1
REPORT OF OVERSIGHT COMMITTEES REPORTING DIRECTLY TO THE COUNCIL allowed in terms of Section 8(1)(f)(b)(i) of the Rules and Orders for consideration by the Council Agenda of the Council Meeting of the CITY OF TSHWANE METROPOLITAN MUNICIPALITY which will be held in the Council Chamber, Sammy Marks Conference Centre, corner Madiba and Lilian Ngoyi Streets, Pretoria, on THURSDAY, 26 OCTOBER 2017, at 10:00 to consider the matters as set out in the agenda hereafter.
PAGES H. FROM THE SECTION 79 OVERSIGHT COMMITTEE:
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING: 12 OCTOBER 2017………………………………………………......... 4-102(26)
RK Mathebe SPEAKER 19 October 2017
2 F. REPORT TO COUNCIL
The Speaker, in terms of Section 8(1)(f)(b)(i) of the Rules and Orders, proposes to Council that the reports contained in this agenda, from the Meeting of the Section 79 Oversight Committee: Economic Development and Spatial Planning held on 12 October 2017, be submitted for consideration, and subsequently requests the Chair of Chairs, Councillor GC Pretorius, to present the report to Council.
* * * * *
3 COUNCIL AGENDA: CITY OF TSHWANE METROPOLITAN MUNICIPALITY: 26 OCTOBER 2017 REPORTS TO COUNCIL INDEX (The recommendation(s) appear(s) on the page(s) indicated in brackets)
Pages H. FROM THE SECTION 79 OVERSIGHT COMMITTEE:
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING: 12 OCTOBER 2017
1. Office of the Speaker
Report on the Annual Performance of the Section 79 Oversight Committee: Economic Development and Spatial Planning in the 2016/17 Financial Year (FY)
(From the Section 79 Oversight Committee: Economic Development and Spatial Planning: 12 October 2017)………….. 4-102(26)
* * * * *
4
COUNCIL AGENDA: CITY OF TSHWANE METROPOLITAN MUNICIPALITY: 26 OCTOBER 2017 JKR Thema (0123581723) COUNCIL: 26 October 2017 1. OFFICE OF THE SPEAKER
REPORT ON THE ANNUAL PERFORMANCE OF THE SECTION 79 OVERSIGHT COMMITTEE: ECONOMIC DEVELOPMENT AND SPATIAL PLANNING IN THE 2016/17 FINANCIAL YEAR (FY)
1. PURPOSE OF THE REPORT
The aim of this report is to provide an overview on the performance of the Section 79 Oversight Committee: Economic Development and Spatial Planning for the period August 2016 to June 2017. The report will further identify areas for improvement, in order to enable the Committee to perform its functions effectively.
2. STRATEGIC OBJECTIVES The Strategic Objectives enshrined in this report are as follows: (a) Strategic Objective 4: Promote good governance and active citizenry (b) Strategic Objective 5: Improve financial sustainability 3. BACKGROUND
The City of Tshwane’s Council Resolution of 30 July 2015 approved the 2016/17 Service Delivery and Budget Implementation Plan (SDBIP) to ensure alignment and integration within the City and to improve planning and budgeting processes. The SDBIP is a firm commitment by the City on how it intends to improve the lives of its citizens with the resources at its disposal. In determining priority areas for oversight, the Committee scrutinized the SDBIP and departmental business plan, to formulate the 2016/17 Process Plan for monitoring and evaluation of projects/programmes implemented within the previous financial year.
4. DISCUSSIONS
The matters for discussion in this annual performance report are the oversight activities and findings of the Committee, for the period October 2016 to June 2017 and the analysis of commitments made by the Executive Mayor during the 2017 State of the City Address. In order to ensure consistency and alignment with its mandate, activities of this Committee were informed by a process plan that was developed and adopted by the Committee as a guiding tool for proper monitoring and evaluation of the departmental approved SDBIP.
5
The Committee plays an oversight role over the department, including proactively and reactively conducting inspection-in-locos as and when required, as well as an advisory legislative role in Council.
4.1. Committee meetings held as per the Council Calendar The activities of the Committee on 2016/17 Financial Year can be summarized as follows:
Date Meeting Inspection-in-loco
Total
13 October 2016 1 0 1
28 October 2016 1 0 1
10 November 2016
1 0 1
18 November 2016
0 1 1
19 January 2017 1 0 1
09 February 2017 0 1 1
23 March 2017 1 0 1
21 April 2017 1 0 1
11 May 2017 1 0 1
15 June 2017 Outreach Programme : Youth Symposium
Total 7 2 9
4.1.1 13th of October 2016
The Economic Development Department was called to make presentations on all its programmes and the SDBIP for 2016/17. They presented on EPWP, Vat Ales, Co-Operatives, Informal Street Trading and the Structure of the Department, but due to high volume of presentation, the meeting was extended to the 28th October 2016.
4.1.2 28th of October 2016
Presentations were done by National Treasury, Economic Desk from the Office of the Executive Mayor, Tshwane Economic Development Agency, City Planning and the Economic Development Department.
National Treasury – addressed the Committee on its support role to municipalities. Their focus is based on Economic Performance of Large Cities in the country. Tshwane was viewed as the highest in economic growth amongst all other municipalities but this trend collapsed since 2015 due to political instabilities. Treasury proposed that the City of Tshwane should develop good infrastructure to attract investors.
Economic Desk from the Executive Mayor’s Office – addressed the Committee on Tshwane’s perspective on business. Tshwane is the 3rd largest city in the world in terms of land space. Thus, the City has enough land for future socio-economic development. In the past few years, the City has seen unprecedented influx of economic migrants coming from other
6
Provinces and the neighboring countries in search of job opportunities. This brought challenges like squatting and informal settlements as well as fighting for scarce job opportunities. Tshwane is the capital city of South Africa and has over 180 embassies in the City. The world sees South Africa through Tshwane and therefore, it is imperative that the City must depict a positive image of the country to the entire world. This can be achieved by the City building a sound economy, creating jobs, minimizing socio-economic unrests and creating an environment that is going to attract investors.
Tshwane Economic Development Agency (TEDA) – addressed the Committee on their role as the key driver in accelerating economic growth in the City. This they do through attracting investors to come and invest in Tshwane. Their key performance areas include Tourism, Trade and Investment Promotion as well Property and Asset Management.
City Planning- addressed the Committee on their mandate based on the following statutes: Spatial Planning and Land-Use Management Act 16 of 2013 (SPLUMA). They clarified role played by their three Divisions namely: City Planning, City Development & Built Environment and Enforcement Division. They also addressed the Committee on Catalytic Projects which include African Gate-Way, West Capital, Symbio-City, East Capital, Northern Gate-Way Precinct and the Caledonian Project.
Economic Development – addressed the Committee on the status of the following Township Revitalisation Projects: Kgora Community Bakery Project, Reiteretse Vehicle Washing Facility and Tshepo 10 000.
4.1.3 10th of November 2016
Economic Development Department - addressed the Committee on progress regarding the following projects: Tshepo 10 000, Informal Traders Bursary Fund, Tshwane Fresh Produce Market and EPWP. On Tshepo 10 000, the Committee suggested that the programme had to be revisited and scrutinized to remove avenues of corruption. The Supply Chain to be invited to answer on questions asked regarding this programme. Full forensic audit of all the co-operatives that exist in the City including this Tshepo 10 000. Pricing of items and services should be scrutinized in comparison with the market related prices. On Informal Traders Bursary Fund, in order to reduce the plight confronting Informal Traders in raising their kids and avoid seeing these kids becoming informal traders themselves, the Former Executive Mayor came up with measures to deal with this intergenerational poverty that is taking its tall. He established a Bursary Fund that caters for City of Tshwane Informal Traders’ children especially the ones who passed grade 12, not to stay at home due to lack of money but to further their studies. The Committee wanted to know who the beneficiaries of the bursary fund are, how they nominated, where are they studying and what is their academic progress to date. The Committee also wanted to know about the structures governing the informal traders. Further, the Committee was concerned that the City was interacting with informal traders from Region 3 only.
7
On Tshwane Fresh Produce Market, The Committee was informed that the Informal Traders were asked to form themselves into a group known as Tshwane Informal traders Management Cooperative (TITMC). TITMC would be a middle-man between the City and informal traders. Again, TITMC would assist informal traders to buy in bulks which will increase the informal traders bargaining power. Only Region 3’s informal traders were organized and the Department promised that other Regions will follow suit.
4.1.4 18th of November 2016
The Committee and the Department of Economic Development and Spatial Planning conducted Inspection-In-Loco on the following projects:
Eco- Furniture Factory in Ga-Rankuwa
Brick-Making Facility in Soshanguve
Paper Towel Manufacturing Facility in Soshanguve
Kgora Community Bakery in Soshanguve
Mabopane Intermodal Change in Mabopane
4.1.5 19th January 2017
Economic Development and Spatial Planning Department - addressed the Committee on the responses emanating from questions that were raised by the the Committee during the Inspection-In-Loco visit of the 18th November 2016.
4.1.5.1 On Eco-Furniture Factory, the Department informed the Committee that: The project commenced in 2014 and is still in progress. It involves harvesting of alien trees and produces the following products: • School desks • Wall-panels for building low-cost housing • Coffins • Beds • Chess desks made from cut-offs It started with hundred (100) employees but the number has since increased to 325. As at the time when the committee went to the facility for inspection in loco, there was no enough work for all employees so shifts have been instituted to ensure that no workers are layed off. Most of the beneficiaries are taken from the youth and Tshepo 10 000 Co-operative in the surrounding areas of Ga-Rankuwa, Soshanguve, Mabopane and Winterveldt. The staff complement in the project consist of 60% females and 20% disabled. The Eco-Furniture Factory is aimed at contributing towards achievement of the following objectives: • Jobs creation by creating sustainable jobs • Utilization of local labor
8
• Skills transfer and capacity building for disadvantaged groups in Ga-Rankuwa, Soshanguve, Mabopane and Winterveldt areas, through accredited training.
• Fighting poverty through job creation and stimulation of economic growth.
Stake-holders in the project include SANPARKS, the City of Tshwane, Working for Water and the Department of Environmental Affairs. CHALLENGES • The project is not marketed • Lack of skills development to beneficiaries • Unavailability of land to dry-up the chopped wood. • The property adjacent to the factory that could be utilized belongs to the North
West Development Corporation. • More people are kept on the project, creating over staffing
4.1.5.2 On Brick Making Facility, the Department informed the Committee that:
• The facility was constructed in 2015 and is currently not functional even though there is a brick making machine on site.
• A budget of R4.900, 000 was allocated. • Bidvest has donated furniture to the project which is kept in the store room at
Centurion. CHALLENGES • No feasibility study was done. • Lack of covering over the storage area is a danger to the sand that will be
swept away during rainy days • No letters of intent signed between the would-be buyers and the operators
in confirming that the business will be viable • No Plan B is made in case the business does not work as envisaged • No plan to recoup money already spent by the City for the purpose of
creating other opportunities in the township The project depends on CoT buying stock from it.
4.1.5.3 On Paper-Towel Manufacturing Project, the Department informed the - Committee that:
• It started in 2015 but launched in February 2016 • In the first oversight visit to the project, it was not functional The budget allocated
was R3 000, 000. • Presently the Department has completed construction in the project as well as
appointment of co-operative, • As at the time of Inspection-In-Loco there was no electricity and the Department
informed the Committee that Eskom is responsible for installations in that area. Challenges • No feasibility study done on the project • No letter of intent signed to assist in confirming that the business will be
viable
9
Toilet rolls produced will be produced at the price toilet rolls are available in retail stores
The project is depending on CoT buying its products.
CoT has a current tender in place for the same product. • No Plan B in case the business does not succeed • Electricity not yet installed in the project
4.1.5.4 On Kgora Community Bakery, the Department informed the Committee that:
• The project is running since 2015. • The budget allocated was R3.8 million • Their core product is bread although they intend to venture into full-
fledged confectionary in future. • During the Committee’s visit to the establishment, the Committee
was informed that the bakery made a turnover of R190 000 and a profit of R6 000 per month. However, this claim could not be supported by evidence.
Challenges • Staff lacks financial and book-keeping skills • Lack of incubation on the project • Unavailability of a generator that would assist in case of load shedding • Unavailability of a Jojo tank in case of water supply interruptions.
4.1.5.5 On Mabopane Station Intermodal Change, the Department informed the - Committee that:
• This project commenced in March 2014 and was expected to be completed at the
end of March 2016. However, the contract was terminated on 03 March 2016, due to non-performance by the service providers.
• Later in April 2016, the new service provider was appointed to start working on the project.
• Currently, the new Service Provider is on site and the work is in progress. • The capital expenditure of the project was R52 million. • This project belongs to the Transport Department of the City however, the
Economic Development Committee has interest in this project because there are 162 stalls which are to be constructed for use by the informal traders at Mabopane Station.
• Based on the findings of the Inspection-In-Loco, the Committee wanted to know the following:
• Could a new Security Company be appointed? • Why metro police is not looking after the City’s assets on site? • Is the contract of the existing Security Company still on? if so, why is he not on
site? Challenges • There were high incidents of theft of building materials reported.
10
• As at the time of Inspection-In-Loco, there was no security guards on site • Non-performance by Contractors and subsequent termination of their
contract delayed the completion of the project.
11
4.1.6 23rd March 2017 Economic Development and Spatial Planning Department - addressed the Committee on the responses emanating from questions that were raised by the Committee during the Inspection-In-Loco visit of the 9th February 2017 at:
• African Gate-Way • Symbio City • Reitiretse Car wash facility • Tshwarisanang Plastic Manufacturing facility
4.1.6.1 On African Gate-Way, the Department informed the Committee that:
• The project is located opposite Centurion Mall on a land belonging to the City of Tshwane.
• The building belongs to BCX, a subsidiary of Telkom SA.. • Construction of this 40 square meter building started in May 2016 and expected to
be completed in April/June2017. • It is a two- phase project and currently on its 1st phase which covers building of
offices and a warehouse that will house BCX’s IT related staff. • Phase 2 of the project is envisaged to include the construction of the African
Union (AU), the United Nations (UN) offices and Tshwane International Convention Centre (TICC).
• The actual construction of phase 2 will involve both the Department of Public Works and Department of International Relations (DIRCO).
• No final agreements and/ or MOU’s between the parties are concluded to date. Challenges • Construction of phase 1 went ahead without prior approval of building plans by the
City. • The Lease Agreement of R100 per annum does not make economic sense and
should be reviewed. • Clarity should be given regarding the relocation of buses and taxis as well as
provision of small business opportunities in the precinct • Memorandum of Understanding between the City and DIRCO/Public Works
regarding the development of the phase 2 site is not yet signed. 4.1.6.2 On Symbio City, the Department informed the Committee that:
• This is a mixed-use development (i.e. offices, retail, and hospitality center etc),. • The rationale behind this project is to provide both high density and large high
quality urban open-space to enhance livability for the inhabitants. • Development is envisaged to stretch from the man-made lake next to the
Centurion Mall to Centurion Gautrain Station. • • A one Ben Van Loof (Developer) submitted an unsolicited bid to the City of
Tshwane for the development of this project. • Currently, there is legal dispute between the City of Tshwane and some
individuals regarding the convention of ERF53 (an open-space) from public park to business site. The dispute has been referred to court for litigation. The City has filed opposing affidavits against the applicants at the Northern Gauteng High
12
Court and the matter remains sub-judice. As at the time of preparing this report, no date of set-down was given.
• Safe for the unsolicited bid by Ben Van Loof, to date, no formal contract has been awarded to anyone to develop the site.
Challenges
The court case is delaying the finalization of the park closure.
No contracts have been signed by anyone for the development of Symbio City as yet.
The water in the man-made lake is contaminated and cleaning it will involve cooperation of the cities of Johannesburg and Ekurhuleni
4.1.6.3 On Reiteretse Vehicle Washing Facility, the Department informed the
Committee that:
The Reiteretse Car Wash Facility opened on 20 November 2015.
The facility was intended to includes a Laundromat, salon, kioski and chisa nyama out lets. ; Although the said operations were catered for, they never worked.
The main objective of developing this mixed use facility was to integrate all car wash operations along the Tsamaya Road in Mamelodi under one roof.
The facility had cost the Municipality R6.6 million and was meant to boost township economy and create jobs.
The facility showed signs of failure from its inception when members of the cooperative could not work as a unit.
There was no accountability and the project manager failed to bring the warring members of the cooperative to work as a team.
Previous site visits found the gates locked and no activity
To add salt to the wound, the roof of the facility was blown away by tornado around October 2017.
The Committee was informed by the Department that the facility is insured for natural disasters such as this but to date, one year after the tornado blew off the roof, nothing has been done to renew it.
Since its inception, no other business was conducted at the facility.
The committee was informed that the city had stocked food and meat for the kiosk, Hair salon equipment and Laundry equipment. However, at the inspection in loco conducted by the Committee during February 2017, it was discovered that all the food and meat meant for the kiosk was missing. Again, some of the equipment’s and the raw material stocked for use at the salon and the laundry were missing. The project manager could not account for all the loss suffered.
Challenges
• The cooperative appointed to run the car wash is unable to work as a team. • The Raw material and equipment meant for use at the facility is stolen. • The Roof of the facility has collapsed. • The facility is deteriorating daily. • The Department is failing to get the insurance to renew the roof damaged by
storm. 4.1.6.4 On Tshwarisanang Plastic Manufacturing facility, the Department informed the Committee that:
13
• The project was launched in May 2016 • And allocated R3,3 Million capital budget. • Since its inception, there was no production on site because one machine at the
tail-end of production line that is needed to seal the plastics had a factory fault and it never worked since it was brought into the plant.
• All other machines to process the product are functional and have a maximum capacity to produce 40 000 refuse bags per day,
• The members of the co-operative who are supposed to work in this facility hail from Refilwe in Region 5.
• The building is in good condition, properly ventilated and with security at the entrance. There is an office in the facility, storage, kitchen, toilets, water tanks and a resting area outside.
Challenges
• No feasibility study was done on the project • No business plan was ever developed for this project. • No Plan B the Department thought of, • No MOA between the City and the appointed co-operative • The sealing machine is not working and the supplier of the machine does not
cooperate. 4.1.7 21st of April 2017 Economic Development and Spatial Planning Department addressed the Committee on
progress regarding the following projects: Mamelodi Rondevels and West Capital
4.1.7.1 On Mamelodi Rondevels, the Department informed the Committee that:
• This is a heritage site which used to be a college in the years gone by.
• Among those who attended the School there were Arch bishop Desmond Tutu.
• The site was revamped during 2011 by the City in an effort to preserve our
heritage..
• Since then, the facility was never used and it continues to deteriorate every day.
• It is alleged that currently, the Nyaope gangs have invaded the site and use it as
their hiding spot.
• The facility has a strong marketing element and a tourism potential.
• It will need about R1.5 Million to renovate the rondervels.
• Currently, the Deparment has allocated a budget of R200 000 for this facilities.
• Currently, there is private security posted by Metro police on site but it would
seem that they are unable to curb the vandalism happening there.
• The Local community has shown interest to guard the facility and this possibility
should be explored further.
• The Department has indicated that they will give the committee a comprehensive plan to save this heritage site.
Challenges
• The site is vandalized and used by Nyaope gangs as their hiding spot.
• The facility is deteriorating.
• There is no tight security.
• The Department does not seem to have clear plan to resuscitate the site.
14
4.1.7.2 On West Capital Project, the Department informed the Committee that: • The West Capital Project is an envisaged residential development in West of the city centre. • The project includes but not limited to the Revamping of Schubert Park residential complex. • Schubert Park Consists of 4 high rising towers: A, B, C and D. • The complex was erected in the 1970s as part of state subsidized rental scheme for the benefit of civil servants. • The complex was handed to the City of Tshwane in July 1999.
• In September 2011, after realizing that the complex has dilapidated to uninhabitable proportions, the City evacuated all residents of Schubert Park. • Thereafter, The City embarked on Tender Process to get the building to be refurbished. • The Tender was awarded to Tshoseletso Consortium owned by a certain Anna Mokgokong. • In terms of the agreement, the building renovations would take approximately 18 months to complete. • On the other hand, residents of Schubert Park took the City to Constitutional -court and the court ordered the City to give residents alternative accommodation; an order of which the City obliged with. • Not only did the City provide alternative accommodation to the residents of Schubert Park, it also paid for their rentals and is still paying to date. •The City has paid more than R100 million for rental of these residents. •The consortium is yet to start with the renovation work. • As a result, a recommendation was made by the Section 79 Oversight Committee that the Tender awarded to Tsoseletso Consortium be revoked and a new Tender be advertised to ensure that the renovation of Schubert is carried out. • The Committee further recommended that while the Schubert Park matter remains sub-judice, an adjacent building, the Kruger Park, be refurbished so as to relieve the City from the burden of Schubert Park debacle. Challenges • To date, renovation of Schubert Park has not started • The City is in breach of court order • The City is paying rental for residents of Schubert Park and to date, more than R100 million has been spent • There is a potential of further revolts by residents of Schubert Park if no solution is found soon. • Five years down the line, Schubert Park remains the same. The Committee also went through its Process Plan and Mid-Term Report. Discussions on the Process Plan were based on the Youth Symposium Event that had to run in June, a month viewed as the Youth Month in commemoration of 1976 Youth Up-Rising. There also were some slight discussions on Mamelodi Rondavels. The information was based on: Current State and Future Plans on the project. The Committee viewed tourism as misplaced in the City and thought of planning a visit to the site. The Economic Development Department also responded to the task the Committee gave them, of coming with a report on improvements in their Tshwane Revitalization projects or designing an alternative to the projects. They were
15
asked to present this progress in the Oversight Committee Meeting of October 2017.
4.1.8 11th May 2017
Economic Development and Spatial Planning Department, Metro Plan, TEDA, and Group and Property addressed the Committee on the following: Inner City Rejuvenation plan/strategy, Investment promotion, Back-round and responsibilities of the Group Property division
4.1.8.1 On Metro Plan, the Committee was informed that: • Metro Plan is a Consulting Company appointed by the City in 2014. • Its core mandate was and still is to draft Tshwane Rejuvenation Strategy on the
inner city. • This involves developing the whole Inner city, breaking it into projects that would
also include rail and road infrastructure. • The inner city rejuvenation is aimed at redesigning the city to match status of a
world-class capital city. •
o Some of the projects envisaged are: o Government Boulevard; o Northern gateway precinct; o Ceremonial Boulevard; o Treason Square; o Church Square; o Caledonian park/Stadium o Civic Precinct; o West Capital; o Nelson Mandela Boulevard; o Sammy Marks Square; o Freedom Park precinct, etc
• These are catalytic projects which needs a lot of money to implement and thus, a tripple-P (Public and private partnership) approach will be needed. .
Challenges The above projects are catalytic in nature and would need a lot of money to be invested. . 4.1.8.2 On TEDA, the Committee was informed that:
• Tshwane Economic Development Agency (TEDA) is a key driver in accelerating
economic growth in the City. This they do through attracting investors to come
and invest in Tshwane. Their key performance areas include Tourism, Agriculture,
Trade and Investment Promotion as well Property and Asset Management.
• Their budget for the current year is R60 Million.
• The agency is currently in talks with an Indonesian Company to develop a freight
and logistic hub around Pyramid in the North of the City.
• On pipe-line, They are having what they term Tshwane agro processing hub
which is intended to beneficiate the agricultural products produced in the City’s
farm lands.
16
• Tshwane Bio Energy; This project will use the waste to produce energy. They
intend to use the waste material from Tshwane fresh produce market to produce
fuel.
• Clothing and textile Project: This Multibillion project is supported by DTI and is
aimed at revamping the textile industry is the country.
• GroenKloof Nature reserve project: Here, the agency intends to have the unused buildings refurbished and turn them into chalets for use by tourists.
Challenges
• TEDA has for many years came with attractive plans but there is little to show of
it.
• Implementation seem to be a challenge for TEDA.
• The projects that the agency intend to do will cost the city a substantial amount of
money and it will need private business to partner with the city.
4.1.8.3 On Group Property Management, the Committee was informed that:
The Division is not fully functional because they are still going to recruit the Head of the division and other support staff.
Their core function is to keep asset register for all properties of the city.
The following summary of events was given:
There are 858 business leases
., 603 residential/non-residential units.
There are a number of derelict buildings belonging to City (eg: Melgisedek) and the city intends to renovate them.
Some of buildings owned by the city were receiving rental far less than what they worth in the market and the city is busy working on plans to renegotiate the rentals with the tenants.
Most of the residential buildings are used by employees of the city.
An audit is underway to check who rents what and to ensure that those who sublet the properties unlawfully are brought to book.
Challenges. • The division is understaffed. • The asset register is not up to date 4.9 On the 15th of June 2017 The section 79 oversight committee, Economic Development and Spatial Planning, Hosted a Youth Symposium; an Outreach Programme which was aimed at bringing young people from all walks of life in the City. The Youth Symposium was held on 15 June 2016 at Sammy Marks Library Hall.
The objective of the Symposium was to educate the youth involved in business and those that wish to become entrepreneurs about business opportunities, access to funding and other matters relating to business. Participants were drawn from the database held by the Department of economic development. Over 150 people were invited but only 50% of them pitched up.
17
The reason for low turn up could be attributed to taxi strike on the day of the symposium which made even some of the presenters to abandon the trip to the city Centre as the taxis blocked most roads towards town.. The following entities presented papers on the day: On Financial Support, • ABSA – Enterprise and Supply Chain Development • National Youth Development Agency • GEP • SEFA On Non-Financial Support: • Gauteng Economic Development Department • Small Enterprise Development Agency (SEDA) • Productivity SA • My Spaza • SMTDC Young people where assisted to understand how to:
register a new business;
draw a business plan;
access a business funding;
register for VAT and tax clearance etc. Challenges
Taxi strike on the day made it difficult for many people to arrive and attend the symposium;
A lot of young people find it difficult to access funding 5. LEGAL PARAMETERS
In rendering services to the community, the Department is guided by the following policies, By-Laws and legal prescripts:
5.1 Section 152 of the Constitution of the Republic of South Africa, Act 108 of 1996.
(Unaltered)
“(1) the objects of local government are- a) to provide democratic and accountable government for local communities;
b) to ensure the provision of services to communities in a sustainable manner;
c) to promote social and economic development;
d) to promote a safe and healthy environment; and
e) to encourage the involvement of communities and community organizations in
the matters of local government.
2) A municipality must strive, within its financial and administrative capacity, to achieve the objects set out in subsection (1).”
Section 152 of the Constitution of the Republic of South Africa provides a framework, within which the municipality and Department in particular, should conduct its business.
18
The discussions below will indicate provisions of the Constitution upheld and provide recommendations if there are areas for improvement. The analysis on whether the Department has satisfied the relevant regulations will be further supported by lessons from other countries or spheres of government.
5.2 The Municipal Systems Act 32 of 2000 determines that a municipality must adopt a framework for integrated development in its areas in the form of an Integrated Development Plan (IDP), as a framework to inform service delivery.
A Spatial Development Framework/Regional Spatial Development Frame work which guides and informs developments must inform the IDP.
5.3 The Tshwane Vision 2055 is further responding to development priorities of the Capital City to ensure that Tshwane is a liveable, resilient and inclusive City whose Citizens enjoy a high quality of life, with access to social, economic and enhanced political freedom. Through implementation of this vision, citizens will be partners in the development of the African Capital City of excellence.
6. LOCAL GOVERNMENT LEGISLATION
The Land Use Management By-law was published by the Municipal Manager of the City of Tshwane in terms of Section 13 (a) of the Local Government Municipal Systems Act 32 of 2000 and it has to give effect to Municipal Planning as contemplated in the Constitution of the Republic of South Africa, Act 108 of 1996. Also has to lay down, consolidate processes and procedures, facilitates and make arrangements for the implementation of land development and its applications, spatial planning and a Land Use scheme within the jurisdiction of the City of Tshwane in line with the Spatial Planning and Land Use Management Act 16 od 2013 whose aim is to provide for the Tribunal and matters incidental thereto.
7. COUNCIL STRATEGIES/ LAWS
The processes of the Department in preparation for the new financial year, includes planning and formulation of predetermined objectives, which are incorporated in the SDBIP, in line with the Integrated Development Plan (IDP) of the municipality. The IDP and SDBIP are plans adopted by Council as a resolution, to guide service delivery. The Committee conducts oversight on the key performance indicators (KPIs) of the Department, informed by the corporate SDBIP and annual Business Plan of the Department, to determine whether those objectives are met within the allocated budget and timeframes. The oversight activities further determines whether services are provided in accordance with policies and by-laws of Council, relevant to the Department. The oversight findings and recommendations provided in this report will be based on compliance by the Department in this regard. This Committee since its inception in August 2016, has established close working relations with all key role players, within relevant policies and by-laws of Council, to ensure that the Department fulfils its legislative obligations.
8. OCCUPATIONAL HEALTH AND SAFETY (OHS) COMPLIANCE
In the Council meeting of 30 August 2012, Council approved the OHS Policy in terms of Section 7 of the Occupational Health and safety compliance.
19
The observation made in the projects where Inspection-in-locos were conducted was that, contractors had employed the service of safety officers who are accredited. Laborers were provided with Personal Protective Equipment (PPE) to comply with safety measures in their work stations. Findings have proven that there are control measures to promote healthy kind of environment and minimize risks in projects implemented by the Department.
9. GENDER, YOUTH AND PEOPLE WITH DISABILITY The Departmental compliance in this category is measured through its adherence to legislation and policy requirements to accommodate the needs of GEYODI category. The opportunities available to the Department in this regard include employment of the targeted groups, ensuring suitable accommodation in the work place and all departmental facilities. The Department of Economic Development does comply as it employs people with disabilities, youth and women in all its projects.
10. INTER GOVERNMENTAL RELATIONS 10.1 OUTREACH PROGRAM YOUTH BUSINESS SYMPOSIUM
The Section 79 Oversight Committee: Economic Development and Spatial Planning assisted by relevant government departments and institutions hosted the Youth Symposium Business Event where all young people involved in business were addressed with business opportunities, access to funding and other matters related to venturing into entrepreneurship.
11. ANALYSIS OF THE 2016/17 STATE OF THE CAPITAL ADDRESS In the 2016/17 State of the City Address, the Executive Mayor announced that about 23 000 job opportunities will be created to alleviate poverty within the Expanded Public Works Programme. Noting that the beneficiaries were exceeding the 6 months contract they were supposed to be appointed for, the Executive Mayor outlined the intention to implement the contracts dor a period ranging between one and three months, to avoid creating an expectation thet the placement would be/was permanent. This would further offer more beneficiaries an opportunity to benefit from the programme. There was also an amount R660 Million allocated for investment in the Industrial nodes of Watloo, Rosslyn and Kangala. The commitments made also include building of a new fire station in Mamelodi to ensure that people have better access to emergency services.
This demonstrates that the City is dedicated to improve people’s lives and resolve key service delivery challenges. The outcomes expected from these initiatives were listed as follows:
Safe City with a clean neighbourhood and public spaces where residents and tourists can move freely through the City while also attracting investment opportunities.
Access to opportunities that empower residents
Delivery on promises made to citizenry
20
Attract approximately 10.8 billion in investment and rejuvenation of the innercity to create a conducive environment for residents and tourists
Involvement of informal traders in the economic opportunities to promote human dignity
Projects to be implemented will address eradication of service backlogs, spatial restructuring and economic development.
21
12 ANALYSIS OF ANNUAL REPORT FROM THE DEPARTMENTS
Numb
er
KPA Annual
target
Actual
annual
Percentage
Achieved
Percentage
not
Achieved
Reason for non-
Achievement
Corrective
Measures to be
Implemented
Responsible
Person to
Implement
Delivery
Date
1. Number of EPWP
work opportunities
created through the
implementation of
operational and
capital projects in the
Department
5 900 6 485 109,92% NA NA NA
NA NA
2. Co-operatives
supported through
different
development
programmes
250 374 149,60% NA NA NA NA NA
22
Numb
er
KPA Annual
target
Actual
annual
Percentage
Achieved
Percentage
not
Achieved
Reason for non-
Achievement
Corrective
Measures to be
Implemented
Responsible
Person to
Implement
Delivery
Date
3. Promote participation
of informal traders in
economic activities
through the number
of workshops to be
conducted
50 51 102% NA NA NA NA NA
4. Contribute to the
financial
sustainability of the
City through the
Rand value of
revenue collected
through licensing and
permits
R1 500 000 R1 451 248 96,75% 3,25% Delay in the
implementation of
the Business
Electronic
Licensing
Management
System (BELMS)
Implement the
BELMS
Mapholisa
Tshisikhawe
As early as
possible in
the
2017/18
financial
year
5. Youth owned
enterprises
supported through
economic
development
programmes
200 230 115% NA NA NA NA NA
23
Numb
er
KPA Annual
target
Actual
annual
Percentage
Achieved
Percentage
not
Achieved
Reason for non-
Achievement
Corrective
Measures to be
Implemented
Responsible
Person to
Implement
Delivery
Date
6. Number of
beneficiaries trained
in sector skills
development
programmes
1 900 2 060 108,42% NA NA NA NA NA
7. Number of tourism
establishments star
graded
70 164 234,29% NA NA NA
NA NA
8. Number of township
tourism SMMEs
supported
25 48 192% NA NA NA NA NA
9. Number of township
automotive SMMEs
supported
4 13 325% NA NA NA NA NA
10. % Capital budget
spent on
local/township
SMMEs
25% 63,23% 252,92% NA NA NA NA NA
24
13. ANALYSIS OF THE SDBIP
The Department had 10 Key Performance Areas for 2016/17 and has managed to achieve them exceedingly in the 4th Quarter. It is attached in the SDBIP the percentages achieved and measures in place to achieve all the Key Performance Areas.
14. COMMENTS FROM STAKE-HOLDERS OF THE DEPARTMENTS
None
15. IMPLICATIONS
15.1 Financial Implications
Rentals of about R230 million paid for former residents of Schubert Park cost the City lots of money.
The Eco-Factory Facility should be marketed and assisted with marketing to increase volumes of purchases of their products
Theft of material at Mabopane Station is a hard-blow to the City as it amounts to R914 440.
The facilities such as the car wash, brick making , paper factory and plastic manufacturing facilities should be revisited for feasibility or alternative uses of the facilities to be successful. The CoT cannot be the sole buyer of products from these facitlites or pay a price higer than they can obtain from other service providers. All township revitilisation projects should be revisited .
15.2 Human Resources Implications
More jobs to be created through initiatives introduced by TEDA
Creation of jobs in the African Gate-Way project
More jobs still to be created by the African Gate-Way project through establishment of AU and UN Offices
Jobs have been created in the Eco-Factory Facility to alleviate poverty 15.3. Constitutional and Legal Factors
Constitution of the Republic of South Africa, Act 108 0f 1996
Local Government Structures Act, Act 117 0f 1998
Local Government Municipal Systems Act, Act 32 of 2000
Municipal Financial Management Act, Act 56 of 2003
Intergovernmental Relations Framework Act of 2005
25
16. CONCLUSION
The report serves to highlight all what the Committee together with the Departments and entities it was overseeing in the 2016/17 Financial Year. There is improvement on reports presented by Tshwane Economic Development Agency (TEDA) compared to previous financial years. The Committee is emphasizing on the importance of service delivery to communities.
IT WAS RECOMMENDED (TO THE SECTION 79 OVERSIGHT COMMITTEE: ECONOMIC DEVELOPMENT AND SPATIAL PLANNING: 12 OCTOBER 2017):
1. That the Economic Development and Spatial Planning Department, together with
the community and the Department of Health and Social Development work
together to source coffins from the Eco Factory for indigent burials, subjects to
the provisions of the City’s Supply Chain Policies.
2. That the Economic Development and Spatial Planning Department, together with
the Department of Human Settlement consider using the panels manufactured at
the Eco Furniture Factory for low cost RDP fire resistant houses.
3. That a Business Plan should be developed for each of the Township
Revitalization projects and submitted to the committee in its meeting of January
2018.
4. That the Mamelodi Rondavels be revamped, secured and utilised for tourist
attraction.
5. That the Group Head: City Planning and Development and Spatial Planning
assist the Eco Furniture Factory to acquire extra land needed to store and dry
wood used at the factory.
6. That the Group Head: Economic Development and Spatial Planning investigate
the possibility of supporting the Eco Furniture Factory with an official from the
City of Tshwane Marketing Department to market the factory and source new
contracts.
7. That another Security Company be appointed to guard the Mabopane Intermodal
Change Project Site 24/7.
8. That the Economic Development and Spatial Planning Department together with
the Legal Division, should ensure that building plans for the 1st phase of African
Gate Way development are submitted and approved.
26
9. That the Committee should be clarified of the R100 Lease Agreement Contract
on the African Gate Way development and a report in this regard be provided to
the committee in its meeting of November 2017.
10. That the provision for relocation of busses and taxis at the African Gate Way
project be made.
11. That the Economic Development and Spatial Planning Department should
approach the Department of Public Works and Department of International
Relations and Corporations (DIRCO) to reaffirm their commitment to use the land
parcel (fashioned 2nd phase of African Gate Way development).
12. That the Economic Development and Spatial Planning Department review the
Informal Traders Bursary Fund.
13. That all contracts for catalytic projects be investigated and corrective measures be taken by the City Manager against developers.
During discussion of this item by the Section 79 Oversight Committee: Economic Development and Spatial Planning at its meeting held on 12 October 2017, the members were of the opinion that recommendation 7 be deleted. It was therefore recommended as set out below: ANNEXURES:
A. Resolutions for the year 2016/17. B. Attendance Register of the Committee Members for the year 2016/17.
C. Process Plan for the year 2017/18. RECOMMENDED: 1. That the Economic Development and Spatial Planning Department, together with
the community and the Department of Health and Social Development work together to source coffins from the Eco Factory for indigent burials, subjects to the provisions of the City’s Supply Chain Policies.
2. That the Economic Development and Spatial Planning Department, together with
the Department of Human Settlement consider using the panels manufactured at the Eco Furniture Factory for low cost RDP fire resistant houses.
3. That a Business Plan should be developed for each of the Township
Revitalization projects and submitted to the committee in its meeting of January 2018.
27
4. That the Mamelodi Rondavels be revamped, secured and utilised for tourist attraction.
5. That the Group Head: City Planning and Development and Spatial Planning
assist the Eco Furniture Factory to acquire extra land needed to store and dry wood used at the factory.
6. That the Group Head: Economic Development and Spatial Planning investigate
the possibility of supporting the Eco Furniture Factory with an official from the City of Tshwane Marketing Department to market the factory and source new contracts.
7. That the Economic Development and Spatial Planning Department together with
the Legal Division, should ensure that building plans for the 1st phase of African Gate Way development are submitted and approved.
8. That the Committee should be clarified of the R100 Lease Agreement Contract
on the African Gate Way development and a report in this regard be provided to the committee in its meeting of November 2017.
9. That the provision for relocation of busses and taxis at the African Gate Way
project be made. 10. That the Economic Development and Spatial Planning Department should
approach the Department of Public Works and Department of International Relations and Corporations (DIRCO) to reaffirm their commitment to use the land parcel (fashioned 2nd phase of African Gate Way development).
11. That the Economic Development and Spatial Planning Department review the
Informal Traders Bursary Fund. 12. That all contracts for catalytic projects be investigated and corrective measures
be taken by the City Manager against developers.
28
ANNEXURE A
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING COMMITTEE ANNUAL RESOLUTIONS
2016/17 FINANCIAL YEAR.
13 OCTOBER 2016
Department Title of the report Author/ Initiator
Resolution Status/ Evidence
Economic Development and Spatial Planning
Presentation on Policies and by-laws
T Mhlekwa 1. That cognisance be taken of the presentation.
2. That cognisance be taken that the presentation was forwarded to the members of the Committee on 3 October 2016.
3. That cognisance be taken of the comments, questions
and answers during the meeting.
Done Done Done
Economic Development and Spatial Planning
Presentation on 2016/17 Service Delivery and Budget Implementation Plan (SDBIP), Budget and Business Plans
T Mhlekwa 1. That cognisance be taken of the presentation.
2. That cognisance be taken that the presentation was forwarded to the members of the Committee on 3 October 2016.
3. That cognisance be taken of the comments, questions
and answers during the meeting.
Done Done Done
Economic Development and Spatial Planning
Presentation on Economic Development Departmental Structure
T Mhlekwa 1. That cognisance be taken of the presentation.
2. That cognisance be taken that the presentation was forwarded to the members of the Committee on 3 October 2016.
3. That cognisance be taken of the comments, questions
and answers during the meeting.
Done Done Done
City Planning and Development
Presentation on City Planning and Development
M Makgata 1. That the presentation due to time constrains be held in abeyance and be referred to a special meeting
Done
29
Office of the Speaker
Oversight report on the performance and challenges of the Economic Development and Spatial Planning Department for the 2011/16 term and Committee Process Plan for 2016/17.
JRK Thema 1. That the two departments submit a report quarterly outlining a monitoring strategy and
challenges resulting in non-compliance with its policies and by-laws, effective from November 2016.
2. That an awareness campaign programme, to
educate communities in the seven regions on dangers and penalties associated with non-
compliance with policies and by-laws, outlining budget implications, be submitted by
the department in the Committee meeting of November 2016. 3. That a report be submitted by the department
in the November 2016 Committee meeting, indicating whether there are outstanding
projects which could not be completed by the end of the 2011/16 IDP term as planned and
budget implications in that regard. 4. That the two departments table a quarterly
report, effective from November 2016, on its performance against the SDBIP and budget
spent. 5. That the attached 2016/17 Process Plan be
adopted as a draft working document and that items be submitted to the Chairperson for
inclusion in the Process Plan.
On-going Not done Not done
On-going Done
30
Department Tittle of the report Author/ Initiator
Resolutions Status/ Evidence
Section 79 Oversight Committee
Calling of reports
Oversight Committee
1. A detailed report on the EPWP, statistics on the total numbers of workers, the breakdown by department, tracking in terms of how these workers are placed in formal employment. How long they have been employed in the EPWP.
2. A report on the findings regarding the Schubart
Park residents case against the City of Tshwane. 3. A report on the West Capital Project: The report
must include but not be limited to the following details: The reasons for the delay of the project, is the City going to demolish or renovate the affected buildings? How much the City spends on providing alternative accommodation for the residents who were evicted in compliance with the constitutional court judgement?
4. A report on the Fresh Produce Programme 5. A report on TSHEPO 10 000: The report include
but not be limited to the following details: A detailed list of all cooperatives which have benefited, how many cooperatives have failed and the reasons why they failed and what sort of intervention was made to assist them.
Done Outstanding Outstanding Done Done
31
6. A list of all derelict buildings in the Inner City: The report must include but not be limited to the following details: detailed list of who owns those buildings. How long the buildings has been neglected? Does the owner pay the City rates?
7. A report on the bursary program for informal traders: The report must include but not be limited to the following details: How much money the City allocated for the bursary scheme? A detailed list of beneficiaries: where are they currently registered? The process used to select successful applicants? How many informal traders have benefitted?
Not done Done
28 OCTOBER 2016
Department Matters considered Author/ Initiator
Resolution Status/ Evidence
Economic Development Department
Department and Policies By-Laws
T Mhlekwa 1. That cognizance be taken of the presentation.
2. That cognizance be taken that the presentation was forwarded to the members of the Committee on 3 October 2016.
3. That cognizance be taken of the comments, questions and answers during the
Done Done Done
32
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING COMMITTEE ANNUAL RESOLUTIONS
2016/17 FINANCIAL YEAR.
MEETING AND INSPECTION IN-LOCO
10 NOVEMBER 2016
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
Office of the Speaker
Process plan for 2016/2017 Oversight Committee
JRK Thema
1. That cognizance be taken of the Process Plan 2016/17.
2. That Councillors are requested to forward new items to the Chairperson for inclusion in the Process Plan 2016/17.
3. That more City Planning items be included on the
Process Plan. 4. That the Inspections-in-Loco dated 9 February and 16
March 2017 be combined on 9 February 2017. 5. That on 16 March 2017 an ordinary meeting be held.
Done Done Done Done Done
33
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
Economic Development
Business Support Operations detailed report on the conceptualization and implementation of Tshwane Youth Skills Development, job creation and entrepreneurship programme- Tshepo 10 000
Tembeka Mhlekwa
1. That cognisance be taken of the contents in this report
2. That the Tshepo 10 000 programme be revisited
and scrutinized and remodelled to remove avenues of corruption and to bring it in line with the vision of the City and the CoT Policy.
3. That the Supply Chain Management be invited to report on the questions and answers regarding Tshepo 10 000 co-operatives.
4. That a full forensic audit be undertaken into the Tshepo 10 000 programme and the cooperatives.
5. That it be ascertained if co-operatives are
registered for VAT when earning over the threshold.
Done Outstanding Outstanding Outstanding Ongoing
6. That all co-operatives be scrutinized for what services are being provided to CoT and the reason why they are supplying more than 1 category of product/service.
7. That the co-operatives be scrutinized for
compliance with requirements of Tshepo 10 000/CoT Policy.
8. That full and proper control measures be
implemented regarding co-operatives to cut out possible corruption.
9. That the pricing of items/services cooperatives be
scrutinized for market related prices
Ongoing Ongoing Ongoing Ongoing
34
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
Economic Development
Business Support Operations detailed report on the conceptualization and implementation of Tshwane Informal Traders Bursary Fund (TITBF)
Tembeka Mhlekwa
1. That the report be referred in order for the different Political Party Caucuses to discuss this report in order to provide a way forward, and that the report be reconsidered at the next meeting of the Oversight Committee.
Outstanding
Economic Development
Business Support Operations Report on the optimisation of Tshwane Fresh Produce Market value chain
Tembeka Mhlekwa
1. That cognizance be taken of the content of the report.
2. That the Department convene an urgent meeting
with all the various groups among the informal traders to hear what challenges they are facing as well as to recommend possible solutions
3. That the abovementioned meeting be held not later than January 2017.
Done Done Done
35
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
Economic Development
Expanded Public Works Programme (EPWP): work opportunities for the 2015/2016 Financial Year and Quarter 1 of 2016/2017 Financial Year
T Mhlekwa 1. That the contents of this report be noted. 2. That the EPWP programme be revisited and updated to
ensure a free and fair manner for choosing beneficiaries.
3. That the beneficiaries be rotated and repeated
beneficiaries not be allowed.
4. That the Oversight Committee and the Department review the Council decision on ward structures involvement in beneficiaries.
5. That Ward Councillors be removed from involvement in appointing beneficiaries.
6. That the policy be reviewed to remove any interference
by Politicians in the EPWP programme. 7. That cognisance be taken that the Policy is a
governance issue and thus may require involvement of the Chief Whip.
8. That clarity be provided on the community structures
and project steering committees driving EPWP projects.
Done Outstanding Ongoing Outstanding Outstanding Outstanding Done Done
36
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
Office of the Speaker
Report on the Inspection in-loco of the Section 79 Oversight Committee: Economic Development and Spatial Planning on the following projects: Eco-Furniture manufacturing, brick-making facility, paper towel manufacturing and Mabopane Station Intermodal Change
JRK Thema 1. That cognizance be taken of the contents of the report.
2. That cognisance be taken of the presentation presented by the Manager of the Eco Furniture Factory Co-operative in Ga-Rankuwa.
3. That a feasibility study, project plan and business plan be developed for the Eco Furniture Factory Co-operative and that a presentation be made at the next Oversight Committee meeting.
4. That the Strategic Executive Director: City Planning and Development investigate the possibility to extend the land surrounding the Eco Furniture Factory Co-operative to allow for an area to dry the wood and submit a report in this regard to the Section 79 Oversight Committee: Economic Development and Spatial Planning at a next meeting.
5. That the Strategic Executive Director: Economic Development investigate the possibility to support the Eco Furniture Factory Co-operative with an official from the City of Tshwane Marketing Department to market the factory and to source new contracts, and submit a report in this regard to the Section 79 Oversight Committee: Economic Development and Spatial Planning at a next meeting.
6. That the Municipal Manager investigate the possibility to purchase furniture for Tshwane House from the Eco Furniture Factory Co-operative and submit a report in this regard to the Section 79 Oversight Committee Economic Development and Spatial Planning at a next meeting.
Done Done Outstanding Outstanding Outstanding Outstanding
37
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
7. That the Municipal Manager investigate the possibility to purchase coffins for the City of Tshwane’s indigent from the Eco-Furniture Factory Co-operative and submit a report in this regard to the Section 79 Oversight Committee: Economic Development and Spatial Planning at a next meeting.
8. That the Strategic Executive Director: Economic Development table a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning, regarding the Memorandum of Understanding between the City of Tshwane and the Eco Furniture factory co-operative.
9. That the Strategic Executive Director: Economic
Development table a report to the members of the Section 79 Oversight Committee: Economic Development and Spatial Planning, regarding the breakdown of the financial assistance to the Eco Furniture factory co-operative e.g. property rent, water, electricity at a next meeting.
10. That a feasibility study and business plan for the
paper-towel manufacturing plant be developed for presentation at the next Oversight Committee meeting.
11. That the Strategic Executive Director: Economic
Development table a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning, at a next meeting inclusive of the contract/agreement with the co-operative as well as the full details of the co-operative.
Outstanding Outstanding Outstanding Outstanding Outstanding
38
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
12. That the Strategic Executive Director: Economic Development table a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning, inclusive of the full details of the signed contract at a next meeting, as well as the cost of the equipment with an indication if the equipment is paid for in full.
13. That the Strategic Executive Director: Economic Development table a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning at a next meeting, inclusive of the signed contract between the City of Tshwane and the cooperative for providing the City of Tshwane with toilet paper.
14. That the Strategic Executive Director: Economic Development obtain letters of intent from the businesses (e.g. Pic ‘n Pay, Shoprite, spazas) wherein they indicate their interest in buying from the paper towelling factory and table a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning, in this regard at a next meeting.
15. That the Strategic Executive Director: Economic Development submit a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning at a next meeting inclusive of the following:
Outstanding Outstanding Outstanding Outstanding
39
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
The production cost of one and two ply toilet paper?
The reason why the City of Tshwane is the primary contract and why would the City of Tshwane buy toilet paper from a factory it is financially carrying?
When will the existing tender, which is in place to provide toilet paper to the City of Tshwane expire?
What is the monthly cost for rates, water and electricity to the City of Tshwane?
16. That a feasibility study and business plan for the brick making facility be developed for presentation at the next Oversight Committee meeting.
17. That the Strategic Executive Director: Economic Development table a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning, at a next meeting inclusive of the contract/agreement with the brick making factory.
18. That the Strategic Executive Director: Economic
Development submit a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning at a next meeting regarding the projected monthly cost to the City of Tshwane regarding the brick making factory.
19. That the Strategic Executive Director: Economic Development provide a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning at a next meeting with the following information:
• Why is there nor covering over the storage area at the brick making factory, will this not affect the sand etc. when it rains?
• Are there any similar projects in a 20km radius area from the brick making
Outstanding Outstanding Outstanding Outstanding Outstanding
40
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
Are there any, City of Tshwane excluded, other contracts in place to provide bricks?
What will the cost per brick be to the City of Tshwane and how does it compare
20. That the Strategic Executive Director: Roads and Transport at the next Oversight Committee meeting submit an updated presentation on the Mabopane Station Intermodal Change, inclusive of the following:
• Why did it took so long to stop the project? • What amount was paid to the contractor?
• What measures did the department put in place to save the project?
21. That the Chief of Police submit a report regarding the theft and the security at the Mabopane Station Intermodal Change at the next meeting of the Oversight Committee.
22. That cognisance be taken that the Soshanguve
Kgora Community Bakery was visited by the Section 79 Oversight Committee: Economic Development and Spatial Planning.
23. That the Strategic Executive Director: Economic
Development table a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning at a next meeting regarding the monthly cost (e.g. water, electricity, rates) to the City of Tshwane in respect of the Soshanguve Kgora Community Bakery.
24. Spatial Planning at a next meeting regarding the financial statements of the Soshanguve Kgora Community bakery
Outstanding Outstanding Done Outstanding Outstanding
41
Department Title of the report
Author/ Initiator
Resolution Status/ Evidence
25. That the Strategic Executive Director: Economic Development provide a report to the Section 79 Oversight Committee: Economic Development and Spatial Planning at the next meeting regarding the financial Statements of the Soshanguve Kgora Community Bakery for the last two years, inclusive of the following:
Does the co-operative pay tax and VAT?
Signatories on the bank account;
Monthly turn-over;
Final profit per month;
Cost of bread;
The total loaves of bread sold per month;
The clients of the bakery;
The individual who is responsible for the banking;
The individual responsible for the book keeping;
The training the co-operative received for the financial running of the business;
What are the salaries of the members of the co-operative?
What is the amount of the monthly stipend of the six volunteers; and
What is the situation in the co-op since one member died, one member is sick and one member is absent?
Outstanding
42
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING COMMITTEE ANNUAL RESOLUTIONS
2016/17 FINANCIAL YEAR.
19 JANUARY 2017
DEPARTMENT TITLE OF THE REPORT INITIATOR/ AUTHOR
RESOLUTION STATUS/ EVIDENCE
Economic Development
Business Support Operations detailed report on the conceptualization and implementation of Tshwane Informal Traders Bursary Fund (TITBF)
T Mhlekwa 1. That cognisance be taken of the report.
2. That the Chairperson of the Oversight Committee: Economic Development and Spatial Planning, liaise with the Executive Mayor/MMC regarding the following:
Discussions of the Executive Mayor/MMC with the informal traders and the process to be followed with them.
State of the Tshwane Informal Traders Bursary Fund (TITBF).
Payment of levies by informal traders.
Industrial areas, e.g. Babelegi.
3. That Political parties’ caucuses are welcome to provide inputs in writing to the Chairperson to also guide him in his interaction with the MMC and Executive Mayor.
4. That the Chairperson in consultation with the Economic Development Department report back to the Committee in March 2017 on the interaction with the MMC and Executive Mayor to provide a way forward.
Done Outstanding Ongoing Not done
43
5. That the Strategic Executive Director: Economic
Development provide a list of all the people who applied and those who benefitted from the ITBF.
Outstanding
Tshwane Metro Police
Report regarding the theft and security at the Mabopane Intermodal Change
KS Ngobeni 1. That cognisance be taken of the report.
2. That cognisance be taken that no member of the Tshwane Metro Police Department (TMPD) attended the meeting to deliberate on the report.
3. That the Chairperson of the Section 79 Oversight Committee: Economic Development and Spatial Planning write a letter to the Chief of the TMPD regarding the following:
3.1. The Section 79 Oversight Committee: Economic Development and Spatial Planning expressed their concern regarding the non-attendance of a member of the TMPD of the meeting held on 19 January 2017, although they were invited
3.2. Update on the position of the contract and Nkoananyana Security Services: - Did Nkoananyana Security Services rectify or
remedy the situation at the Mabopane Intermodal Change?
- If not has their contract been terminated? - Has the R914 440 for the stolen items been
paid back? - Who is guarding the property now?
3.3. The members of the TMPD should be deployed to guard the assets of the CoT at the Mabopane Intermodal Change.
Done Done Done
44
4. That the Chief of the TMPD respond in writing to the abovementioned letter.
5. That the Chief of the TMPD do a presentation on the current situation at the Mabopane Intermodal Change at the Section 79 Oversight Committee: Economic Development and Spatial Planning meeting scheduled in March 2017.
Outstanding Outstanding
Economic Development
Sector Support and analysis Division Response report to the issues raised by the Oversight Committee: Economic Development and Spatial Planning regarding the Ga-Rankuwa Eco-Furniture Factory
Tembeka Mhlekwa
1. That the report be referred back to be submitted before 9 February 2017 for the March 2017 meeting of the Committee.
2. That cognisance be taken that the Project Manager
was absent from the meeting and that the Project Manager be present at the meeting scheduled for March 2017.
3. That resolutions 2 to 9 in the minutes of 10
November 2016 of the Section 79 Oversight Committee: Economic Development and Spatial Planning be addressed in the report as resolutions and answers according to the C9 report writing format.
4. That the questions asked/comments made during
the meeting be incorporated in the report with the answer.
Done Done Outstanding Outstanding
45
5. That a SWOT analysis be made in order to assist
the Committee to evaluate the viability of the projects.
6. That audited financial statements be submitted as
annexures to the report. 7. That the Strategic Executive Director review the
report before submitting. 8. That cognisance be taken of the Strategic
Executive Director: Economic Development letter to the Acting City Manager wherein she requested that the possibilities be investigated: - To purchase furniture for Tshwane House from
the Eco Furniture Factory Co-operative. - To purchase coffins for the indigent from the
Eco-Furniture Factory Co-operative. 9. That the Strategic Executive Director: Executive
Director report back to the Committee regarding her communique with the Acting City Manager.
10. That Strategic Executive Director: Economic Development should lobby the Social Development Department to request the appointed service providers to procure coffins from the Eco-Furniture Factory Co-operative.
11. That the Chairperson interact with the Executive
Mayor to unlock the POP for funds to buy coffins for the indigent.
12. That the Strategic Executive Director: Economic
Development lobby the Housing Department to use the material produced at the Eco-Furniture Factory
Outstanding Outstanding Done Outstanding Outstanding Done Outstanding Outstanding
46
to build RDP houses.
13. That the Strategic Executive Director: Economic Development undertake public participation to get a buy-in of the community regarding the usage of material produced by the Eco-Furniture Factory for building the RDP houses. 14. That the Strategic Executive Director: Economic Development undertake public participation to get a buy-in of the community regarding the usage of material produced by the Eco-Furniture Factory for building the RDP houses. 15. That the Strategic Executive Director: Economic Development should provide the marketing plan and the responsible person for the marketing strategies of the factory. 16. That cognisance be taken that the entities does not belong to the CoT and it provide serious problems for economic development and therefore the Chairperson must interact with the Executive Mayor regarding the transfer of the entities from North West and Mpumalanga Provinces into Gauteng
Outstanding Outstanding Done Done
Economic Development Department
Business Support Operations Response to Oversight Committee: Economic Development and Spatial Planning questions raised during the Inspection-in-Loco of 10 November 2016 to the Paper Towel Factory and progress update in Mabopane
Tembeka Mhlekwa
1. That the report be referred back to be submitted before 9 February 2017 for the March 2017 meeting of the Committee.
2. That cognisance be taken that the Project Manager
was absent from the meeting and that the Project Manager be present at the meeting scheduled for March 2017.
3. That resolutions 10 to 15 in the minutes of 10
Outstanding Done Outstanding
47
November 2016 of the Section 79 Oversight Committee: Economic Development and Spatial Planning be addressed in the report as resolutions and answers according to the C9 report writing format.
4. That a SWOT analysis be made in order to assist
the Committee to evaluate the viability of the project.
5. That the contract between the CoT and the co-
operative be attached to the report as an annexure.
6. That the owners of the factory equipment/machines be named in the report.
7. That the Strategic Executive Director: Economic Development review the report before Submitting
Outstanding Outstanding Outstanding Outstanding
Economic Development Department
Business Support Operations Response to Oversight Committee: Economic Development and Spatial Planning questions raised during the Inspection-in-loco of 10 November 2016 to the Kgora Community Bakery and progress update in Soshanguve
Tembeka Mhlekwa
1. That the report be referred back to be submitted before 9 February 2017 for the March 2017 meeting of the Committee.
2. That cognisance be taken that the Project Manager
was absent from the meeting and that the Project Manager be present at the meeting scheduled for March 2017.
3. That resolutions 22 to 24 of the report in the
minutes of 10 November 2016 of the Section 79 Oversight Committee: Economic Development and Spatial Planning be addressed in the report as
Done Done Outstanding
48
resolutions and answers according to the C9 report writing format.
4. That a SWOT analysis be made in order to assist
the Committee to evaluate the viability of the projects.
5. That audited financial statements be attached to
the report as an annexure. 6. That the Strategic Executive Director: Economic
Development review the report before submitting
Outstanding Outstanding Outstanding
TEDA Tshwane Economic Development Agency
Solly Mogaladi
1. That cognisance be taken that no official of the Tshwane Economic Development Agency was present at the meeting.
2. That the presentation be held in abeyance until the
Oversight Committee: Economic Development and Spatial Planning meeting, pre-scheduled for 9 March 2017.
Done Outstanding
Economic Development Department
Business Support Operations Response to Oversight Committee: Economic Development and Spatial Planning questions raised during the Inspection-in-loco of 10 November 2016 to the Brick-Making Factory and progress update in Mabopane
Tembeka Mhlekwa
1. That the report be referred back to be submitted before 9 February 2017 for the March 2017 meeting of the Committee.
2. That cognisance be taken that the Project Manager was absent from the meeting and that the Project Manager be present at the meeting scheduled for March 2017.
3. That resolutions 16 to 21 of the report in the
minutes of 10 November 2016 of the Section 79 Oversight Committee: Economic Development and Spatial Planning be addressed in the report as resolutions and answers according to the C9 report writing format.
Done Done Outstanding
49
4. That a SWOT analysis be made in order to assist
the Committee to evaluate the viability of the projects.
5. That the contract between the CoT and the co-
operative be attached to the report as an annexure.
6. That the owners of the factory
equipment/machines be named in the report. 7. That the Strategic Executive Director: Economic
Development review the report before submitting.
Outstanding Outstanding Outstanding Done
50
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING COMMITTEE ANNUAL RESOLUTIONS
2016/17 FINANCIAL YEAR.
09 JANUARY 2017
DEPARTMENT TITLE OF THE REPORT INITIATOR/AUTHOUR
RESOLUTION STATUS/ EVIDENCE
Economic Development and Spatial Planning
Policies and By-laws
Tembeka Mhlekwa
1. That cognizance be taken of the presentation.
2. That cognizance be taken that the presentation was forwarded to the members of the Committee on 3 October 2016.
3. That cognizance be taken of the comments,
questions and answers during the meeting
Done Done Done
Economic Development and Spatial Planning
2016/17 Service Delivery and Budget Implementation Plan (SDBIP), Budget and Business Plans
Tembeka Mhlekwa
1. That cognizance be taken of the presentation.
2. That cognizance be taken that the presentation was forwarded to the members of the Committee on 3 October 2016.
3. That cognizance be taken of the comments,
questions and answers during the meeting.
Done Done Done
Economic Development and Spatial Planning
Departmental Structure 1. That cognizance be taken of the presentation.
2. That cognizance be taken that the presentation was forwarded to the members of the Committee on 3 October 2016.
3. That cognizance be taken of the comments, questions and answers during the meeting.
Done Done Done
Office of the Speaker
Oversight report on the performance and challenges of the Economic development and spatial
JRK Thema 1. That the two departments submit a report quarterly outlining a monitoring strategy and challenges resulting in non-compliance with its
On-going
51
planning department for the 2011/16 term and committee process plan for 2016/17.
policies and by-laws, effective from November 2016.
2. That an awareness campaign programme, to
educate communities in the seven regions on dangers and penalties associated with non- compliance with policies and by-laws, outlining budget implications, be submitted by the department in the Committee meeting of November 2016.
3. That a report be submitted by the department in the
November 2016 Committee meeting, indicating whether there are outstanding projects which could not be completed by the end of the 2011/16 IDP term as planned and budget implications in that regard.
4. That the two departments table a quarterly report,
effective from November 2016, on its performance against the SDBIP and budget spent.
5. That the attached 2016/17 Process Plan be
adopted as a draft working document and that items be submitted to the Chairperson for inclusion in the Process Plan. Section 79 Oversight Committees as required by the City’s Governance Model of 9 June 2011”, ensure submission thereof to the Section 79 Oversight Committee: Economic Development and Spatial Planning.
On-going On-going
On-going On-going
Economic Development and Spatial Planning
1. A detailed report on the EPWP, statistics on the total numbers of workers, the breakdown by department, tracking in terms of how these workers are placed
1. That cognisance be taken of the reports called for during this meeting and directed to the Chairperson who will in turn, in line with the Council resolution of 27 February 2014, namely “Overview: Functioning, successes and challenges
Done
52
in formal employment. How long they have been employed in the EPWP.
of the Section 79 Oversight Committees as required by the City’s Governance Model of 9 June 2011”, ensure submission thereof to the Section 79 Oversight Committee: Economic Development and Spatial Planning.
2. A report on the findings regarding the Schubert Park residents case against the City of Tshwane
3. A report on the West
Capital Project: The report must include but not be limited to the following details: The reasons for the delay of the project, is the City going to demolish or renovate the affected buildings? How much the City spends on providing alternative accommodation for the residents who were evicted in compliance with the constitutional court judgement?
4. A report on the Fresh Produce
Programme:
4.1. report on TSHEPO 10 000: The report include but not be limited to the following details: A detailed list of all cooperatives which have benefited, how many cooperatives have failed and
53
the reasons why they failed and what sort of intervention was made to assist them.
4.2 A list of all derelict buildings
in the Inner City: The report must include but not be limited to the following details: detailed list of who owns those buildings. How long the buildings has been neglected? Does the owner pay the City rates?
4.3 A report on the bursary
program for informal traders: The report must include but not be limited to the following details: How much money the City allocated for the bursary scheme? A detailed list of beneficiaries: where are they currently registered? The process used to select successful applicants? How many informal traders have benefitted? Economic Development Department
54
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING COMMITTEE ANNUAL RESOLUTIONS
2016/17 FINANCIAL YEAR.
19 FEBRUARY 2017
DEPARTMENT TITLE OF THE REPORT
INITIATOR/ AUTHOR
RESOLUTION STATUS/ EVIDENCE
Economic development and spatial Planning:
Report on the inspection-in-loco to the African gate-way project, Symbio-City, Tswarisanang and Reiteretse integrated vehicle Facilities.
JRK Thema 1. That an updated report, wherein the following questions/comments are addressed, be submitted to the Oversight Committee: Economic Development and Spatial Planning’s next meeting in March 2017:
How does this qualify as a catalytic project?
Has the city done due diligence in considering the proposed site for the Tshwane
International Convention Centre in terms of economic impact? If so how?
Has the developer provided the required guarantees before entering into a binding
agreement regarding phase 1. Is there a binding agreement? If so please provide
the full document.
Outstanding
55
In May 2015 the portfolio was told “ Once all the guarantees are received from the
developer the city will finalize the supply chain process and sign the MOU with DIRCO. The guarantees required, includes: Financial guarantees Feasibility study and financial due diligent Developing a coasted project plan”
Please provide these documents with the guarantees.
Has the MOU and lease agreement been signed with DIRCO - if yes please
provide such documentation. If not what next?
Who is/will be monitoring the implementation of the signed agreements?
Why were roads in the area not upgraded to accommodate the + 6 000 extra motorists expected with this development?
What have the bulk service contribution agreements been with the developer?
What bulk service contributions have been paid to date by the developer?
56
Please provide a copy of the lease agreement with the developer and what are the responsibilities of the developer and who are the developers.
When do the CoT expect the Public Works Department to finalise the transition.
Please submit a Policy on the land leases at the next meeting.
Indicate how hawkers will be awarded a space for their business in the precinct and
show it on the plan.
How many jobs will be created
2. That Legal Services review the original agreement with the developer and impose a fast track programme with penalties.
3. That if the steps, as set out in 2
above, fails separate the DIRCO and TICC developments.
4. That as a last resort, explore new
partners to implement the African Gate-Way project
B. SYMBIO CITY: 1. That an updated report, wherein
Outstanding Outstanding Outstanding
57
the following questions/comments are addressed, be submitted to the Oversight Committee: Economic Development and Spatial Planning’s next meeting in March 2017:
How does this project qualify to be a catalytic project?
During a presentation in February 2015 to the Portfolio committee the following was said: “Letters to National and Provincial Treasury were hand delivered on the 9 of September 2014 to solicit their comments and recommendations on the proposed long term lease and purchase of high value assets and only Provincial Treasury has responded raising concerns regarding the valuation and long term plans of the City. 15
What action was taken with regards to the concerns of Provincial Treasury above?
Please provide the response by the City Manager at the time to Provincial Treasury Provincial Treasury has responded raising concerns regarding compliance to
Supply Chain Management
Outstanding
58
Regulations and the process followed. Please provide
the full supply chain management process that was followed and the responses to
the concerns.
Does the property still belong to CoT?
This proposed agreement was due to an unsolicited bid. Please provide all documentation with regards to the advertising of the proposed development, dates, where advertised, etc.
Please provide all Council decisions with all annexures regarding Symbio City and
the proposed development.
Who is the developer in question – please provide with details of all companies and individuals involved?
Please provide the feasibility study done regarding this project.
Was a SEA ( STRATEGIC ENVIRONMENTAL ASSESMENT) done before
Proceeding? If not why not?
Apparently the developer has no
59
cash or security to continue with this development - Does the developer have funding available? If not why was this
proposal even considered? If funding is available via which avenue? What security does the developer have?
Has the project been tested for time frames, costing or economic value, etc? If not why not?
If feasibility and costing studies were done, were it ever made public? If yes , How and if no – why not? When will such studies be made available?
Why has the rehabilitation of the mess at the lake, which cost this City millions in economic value, not been part of the immediate actions?
Has the rehabilitation of the river back to its original course been considered? If not why not?
The lake is manmade and land converted into the lake can be reclaimed and used rather than further destroy the river. Has this option been considered and if so
when and what was the result?
60
According to the City Planner, Hein Holtzhauzen, the lake has been secured for Symbio City and it is only a court case stalling the transfer. Since the lake has been committed then, why has Symbio City not paid one cent towards Tshwane?
Is this a case of an asset of this city being hijacked?
Please provide all legally binding documents which prove Symbio City has been secured.
Why was no other developments around the lake been considered in the planning
of Symbio City?
What is done to stop the influx of raw sewerage from Ekurhuleni and Johannesburg
Metros into the river?
How are you going to make sure the lake is cleared?
Who is the contractor who was given the contract to build Symbio City?
Regarding Erf 53, what is the argument brought before court and what are you expecting the
61
judge to do?
An expectation was created by Tshwane that Simbio City was final and binding. Did we mislead the public with this? 16
Who currently owns the Centurion lake, City of Tshwane or Symbio City
That a full forensic investigation be taken into processes regarding this unsolicited bid
and all agreements reached. C. Tswarisanang Plastic
Manufacturing Facility 1. That an updated report, wherein
the following questions/comments are addressed, be submitted to the Oversight Committee: Economic Development and Spatial Planning’s next meeting in March 2017:
Please make the MOA between the CoT and the co-operative available.
How does this qualify as a revitalisation project?
Has there ever been a feasibility study or business plan regarding
Outstanding
62
this facility? If not why not?
Why was R 2.2 million spent on this facility worth only a fraction of this cost to build? Please provide the original quotes from Early Moon Trading for the building of the facility.
Was the building of the facility put out on tender? If not why not? If yes please
provide proof of such.
Is the equipment costing R 1 million new or second hand? Why does the equipment not work and what has been done to have it repaired? Please provide all details.
Please provide the name and details of the company supplying the equipment as well as the tender process and proof thereof followed to procure it.
The water in the bathrooms is hot when opening the hot water tap. Why is the geyser on at the facility when it is not in use?
Please provide the last 12 months electricity and water bills for this erf. This must include the quantity of water and electricity used monthly.
63
When was the last production date at this facility?
Has any product ever been sold from this facility?
Please provide a list of potential customers with letters of intent for this facility.
Please include proposed quantities per client and pricing offered to them.
Please provide the pricing of the product produced, including cost to company and profit margin.
How many bags can be produced daily? How many should be sold at the above
prices to break even and to make profit monthly.
Please provide a detailed list of the members of the co-operative, including where they live.
How many jobs have been created to date for those living in the area?
At what price is the same product available in the
64
retailers? At what price from wholesalers and what price will
CoT pay for the product after the middle man procurement process? At what price is CoT currently buying bags?
Is this a Tshepo 10 000 project?
Who is the incubator and who pays for all the services?
What is the position regarding the unfunctional sealing machine?
What is the return on the investment for the CoT?
In terms of the procurement policy, you cannot use the same contractors. Please explain
2. That EARLY MOON TRADING
building contractors be investigated for all building
projects undertaken for CoT in the last 5 years, particularly regarding the cost for facilities that are way overpriced, which projects were out on tender.
3. That in addition that officials
responsible give account for allowing this project to continue at huge cost to the CoT with no outcomes, particularly job creation.
Outstanding Outstanding
65
4. That a forensic audit regarding the
expenditure of R3,2 million to build the facility, to renovate the existing offices and to buy the machinery, be done.
D. REITERETSE INTEGRATED
VEHICLE WASHING FACILITY:
1. That an updated report, where-in, the following question/comments are addressed, be submitted to the Oversight Committee: Economic Development and Spatial Planning’s next meeting in March 2017:
Is there an insurance on the facility? If yes why is it taken so long to repair the damage?
Please provide the MOA between the CoT and co-ops. Was it signed?
Why are there no advertisements on the outside wall?
Who was the building contractor?
Was there any feasibility study done? If so please provide it.
Is there any Plan B to change the plans if it does not work?
Outstanding Outstanding
66
Why is it that the co-ops work outside the facility as agreed?
The project was launched on 20 November 2015, the co-opt was only founded in March 2016, what was happening in the 4 months period?
Why was the job of caretaker not advertised but given to the CLO?
2. That a forensic audit regarding the
expenditure of R6, 5 million to build the above mentioned facility be done.
Outstanding
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING COMMITTEE ANNUAL RESOLUTIONS
2016/17 FINANCIAL YEAR.
23 MARCH 2017
DEPARTMENT TITLE OF THE REPORT INITIATOR/ AUTHOR
RESOLUTIONS STATUS/ EVIDENCE
City Planning and Development
Report on the progress of the building plan for Erf 628 Soshanguve – Clinic
Amolemo Mothoagae
1. That cognisance be taken of the content of the report.
2. That the plans for Erf 628 Soshanguve
Clinic be given priority for approval as per official policy and procedures.
3. That the Group Property Department do
a presentation on how it is dealing with the backlog on business sites, including challenges and indicate City of
Done Done Outstanding
67
Tshwane owned derelict buildings 4. That the Metro Plan be invited to brief
the Committee on the 2055 Vision regarding the Inner City rejuvenation
Outstanding
City Planning and Development
Report on the implementation of the African Gateway Project
Amolemo Mothoagae
1. That cognizance be taken of the contents of the report.
2. That in the future, reports should
include both questions asked followed by the answers.
3. That the Legal Division be invited to the Committee to update the Committee on the the following:
The court process regarding the closure of Erf 53, Centurion Lake.
Title deeds and township establishments, e.g. Eersterus.
The lease of R190 per annum for the African Gateway project.
4. That the Group Management Division be invited to come and brief the Committee on all properties belonging to the City, including but not limited to the derelict buildings.
5. That the City Planning Department should engage DIRCO and Public Works Department with the intention of establishing time lines to finalise agreements on the African Gateway
Done Done Outstanding Outstanding Outstanding
68
Project. 6. That both the Economic Development
Department and City Planning and Development Department must develop policies or By-laws that compel new mall developers to accommodate Informal Traders within the new establishment.
Outstanding
City Planning and Development Planning
Report on the implementation of the Symbio City Project
Amolemo Mothoagae
1. That cognisance be taken of the content of the report.
2. That the Legal Division present the
progress regarding the court proceedings in relation to the closure of Erf 53, Centurion Lake to the Oversight Committee: Economic Development and Spatial Planning.
Done Outstanding
City Planning and Development Planning
Report on the implementation of the West Capital Project
Amolemo Mothoagae
1. That cognisance be taken of the content of the report.
2. That the Legal Division update the
Committee on the progress regarding the termination of contract between the City of Tshwane and Tsosoletso Consortium for the West Capital Project.
3. That the City of Tshwane consider the
fast tracking of the refurbishment of Kruger Park and other land parcels within the West Capital precinct.
4. That the City Planning and
Development Department set up a working Committee between the latter and the residents to encourage
Done Outstanding Outstanding
Outstanding
69
dialogue. 5. That the Chairperson of the Oversight
Committee: Economic Development and Spatial Planning interact with his counterpart in the Housing Department to align activities and programmes for this purpose and to report back to the Oversight Committee: Economic
Development and Spatial Planning.
Done
Tshwane Metro Police Department
Report regarding theft and security at the Mabopane Intermodal Change
Steve Ngobeni
1. That cognisance be taken of the contents and importance of the report.
2. That the Project Manager be invited to
the Committee to give an updated report regarding the provision of stalls for informal traders at the Mabopane Intermodal Change
Done Outstanding
Section 79 Oversight Committee
Calling of reports Oversight Committee
1. Committee: Economic Development and Spatial Planning.
2. RSDF review report. 3. A detailed report by Mr Peter Phala
regarding the Section 7(6) certificated issue since 2014 with why each was allowed and where they were allowed.
4. A detailed report per region on building
plans backlog, staffing challenges and other challenges in the building offices. Recommendations to be included.
5. A report on BRT SDP Line2A for
Hatfield. 6. A report by the City Planning and
Outstanding Outstanding Outstanding Outstanding Outstanding
70
Development department on the progress in the compiling of data for the revision of the MSDP as per Section 21 of SPLUMA and progress in compiling the new MSDF for public participation. Included should be their development plan for the City of Tshwane for the next 5 to 10 years.
7. A presentation on the Inner City
Rejuvenation project.
8. A report on the need to build facilities for informal traders, including ablution facilities.
9. A report on the need for facilities for
busses and taxis in new developments. 10. A report on the need for developers to
create a space for smaller SMMEs. The Committee need to include equity ownership for smaller SMMEs
11. The policy on derelict buildings and a
report on ownership of all accommodation facilities so that the Committee can change ownership patterns
Outstanding Outstanding Outstanding Outstanding Outstanding Outstanding
71
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING COMMITTEE ANNUAL RESOLUTIONS
2016/17 FINANCIAL YEAR.
11 May 2017
Department Matters considered Author/ Initiator
Resolution Status/ Evidence
Economic Development Department
Business Support Operations Division Response to the Oversight Committee: Economic Development and Spatial Planning questions raised during the Inspection-In-loco of 9 February 2017 at Mamelodi Integrated Vehicle Washing Facility (IVWF)
Mapholisa Tshisikhawe/ Lufuno Tshikovhi
1. That cognisance be taken of the content of the report.
2. That the current business model is not viable and that an alternative model be designed to ensure that this project becomes viable.
Done Outstanding
72
ECONOMIC DEVELOPMENT AND SPATIAL PLANNING COMMITTEE ANNUAL RESOLUTIONS
2016/17 FINANCIAL YEAR.
11 May 2017
Department Matters considered Author/ Initiator
Resolution Status/ Evidence
Office of the Speaker
Quarter 2 report of the Section 79 Oversight Committee: Economic Development and Spatial Planning: (October-December 2016)
Kgopotso Thema
1. That the City of Tshwane together with other stake-holders involved in Eco-Furniture Factory Facility market the project in order to make it economically viable.
2. That the Economic Development Department market the products
made in the factory both locally and internationally.
3. That the Department work together with Department of Health and Social Development to consider the coffins, produced in the Eco-Factory, for indigent burials.
4. That the personnel’s skills be up-graded.
5. That the facility needs to be expanded to allow progress in the factory
6. That the land and property issue be resolved by the City and North
West Government
7. That, should the current business model in the Brick-Making Facility not be viable, an alternative model be designed to make sure that this project succeeds.
8. That should the current business model in the Paper-Towel
Manufacturing not be viable, an alternative model be designed to make sure that this project succeeds.
Outstanding Outstanding Outstanding Outstanding Outstanding Outstanding
Outstanding Outstanding
73
9. That the Kgora Community Bakery Co-operative writes a report to the Committee indicating challenges and listing areas where they need assistance
10. That the staff on the project be up-skilled on finance and book-
keeping.
11. That a new Security Company at Mabopane Station be appointed to guard the assets of the City on site.
12. That the City recoup the money lost at Mabopane Station
Intermodal Change Project due to theft of materials on site.
13. That the City appoint a new contractor to finalise the project as a matter of urgency.
14. That where it is possible, the City should utilise Tshwane Metro
Police Service to guard the site to guard the site.
15. That a full forensic audit be done on all co-operatives that exist in the City, including the Tshepo 10 000.
16. That the Tshepo 10 000 be revisited and scrutinised.
Outstanding Outstanding Outstanding Outstanding Outstanding Outstanding Outstanding Outstanding
74
17. That the implementation of the EPWP Programme be revisited to ensure a free and fair method of choosing beneficiaries and their rotation.
18. That Councillors should not be involved in recruitment or
appointment of workers in the communities and the relevant policy be reviewed.
19. That the Department indicate the following:
How many people applied for the Informal Traders Bursary Fund?
Who benefitted and provide a list of beneficiaries and their relationship to the traders.
How far are beneficiaries today with regard to their academic performances.
Outstanding Done Outstanding
75
Metro Plan Presentation on Tshwane Inner City Regeneration Strategy
Mr V du Plessis
1. That cognisance be taken of the presentation “Tshwane Inner City Regeneration Strategy” done by Mr V du Plessis and Mrs M Schoonraad from Metroplan.
2. That the Inner City By-Law be revisited, revised and considered
for public participation.
3. That the Inner City Regeneration Project be revised and fast tracked.
4. That the relations be improved between CoT and the large roll
players in the Inner City.
5. That the Northern Gateway tender be examined/pursued and the status be reported to the Committee.
6. That a Capital City Commission comprising of all stakeholders,
e.g. the CoT, Business Chambers, etc., be established to monitor and oversee the development of the Inner City.
7. That the synagogue should be converted into a museum.
Done Done Ongoing Done Outstanding Outstanding Ongoing
Economic Development and Spatial Planning (TEDA)
Presentation on Tshwane Economic Development Agency
Mr M Leshilo, Ms K Liebenberg, Mr T Mkwanazi
1. That cognisance be taken of the presentation on TEDA and their projects by M Leshilo, K Liebenberg and T Mkhwanazi of TEDA.
2. That cognisance be taken that the TEDA presentation was
distributed to the Committee members on 10 May 2017.
3. That reports ought to have substance to detail, especially when numbers/quantities are concerned
Done Done Done
76
Department Matters considered Author/ Initiator
Resolution Status/ Evidence
Group Property Management
Presentation on Group Property Management
Pule Mmutlana
1. That cognisance be taken of the oral presentation on the Group Property Management done by P Mmutlana, Acting Head of Group Property Management.
2. That cognisance be taken that Mr P Mmutlana only received
notice to do a presentation at 16:00 the previous day and could thus not prepare a Power Point presentation.
3. That a detailed and updated report based on the presentation by
the Acting Head be submitted to the Committee in the next meeting including:
Derelict buildings.
CoT residential properties in Pretoria West and other regions.
Group Property Management.
Done Done Done
Group Legal Division
Presentation on Group Legal Division
1. That cognisance be taken that the Legal Division did not show up for the presentation but indicated that they will do the presentation at the next meeting.
Outstanding
ANNEXURE B77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
PROCESS PLAN FOR THE SECTION 79 COMMITTEE: ECONOMIC DEVELOPMENT AND SPATIAL PLANNING - 2016/17 FINANCIAL YEAR
First Quarter : July–September 2017
Activity
Description
Responsibility
Time Frame/ Target Dates
RECESS!!! RECESS!!! RECESS!!!
RECESS!!!
Meeting
Detailed report on all properties including derelict buildings City wide.
Group Property Management xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
17 August 2017, from 09h00-12h00
99
Report on all properties of the City including Derelict Buildings
Review of the Street-Trading By-Law
Presentation on the Budget for the 2017/18 Financial Year
3rd Quarter and 4th Quarter Reports of the Committee
Report on RSDF
Progress Report from Legal including the following: - Court case for Symbio City - Termination of the agreement
between Developer of the West Capital Project and the City.
Group Properties Management Economic Development Economic Developmentand Spatial Planning Department Committee Researcher City Planning Legal Group
14 September 2017, from 09h00-14h00
Second Quarter: October-December 2017
Meeting Report on Out-Door Advertising
Progress report on BPO in Hammanskraal
First Quarter Reports from the
Economic Development Economic Development
12 October 2017, from 09h00-12h00
100
Committee Researcher and Department
Progress Report on ALL the Township Revitalization Projects as resolved in the Committee Meeting of May 2017
Inspection-In Loco
African Gate-Way Project
Mamelodi Rondavels
Melgesedek Building
Township Revitlisation Projects: - Brick Making Facility - Paper Towel Manufacturing - Tshwarisanang Plastic
Manufacturing Project - Kgora Community Bakery - Reiteretse Vehicle Washing
Project - Ga-Rankuwa Eco Furniture
Factory - Mabopane Intermodal
Change
Committee and Economic Development and Spatial Planning
16 November 2017, from 09h00-12h00
RECESS!!! RECESS!!!
RECESS!!! December
Third Quarter: January - March 2018
Meeting
Mid-Term Reports from the Committee Researcher and Department
Performance Report from TEDA
Committee Researcher and Economic Development Department TEDA
11 January 2018
101
Performance Report from the Tourism Desk
Report on Programmes of Fresh Produce Market
Tourism Economic Development Department
Meeting Performance Report from the Innovation Hub
Reviewal of all the Committee By-Laws
Innovation Hub 08 February 2018, from 09h00-12h00
Inspection-In-Loco
Ga-Rankuwa Eco-Furniture Factory
Mabopane Intermodal Change
Economic Development Department
15 March 2018, from 09h00-14h00
Fourth Quarter Report: April-June 2018
Meeting Considering reports as called-up by Committee Members in the previous month
Supplementary Agendas from the Inspection-In-Loco in Ga-Rankuwa Eco-Factory and Mabopane Intermodal Change Project
Committee Economic Development Department
13 April 2018, from 09h00-12h00.
Meeting Consideration of reports from the previous meeting
Committee 17 May 2018, from 09h00-12h00
Out Reach Doing Community Out Reach Committee 14 June 2028, from 09h00-14h00
102