: ..................... 19 17 Determine applicable limits for each State and federal rule.* ......................................................... 19 18 Review "similar” issued Title V permits for consistency.* 20 18 Page 1 of 81

chagrin.epa.ohio.govchagrin.epa.ohio.gov/.../DAPC/Title_V/...Working_Copy_toc_kramer.docx  · Web view“Title V” refers to Title V of the 1990 Clean Air Act Amendments. This portion

  • Upload
    letuyen

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

ContentsPurpose: To develop Terms and Conditions for Title V permits for major sources of air pollution regulated by the State of Ohio. ..................................4Scope: The District Office or local air agency (DO/LAA) is designated as the resource responsible for preparing permit recommendations for major air pollution sources that have applied for Title V operating permits under Chapter 3745-77 of the Ohio Administrative Code (OAC). ...............................4Purpose and Use of this document: .................................................................4What is Title V and who is subject to the requirements? .................................4Very high level overview of how a Title V facility gets permitted ....................5Processing time frames and stages .................................................................6Who participates in the permitting process .....................................................8Overview of the business workflow for permitting a Title V facility .................9

Receipt of Application. ............................................................................1110Preliminary Completeness Review performed by DO/LAA Permit Writer. ...............................................................................................................1210Technical Review performed by DO/LAA Permit Writer. .........................1312

File review. ..........................................................................................1312Application review. ..............................................................................1312Site visit. ..............................................................................................1513

Contact CO Reviewer. .............................................................................1615Permit Preparation performed by DO/LAA Permit Writer. .......................1817

Develop a listing of applicable rules for each emissions unit* using the following resources: ............................................................................1917Determine applicable limits for each State and federal rule.* .............1918Review "similar” issued Title V permits for consistency.* ...................2018The DO/LAA Permit Writer and DO/LAA PRM evaluate the need for pre-draft strategy. This might not be needed since we can now group identical EUs in STARS2. ......................................................................2119The Term and Conditions document must be generated in STARS2. . .2119The DO/LAA Permit Writer researches permit Terms and Conditions. .2220Assemble State/federal Terms and Conditions after rules and emission limitations have been determined. ......................................................2422Part C Emissions Unit Terms and Conditions. ......................................2422

Page 1 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Identify State Terms and Conditions. ..................................................2825Quality Indicators for Terms and Conditions. .............................................2826DO/LAA Supervisory Review performed by DO/LAA PRM. ..........................3028

Pre-Draft Strategy Review. With the grouping of similar EUs allowed in STARS2, the Pre-Draft Strategy might not be needed. However, it’s possible that some units might be similar but not identical which requires separate terms. ...................................................................................3028Conduct initial review of hard copy of permit recommendation; this review focuses on permit structure. ....................................................3128Review Terms and Conditions for each emission unit ensuring that: . .3129Review permit Terms and Conditions. .................................................3230Check each term and condition for consistency. .................................3331

Central Office Review ................................................................................3533Optional Site Visit. ..................................................................................3633Standard Review (i.e., non - Pre-Draft Review Strategy). .......................3735

Review insignificant emissions unit lists in Part B, Facility-Wide Terms and Conditions. ....................................................................................3735Identify any generally applicable facility-wide requirements for inclusion in Part B, Facility-Wide Terms and Conditions. ....................................3835Review the Terms and Conditions for each non-insignificant emissions unit in Part C, Emissions Unit Terms and Conditions. ..........................3835Review applicable rules cited in permit. ..............................................3836Review each Applicable Emission Limitation/Control Requirement. ....3936Check for parametric monitoring. ........................................................3936Review each Operational Restriction. ..................................................4037Review each Reporting requirement. ..................................................4138Review each Testing (Compliance Method) requirement. ...................4138Review each Miscellaneous requirement. ...........................................4239Review air toxic modeling, if applicable. .............................................4239Review rule citations for non-SIP approved rules. ...............................4239

Apply the following Quality Indicators for Permit Terms and Conditions: ...............................................................................................................4340Review the Statement of Basis (SOB). ....................................................4340Contact DO/LAA Permit Writer/DO/LAA PRM. ..........................................4441

Issuance of Draft Permit ............................................................................4542Post-Draft Permit Process ..........................................................................4542

Page 2 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Changes to Permit After Issuance ..............................................................4845Additional Title V actions ...........................................................................4845No table of contents entries found.

Page 3 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Policy: Guidelines for Preparing Air Pollution Title V Permits

Purpose: To develop Terms and Conditions for Title V permits for major sources of air pollution regulated by the State of Ohio.

Scope: The Cleveland Division of Air QualityDistrict Office or local air agency (CDAQDO/LAA) is designated as the local air agency in

Cuyahoga Countyresource responsible for preparing permit recommendations for major air pollution sources that have applied for Title V operating permits under section Chapter 3745-.77 of the

Ohio Administrative Code (OAC).

Purpose and TrainingUse of this document:

[1.] Upon completion of this manual in 2005, staff were trained on the requirements of this permit preparation procedureThis document is intended to be used by all permit staff involved in the Title V permitting process. The document starts at a broad level and delves in to the detail of the Title V permitting process and steps that must be taken to review Title V applications and develop Title V permits. This document is not intended to establish regulatory guidance.

1.[2.] New staff will be trained on the requirements of this procedure during the first year of employment as appropriate in accordance with the progress of development.

2. Contact the Manager of the DAPC Permit Issuance and Data Management Section of if you identify any broken links or outdated references while using this document.

What is Title V and who is subject to the requirements?“Title V” refers to Title V of the 1990 Clean Air Act Amendments. This portion of the Act established an operating permit program at the federal level for the first time. The program required, for the first time, that one comprehensive permit be issued to each major stationary source. One of the primary goals was to identify every “applicable requirement” that applied to every operation (emissions unit) located at the facility. Additionally, the Title V permit program required that the permits include requirements to “assure compliance” with the applicable requirements. The “assurance” is implemented through operational restrictions and/or control measures that are developed as the permit is developed. In addition a major part of this new permitting program was to shift responsibility from the regulator to the company when for showing whether a source is in compliance. So, in other words, before Title V, regulators had to assert and prove noncompliance. However, Title V facilities have to assert that they are in compliance and

Page 4 of 69

Date: 12/28/2000Rev 1: _6/11/2003_Rev 2: _12/1/2005_Rev 3: _ 7/15/2010_

cwieg, 11/15/10,
Need table of contents for document
Ahern, 11/15/10,
See Renewal guidance to see if this partially fits the bill.
cwieg, 11/15/10,
I would like to see Background section here for new folks describing what requires these permits and some history here……very helpful for the full picture when you first begin…for instanceIt is required by the 1990 Clean Air ActThe state rules are found in 3745-77The documents are intended to be comprehensive facility wide documents that contain all applicable Federal and State requirements.What is the applicability? PTE greater than 100 TPY of criteria pollutant or PTE greater than PTE greater than 10 TPY of any HPA or PTE greater than 25 tons per year of any combined HAPs. Why not reference applicable EG s like #61, #58, #64, etc…Use our already existing sources like reference were on US EPAs or our website more info can be found.Mention what the deadline is/was for submittal of initial Title V and renewals and how long the renewal cycle is for Title Vs

ApplicationApplicati

on Review

Draft Issued

PPP Issued PP Issued Final

Issued

Company establishes an Air Services account and gets connected to the facility record

Workflow is generated in STARS2

Public noticed in newspaper – 30 day comment period, adjoining states and MPOs notified if necessary

Company has 14 days from receipt to submit comments or request a meeting

U.S. EPA has 45 days to object to the proposed permit

Final action is public noticed

Facility Profile is buit. Application is developed.

Preliminary completeness review conducted

If hearing is held, separate public notice is published (30 days prior to hearing)

Consider comments/enter discussions

PIDM develops final on or later than the 46th day

Final action is appealable to ERAC

Application is submitted.

Technical review/begin drafting permit terms

Review comments, begin drafting PPP

Begin developing PP

Citizens can petition U.S. EPA to reconsider objecting to the permit

Stages of a Title V Application/Permit

Develop Statement of Basis (SOB)

Draft is available on the web

PPP is available on the web

PP is available on the web

Final is available on the web

Receipt of application is public noticed.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

report instances of non/intermittent compliance. This was a really important development because this ongoing evaluation of compliance with the applicable and other permit requirements is tied to personal liability on the part of the responsible official (RO).

As you review and develop Title V permits, you may note monitoring, recordkeeping, and reporting requirements that are more detailed than what you see in the corresponding PTIs (particularly for sources that were installed prior to the early 1990’s and particularly for sources that pre-date the new source review program that would have been subject to very minimal State PTOs prior to Title V). The reason you will notice more robust monitoring, recordkeeping and reporting in the Title V permits is in order to make sure the company and RO has sufficient information to be able to evaluate/assert compliance.

For more information about the history of the Act and the Title V program in particular, go to http://epa.gov/airquality/permits/permitupdate/index.html

Very high level overview of how a Title V facility gets permitted

Page 5 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Processing time frames and stagesThe regulations require Ohio EPA to process applications within certain time frames as shown below.Type of permit being processed

Regulatory time frame to issue a final permit/permit revision

Underlying rule basis

Initial Final permit issued within 18 months of receipt of a complete application

OAC rule 3745-77-08(A)(6)

Administrative Permit Amendment (APA)

Final permit issued within 60 days

OAC rule 3745-77-08(B)(1)(a)

Minor Permit Modification (MPM)

Final permit issued within 90 days

OAC rule 3745-77-08(C)(1)(e)

Significant Permit Modification (Sig. Mod)

Final permit issued within 18 months of receipt of a complete application

OAC rule 3745-77-08(A)(6)

Reopening Final permit within eighteen months of promulgation of the applicable requirement

OAC rule 3745-77-08(D)(1)(a)

Renewal Final permit issued within 18 months of receipt of a complete application

OAC rule 3745-77-08(A)(6)

Off-permit change*

Final permit issued as part of permitting for one of the other reasons identified above.

OAC rule 3745-77-07(I)

* Off-permit changes do not require an application, but they do require the responsible official to provide “contemporaneous notification” of the change. DAPC has implemented this via the “Request Administrative Permit Modification” option in Air Services.

Page 6 of 69

Stages of the Title V Permit Process:

1. Draft Permit – allows for a 30-day public comment period. A public hearing can be requested at this time also which requires an additional 30-day public notice.

2. Preliminary Proposed Permit – the facility has 14 days to request to have a PPP meeting to discuss any further changes that might be needed for the permit.

3. Proposed Permit – allows USEPA

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Page 7 of 69

PPP PPDraft

The draft permit is public noticed in the newspaper of largest general circulation in the county where the facility is located. USEPA is notified via email (adjoining states are notified as well if applicable) that the draft has been issued and the company receives a hard copy via certified mail. Anyone can comment on the draft. The comment period is open thirty days from the date the notice is published in the newspaper. The newspaper publication date is posted to the web once DAPC receives the publication date. A PDF copy of the draft is available on the web. A response to comments document must be developed identifying comments and actions taken (or not taken) as a result of the comments.

Final

Applicant, public, USEPA, any other

interested party

The PPP is sent to the applicant via certified mail once comments have been considered and the document has been updated in response to the comments. The applicant has fourteen days to request a meeting to discuss the revised document. This permit stage is unique to Ohio in order to allow applicants an opportunity to review and discuss if requested changes to the document before it is proposed to USEPA. The PPP is posted to the web.

Applicant

USEPA receives email notification of all issued PP documents. The PP is posted to the web and USEPA has access to the document via STARS2 user accounts. Pursuant to 40 CFR Part 70 and OAC rule 3745-77-08(A)(5), USEPA has forty-five days to review the proposed permit. The rule specifies a procedure if the USEPA Administrator objects to the proposed permit. Otherwise, Ohio EPA can issue the final permit after the 45th day.

USEPA

The final permit is a final action of the Director. As such, it is subject to appeal to the Environmental Review Appeals Commission for thirty days after public notice of the final action in the newspaper of largest circulation in the county where the facility is located. The permit is also subject to reconsideration by USEPA for up to sixty days after the permit is issued final if someone appeals to the USEPA Administrator to reconsider and object to the final permit. Both the ERAC and federal reconsideration procedures fall outside the scope of this memo. Please contact your central office permit reviewer if you become aware that a permit you worked on is subject to appeal or federal reconsideration.

No one – but final action is subject to appeal rights and reconsideration by

USEPA.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Who participates in the permitting processParticipation changes as the permit progresses through each stage of permitting. The graphic below shows the stages, who can comment, how the participant becomes aware of the action, and generally what flows from the interaction.

Page 8 of 69

Permit terms and conditions development/review

Develop permit termsUse previously issued permit if avialableUse t&c libraryUse suggested language from applicant

Submit recommendation to supervisorUpload terms documentComplete workflow task

PIDM Permit issuanceNotify all required partiesMail hard copiesComplete workflow taskCentral Office Manager ReviewCheck for consistency, new permit issues, potential citizen/federal issuesComplete the workflow task when ready

Supervisor reviewReview permit termsConsult with the permit writer , other permis and the CO reviewer

Submit recommendation to Central Office reviewerComplete the workflow task when ready.

Submit recommendation to Central Office ManagerComplete the workflow task when ready. Central Office review

Review permit termsConsult with the permit writer , other permis and the DO/laa reviewer

Rework and resubmit as necessary

Rework and resubmit as necessary

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Overview of the business workflow for permitting a Title V facilityGenerally the workflow of the permit document follows a pattern from the permit writer, to the DO/laa reviewer, then to the Central Office reviewer, the Central Office permitting manager, and finally to PIDM to be issued. This pattern applies to all stages except the final permit where PIDM issues the final permit once U.S. EPA’s 45 days to object passes and no other issues arise. The permit document can be “returned” to the previous stage in the development/review process to be reworked and resubmitted. Note that in STARS2 this can be accomplished directly via the workflow engine in the system (e.g., the CO permit reviewer can reassign the permit back to the permit writer directly, bypassing the DO/laa supervisor). As with any interactive collaboration, communication is key so please make extensive use of the notes feature in STARS2 as you update the workflow tasks.

Four Stages of a Title V Permit:

Page 9 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[1.] Draft Permit – allows for a 30-day public comment period. A public hearing can be requested at this time also which requires an additional 30-day public notice.

[2.] Preliminary Proposed Permit – the facility has 14 days to request to have a PPP meeting to discuss any further changes that might be needed for the permit.

[3.] Proposed Permit – allows USEPA 45 days to submit any further comments on the permit.

[4.] Final Permit – permit gets issued Final shortly after resolving any items submitted by USEPA.

Page 10 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Procedure:

Receipt of Application.

1. Title V application received electronically by the Ohio Environmental Protection Agency (Ohio EPA), Division of Air Pollution Control Central Office (DAPC CO) through the e-Business Center – Air Services.

a. STARS2 Workflow created by DAPC CO.

[b.] Permit action listed on CDAQDO/LAA Chief of Engineering’s STARS2 “To Do” list.

[c.] CDAQDO/LAA Chief of Engineering checks STARS2 "To Do" list daily.

[2.] Hard copy signed receipt is no longer needed with STARS2.

2.[3.] The “responsible official” signature is handled through the acquisition of a PIN for use of the e-Business Center for the submittal of applications.

[4.] Receipt of application is published as a public notice by DAPC CO (Loretta Foster)

[a.] Date of public notice is entered in STARS2.

[5.] CDAQDO/LAA Chief of Engineering determines staff workload.

a. In general, Title V permit work is assigned to staff based on each Permit Writer's number of major and minor permits as well as their current and projected workload and their current skill level.

[b.] Facility assignments made by CDAQDO/LAA Chief of Engineering (in accordance with protocol (See Appendix A).

[6.] CDAQDO/LAA Chief of Engineering updates STARS2 Workflow.

b.[a.] Record staff person's name in Workflow-Task Profile with date the activity is assigned.

c.[b.] Assign tasks in Workflow to selected staff.

Preliminary Completeness Review performed by CDAQDO/LAA Permit Writer.

3.[7.] There are two completeness checks used to evaluate Title V applications. The first completeness check performed is called the

Page 11 of 69

cwieg, 11/15/10,
This can probably be condense since every district assigns work loads differently…perhaps it could simply be stated that the application will be assigned to staff via their supervisor or whatever…
Ahern, 11/15/10,
Not accurate. Receipt of application is automatically requested, but we don’t enter the actual publication date – we only do this for draft permits.
Ahern, 11/15/10,
We can describe the public notice process and why it happens
cwieg, 11/15/10,
Where is this public noticed?
Ahern, 11/15/10,
Can add a description
cwieg, 11/15/10,
New people would have no idea what you are talking about with this comment….may need further info here to explain…
Ahern, 11/15/10,
Agreed – can be developed
cwieg, 11/15/10,
I would like to see us back up here before talking about how to process an application and describe the parts of the application. Talk about the parts such as application facility level summary, non-insignificant EU and significant EU, EAC, calculations, and flow diagrams….Remember that EACs are required for those insignificant sources that may have requirements. What is an EAC form? Where are they located on our website? Are calculations required to be submitted? New staff have no idea what the parts of the application are or what EAC forms are.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

“Preliminary Completeness Check”, the second completeness check is called the “Technical Completeness Check.” The completeness checks are important to the facility because they directly impact whether or not the facility maintains its Application Shield.

4.[8.] The Application Shield is described in OAC rule 3745-77-06. This rule, in combination with OAC rule 3745-77-04(A), basically states that as long as the Title V facility submits a complete and timely Title V application, the facility may legally operate under the terms and conditions of its old permits to install and operate (or previously issued Title V permit for renewals) until the Title V permit is issued. If the Title V facility loses this Application Shield, it has no legal right to operate before the issuance of the Title V permit. As stated above, the rule requires that a timely and complete Title V application be submitted for the facility to receive the Application Shield. The preliminary and technical completeness checks are used to determine the completeness of the application for purposes of the Application Shield.

5.[9.] All application blanks must be completed (including EAC forms) by the applicant in order to complete the submittal of the application through the e-Business Center Air Services. Use application to ensure all necessary components are present to begin permit processing.

6.[10.] Compare the application to the preliminary completeness checklist (Appendix B).

7.[11.] Submittal of the application through Air Services essentially makes the application preliminary complete as it is necessary to pass validation in order to submit the application. However, be aware that the facility may have neglected to include some items such as new emissions units, EAC forms, etc.. If more than 60 days has passed since the date of application submittal, the application is automatically Preliminary Complete by rule.

8.[12.] OAC rule 3745-77-05(B)(1)- The director shall promptly provide notice to the applicant for a Title V permit of whether the application is complete. Unless the director determines within sixty days after receipt of the application that the application is not complete, and issues a written notice of such determination as provided in paragraph (B)(2) of this rule, the application shall be deemed to be complete. A completeness determination is not required for modifications processed through minor permit modification procedures contained in rule 3745-77-08 of the Administrative Code. In other words…..You have 60 days from the time we get the application to determine if it is preliminarily complete otherwise it is deemed to be complete and you

Page 12 of 69

cwieg, 11/15/10,
I know this has been discussed in permit calls before…but we really need a definite answer here….so, are we to assume that they are preliminarily complete if they make it through STAR2 or not…personally, I think there can be A LOT missing from the application and still make it through the system….case in point, whole emissions units can be missing or they can scan blank documents and upload them as EAC forms…just my thoughts…either way, we need to make a decision state wide if they are automatically preliminarily complete if they make it through STAR2 and if they are then there really should be an automated processes for preliminarily completeness letters being generated verses having the staff go through this process.
cwieg, 11/15/10,
I couldn’t find Appendix documents…which checklist are you using in this document?
cwieg, 11/15/10,
The biggest question we get from our staff is where does preliminary review end and technical review begin? What is looked at to determine that it is preliminarily complete? That Is why the checklist are SO important, especially for new staff
Mahern, 11/15/10,
Need to clarify the stringency of this review step (system ok? It’s preliminarily complete versus an actual first look then letter) . reality is 60 days pass before app is reviewed it is deemed complete by rule.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

must proceed with the processing of the application.

9.[13.] Send ”Completeness” letter or ”Return Application” letter to applicant as appropriate.

a. Use letter templates for Completeness or Return letters (Appendices C and D respectively). Letter templates are also available in STARS2.

b. Send letter to applicant within 60 days of application receipt.

10.[14.] Update STARS2 Workflow.

Technical Review performed by CDAQDO/LAA Permit Writer.

File review.

a. Review existing facility files as well as application materials including hard copy and STARS2 version (see checklist Appendix E)

(i) Gather files (may include confidential information or other attachments).

(ii) Review hard copy information.

(iii) Check completeness with active as well as archive file databases.

(iv) Review relevant files.

(v)Make notes and/or list questions to ask.

Application review.

b. Print hard copy of the application, as needed, or review in STARS2. Confirm that all technical information has been received to allow for completion of permit.

(i) Review new application and existing file for comparison making notes, listing questions when conducting review.

(ii) Request missing information in writing from company (applicable throughout technical review or permit tasks).

Page 13 of 69

cwieg, 11/15/10,
If we are waiting on info from facility we should mention that the Clock needs to stop in STARS2 and it should be referred.
cwieg, 11/15/10,
Which checklist is this? Not included in document
cwieg, 11/15/10,
More detail? Refer? What do we want staff to do? Include note in STARS2?

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[(iii)] Whenever additional information is received, the CDAQDO/LAA Permit Writer should reassess if application is adequate.

c. Review non-insignificant and insignificant emissions units.

(i) Identify major issues (e.g., stack test or information missing from the application).

(ii) Review (most current) PTIs.

(iii) Check installation dates.

(iv) Pull PTI application file.

(A) Check PTI and look for related files (if applicable) to PTI (both insignificant and non-insignificant).

(B) Request and review emissions calculations and relevant information for questionable insignificant emissions units.

(C) Review EAC forms.

d. Review for controls.

(i) List emissions limitations.

(ii) Review most recent stack test data.

(iii) Review most recent inspection report(s); check to determine the currency of a facility inspection.

(iv) Look for "unknowns" and /or problem areas at facility.

(v) Check continuity of inspection report with Title V application.

(vi) Check PTOs.

e. Feedback loop.

(i) Assess whether application is adequate.

(A) Determine if additional information is needed.

(B) Establish whether the application needs to be returned to the applicant.

Page 14 of 69

cwieg, 11/15/10,
For what?
cwieg, 11/15/10,
Such as? Address in inspection section with examples?
cwieg, 11/15/10,
What is current and what is not? What are you looking for in the inspection?
cwieg, 11/15/10,
Why?
cwieg, 11/15/10,
For what? These are the questions I get from new staff…they need more info for what they are checking for when asked to do this type of stuff
cwieg, 11/15/10,
Would like definition here of insignificant emissions unit here for new staff or reference as to where to find this info…we should include references to EG guides that apply such as #62 or Question/Answer sheets such as the Title V Insignificant Activities sheet

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[(ii)] Upon resubmittal of a returned application, the CDAQDO/LAA Permit Writer needs to check the following:

(C)[(A)] Compare corrections to original version;

(D)[(B)] Check for omissions from original version; and

(E)[(C)] Check for newly-discovered issues.

Site visit.

[f.] At some point during the development of a Title V permit for a facility, the CDAQDO/LAA Permit Writer must conduct a site visit of the facility.

(ii)[(i)] Ideally, this site visit takes place after the review of the facility files and application.

[(ii)] If the CDAQDO/LAA Permit Writer has visited the entire facility (as part of a previous site visit or facility inspection) a short time before the application receipt, this visit may suffice – if there is any question, the CDAQDO/LAA Permit Writer should schedule and conduct a site visit as part of their technical review.

[g.] The CDAQDO/LAA Permit Writer conducts site visit via a set appointment and including the following elements:

(iii)[(i)] Ask questions;

(iv)[(ii)] Take notes;

(v)[(iii)] View emissions unit in operation;

(vi)[(iv)] Check condition and operation of control equipment:

(A)Verify control equipment identified in application.

(vii)[(v)] Identify and view all emission points:

(A) Make a special point to review “stack” versus “fugitive” emissions points (this is a critical step for proper application of OAC rules 3745-17-07, -08 and -11).

(viii)[(vi)] Review monitoring and record keeping programs:

Page 15 of 69

Ahern, 11/15/10,
This is geared toward making sure the company understands their MRR requirements and has systems in place to meet the permit requirements.
Ahern, 11/15/10,
The intent of the inspections associated with the TV app review/permit development is to become familiar with the operations and to provide an opportunity to discuss the application/upcoming permit development with the facility contact. If violations are found, they should not be ignored, but at least when this program first went into place, this was not intended as a compliance inspection.
cwieg, 11/15/10,
Do you mean an appt with the facility? At SEDO we typically do not notify the facility of our inspections unless there is a reason such as a gas compressor that is not manned or if we are meeting with a specific person to talk about a permit issue. If it is a compliance inspection, typically these are done unannounced.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(A) Check some of the records; where possible, align the record keeping in the permit with recordkeeping currently maintained by the facility;

(B) Check continuous emission monitoring (CEM) system (if applicable – refer to Engineering Guide 52); and

(C) Check records for operation and maintenance (O&M) if applicable.

[h.] The CDAQDO/LAA Permit Writer may wish to have a CDAQDO/LAA Enforcement Specialist attend the site visit, depending upon the circumstances.

[(i)] The CDAQDO/LAA Enforcement Specialist may be able to bring a different perspective to viewing the current operations and compliance at the facility.

Contact CO Reviewer.†

[i.] The CDAQDO/LAA Permit Writer and/or CDAQDO/LAA Permit Review Manager (PRM) and/or CDAQDO/LAA Chief of Engineering initiate contact with DAPC CO Reviewer via verbal or written communication (typically email) prior to the drafting of the permit.

f.[j.] After initial contact, all parties maintain contact with DAPC CO Reviewer as needed.*

g.[k.] This communication establishes the working relationship that is critical to effective and timely permit issuance; discussions include deadlines, guidance, and resource suggestions.

[l.] Two levels of due dates – Central Office’s and CDAQDO/LAA’s.

[m.] The CDAQDO/LAA Permit Writer should direct questions to the CDAQDO/LAA PRM; if CDAQDO/LAA PRM is unable to address, he/she will coordinate contact with DAPC CO Reviewer.

h.[n.] Information/guidance typically provided via written or verbal communication.

11.[15.] Review "similar” Title V permits for consistency.*STOPPED REVIEW 9/15/2010

[a.] Initiated by the CDAQDO/LAA Permit Writer.

† Task can be conducted in one or more sectionsPage 16 of 69

cwieg, 11/15/10,
I would use caution here like I mentioned in my comment in our PowerPoint.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(i) Used to determine how much language in the permit needs to be changed.

b. The Title V list of permits on the DAPC web site is a possible tool, as well as searching for Title V facilities in STARS2.

12.[16.] OAC rule 3745-77-05(B)(2)- If, during the processing of an application before or after it has been determined or deemed to be complete, the director determines that additional information is necessary in order to evaluate or take final action on the application, the director may request that information in writing from the applicant. Any such request shall identify the information requested with reasonable specificity, provide a basis for the request, and shall provide a reasonable time period, not less Than fifteen days, for the applicant's submission of the requested information. In other words……if you find it to be technically incomplete you should request the information in writing (with a formal letter) and you have to request the information to be given to us no less than 15 days.

13.[17.] OAC rule 3745-77-05(B)(2)- If, during the processing of an application before or after it has been determined or deemed to be complete, the director determines that additional information is necessary in order to evaluate or take final action on the application, the director may request that information in writing from the applicant. Any such request shall identify the information requested with reasonable specificity, provide a basis for the request, and shall provide a reasonable time period, not less than fifteen days, for the applicant's submission of the requested information. In other words……if you find it to be technically incomplete you should request the information in writing (with a formal letter) and you have to request the information to be given to us no less than 15 days.

14.[18.] OAC rule 3745-77-05(B)(3)- If an applicant fails to make a good faith and timely response to a request for additional information under this rule with regard to an application that the director believes to be incomplete, the director shall offer to meet with the applicant within seven days after issuance of a letter for failure to submit the requested information. If the meeting or meeting offer fails to obtain a complete application form the applicant, the director, without prior hearing, shall make a final determination that the application is not complete. Any such determination shall not become effective until twenty days after notice of the determination is sent to the applicant by certified mail. An incompleteness determination by the director may be appealed in accordance with section 3745.04 of the Revised Code, except that if the notice of appeal is timely filed and is accompanied by an application for stay, the stay shall become effective upon filing and

Page 17 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

shall continue until such time as the environmental board of review rules on the merits of the stay. In other words…if they don’t give you the requested information, you have to request to meet with them (work this out with your supervisor) within 7 days of sending them a failure to submit the requested information..…and if that doesn’t work…..we can make a determination that the application is not complete.

15.[19.] Try and take the time to look over the ENTIRE application, and make list of questions, then ask for the information from the facility via a certified, formal agency letter with a requested time frame.

16.[20.] Make sure to “stop the clock” in STARS2 whenever requesting information from the facility. Restart the clock when the requested information is received.

17.[21.] The requested application information should be received in STARS2 via a permit application amendment/revision.

18.[22.] See Appendix E for the Technical Completeness check list.

19.[23.] See Appendix F for instructions on making a Technical Incompleteness determination.

Permit Preparation performed by CDAQDO/LAA Permit Writer.Pre-Term and Condition Emission Unit Review

Prior to permit term and condition development it is important to understand in detail the functioning of the emission unit, its pollutant egress points, and any associated control devices. One approach to understanding the functioning of the emission unit and the pollutants emitted would be to:

I. R eview the Engineering Activity Category forms and Process Flow Diagrams submitted with the Title V Application in Stars 2.

II. Review the “Facility Tree” for emission unit level information in the Facility Profile found in Stars 2. The emission unit level information found here will provide you with a listing, and the details, of egress points and any control devices associated with the emission unit.

III. After the review of the Title V Application detailed in I and II above, AP-42 should be reviewed to better understand the emission unit and the pollutants emitted from the emission unit. Should AP-42 not have information relating to the emission unit type and the associated emissions other documents to be reviewed would be:

Page 18 of 69

HCDOES, 11/15/10,
I added some detail about actually understanding the emission unit. I have seen many people drafting T&C for emission units they don’t understand and this leads to problems. MK
cwieg, 11/15/10,
Somewhere in document we need to discuss the process of the facility submitting an Amended application and how you line those up together in STARS2 or at least reference where that procedure description can be found. I get a lot of questions about this from staff.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

a. AP-40b. RACM Manual and Engineering Guide 75c. Internet searchd. AWMA Air Pollution Engineering Manual

Should there still be questions about how the emission unit operates and how it is configured, a facility inspection should be conducted to get any additional details needed.

20.[24.] Prepare a listing of pollutants* using the following resources:

a. Title V application;b. AP-40;c. AP-42;d. RACM manual and Engineering Guide 75 (both are posted on Ohio

EPA’s DAPC web site);e. Internet;f. TLV booklet;g. Experienced colleagues;h. Fee reports;i. Stack test information;j. Previous permits; k. Similar issued permits (i.e. permits issued for "sister" facilities

with the same facility name located in different parts of the State as well as permits issued for other facilities with the same types of emissions units);

l. Process flow diagrams; m. Raw materials review; andn. AWMA Air Pollution Engineering Manual (successor to AP-40).

Develop a listing of aApplicable rRules/Requirements for each emissions unit* using the following resources:

During the preliminary and technical review of the Title V Application detailed in section XXXXX of this document, a review of the Applicable Requirements (federal and state rules) was conducted. As the Title V Permit Application has been deemed complete, at this point a listing of the federal and state applicable requirements that need to be incorporated into the Title V can be found in the Title V application found in Stars 2. Specifically, these rules can be found under the Emission Unit Specific Requirement section of the Title V Application (Stars 2/Application/Click on the Emission unit for the T&C you are working on from the Application tree/Emission Unit Specific Requirements)

Page 19 of 69

HCDOES, 11/15/10,
At this point of permit development the Title V Application should have the correct listing of all the Applicable Rules and Requirements. Therefore I referenced the area in Stars 2 where the Applicable rule and requirements can be found. The process previously listed would be redundant with the work that already occurred to make sure the permit as complete (ie all applicable requirements spelled out. MKI think we should add a screen shot to the correct area in Stars 2 here as well. MK
Ahern, 11/15/10,
Why? You are not establishing any limits via the TV permit.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Additional Information relating to the applicable federal and state rules for the emission unit can be found by reviewing the Permit to Install and previous Permits to Operate for the emission unit. Reviewing similar emission units may be helpful as well. The following Ohio EPA Website is very useful in looking for recently issued similar permits.

http://www.epa.ohio.gov/dapc/newpermits/issued.aspx#IssuedPermits

[o.] CDAQDO/LAA applicable rule index (see Appendix K);

o.[p.] Previous permits (i.e. PTO's, PTIs, Title V, etc.);

p.[q.] Internet;

q.[r.] Similar issued permits (i.e., permits issued for "sister" facilities with the same facility name located in different parts of the State as well as permits issued for other facilities with the same types of emissions units);

r.[s.] Permit application;

s.[t.] Inspection reports;

t.[u.] Review installation/modification dates in application to determine if PTI is necessary; and

u.[v.] Applicable federal rules for each pollutant (e.g. MACT, if HAPS are listed as a pollutant).

Determine aApplicable Emission limitsations/Control Measeures for each State and federal rule.*The pollutant specific emission limitations associated with the applicable federal and state rules can be found in the Title V Application in Stars 2. Similarly to the applicable rules, the emission limits can be found under the “Emission Unit Specific Requirement“ section of the Title V Application (Stars 2/Application/Click on the Emission unit for the T&C you are working on from the Application tree/Emission Unit Specific Requirements)

Additional Information relating to the emission limitations associated with the applicable federal and state rules for the emission unit can be found by reviewing the Permit to Install and previous Permits to Operate for the emission unit. Reviewing similar emission units may be helpful as well. The following Ohio EPA Website is very useful in looking for recently issued similar permits.

Page 20 of 69

HCDOES, 11/15/10,
Similarly to comment 32 these emission limitations should be spelled out and correct in the Title V Application in Stars 2. Going through the review process would again be redundant with the work already completed for the completeness check.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

http://www.epa.ohio.gov/dapc/newpermits/issued.aspx#IssuedPermits

v.[w.] If there is a PTI, then use the PTI limits, but verify through a review of currently applicable rules (use previous list of resources to be used in determining applicable rules).

(i) Accurately reference PTIs in permit citing the PTI number and issuance date under the 31-05(A)(3) rule cite in the b)(1) table of the permit.

w.[x.] If there is no PTI, then use the limits from the previous PTO, which should be verified through rule review.

x.[y.] Review issued PTIs for similar facilities.

y.[z.] Incorporate PTO Terms and Conditions.

z.[aa.] Compare current State/federal regulations to PTI limits and check the current validity of any emission factors relied upon to establish PTI limits.

[bb.] If a new State regulation is more stringent than a PTI limitation, or when emission factors change, CDAQDO/LAA may need to process a modification of the PTI concurrently with the processing of the Title V permit.

aa.[cc.] Compare all limits for the same pollutant to determine whether the limits are less stringent or equivalent to each other in order to include appropriate "less stringent than" or "equivalent to" wording in the permit.

(i) Types of pollutants emitted (criteria pollutants/HAPS).

(ii) Maximum capacity of the emissions unit.

(iii) If needed, determine the process weight rate and uncontrolled mass rate of emissions (UMRE) for OAC 3745-17-11 determination and document in permit Terms and Conditions whether Table 1 or Figure II is more stringent.

(iv) Identify release point(s) (stack or fugitive).

Page 21 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(v) Identify PTI "streamlining" language as needed.

Review "similar” issued Title V permits for consistency.*

bb.[dd.] Determine how much (if any) language in the permit needs to be changed.

cc.[ee.] Permit writer uses existing data from STARS2 to assist in reviewing similar Title V permits for consistency.

dd.[ff.] The Title V list of permits on the DAPC web site is a possible tool, as well as searching for Title V facilities in STARS2.

ee.[gg.] DACP CO can be contacted and utilized as an additional resource or tool.

The CDAQDO/LAA Permit Writer and CDAQDO/LAA PRM evaluate the need for pre-draft strategy. This might not be needed since we can now group identical EUs in STARS2.

[hh.] The CDAQDO/LAA Permit Writer and CDAQDO/LAA PRM determine if enough emissions units to be included in the permit are similar to pursue a pre-draft strategy.

(i) If there are several similar emissions units, Terms and Conditions may be prepared for a sample emissions unit and submitted for review under a pre-draft strategy.

(ii) When prepared, the sample Terms and Conditions prepared under a pre-draft strategy will be sent to DAPC CO Reviewer through STARS2 for review.

(iii)If necessary, it might be helpful to put together a table identifying all of the emissions units and associated emission limits with the total facility emissions identified.

The Term and Conditions document must be generated in STARS2.

ff.[ii.] Prior to generating the terms and conditions document, make sure that the list of emissions units on the “Permits” tab includes all active emissions units at the facility for both insignificant and non-insignificant emissions units. The insignificant emissions units will have the small gears. If the list is not accurate it will need to be adjusted and might require the facility to resubmit their application and also update their facility profile. When the term and condition document is generated, all of the insignificant emissions units should be grouped together in Part C

Page 22 of 69

HCDOES, 11/15/10,
I deleted this section as I referenced the best way to get recently issued similar permits above. It would be redundant to keep it in here.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(see Answer Place 1259 and Appendix J). Copy the list of insignificant emissions units and paste in Part B, then delete the grouped insignificant terms from Part C. The insignificant units will need to be split into two groups as needed: De Minimis and no applicable requirements are State only; and all other insignificant units are State/Federal. For the insignificant units that are State/Federal, the facility must include an EAC form for these units.

gg.[jj.] Any previously identified “z” units must be changed to the correct identification (e.g., B001, K001, P001, etc.) in STARS2.

hh.[kk.] If there are identical emissions units (i.e., identical type of unit, identical emission limits, identical terms and conditions) then these units can be grouped in STARS2 prior to generating the terms and conditions document. When grouped, the term and condition document will have just one set of terms for the list of grouped units. The established terms will apply to each emissions unit separately. To group emissions units in STARS2, do the following:

(i) open the permit detail page;

(ii) click on “create EU group” at the bottom of the page;

(iii) name the EU group;

(iv) move over applicable EUs from “available EUs” to “current EUs”; and

(v)save changes.

ii.[ll.] In order to generate the terms and conditions document, go the Permits tab in STARS2 for the Title V permit action that is needed. On the menu on the left side of the screen, click on “Terms and Conditions”. In the “Working Copies” section, click on the “edit” button and then click on the “generate” button. The term and condition document will be generated and populated with the facility name, facility number, and a new permit number will be automatically assigned. After the document has been generated click on the “save” button to save the skeleton document in STARS2 (it will later be deleted by the PRM). Open the skeleton document and then choose “Save As” and save the document at L:\Data\Facilities.

jj.[mm.] Note that for renewal permits, it might be necessary to convert the previous legacy Title V permit from HTML to Word. If this is needed, follow the instructions in Appendix G. Insert the converted terms into the saved terms and conditions document at L:\Data\Facilities.

Page 23 of 69

Ahern, 11/15/10,
De minimis and PTI exempt eus do not need to be included in applications or permits as of February 2010 when the applicability rule changed.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

kk.[nn.] For Title V renewal permits, make sure the correct superceded permit is chosen (i.e., the permit number for the previously issued Title V permit) under each emissions unit.

The CDAQDO/LAA Permit Writer researches permit Terms and Conditions.

[oo.] Optional, the CDAQDO/LAA Permit Writer can also begin to prepare the Statement of Basis at this time or wait until the complete permit recommendation is done. The SOB document must be generated in STARS2 and then save the document to L:\Data\Facilities.

ll.[pp.] Research Terms and Conditions for non-insignificant emissions units (see recently issued Title V permits for examples).

mm.[qq.] Permit writer must use Word to develop Terms and Conditions for submittal of the permit recommendation. The permit template should be generated through STARS2 as noted above and then saved to L:\Data\Facilities.

nn.[rr.] Review the following sources of information to identify terms that need to be included in the permit:

(i) Accurately reference the PTI number(s) and issuance date for BOTH non-insignificant and insignificant unit(s);

(ii) Incorporate the terms from the PTI(s) into Title V permit Terms and Conditions;

(iii) Review issued Title V permits from similar sources – use as appropriate (with modifications where needed);

(iv) Check Library of Terms and Conditions (http://www.epa.state.oh.us/dapc/terms/termsintro.aspx) – use as appropriate;

(v) Identify possible Terms and Conditions from inspection report and/or site visit;

[(vi)] The CDAQDO/LAA Permit Writer checks with CO for up-to-date information on previous permits prior to writing current Title V permit;

(vi)[(vii)] Ascertain whether emission testing has been performed for the emissions unit (or an identical emissions unit) to verify compliance with applicable limit(s):

Page 24 of 69

Ahern, 11/15/10,
You also need to check to see if the company has proposed any terms. If so, you should use, or use as the basis of the term, what they have submitted if it meets the underlying rule requirements.
Ahern, 11/15/10,
I know mosrt offices have a similar repository for this and other in-process documents. U suggest that the document be uploaded to STARS2. Doing so affords CO the ability to take a look if requested without having to email the doc, allows others in your office to open a copy without having to know the file name, saves storage space on your lan, and makes it one less thing to remember to upload when you are ready to submit the recommendation. You can over-write the file by subsequent uploads at any time.
Ahern, 11/15/10,
Reference AP ID 2260 – add what the SOB is to either this document or the AP topic.

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(A) Determine if the testing was witnessed by Agency personnel;

(B) Determine if acceptable test methods were employed; and

(C) Determine if the stack test demonstrated compliance with the allowable emission limits;

(vii)[(viii)] Check recent fee emission reports:

(A) Use actual TPY emission rates and hours of operation to estimate short term pollutant emissions rates to determine whether source is likely to be in compliance with emission limits; and

(B)Where possible, emission estimation methodology in fee emissions report (FER) should match compliance method in permit;

(viii)[(ix)] For each allowable emission rate or control requirement, determine if an adequate demonstration of compliance has been provided (must be clear, accurate, and current);

(ix)[(x)] Determine what type of monitoring, record keeping, and reporting program is necessary for the permit;

(x)[(xi)] Define any necessary operational restrictions (by PTI, rule, etc.);

(xi)[(xii)] Determine the frequency of emission testing (required by PTI, Engineering Guide #16, etc.); and

(xii)[(xiii)] Identify alternative operating scenarios – if requested by facility, this should have been included in the application.

Assemble State/federal Terms and Conditions after rules and emission limitations have been determined.

oo.[ss.] Part B Facility-Wide Terms and Conditions.

(i) This section of the permit provides for the placement of requirements that apply to the entire facility or to several emissions units at the facility.

(ii) MACT, synthetic minor limits for HAPs, and insignificant emission units requirements are usually included in Part B.

Page 25 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Part C Emissions Unit Terms and Conditions.

(iii) Used to identify each individual emission unit's specific requirements.

(iv) Main Header [section 1].

(A) Operations, Property, and/or Equipment.

(i) Clearly describe the equipment and processes that comprise the emissions unit and the associated control equipment.

(B) Section a)(1) is used to identify terms that are State-only enforceable (e.g. air toxics, OAC rules that are not part of the federally approved SIP).

(C) Applicable Rules/Requirements [section b)(1)].

(i) List the applicable rules identified above.

(D) Applicable Emission Limitations/Control Measures [section b)(1)].

(i) List the applicable emission limitations/control measures identified above.

(v) Additional Terms and Conditions [section b)(2)].

(A) This section contains overflow from section b)(1) and provides the following:

(i) Clarification of emission limits/control measures;

(ii) Synthetic minor and any rolling,12-month average summations of emissions;

(iii) Definitions of control requirements or control measures; and

(iv) Negative declarations and/or rule exemptions that apply to the specific emissions unit may be included in this section.

(vi) Operational Restrictions [section c)]. Page 26 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(A) Specific operational restrictions necessary to ensure ongoing compliance with the applicable requirements/control measures including any operational restrictions necessary to satisfy OAC chapter 3745-77 "gap-filling" requirements.

(vii) Monitoring and Record keeping [section d)].

(A) Monitoring required for each operational restriction, control measure and emission limit as needed (unless otherwise specified in the permit T &C's).

(B)Permit needs to include sufficient M/Rk/Rp to demonstrate compliance with applicable emissions limits and operating restrictions. A 2008 federal District Court decision upheld right to gap-fill if underlying monitoring is not sufficient to assure compliance

(C) Monitoring results are required to be recorded and maintained.

(i) Must specify frequency of monitoring.

(ii) Use Library of Terms appropriate language.

(iii) Specify monitoring devices (e.g., pressure gauge, temperature monitor, CEMs, etc.).

(iv) Refer to Engineering Guide #52 for CEM systems.

(viii) Reporting Section [section e)].

(A) Specify what record keeping results need to be reported.

(B) Specify the frequency of reports (e.g., quarterly deviation-based, annual, "after the event," others).

(C) As appropriate, include requirements to submit reports of deviations from operational restrictions and/or emission limitations.

(ix)Testing [section f)].

(A) List each applicable emission limitation from section b)(1) and provide a method for determining compliance for each.

Page 27 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(B) Explain how the emission rate is calculated or why no emission testing is required in this section.

(C) Use Engineering Guide #16 to determine frequency for stack testing.

(D) Review past permits, stack test results, and inspection reports.

(E) Review stack tests required by applicable rule(s).

(F) Note that compliance may be based solely on monitoring, record keeping and reporting in some cases.

(G) Note that compliance may be based on emission factor(s) rather than testing in some cases.

(H) The selected compliance method should be representative of current operation and reflect worst-case conditions.

(I) The selected compliance method MUST be consistent with regulatory requirements.

(J) Testing methodologies include:

(i) Emissions tests;

(ii) Material balance calculations;

(iii) AP-42 emission factor calculations;

(iv) Method 24 analyses;

(v)CEM data (refer to Engineering Guide 52);

(vi) Record keeping program; and

(vii) VE readings/VE checks among other methodologies.

(K)If stack testing will be required, need to add the Library term in section f)(2) that specifies when the test should be done and what test methods will be used for each pollutant to be tested.

(x) Miscellaneous [section g)].

Page 28 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(A) Items that do not fit under any of the above categories. For example, identifying dates of installation; providing potential to emit calculations; clarifying why an emissions unit was permitted a certain way that might not be evident otherwise.

Identify State Terms and Conditions.

(xi)In section a)(1), identify the specific terms that are enforceable under state law only. Examples of state only requirements are:

(A) Air toxic modeling requirements, if applicable.

(B) Any requirements resulting from OAC rules that are not part of Ohio’s federally approved SIP (check USEPA Region V web site for current SIP approval).

21.[25.] For all terms in the permit both in Part B and Part C, need to identify the authority for each term. See recently issued Title V permits for examples.

22.[26.] Include Section 112(r) Risk Management Plan Requirements (if needed) Central Office permit review staff must continue to identify Title V facilities that are required to file a 112(r) risk management plan. Notify Central Office contact when a facility is subject to 112(r) requirements so that the permit language can be properly reflected in Part B of the permit. (CHECK FLAG IN STARS2) Available Guidance: October 16, 2001 e-mail guidance from Tom Rigo.

23.[27.] Include Acid Rain Requirements (if needed) Central Office permit review staff must continue to identify Title V facilities that subject to 40CFR Part 72 (acid rain requirements). Notify Central Office contact when a facility is subject to acid rain requirements so that the permit language can be properly reflected in Part B of the permit. (CHECK FLAG IN STARS2) Available Guidance: October 16, 2001 e-mail guidance from Tom Rigo.

Quality Indicators for Terms and Conditions.

a. Terms and conditions developed for Title V permits should be:

(i) Accurate and comprehensive (from a regulatory standpoint);

(ii) Clearly written and understandable (put yourself in the place of the facility environmental contact or other reasonably competent technical person -- are compliance obligations clearly spelled out?);

Page 29 of 69

Ahern, 11/15/10,
Use how the terms are cited in the standard terms section of the permit as a guidepost.
cwieg, 11/15/10,
Our staff has been asking for guidance about this. When you look at recent issued permits, these authority citations are all over the board….Some people are using the citations provided in the Terms and Conditions library and others are using other citations,,,,even the format is varying….Any guidance or examples we can give?????

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(iii) Enforceable – terms should be relevant to what is being permitted, if a term is requesting information that has no connection to controlling emissions then the term most likely is not needed – must be practically enforceable by our inspectors;

(iv) Grammatically correct; and

(v) Reflective of a high level of quality and appear to be a professional-looking document.

[b.] Upon completion of the Draft permit recommendation, the CDAQDO/LAA Permit Writer reviews the Draft permit recommendation against the listed criteria to ensure that quality Terms and Conditions have been written.

24.[28.] If not already done, prepare or update the Statement of Basis (SOB) document using the Ohio EPA guidance (Appendix M), or the most recent/updated guidance. The SOB document must be generated in STARS2 and saved at L:\Data\Facilities. The SOB document can be prepared during the assembly of the permit recommendation.

25.[29.] CAM Plan Review.

a. Determine if a Compliance Assurance Monitoring (CAM) plan is required for one or more emissions units at the facility using CAM guidance (Appendix L).

b. If a CAM plan is required, provide a discussion of the CAM plan as part of the Draft Title V permit recommendation.

c. Contact DAPC CO Reviewer to discuss progress, schedule, technical issues, etc. associated with the review of the submitted CAM plan.

[d.] In cases where a CAM plan is required but has not been submitted, the CDAQDO/LAA Permit Writer shall contact the facility contact to obtain a CAM plan. This might require the need to resubmit the Title V application.

d.[e.] Additional CAM guidance from U.S. EPA can be found at: http://www.epa.gov/ttn/emc/cam.html

[30.] For Title V Permit Renewals, the CDAQDO/LAA Permit Writer shall follow the current Ohio EPA guidance concerning the preparation of Title V permit renewals (Appendix P).

Page 30 of 69

Ahern, 11/15/10,
Reference CAM guidance AP ID

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[a.] Upon submittal of the permit renewal recommendation to Central Office, CDAQDO/LAA PRM will attach a copy of the completed checklist in STARS2.

[b.] The CDAQDO/LAA Permit Writer and CDAQDO/LAA PRM shall contact DAPC CO Reviewer to discuss technical issues, progress, schedule, etc. for permit renewals.

e.[c.] Note that the old legacy permits were in a different format that contained two sections for the individual emissions units terms: State/Federal and State Only. The new STARS2 format contains only one section for the emissions unit terms. In this section, it will be necessary to include terms that were previously in the State Only section and identify them accordingly in term a)(1).

[31.] Whenever possible, the CDAQDO/LAA Permit Writer will allow "breathing space" after the first draft of Terms and Conditions before submitting the permit recommendation for review.

[a.] This time (typically from 2 to 7 days) allows a cooling off period before the CDAQDO/LAA Permit Writer conducts a final review of the entire permit recommendation.

f.[b.] Print out hard copy of entire permit recommendation.

[c.] Review the entire permit recommendation, making corrections or seeking guidance from CDAQDO/LAA PRM or DAPC CO where appropriate.

[32.] The CDAQDO/LAA Permit Writer updates the Workflow in STARS2 and assigns the permit recommendation to CDAQDO/LAA PRM.

CDAQDO/LAA Supervisory Review performed by CDAQDO/LAA PRM.

Pre-Draft Strategy Review. With the grouping of similar EUs allowed in STARS2, the Pre-Draft Strategy might not be needed. However, it’s possible that some units might be similar but not identical which requires separate terms.

[a.] If submittal of a pre-draft strategy is determined to be a practicable approach, evaluate pre-draft strategy (i.e., preliminary draft Terms and Conditions for sample emissions units) prepared by the CDAQDO/LAA Permit Writer.

(i) Follow the standard review tasks outlined in this section to evaluate pre-draft strategy.

Page 31 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[(ii)] The CDAQDO/LAA PRM updates the Workflow in STARS2 and assigns the pre-draft strategy to DAPC CO Reviewer.

[33.] The CDAQDO/LAA Permit Writer gives permit package to the CDAQDO/LAA PRM; package includes:

g.[a.] Printed copy of permit application or note that the application is in STARS2;

h.[b.] Printed copy of permit Terms and Conditions;

i.[c.] SOB Document;

j.[d.] Renewal checklist for renewal permits;

k.[e.] Main Title V permit facility file; and

l.[f.] Any pertinent supporting information that was used to prepare the permit recommendation.

Conduct initial review of hard copy of permit recommendation; this review focuses on permit structure.

m.[g.] Assure that correct spelling, grammar, punctuation and format has been used (see Appendices J and K).

Review Terms and Conditions for each emission unit ensuring that:

n.[h.] All emissions units are addressed;

o.[i.] All pollutants are identified;

p.[j.] Any recommended PTI modifications are initiated;

q.[k.] All correct rules are cited;

r.[l.] Any emissions units identified as being insignificant units are, in fact, “insignificant” and divided into two separate permit terms:

(i) Insignificant emissions units that are subject to federally approved SIP limits and/or have an issued PTI are both State and federally enforceable (note, facility must submit an EAC form for this type of insignificant emissions unit); and

(ii) Insignificant emissions units that are either de minimis or not subject to any applicable air pollution control requirements are

Page 32 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

State only enforceable (note, this term should be identified in section B.1 as State only).

26.[34.] Review additional elements in the Terms and Conditions for each emissions unit.

a. Review application for emissions unit installation and/or modification dates.

b. Review application for control equipment combinations (which/where); verify that control equipment listed in application is included in permit (and vice-versa).

c. Ensure that emissions unit descriptions match rules, requirements, operational restrictions and additional Terms and Conditions (e.g., coating line – VOC, grinding operation – PM, etc.).

d. Review list of federal and OAC rules to determine which apply.

e. Check each pollutant emitted by each emissions unit along with applicable emission limits for each pollutant.

f. Check emissions unit descriptions in application with permit write-up.

g. Determine if any alternative operating scenarios are possible - these should be identified in the application.

h. Certify that all PTIs and PTI modifications have been issued as appropriate.

Review permit Terms and Conditions.

i. Continue check of each allowable emissions limitation or other requirement for follow-through in Terms and Conditions: ‡

(i) Operational restrictions;

(ii) Monitoring;

(iii) Record keeping:

(iv) Reporting; and ‡ ”Follow-through” means ensuring that for each emission limit in the permit, there are associated operational restrictions, monitoring, record keeping, reporting and testing requirements as appropriate

Page 33 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(v)Testing:

(A) Check to see if emissions testing is required. When was the last test performed? Borderline compliance? Refer to Engineering Guide 16 to determine frequency.

j. Continue to ensure that the correct and most up-to-date Terms and Conditions are in the permit.

k. Identify PTI "streamlining language" as necessary. This is used when language in the Title V permit is modified from what was in the PTI.

l. Ensure that all terms in the permit for both Part B and Part C have the proper “authority for term” cited.

m. Apply technical experience in reviewing each permit.

(i) Continue to check permit content.

(A) Ensure that the permit makes sense for each emissions unit (e.g., applying VOC rules for coating lines).

(ii) Continue to ensure that there is proper parametric monitoring included for each emission unit.

(A) The permit is a building process where each successive section of the permit builds on the previous section of the permit (e.g., monitoring/record keeping builds on operational restrictions).

Check each term and condition for consistency.

(iii)Continue to check sections of permit making sure that the Terms and Conditions used are up-to-date:

(A)Additional terms;

(B)Operational restrictions;

(C) Monitoring;

(D) Record keeping;

(E) Reporting

(F)Testing; and Page 34 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(G) Miscellaneous requirements.

(iv)Review similar permits that have been issued including the following:

[(A)] CDAQDO/LAA file of some standard terms that have been supplied by DAPC Central Office in the past;

(A)[(B)] STARS2 Terms and Conditions;

[(C)] CDAQDO/LAA PRM and CDAQDO/LAA Permit Writer knowledge and experience of terms from past work efforts; and

[(D)] If needed, CDAQDO/LAA can request updated Terms and Conditions from DAPC Central Office Reviewer.

n. Identify any generally applicable facility-wide requirements for inclusion in Part B, Facility-Wide Terms and Conditions.

(i) Assure that PTI number(s) and date of issuance are listed for post-1974 insignificant emissions unit(s).

27.[35.] Review Statement of Basis document (SOB).

a. Ensure that all emission limits for each emissions unit have been included in the SOB and that the proper monitoring, record keeping, reporting and testing have been identified for each emission limit.

b. Ensure that current SOB form has been used. The SOB template should be generated in STARS2 and then save a copy to L:\Data\Facilities.

[36.] After thorough review, mark changes on hard copy of pre-draft permit recommendation and SOB and return documents and supporting information to the CDAQDO/LAA Permit Writer for any needed changes.

[a.] Corrections should be clearly marked in red (or other distinguishing color) and/or highlighted by CDAQDO/LAA PRM. Alternatively, Track Changes in Word can be used to identify the needed changes.

[b.] The permit recommendation can be Looped Back to the CDAQDO/LAA Permit Writer in STARS2 at the discretion of the CDAQDO/LAA PRM.

Page 35 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[37.] The CDAQDO/LAA Permit Writer makes the revisions and highlights the changes to ensure that all the changes have been made.

[38.] The permit recommendation is returned to CDAQDO/LAA PRM for further review.

[39.] CDAQDO/LAA PRM makes additional changes as needed and returns to the CDAQDO/LAA Permit Writer.

[40.] When there are no further changes, CDAQDO/LAA Permit Writer sends the permit recommendation to the facility to allow opportunity to comment. The permit action should be placed on Referral in STARS2.

[41.] Facility provides any suggested changes and CDAQDO/LAA Permit Writer modifies the recommendation as needed in concurrence with CDAQDO/LAA PRM.

[42.] When there are no further changes, CDAQDO/LAA PRM submits the permit recommendation to CO. CDAQDO/LAA PRM uploads the permit recommendation, SOB, and renewal checklist (if applicable) in STARS2 and sends an e-mail to CO Reviewer.

[43.] CDAQDO/LAA PRM updates the STARS2 Workflow to reflect submittal of the official Draft Permit recommendation to Central Office for review.

Central Office Review

28.[44.] Technical review prior to permit review.

a. CO Reviewer prints hard copy of the Title V application from STARS2 or review "on screen" (electronically).

b. Review of PTI file(s).

(i) CO Reviewer checks PTI files for recently issued PTIs for the Title V facility under review.

c. Review of Title V STARS2 application.

(i) Review the non-insignificant and insignificant emissions units.

(ii) CO Reviewer checks for major issues: emissions unit status (insignificant vs. non-insignificant, as identified by the

Page 36 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

permittee); "insignificant emissions units" that, based on available information, do not qualify as insignificant, etc....

Optional Site Visit.

[d.] At any time the CO Reviewer may contact CDAQDO/LAA to schedule a site visit, as part of the technical review/permit review; this is especially useful when complex permitting issues have been identified.

29.[45.] Pre-Draft Review Strategy (if applicable). Since similar EUs can be grouped now in STARS2, Pre-Draft strategy might not be needed.

[a.] CDAQDO/LAA submits pre-draft strategy review to CO via STARS2 from CDAQDO/LAA PRM w/sign-off date and notifies CO Reviewer through e-mail with important information listed (e.g. similar sources, special language).

(i) CO receives pre-draft review strategy.

(ii) Pre-Draft Strategy identifies groups of similar Emission Units, with the idea of reviewing one EU from each group.

b. Workflow for pre-draft review.

[(i)] CDAQDO/LAA PRM updates STARS2 Workflow when the pre-draft strategy recommendation is submitted to CO and identifies that this is a pre-draft review.

(i)[(ii)] All CO Title V permit reviewers will be instructed that this is the approach to be used for reviewing Cleveland Title V permits.

[c.] CO Reviewer prints Terms and Conditions of emissions unit(s) for pre-draft review provided by CDAQDO/LAA via STARS2 immediately prior to review.

[d.] CO Reviewer reviews the Terms and Conditions (in accordance with "Title V Permit Terms and Conditions Review" below) for the selected pre-draft emissions units by reading the emissions units Terms and Conditions that CDAQDO/LAA identified should be reviewed. Corrections or questions are to be noted along the way to attempt to address all needed corrections and questions as early in the review process as possible and to avoid the need for multiple and redundant reviews.

[(i)] Any comments on pre-draft strategy from the CO Reviewer should be sent to CDAQDO/LAA PRM and CDAQDO/LAA Permit

Page 37 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Writer. Update the Workflow in STARS2 and loop the permit recommendation back to the CDAQDO/LAA PRM.

[(ii)] CDAQDO/LAA PRM and/or CDAQDO/LAA Permit Writer will incorporate, revise and re-submit to CO Reviewer. CDAQDO/LAA PRM uploads the revised terms in STARS2 and updates the Workflow to assign the permit recommendation back to CO Reviewer.

[e.] CO Reviewer will communicate via email to CDAQDO/LAA PRM and CDAQDO/LAA Permit Writer when the Terms and Conditions for the pre-draft strategy are acceptable. Update the Workflow in STARS2 and loop the permit recommendation back to the CDAQDO/LAA PRM.

[(i)] CDAQDO/LAA Permit Writer will copy Terms and Conditions to similar additional emissions units as appropriate. Note that identical units can now be grouped in STARS2 so that the permit will only have one set of terms for identical units instead of multiple identical terms.

[(ii)] CDAQDO/LAA Permit Writer submits the complete set of terms along with the permit file folder to the CDAQDO/LAA PRM for final review.

[(iii)] If there are no further changes, CDAQDO/LAA PRM submits the complete Draft permit recommendation to CO Reviewer through STARS2. CDAQDO/LAA PRM uploads the revised terms along with the SOB and renewal checklist (if applicable) in STARS2 and updates the Workflow to assign the permit recommendation back to CO Reviewer.

c.[f.] CO Reviewer receives the Draft permit recommendation after the entire Title V permit is complete and ready for CO Reviewer to begin a full review.

Standard Review (i.e., non - Pre-Draft Review Strategy).

d.[g.] CO Reviewer prints entire Title V permit for hard copy review.

30.[46.] CO Review of Title V Permit Terms and Conditions.

Review insignificant emissions unit lists in Part B, Facility-Wide Terms and Conditions.

(i) PTI number(s) and issuance date listed for post-1974 insignificant emissions unit(s).

Page 38 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(ii) Perform cursory check of Title V application - "Maintain Emissions Units" - for installation dates of insignificant emissions units to determine which insignificant emissions units should have PTI numbers listed in Part B, Facility-Wide Terms and Conditions.

Identify any generally applicable facility-wide requirements for inclusion in Part B, Facility-Wide Terms and Conditions.

(iii)These include standard Terms and Conditions for:

(A) Emergency Action Plans (EAPs);

(B) Asbestos; and

(C) Part 82 (stratospheric ozone).

(iv)Check Title V application - Facility Level form, Applicable Requirements tab, "Facility" from drop down list box for facility-wide applicable requirements identified by the permittee.

Review the Terms and Conditions for each non-insignificant emissions unit in Part C, Emissions Unit Terms and Conditions.

(v) Identify pollutants for each emissions unit in the permit, creating list, if needed.

(vi)Review Title V application - Emissions Unit Level form, Emissions tab - for pollutant(s) identified by the permittee.

(A) Consult other issued Title V permits with similar emissions units (as needed).

[(B)] First, consult known similar Title V permits from CDAQDO/LAA.

[(C)] Second, if similar Title V permits from CDAQDO/LAA are unavailable or nonexistent, consult known similar permits from other Ohio EPA district offices/local air agencies.

Review applicable rules cited in permit.

(B)[(D)] Consult other issued Title V permits with similar emissions units (as needed).

Page 39 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[(E)] First, consult known similar Title V permits from CDAQDO/LAA.

[(F)] Second, if similar Title V permits from CDAQDO/LAA are unavailable or nonexistent, consult known similar permits from other Ohio EPA district offices/local air agencies.

Review each Applicable Emission Limitation/Control Requirement.

(C)[(G)] Check for correct limit and/or proper application of the rule.

(D)[(H)] Check PTI limit, if applicable.

(E)[(I)] Perform cursory check of Title V application - "Maintain Emissions Units" for installation dates of non-insignificant emissions units to determine which non-insignificant emissions units should have PTI requirements specified in the Terms and Conditions.

(F)[(J)] Confirm that all PTI requirements have been copied over into the Title V permit. Use CO PTI hardcopy files or STARS2 electronic files to compare the Title V Terms and Conditions versus the PTI Terms and Conditions.

(G)[(K)] Use "PTI Streamlining Language" in permit, as appropriate. Note where substantive changes have occurred between the Title V Terms and Conditions and the PTI Terms and Conditions and apply the "PTI Streamlining Language" to that section(s) of the permit Terms and Conditions.§

Check for parametric monitoring.

(H)[(L)] Where the applicable requirement does not mandate periodic testing or instrumental or noninstrumental monitoring (which may consist of record keeping designed to serve as monitoring) Terms and Conditions should specify parametric monitoring "sufficient to yield reliable data from the relevant time period that are representative of the source's compliance with the permit…." [OAC rule 3745-77-07(A)(3)(ii)]

§ In certain cases where a new State regulation is more stringent than a PTI limitation, or when emission factors change, CDAQDO/LAA may need to process a modification of the PTI concurrently with the processing of the Title V permit.

Page 40 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(I)[(M)] If the facility is major for HAP, check for applicable MACT standards.

(J)[(N)] Check Title V application, Facility Level form, Estimated Emissions tab - for any HAP pollutants emitted (as reported by the permittee); also refer to specific MACT preamble for listing of HAPs for the specific source category.

(K)[(O)] Maximum capacity of the emissions unit.

(L)[(P)] Check maximum capacity via Title V application - EAC form.

(M)[(Q)] Check process weight rate (PWR) and uncontrolled mass rate of emissions (UMRE) for OAC rule 3745-17-11 determination and document in permit Terms and Conditions whether Table 1 or Figure II is more stringent.

(N)[(R)] Identify release point(s) (stack or fugitive) for proper application of OAC Rule 3745-17 via Title V application - "Maintain Egress Points".

(O)[(S)] Review negative declarations and rule exemptions specified for the specific emissions unit.

Review each Operational Restriction.

(P)[(T)] Check that the Operational Restriction(s) will ensure ongoing compliance with the applicable requirements/control measures and/or satisfy OAC Chapter 3745-77 "gap-filling" requirements.

(Q)[(U)] Review wording of T&C to ensure that the Operational Restriction is clearly worded and not vague.

(vii) Review each Monitoring/Record Keeping requirement.

(A) In most cases, a Monitoring/Record Keeping requirement is necessary for each Emission Limitation/Control Requirement and Operational Restriction.

(B) Check specific rules to see whether the required Monitoring/Record Keeping approach is prescribed by rule or another approach can be used.

Page 41 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(C) Review wording of Terms and Conditions to ensure that the monitoring method enables the agency to enforce the respective Emission Limitation/Control Requirement or Operational Restriction; check that the monitoring frequency is appropriate; check that the correct monitoring is specified (e.g., CEMS, if required by rule, refer to Engineering Guide 52).

Review each Reporting requirement.

(D) In most cases, a Reporting requirement is necessary for each Emission Limitation/Control Requirement and Operational Restriction.

(E) Check specific rules to see whether the required Reporting approach is prescribed by rule or whether another approach can be used.

(F) Review wording of T&C to ensure that the reporting method satisfies "prompt reporting" per OAC Chapter 77 requirements for the respective Emission Limitation/Control Requirement or Operational Restriction; check that the appropriate frequency of reporting (rule-based, policy, etc…) has been specified.

Review each Testing (Compliance Method) requirement.

(G) In most cases, a Testing (Compliance Method) is necessary for each Emission Limitation/Control Requirement and Operational Restriction.

(H) Check specific rules to see whether the required Testing (Compliance Method) approach is prescribed or another approach can be used.

(I) Review wording of T&C to ensure that the Testing (Compliance Method) enables the agency to enforce the respective Emission Limitation/Control Requirement or Operational Restriction. Whenever possible, Testing (Compliance Method) should refer to information from Monitoring/Record Keeping. Check to see whether emission testing is specified, if needed (and appropriate frequency set). This T&C must clearly and precisely define how compliance with the respective Emission Limitation/Control Requirement or Operational Restriction will be ascertained by the permittee, the agency, or a third party.

Page 42 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(J) Ensure that emission rate calculation is accurate and concise. In cases where "no emission testing is required" an explanation should be provided (e.g., cite past emission test/test date that demonstrated the tested emission rate was well below the permit allowable emission rate, etc…).

(K) Check that Terms and Conditions include appropriate frequency for emission testing.

(L) Ensure that Testing (Compliance Method) and/or emission Test Method(s) (i.e., U.S. EPA reference methods) are consistent with regulatory requirements.

Review each Miscellaneous requirement.

(M) This section is typically used for clarification statements. For example, Miscellaneous requirement may be used to justify why certain Terms and Conditions are specified in the permit. Additionally, Miscellaneous requirements may be used to include Compliance Plans and Schedules in a Title V permit to address noncompliance issues including the requirement to obtain a PTI.

(N) Review wording of Terms and Conditions to ensure that each Miscellaneous requirement is clearly worded and serves the intended function in the permit.

Review air toxic modeling, if applicable.

(O) Review Terms and Conditions; should be identified as State-only in section a)(1) of the permit.

(P) Ensure current air toxics language has been used.

(Q) Perform cursory check of modeled emission rate vs. MAGLC.

Review rule citations for non-SIP approved rules.

(R) Non-SIP approved rules (i.e., OAC rules that have not been approved by USEPA as part of Ohio’s federally approved SIP) are identified as State-only in section a)(1) of the permit.

(S) Check that the appropriate cross reference from non-SIP approved rules (State-only) to SIP approved rules (State/fed) have been cited.

Page 43 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

(viii) Ensure that all terms in both Part B and Part C contain the proper “authority for term” cite.

(ix) Check for CAM Plan.

(A) A CAM plan must be incorporated in the Terms and Conditions, if applicable, using the most recent Ohio EPA or U.S. EPA guidance.

[(B)] Check SOB (see below) for whether CDAQDO/LAA evaluated CAM applicability for each Pollutant Specific Emissions Unit (PSEU) - SOB should indicate "yes" or "N/A" for CAM for each emissions unit.

Apply the following Quality Indicators for Permit Terms and Conditions:

(B)[(C)] Terms and conditions should:

(i) Be accurate and comprehensive (from a regulatory standpoint);

(ii) Be clearly written and understandable (put yourself in the place of the facility environmental contact or other reasonably competent technical person -- are compliance obligations clearly spelled out?);

(iii) Contain "follow through" (i.e., every permit Emission Limitation/Operational Restriction has associated and accurate Monitoring/Record Keeping, Reporting, and Testing (Compliance Method) Terms and Conditions specified);

(iv) Be grammatically correct;

(v)Be in a consistent format within Emission Unit Terms and Conditions;

(vi) Be in a consistent format throughout entire Title V permit; and

(vii) Be an overall high-quality, professional-looking product.

Review the Statement of Basis (SOB).

Page 44 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

b. Ensure that the most up-to-date SOB form has been used to prepare SOB. This form should have been generated and stored in STARS2.

c. A complete SOB is required at the Draft permit issuance stage.

[d.] If no SOB has been sent, DAPC Reviewer contacts CDAQDO/LAA PRM.

31.[47.] Title V permit corrections & questions.

[a.] Prepare a hard copy mark up of the Title V permit recommendation noting all corrections/questions to send to CDAQDO/LAA via fax or e-mail (scanned PDF). Or use the “Track Changes” feature in Word to identify any changes that are needed.

[b.] If only minor corrections (i.e., grammar, spelling, etc.) are noted, and as time allows (typically less than 2 hrs expected/permit to make the changes), the CO Reviewer may elect to make the changes to the permit instead of sending the corrections to CDAQDO/LAA to make the changes.

[c.] If certain questions identified during the permit review will require research and a response by CDAQDO/LAA and/or different individuals need to have input to respond to the question(s) then e-mail is preferred over fax.

Contact CDAQDO/LAA Permit Writer/CDAQDO/LAA PRM.

a.[d.] Discuss progress, schedule, technical issues, etc. through e-mail, phone calls or meetings.

[e.] The permit can be in both “shops” at the same time - for instance: CO could be addressing certain technical issues while CDAQDO/LAA is addressing other technical issues and/or making corrections to the Terms and Conditions; through STARS2, there is currently no way to track when permit is in "both shops". However, whoever the permit recommendation is assigned to in STARS2 is responsible for making progress and moving the recommendation forward accordingly.

[48.] Once the permit has been assigned to CO, for any changes made by CDAQDO/LAA , including the issuance of any PTIs that affect the review, CDAQDO/LAA PRM requests that the permit recommendation get looped back to CDAQDO/LAA After making changes, CDAQDO/LAA PRM will upload the revised terms in STARS2 and delete the previous version.

Page 45 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[49.] It is suggested that the CO Reviewer allow "breathing space" after receiving the corrected Terms and Conditions from CDAQDO/LAA (2 -- 7 days) and then review the entire permit again.

32.[50.] When CO Reviewer is satisfied that the permit is approvable, he or she assigns the permit to DAPC CO PRM in STARS2.

[a.] Based on DAPC CO PRM, additional revisions may be made to the permit by either the CO Reviewer or the permit may be reassigned to CDAQDO/LAA PRM or CDAQDO/LAA Permit Writer.

[(i)] In instances where CO recommends permit revisions, CO will contact CDAQDO/LAA PRM and CDAQDO/LAA Permit Writer to discuss revisions prior to incorporation into the permit.

33.[51.] Ongoing Title V Permit T&C training.

a. At least once per week, CO Reviewer reads through the issued Title V permits posted on the DAPC web site or in STARS2 in order to stay up-to-date on different permitting language options, compliance method approaches, etc..

Issuance of Draft Permit

34.[52.] Permit is issued by CO DAPC Permit Issuance and Data Management Section.

35.[53.] Public notice is registered in STARS2 by CO DAPC.

[54.] Preliminary Proposed Permit (PPP) action is assigned to CDAQDO/LAA Permit Writer.

Post-Draft Permit Process

36.[55.] After the Draft permit has been issued, there is a 30-day public comment period during which the public, the facility, and/or USEPA may submit comments on the Draft Permit. Anyone from the public can also request to have a public hearing.

a. Public hearing held if requested – need to provide 30-day public notice for the hearing.

(i) Any public hearing will be coordinated through Ohio EPA Public Information Center. A notice must be posted in the newspaper 30 days prior to the public hearing.

Page 46 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[b.] At close of comment period, CDAQDO/LAA Chief of Engineering shall remind CDAQDO/LAA PRM and CDAQDO/LAA Permit Writer of permit time lines.

[c.] If public comments are received, including comments from a public meeting, a "Response to Comments" document must be prepared by the CDAQDO/LAA Permit Writer (even if no comments are received) and reviewed and discussed with the CDAQDO/LAA PRM before making changes to the permit (see Appendix N). The “Response to Comments” document should be generated through STARS2 using the “Tools” tab. Save the document at L:\Data\Facilities.

b.[d.] Comments received from the permittee or from US EPA (Region V) do not require the preparation of a response to comments document, however, the comments must be discussed and addressed in the permit file.

(i) Our response may be that we disagree with the commenter (with justification), but that must be documented in the file should the issued permit be appealed.

[e.] CDAQDO/LAA PRM and CDAQDO/LAA Permit Writer will discuss significant changes with DAPC CO Reviewer.

[f.] Within a week of the close of the comment period, CDAQDO/LAA will assess how to proceed with the next stage of the permit.

[g.] If the changes are agreed to, the CDAQDO/LAA Permit Writer makes changes in the Preliminary Proposed Permit (PPP) recommendation and adjusts the SOB if needed and submits the PPP permit recommendation to the CDAQDO/LAA PRM with the changes identified using “Track Changes” in Word.

[h.] CDAQDO/LAA PRM reviews changes and has CDAQDO/LAA Permit Writer make any additional changes necessary.

c.[i.] When there are no further changes, the PPP permit recommendation is sent to the facility to allow comment.

[j.] CDAQDO/LAA Permit Writer makes any adjustments needed based on facility comments.

[k.] After all the necessary changes are made, the Response to Comments document along with the ”Track Changes” copy of the PPP permit recommendation is submitted to CO by CDAQDO/LAA PRM through STARS2.

Page 47 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

[l.] CDAQDO/LAA PRM updates Workflow in STARS2 and assigns PPP recommendation to CO Reviewer.

[m.] CO Reviewer reviews and approves changes. Any further changes that are needed can be done by CO or CDAQDO/LAA.

37.[56.] After the Preliminary Proposed Permit is issued.

[a.] A PPP meeting or conference call may be scheduled upon request by the permittee. This must be done within 14 days after issuance of the PPP permit. If the company does not request a meeting, then CDAQDO/LAA can move forward with processing the Proposed Permit (PP) recommendation.

[(i)] PPP meetings are scheduled with the permittee, CO, and CDAQDO/LAA.

(i)[(ii)] PPP meetings may take place in person (typically in Columbus) or via conference call.

(ii)[(iii)] All necessary changes must be agreed to during the PPP meeting to minimize further delays.

[(iv)] If changes are agreed to, the CDAQDO/LAA Permit Writer makes the changes in the Proposed Permit recommendation using Track Changes and submits the PP recommendation to the CDAQDO/LAA PRM for review.

(iii)[(v)] After all necessary changes are made, the Proposed Permit recommendation is shared with the company for their concurrence on the changes that have been made.

[(vi)] After facility concurs with the changes, the CDAQDO/LAA PRM submits the Proposed Permit recommendation to CO through STARS2.

[(vii)] CO Reviewer reviews the PP recommendation and communicates any changes that are needed to CDAQDO/LAA.

38.[57.] After the Proposed Permit is issued.

[a.] USEPA has 45 days to review and comment on the Proposed Permit. If USEPA requests any additional changes, these are handled either by CO or the CDAQDO/LAA Permit Writer before issuing the final permit.

Page 48 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

a.[b.] CO coordinates response to U.S. EPA comments.

(i) Recently, comments from U.S. EPA have not been received for most permits and permits are typically issued final after U.S. EPA grants its approval.

(ii) Since 2004, CO has not received many USEPA comments at the PP stage. This trend is attributed to effective early participation and comment from USEPA (typically at the Draft permit stage).

[(iii)] The Final Permit recommendation is assigned to the CDAQDO/LAA Permit Writer in STARS2. If any changes are needed as a result of comments from USEPA, the CDAQDO/LAA Permit Writer makes the changes in the Final Permit recommendation using Track Changes and then submits the recommendation to the CDAQDO/LAA PRM.

[(iv)] If there are no further changes, the CDAQDO/LAA PRM uploads the revised terms, if changes were made, in STARS2 and updates the Workflow to assign the recommendation to the CO Reviewer.

Changes to Permit After Issuance

39.[58.] Changes at the facility or changes in regulations or policy may require changes to a Title V permit after it is issued but before it expires.

40.[59.] Guidance prepared by Ohio EPA provides various scenarios and the permitting approaches that are required to address the need for these changes (see Appendix O). In using this guidance, it is recommended to first go to the Significant Modification section and determine if the proposed modification will be a Significant Modification or not. If it is not a Significant Modification, then we do not need to process the modification right away. If it is a Significant Modification, then the Significant Mod must be issued Final before the facility can operate under the proposed modification (there are some exceptions as noted in the guidance). Significant Modifications must be issued through all four stages which can take a long time; therefore, if possible, process the Significant Mod at the same time as the PTI is being processed. For the other types of Title V permit modifications, these can usually wait until renewal of the Title V permit and then roll them all into one permitting action.

Additional Title V actions

41.[60.] Review quarterly and semi-annual deviation reports.Page 49 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

42.[61.] Review annual Title V certifications (see Appendix Q).

43.[62.] Review annual Title V Fee Reports (see Appendix R).

History: Initiated December 29, 2000; Revised June 11, 2003; Revised December 1, 2005 by incorporating recommendations of an interagency process improvement team reviewing the processing of Title V permits at Cleveland DAQ. Updated July 15, 2010 to include information regarding STARS2.

Page 50 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

List of Appendices

Appendix A: CDAQDO/LAA Permitting Workload Assignment Procedure

Appendix B: Preliminary Completeness Review Checklist and Instructions

Appendix C: Preliminary Complete Determination Template letter for a Title V Permit

Application

Appendix D: Preliminary Incomplete Determination Template letter for a Title V Permit

Application

Appendix E: Technical Completeness Checklist and Instructions

Appendix F: Technical Incompleteness Procedures (see Answer Place 2172)

Appendix G: STARS2 conversion guidance for legacy permits

Appendix H: Ohio EPA Permit Structure Guidance and Ohio EPA Style Manual

Appendix I: Answer Place Questions and Engineering Guides

Appendix J: Insignificant Emissions Units

Appendix K: CDAQDO/LAA Rule Chart, and list of rules for OAC, NSPS, NESHAP, and MACT

Appendix L: CAM Guidance. Additional guidance can be found at: http://www.epa.gov/ttn/emc/cam.html

Appendix M: Statement of Basis Template and Instructions

Appendix N: CDAQDO/LAA Response to Comment Guidance and JB e-mail guidance. Use template

from STARS2. See Answer Place 1521.

Appendix O: Guidance for Incorporating Facility Changes into a Title V Permit (i.e., modifications)

Appendix P: Permit Renewal Guidance and Checklist.

Appendix Q: Guidance for reviewing annual Title V certifications

Appendix R: Guidance for reviewing annual Title V Fee Reports

Page 51 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix A: CDAQDO/LAA Permitting Workload Assignment Procedure

Page 52 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix B: Preliminary Completeness Review Checklist and Instructions

Page 53 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix C: Preliminary Complete Determination Template Letter for a

Title V Permit Application

Page 54 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix D: Preliminary Incomplete Determination Template Letter for a Title V Permit Application

Page 55 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix E: Technical Completeness Checklist and Instructions

Page 56 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix F: Technical Incompleteness Procedures (see Answer Place 2172)

Page 57 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix G: STARS2 Conversion Guidance for Legacy Permits

Page 58 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix H: Ohio EPA Permit Structure Guidance and Ohio EPA Style Manual

Page 59 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix I: Answer Place Questions and Engineering Guides

Page 60 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix J: Insignificant Emissions Units

Page 61 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix K: CDAQDO/LAA Rule Chart, and list of rules for OAC, NSPS, NESHAP, and MACT

Page 62 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix L: CAM Guidance – additional guidance can be found at http://www.epa.gov/ttn/emc/cam.html

Page 63 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix M: Statement of Basis Template and Instructions

Page 64 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix N: CDAQDO/LAA Response to Comments Guidance and JB e-mail guidance. Use template from STARS2. See Answer Place

1521.

Page 65 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix O: Guidance for Incorporating Facility Changes into a Title V Permit (i.e., modifications)

Page 66 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

P: Permit Renewal Guidance and Checklist

Page 67 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix Q: Guidance for Reviewing Annual Title V Certifications

Page 68 of 69

Cleveland Division of Air QualityTitle V Permit Preparation Manual KramerProcedure

Appendix R: Guidance for Reviewing Annual Title V Fee Reports

Page 69 of 69