Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
Inner M ora y Firth (SPA, Ra m s a r)Longm a n a nd Ca stle
Stua rt Ba ys (SSSI)
11_LP
14_LP
12_LP
06_LP
10_LP
09_LP
08_LP
07_LP
13_LP05_LP04_LP
03_LP
02_LP
01_LPCM S_ Telford
M ora y Firth (SAC)
HIGHLAND M A
IN LINE R
AILWAYSTRATTON
CU LLODEN
RESAU RIE
CRADLEHALL
SM ITHTON
INSHES
INV ERNESS CAM PU S
ABERDEEN TO INV ERNESSRAILWAY LINE
INV ERNESS
M ORAYFIRTH
A9
A96
INV ERNESS RETAILAND BU SINESS PARK
RAIGM ORE INTERCHANGE
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres
Figure 7.1
Client
ProjectA9/A96 Ins hes to Sm ithton
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCALE@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure 7.1
DM RB Sta ge 3 EIARAir Qua lity As s es s m ent:Cons tra ints Pla n
C00
Drawing Status A – APPROV ED AS STAGE COM PLETESheet 1 of 1
1:25,000
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn
Legend
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals
!(Scheme Specific Air Quality MonitoringLocationsModelled Road NetworkAffected Road Network**Site of Special Scientific Interest (SSSI)*Wetland of International Importance(Ramsar Site)*Special Protection Area (SPA)*Special Area of Conservation (SAC)*
A9-A96IS-JAC-EGN-XXX-FG-EN-0701
Proposed Scheme(DMRB Stage 3 design)
Data source:* Scottish National Heritage (SNH) - Data provided March 2018**Affected Road Network includes the proposed scheme and A96 dualled sections in the Do-Minimum and Do-Something scenarios
CSSEPT 2019C00 ASEIAR Publication KL DGC