18

Outfall F 0 50 100 200 300 400 Feet Outfall C Outfall D Outfall B Outfall A Gabion Wall Piers 42 & 43 Plan prepared by Mr. Kevin Maley, Surveillance and Enforcement

  • Upload
    others

  • View
    21

  • Download
    0

Embed Size (px)

Citation preview

Outfall F

0 100 200 300 40050Feet

Outfall C

Outfall D

Outfall B

Outfall A

Gabion Wall

Piers 42 & 43

Plan prepared by Mr. Kevin Maley, Surveillance and Enforcement Section, Regulatory Branch, Philadelphia District, U.S. Army Corps of Engineers, on February 26, 2013, using GoogleEarth aerial imagery dated April 11, 2010 and ESRI ArcMap.

£

EXHIBIT 1Settlement AgreementUnited States & HSP Gaming, L.P.CENAP-OP-R-2007-120 (NWP-32)Surveillance and Enforcement SectionRegulatory Branch, Philadelphia DistrictU.S. Army Corps of Engineers

SUGARHOUSE CASINO

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

4

6.56.1

5.4

2

4.9

3.8

2.9

2.6 0.80.7

3.8

0 1 2 3 40.5

Feet

ConcreteConcrete

Concrete Spillway

Settlement Agreement:United States & HSP Gaming, L.P.CENAP-OP-R-2007-120 (NWP-32)Surveillance and Enforcement SectionRegulatory Branch, Philadelphia DistrictU.S. Army Corps of Engineers

18" ID Stormwater PipeFilled 16" Pipe

OUT FALL "F"(Plan View) Settlement Agreement:

United States & HSP Gaming, L.P.CENAP-OP-R-2007-120 (NWP-32)Surveillance and Enforcement SectionRegulatory Branch, Philadelphia DistrictU.S. Army Corps of Engineers

Work authorized by Nationwide Permit (NWP) 32, Completed Enforcement Actions. 49 square feet of dredged and/or fill material discharged into waters of the United States associated with reconstruction of storm water Outfall "F".

Plan prepared by Messrs. Kevin F. Maley and Jeffrey Steen, Philadelphia District, USACOE, on February 11, 2013, using field measurementsdated January 31, 2013. Elevations provided by Mr. Stephen A. Farrell, Philadelphia District, Survey Branch, based on survey dated May 20, 2011.

EXHIBIT 3

High Tide LineLimit of Area Subject to

Federal Jurisdiction

DELAWARE RIVER

Concrete Headwall

High Tide LineEl. 4.55" NAVD 1988

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

5

7.9

6.1

2

4.7

4.13.7

3.4 2.2

1.9

1.7 1.6

1.4

0.51.4

0 1 2 3 40.5

Feet

Filled16" Pipe

StoneBlocks

OUT FALL "F"(Front View)

StoneBlocks

OUT FALL "F"(Front View) Settlement Agreement:

United States & HSP Gaming, L.P.CENAP-OP-R-2007-120 (NWP-32)Surveillance and Enforcement SectionRegulatory Branch, Philadelphia DistrictU.S. Army Corps of Engineers

High Tide LineEl. 4.55" NAVD 1988

Concrete Headwall

Mean High Water LineEl. 2.94' NAVD 1988

StoneBlocks

OUT FALL "F"(Front View) Settlement Agreement:

United States & HSP Gaming, L.P.CENAP-OP-R-2007-120 (NWP-32)Surveillance and Enforcement SectionRegulatory Branch, Philadelphia DistrictU.S. Army Corps of Engineers

High Tide LineEl. 4.55" NAVD 1988

Plan prepared by Messrs. Kevin F. Maley and Jeffrey Steen, Philadelphia District, USACOE, on February 11, 2013, using field measurementsdated January 31, 2013. Elevations provided by Mr. Stephen A. Farrell, Philadelphia District, Survey Branch, based on survey dated May 20, 2011.

18" ID Stormwater

Pipe

Rip-Rap &Concrete

Blocks

Concrete Concrete

Concrete Headwall

Concrete Spillway

Work authorized by Nationwide Permit (NWP) 32, Completed Enforcement Actions. 49 square feet of dredged and/or fill material discharged into waters of the United States associated with reconstruction of storm water Outfall "F".

EXHIBIT 4