“ Pan -E uropean Corridors ” Belgrade, April 15 th 2013. International Corridor X. Motorway network in the Republic of Se r bia. Projects on Corridor X in the Republic of Se r bia. Project North (Horgoš-Novi Sad) Project South (Niš-BC FYR of Macedonia) Project East (Niš-BC Bulgaria) - PowerPoint PPT Presentation

Citation preview

Page 1: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

“Pan-European Corridors”Belgrade, April 15th 2013

Page 2: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

International Corridor X

Page 3: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway network in the Republic of Serbia

Page 4: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Projects on Corridor X in the Republic of Serbia

• Project North (Horgoš-Novi Sad)• Project South (Niš-BC FYR of

Macedonia)• Project East (Niš-BC Bulgaria)• Project Belgrade Bypass

Page 5: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-75 (North)

• Section: • BC Horgoš – Novi

Sad

• Section: • BC Kelebija –

interchange Subotica-South

Page 6: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

SectionsLeng

th (Km)

Financing

Preliminary

design

Main desig

n

Technical

review

Tender

Construction works

Constructor

deadline

BC Kelebija - Interchange Subotica-South

22.3Budget

RScomple

tedcompleted

completed

completed

JV Putevi Uzice, Nibens group,

Planum, Borovica

Autumn

2013

BC Horgoš - Novi Sad

86.9Budget

RScomple

tedcompleted

completed

completed

JV Putevi Uzice, Nibens group,

Planum, Borovica

Aug. 2011

Motorway E-75 (North)

Page 7: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-75 (South)Section: Grabovnica -

LevosojeSections:

•Grabovnica-Grdelica

•Grdelica-Caricina dolina

•Caricina dolina-Vladicin Han

•Vladicin Han-DonjiNeradovac

•Donji Neradovac-Srpska kuca

•Srpska kuca-Levosoje

Page 8: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Sections

Length (Km

)

Financing

Preliminary

design

Main desig

n

Technical

review

Tender

Construction works

Constructor

deadline

Gornje Polje - Caricina Dolina

12.0

EIBcompleted

completed

completed

completed

 TERNA

Jul. 2014

 

Caricina Dolina - Vladicin Han

14.4

EIBcompleted

completed

completed

finishing

   

Vladicin Han - Donji Neradovac

26.3

WBcompleted

completed

completed

completed

 TERNA

Jul. 2014

 

Donji Neradovac - Srpska kuca

8.0

Budget RS, HiPER

B

completed

completed

completed

completed

ACTORJul.

2013

Srpska kuca - Levosoje

8.0

Budget RS, HiPER

B (EIB)

completed

completed

completed

preparing 

   

Motorway E-75 (South)

Page 9: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-80section: Prosek –

DimitrovgradSections:

•Prosek-Crvena reka

•Crvena reka-Ciflik

•Ciflik-Stanicenje

•Stanicenje-Pirot

•Pirot East-Sukovo

•Sukovo-Dimitrovgrad

•Dimitrovgrad bypass

Page 10: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-80

 SectionsLeng

th (Km)

Financing

Preliminary

design

Main desig

n

Technical

review

Tender

Construction works

Constructor

deadline

Prosek - Crvena reka

22.5 EIBcomple

tedcompleted

completed

completed

JV TERNA AKTOR

SUBTERRA  (tunn.)

Dec.2014 

Crvena Reka - Ciflik

12.7 EBRDcomple

tedcompleted

completed

completed

AKTOR   Dec.2013

Ciflik-Stanicenje

12.2 EIBcomple

tedcompleted

completed

finishing 

   

Stanicenje - Pirot East

14.5 EIBnot

completed

completed

completed

finishing

   

Pirot East -Sukovo

6.0 EBRDcomple

tedcompleted

completed

completed

AlpineDec. 2013

Sukovo-Dimitrovgrad

9.3 EBRDcomple

tedcompleted

completed

completed

Alpine Maj.

2013

Dimitrovgrad bypass

7.0 WBcomple

tedcompleted

completed

completed

Alpine

TERNA (tunn.)

Jul. 2014.

Okt.2014 (Tunn)

Page 11: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-70/E-75Belgrade Bypass

Page 12: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Sectors Leng

th (Km)

Financing

Preliminary

design

Main desig

n

Technical

review

Tender

Construction works

Constructor

deadline

Sector A1: Interchange Batajnica

3.9 EIBcompleted

 completed

 completed

completed 

JV: Planum, Ratko

Mitrovic

Dec. 201

3

Sector A2: Batajnica - Dobanovci

6.1 EBRDcompleted

completed

completed

completed

Strabag AG

Nov. 2012

Sector B1-B4: Interchange Dobanovci - Interchange Orlovaca

24.5EIB/

EBRD 

completed

completed

completed

 

 JV: Planum, Ratko

Mitrovic

Dec. 2013

Sector B5: Interchange Orlovaca - Tunnel Strazevica

5.7 EIBcompleted

completed

completed

completed

JV Primorje, Ratko Mitrovic (Bridges

), Eenergoprojekt

(Tunnel)

Nov. 201

2

Sector B6:Tunnel Strazevica - Interchange Bubanj potok

7.2 EIBcompleted

 not completed

  not completed

     

Motorway E-70/E-75

Page 13: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-763Section: Belgrade - Pozega

Sections:

• Belgrade-Obrenovac

• Obrenovac-Ub• Ub-Lajkovac• Lajkovac-Ljig• Donji Banjani-Ljig• Boljkovci-Takovo• Takovo-Preljina• Preljina-Prijevor• Prijevor-Lucani• Lucani-Pozega

Page 14: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-763Sections  Length 

(Km) Financing Preliminary design

Main design

Technical review Tender

Construction works

Constructor deadline

Belgrade - Obrenovac 25.0   completed

           

Obrenovac - Ub 26.2 LoanRC  completed completed completed  finishing   Shandong Hi-

speed Group Dec. 2016

Ub - Lajkovac 12.5 Budget RS completed completed completed completed

JV Putevi Užice, Nibens group, Planum, Borovica 

Dec. 2011

Lajkovac - Ljig 24.7LoanRC  

completed completed completed   finishing   Shandong Hi-speed Group

 Dec. 2016 

Donji Banjani – Ljig 10.7  LoanR Az completed completed completed completed  AzVirt  Dec. 

2016 

Boljkovci – Takovo 12.6LoanR Az 

completed completed completed completed  AzVirt  Dec. 2016 

Takovo – Preljina 16.8  Loan R Az completed completed completed completed  AzVirt  Dec. 

2016 

Preljina - Prijevor 8.3   completed          

Prijevor - Lucani 15.5   completed          

Lucani – Pozega 7.2   completed          

Page 15: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-761Section: Pojate - Preljina

Sections:

• Pojate-Krusevac

• Krusevac-Adrani

• Adrani-Preljina

Page 16: “ Pan -E uropean Corridors ” Belgrade, April 15 th  2013

Motorway E-761

 Sections Length (Km) Financing Preliminary 

designMain design

Technical review

Tender

Construction works

Constructor deadline

Pojate-Krusevac 27.6 Loan

RC  on going on going    CRBC

Krusevac-Adrani

51.4  LoanRC 

not completed

not completed    CRBC

Adrani- Preljina 30.6 LoanRC   on going on going    CRBC  