COUNTY AGENCY PIN PROJECT DESCRIPTION FUND SOURCES FFY TOTAL 4-YEAR PROGRAM in millions of dollars PHASE AQ CODE FFY 2022 FFY 2023 FFY 2021 FFY 2020 4-YEAR PROGRAM (FFY) Starting October 01, 2019 Monday, March 2, 2020 Page 1 of 87 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) for REGION 05 TOTAL PROJECT COST 0.200 STBG FLEX 0.200 CONINSP 2020 CONINSP 0.050 0.050 2020 NFA 1.666 STBG FLEX 1.666 CONST 2020 CONST 0.416 0.416 2020 NFA NYSDOT 500913 RT 83 SLOPE FAILURE - HIGHWAY ALIGNMENT RELOCATION AND RT 83 CULVERT REPLACEMENTS (2) IN THE TOWN OF ARKWRIGHT, CHAUTAUQUA COUNTY. THIS PROJECT WILL RELOCATE THE ALIGNMENT OF 0.4 MILES OF NY ROUTE 83 APPROXIMATELY 30 FT TO THE SOUTH IN THE TOWN OF ARKWRIGHT, CHAUTAUQUA COUNTY. THIS WILL HELP STABILIZE THE EMBANKMENT WHICH HAS BEEN EXHIBITING SIGNS OF FAILURE. TWO CULVERTS ON RT 83 WILL ALSO BE REPLACED. 2.332 2.332 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST : CHAUTAUQUA TPC : $3.3-$5.6 M 0.336 STBG FLEX 0.336 CONINSP 2020 CONINSP 0.084 0.084 2020 NFA 2.800 STBG FLEX 2.800 CONST 2020 CONST 0.700 0.700 2020 NFA NYSDOT 501131 STRUCTURAL BRIDGE REPLACEMENTS OF BINS 1034702, 1034690 & 1048340 & REPLACEMENT OR REMOVAL OF 1034701 ON RT 93 & 425 BRIDGE OVER E. BRANCH 12 MILE CREEK. THIS PROJECT WILL ALSO INCLUDE WORK TO PERMANENTLY STABILIZE THE LAKE ONTARIO SHORELINE AT THREE SLOPE FAILURE AREAS ALONG A 0.7 MILE SECTION OF RT 18; TOWNS OF PORTER & WILSON; NIAGARA COUNTY 3.920 3.920 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST : NIAGARA TPC : $4.6-$7.5 M 0.936 STBG FLEX 0.936 CONINSP 2020 CONINSP 0.234 0.234 2020 NFA 7.800 STBG FLEX 7.800 CONST 2020 CONST 1.950 1.950 2020 NFA NYSDOT 503817 RT 354; BUFFALO ECL TO RT 954G (TWO ROD RD) - MILLING AND RESURFACING WITH A TWO COURSE OVERLAY; TOWNS OF CHEEKTOWAGA, WEST SENECA, ELMA, & MARILLA IN ERIE COUNTY.. WORK WILL ALSO INCLUDE RESTORING DRAINAGE ON RT 354 FROM RT 240 TO RT 954G TO AN ADEQUATE HYDRAULIC CAPACITY BY REPLACING EXISTING PIPES AND DRAINAGE STRUCTURES. DRAINAGE INLETS WILL ALSO BE RESTORED AS NEEDED. 10.920 10.920 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST : ERIE TPC : $9.5-15.5 M 0.200 STBG FLEX 0.200 DETLDES 2020 DETLDES 0.050 0.050 2020 NFA 0.174 0.174 CONINSP STBG FLEX 2021 CONINSP 0.044 0.044 2021 NFA 1.975 1.975 CONST STBG FLEX 2021 CONST 0.494 0.494 2021 NFA NYSDOT 504019 NY 430 OVER DEWITTVILLE CK, BRIDGE REPLACEMENT; BIN 1012040; TOWN OF CHAUTAUQUA; CHAUTAUQUA COUNTY 2.937 0.250 2.687 0.000 0.000 AQC:A19 TOTAL 4YR COST : CHAUTAUQUA TPC : $2-$4 M

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 1 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.200 STBG FLEX 0.200 CONINSP2020CONINSP 0.050 0.050 2020NFA

1.666 STBG FLEX 1.666 CONST2020CONST 0.416 0.416 2020NFA

NYSDOT

500913

RT 83 SLOPE FAILURE - HIGHWAY ALIGNMENT RELOCATION AND RT 83 CULVERT REPLACEMENTS (2) IN THE TOWN OF ARKWRIGHT, CHAUTAUQUA COUNTY. THIS PROJECT WILL RELOCATE THE ALIGNMENT OF 0.4 MILES OF NY ROUTE 83 APPROXIMATELY 30 FT TO THE SOUTH IN THE TOWN OF ARKWRIGHT, CHAUTAUQUA COUNTY. THIS WILL HELP STABILIZE THE EMBANKMENT WHICH HAS BEEN EXHIBITING SIGNS OF FAILURE. TWO CULVERTS ON RT 83 WILL ALSO BE REPLACED.

2.332 2.332 0.000 0.000 0.000 AQC:A2 TOTAL 4YR COST :CHAUTAUQUA TPC : $3.3-$5.6 M

0.336 STBG FLEX 0.336 CONINSP2020CONINSP 0.084 0.084 2020NFA

2.800 STBG FLEX 2.800 CONST2020CONST 0.700 0.700 2020NFA

NYSDOT

501131

STRUCTURAL BRIDGE REPLACEMENTS OF BINS 1034702, 1034690 & 1048340 & REPLACEMENT OR REMOVAL OF 1034701 ON RT 93 & 425 BRIDGE OVER E. BRANCH 12 MILE CREEK. THIS PROJECT WILL ALSO INCLUDE WORK TO PERMANENTLY STABILIZE THE LAKE ONTARIO SHORELINE AT THREE SLOPE FAILURE AREAS ALONG A 0.7 MILE SECTION OF RT 18; TOWNS OF PORTER & WILSON; NIAGARA COUNTY

3.920 3.920 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :NIAGARA TPC : $4.6-$7.5 M

0.936 STBG FLEX 0.936 CONINSP2020CONINSP 0.234 0.234 2020NFA

7.800 STBG FLEX 7.800 CONST2020CONST 1.950 1.950 2020NFA

NYSDOT

503817

RT 354; BUFFALO ECL TO RT 954G (TWO ROD RD) - MILLING AND RESURFACING WITH A TWO COURSE OVERLAY; TOWNS OF CHEEKTOWAGA, WEST SENECA, ELMA, & MARILLA IN ERIE COUNTY.. WORK WILL ALSO INCLUDE RESTORING DRAINAGE ON RT 354 FROM RT 240 TO RT 954G TO AN ADEQUATE HYDRAULIC CAPACITY BY REPLACING EXISTING PIPES AND DRAINAGE STRUCTURES. DRAINAGE INLETS WILL ALSO BE RESTORED AS NEEDED.

10.920 10.920 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :ERIE TPC : $9.5-15.5 M

0.200 STBG FLEX 0.200 DETLDES2020DETLDES 0.050 0.050 2020NFA

0.174 0.174 CONINSPSTBG FLEX 2021CONINSP 0.044 0.044 2021NFA

1.975 1.975 CONSTSTBG FLEX 2021CONST 0.494 0.494 2021NFA

NYSDOT

504019

NY 430 OVER DEWITTVILLE CK, BRIDGE REPLACEMENT; BIN 1012040; TOWN OF CHAUTAUQUA; CHAUTAUQUA COUNTY

2.937 0.250 2.687 0.000 0.000 AQC:A19 TOTAL 4YR COST :CHAUTAUQUA TPC : $2-$4 M

Page 2: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 2 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.045 HSIP 0.045 PRELDES2020PRELDES 0.005 0.005 2020NFA

0.090 0.090 DETLDESHSIP 2021DETLDES 0.010 0.010 2021NFA

0.015 0.015 ROWACQUHSIP 2021ROWACQU 0.002 0.002 2021NFA

0.009 0.009 ROWINCDHSIP 2021ROWINCD 0.001 0.001 2021NFA

0.149 0.149 CONINSPHSIP 2022CONINSP 0.017 0.017 2022NFA

0.606 0.606 CONSTHSIP 2022CONST 0.067 0.067 2022NFA

0.560 0.560 CONSTSTBG FLEX 2022CONST 0.140 0.140 2022NFA

NYSDOT

504527

NY RT 104 & NY RT 93 INTERSECTION SAFETY IMPROVEMENTS IN THE TOWNS OF CAMBRIA AND LOCKPORT, NIAGARA COUNTY. WORK WILL INCLUDE INSTALLATION OF A TRAFFIC SIGNAL, REALIGNMENT OF THE INTERSECTION, AND THE REPLACEMENT OF TRAFFIC SIGNS AS NEEDED. THIS PROJECT WILL ALSO INVESTIGATE INSTALLING DEDICATED TURN LANES AND THE ELIMINATION OF THE RIGHT TURN SLIP RAMP. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

1.716 0.050 0.127 1.539 0.000 AQC:D2 TOTAL 4YR COST :NIAGARA TPC : $1.2-$2.5 M

CONINSP 0.512 0.512 2020NFACONST 4.269 4.269 2020NFA

0.166 NHPP 0.166 CONINSP2020CONINSP 0.041 0.041 2020NFA

1.381 NHPP 1.381 CONST2020CONST 0.345 0.345 2020NFA

0.160 NHPP 0.160 DETLDES2020DETLDES 0.040 0.040 2020NFA

0.027 NHPP 0.027 ROWACQU2020ROWACQU 0.007 0.007 2020NFA

NYSDOT

505851

RT 60 OVER BRANCH OF CASSADAGA CK, BIN 1027800, BRIDGE REPLACEMENT AND CONSTRUCTION OF NB & SB PASSING LANES ON RT 60; WORK WILL ALSO INCLUDE RESURFACING AND ADA REQUIREMENTS ON RT 60. TNS OF GERRY, CHARLOTTE, STOCKTON, & ELLICOTT; VILS OF CASSADAGA & SINCLAIRVILLE; CHAUTAUQUA COUNTY

6.948 6.948 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :CHAUTAUQUA TPC : $6-$9.4 M

0.568 HSIP 0.568 CONINSP2020 4.738 HSIP 4.738 CONST2020 0.029 STBG FLEX 0.029 CONINSP2020

CONINSP 0.007 0.007 2020NFA 0.246 STBG FLEX 0.246 CONST2020

CONST 0.062 0.062 2020NFA

NYSDOT

50PS03

PEDESTRIAN SAFETY ACTION PLAN (PSAP), PHASE IIB. PROJECT WILL IMPLEMENT COUNTERMEASURES THAT IMPROVE PEDESTRIAN SAFETY IN FEDERAL AID ELIGIBLE URBAN AREAS THROUGHOUT ERIE & NIAGARA COS. THE WORK IN THIS PROJECT HAS BEEN REVIEWED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND USE OF HSIP FUNDS HAS BEEN APPROVED BY THE REGIONAL TRAFFIC ENGINEER. PSAP PROJECTS WILL USE 100% HSIP FUNDING USING 10% TOLL CREDIT.

5.650 5.650 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 3: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 3 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.359 HSIP 0.359 CONINSP2020 2.995 HSIP 2.995 CONST2020

NYSDOT

50PS04

PEDESTRIAN SAFETY ACTION PLAN (PSAP), PHASE IIB. PROJECT WILL IMPLEMENT COUNTERMEASURES THAT IMPROVE PEDESTRIAN SAFETY IN URBAN AREAS THROUGHOUT CATTARAUGUS, CHAUTAUQUA& ERIE COUNTIES.THE WORK IN THIS PROJECT HAS BEEN REVIEWED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND USE OF HSIP FUNDS HAS BEEN APPROVED BY THE REGIONAL TRAFFIC ENGINEER. PSAP PROJECTS WILL USE 100% HSIP FUNDING USING 10% TOLL CREDIT.

3.354 3.354 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.173 NHPP 0.173 CONINSP2020CONINSP 0.044 0.044 2020NFA

1.440 NHPP 1.440 CONST2020CONST 0.367 0.367 2020NFA

0.041 NHPP 0.041 DETLDES2020DETLDES 0.010 0.010 2020NFA

0.032 NHPP 0.032 ROWACQU2020ROWACQU 0.008 0.008 2020NFA

NYSDOT

510167

STRUCTURAL BRIDGE REPLACEMENT OF BIN 1041550 ON RT 219 OVER CROWLEY CREEK; TOWN OF ELLICOTTVILLE; CATTARAUGUS COUNTY

2.115 2.115 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $2-$4 M

0.423 NHPP 0.423 DETLDES2020DETLDES 0.106 0.106 2020NFA

0.460 0.460 CONINSPNHPP 2021CONINSP 0.115 0.115 2021NFACONINSP 0.069 0.069 2021NFA

3.835 3.835 CONSTNHPP 2021CONST 0.959 0.959 2021NFACONST 0.581 0.581 2021NFA

NYSDOT

510192

MULTICOURSE OVERLAY OF ROUTE 219; 1 MILE SOUTH OF SNI TERRITORY - I-86 AND ROUTE 954T; I-86 - RT 417; INCLUDING GENERAL BRIDGE REPAIRS TO BINS 6041450; TOWN OF CARROLLTON; CATTARAUGUS COUNTY

9.153 0.529 8.624 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $7.5-$12 M

0.320 NHPP 0.320 DETLDES2020DETLDES 0.080 0.080 2020NFA

1.065 1.065 CONINSPNHPP 2021CONINSP 0.266 0.266 2021NFA

8.880 8.880 CONSTNHPP 2021CONST 2.220 2.220 2021NFA

NYSDOT

510193

US RT 219; SNI RESERVATION LINE TO PA STATE LINE; TOWN OF CARROLLTON, CATTARAUGUS COUNTY. THIS PROJECT WILL UTILIZE A CRACK AND SEATING TREATMENT, FOLLOWED BY A 3-COURSE OVERLAY ON THIS SECTION OF US RT 219.

12.831 0.400 12.431 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $9.5-15.5 M

Page 4: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 4 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.240 NHPP 0.240 DETLDES2020DETLDES 0.060 0.060 2020NFA

0.120 NHPP 0.120 ROWACQU2020ROWACQU 0.030 0.030 2020NFA

0.480 0.480 CONINSPNHPP 2021CONINSP 0.120 0.120 2021NFA

4.080 4.080 CONSTNHPP 2021CONST 1.020 1.020 2021NFA

NYSDOT

511177

RT 20/CAZENOVIA CREEK, BIN 1015520, MINOR BRIDGE MAINTENANCE; TOWNS OF ELMA AND WEST SENECA; ERIE COUNTY

6.150 0.450 5.700 0.000 0.000 AQC:A19 TOTAL 4YR COST :ERIE TPC : $6-$9.4 M

0.184 HSIP 0.184 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.046 HSIP 0.046 ROWACQU2020ROWACQU 0.005 0.005 2020NFA

0.083 0.083 CONINSPNHPP 2022CONINSP 0.021 0.021 2022NFA

0.832 0.832 CONSTNHPP 2022CONST 0.208 0.208 2022NFA

NYSDOT

511188

RT 5 & OLD LAKESHORE RD INTERSECTION IMPROVEMENTS; TN OF BRANT; ERIE CO. PROJECT WILL MAKE SAFETY IMPROVEMENTS AT INTERSECTION INCLUDING LEFT TURN AND RIGHT TURN LANES. THE WORK IN THIS PROJECT HAS BEEN REVIEWED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND USE OF HSIP FUNDS FOR THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL TRAFFIC ENGINEER.

1.399 0.255 0.000 1.144 0.000 AQC:D1 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.018 HSIP 0.018 DETLDES2020DETLDES 0.002 0.002 2020NFA

0.009 HSIP 0.009 PRELDES2020PRELDES 0.001 0.001 2020NFA

0.018 HSIP 0.018 ROWACQU2020ROWACQU 0.002 0.002 2020NFA

0.009 HSIP 0.009 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.031 0.031 CONINSPHSIP 2021 0.255 0.255 CONSTHSIP 2021

NYSDOT

513139

RT 277 (UNION RD) @ RT 33 RAMPS; TOWN OF CHEEKTOWAGA; ERIE CO. THIS PROJECT WILL REPLACE TRAFFIC SIGNALS ON NY ROUTE 277, UNION ROAD AT THE NY ROUTE 33 RAMPS TO ACCOMMODATE OVERHEAD SIGNAGE AND ACCESSIBLE PEDESTRIAN SIGNALS. THE WORK IN THIS PROJECT HAS BEEN REVIEWED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND USE OF HSIP FUNDS HAS BEEN APPROVED BY THE REGIONAL TRAFFIC ENGINEER. PSAP PROJECTS WILL USE 100% HSIP FUNDING USING 10% TOLL CREDIT.

0.346 0.060 0.286 0.000 0.000 AQC:D2 TOTAL 4YR COST :ERIE TPC : < $0.75 M

1.360 NHPP 1.360 MISC2020MISC 0.340 0.340 2020NFA

2.693 2.693 MISCNHPP 2021MISC 0.673 0.673 2021NFA

NYSDOT

513448

RT 5 (SKYWAY) - PREPARATION OF A PLANNING STUDY LEADING TO AN ENVIRONMENTAL IMPACT STATEMENT (EIS) TO EVALUATE ALTERNATIVES OF THE SKYWAY, IN THE CITY OF BUFFALO, ERIE COUNTY.

5.066 1.700 3.366 0.000 0.000 AQC:C3 TOTAL 4YR COST :ERIE TPC : $7.5-$12 M

Page 5: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 5 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.300 HSIP 0.300 DETLDES2020 0.100 HSIP 0.100 ROWACQU2020 0.020 HSIP 0.020 ROWINCD2020 0.145 0.145 CONINSPHSIP 2021

CONINSP 0.016 0.016 2021NFA 1.321 1.321 CONSTHSIP 2021 0.086 0.086 CONINSPNHPP 2021

CONINSP 0.021 0.021 2021NFA 0.717 0.717 CONSTNHPP 2021

CONST 0.180 0.180 2021NFA

NYSDOT

530834

RT 62 @ NY 429 INTERSECTION IMPROVEMENTS, IN THE TOWN OF WHEATFIELD, NIAGARA COUNTY. THIS PROJECT WILL RECONSTRUCT AND WIDEN THE INTERSECTION OF US ROUTE 62 AND NY ROUTE 429, TO INCLUDE THE ADDITION OF LEFT TURN LANES. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK

2.906 0.420 2.486 0.000 0.000 AQC:A2,A6 TOTAL 4YR COST :NIAGARA TPC : $2-$4 M

0.147 NHPP 0.147 CONINSP2020CONINSP 0.037 0.037 2020NFA

1.224 NHPP 1.224 CONST2020CONST 0.306 0.306 2020NFA

0.160 NHPP 0.160 DETLDES2020DETLDES 0.040 0.040 2020NFA

NYSDOT

530836

US 62 OVER BIG SISTER CK (BIN 1028170), STRUCTURAL BRIDGE REPLACEMENT OR REHABILITATION; VILLAGE OF NORTH COLLINS; ERIE COUNTY

1.914 1.914 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.063 HSIP 0.063 PRELDES2020PRELDES 0.007 0.007 2020NFA

0.094 0.094 ROWACQUHSIP 2021ROWACQU 0.010 0.010 2021NFA

0.018 0.018 ROWINCDHSIP 2021ROWINCD 0.002 0.002 2021NFA

0.116 0.116 DETLDESNHPP 2021DETLDES 0.029 0.029 2021NFA

0.083 0.083 CONINSPHSIP 2022CONINSP 0.010 0.010 2022NFA

0.692 0.692 CONSTHSIP 2022CONST 0.077 0.077 2022NFA

0.177 0.177 CONINSPNHPP 2022CONINSP 0.045 0.045 2022NFA

1.478 1.478 CONSTNHPP 2022CONST 0.369 0.369 2022NFA

NYSDOT

530837

RT 62 @ WITMER RD SAFETY IMPROVEMENTS; TOWN OF WHEATFIELD; NIAGARA COUNTY. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

3.270 0.070 0.269 2.931 0.000 AQC:A2 TOTAL 4YR COST :NIAGARA TPC : $2-$4 M

Page 6: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 6 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.240 HSIP 0.240 CONINSP2020CONINSP 0.028 0.028 2020NFA

2.000 HSIP 2.000 CONST2020CONST 0.226 0.226 2020NFA

0.140 HSIP 0.140 DETLDES2020DETLDES 0.016 0.016 2020NFA

0.060 HSIP 0.060 PRELDES2020PRELDES 0.007 0.007 2020NFA

NYSDOT

530838

RT 62/950K, NIAGARA FALLS BLVD PEDESTRIAN SAFETY IMPROVEMENTS (KENMORE - ERIE CO LINE); TOWNS OF AMHERST AND TONAWANDA, ERIE COUNTY. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

2.717 2.717 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.072 HSIP 0.072 DETLDES2020DETLDES 0.008 0.008 2020NFA

0.036 HSIP 0.036 PRELDES2020PRELDES 0.004 0.004 2020NFA

0.045 HSIP 0.045 ROWACQU2020ROWACQU 0.005 0.005 2020NFA

0.018 HSIP 0.018 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.102 0.102 CONINSPNHPP 2022CONINSP 0.025 0.025 2022NFA

0.877 0.877 CONSTNHPP 2022CONST 0.219 0.219 2022NFA

NYSDOT

535001

NY 187 (TRANSIT ROAD) AT MILESTRIP ROAD, INTERSECTION SAFETY IMPROVEMENTS; TOWNS OF ORCHARD PARK & ELMA, ERIE COUNTY. WORK WILL INCLUDE INSTALLING A THREE-COLOR TRAFFIC SIGNAL AT THE NY ROUTE 187 (TRANSIT ROAD) AND MILESTRIP ROAD INTERSECTION AND INCLUDE CONSTRUCTION OF A LEFT TURN LANE ON NY ROUTE 187 AT THE INTERSECTION.

1.413 0.190 0.000 1.223 0.000 AQC:A6 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.027 HSIP 0.027 PRELDES2020PRELDES 0.003 0.003 2020NFA

0.055 0.055 DETLDESHSIP 2021DETLDES 0.006 0.006 2021NFA

0.100 0.100 CONINSPNHPP 2021CONINSP 0.025 0.025 2021NFA

0.624 0.624 CONSTNHPP 2021CONST 0.156 0.156 2021NFA

NYSDOT

539246

RT 400 @ RT 16 TRAFFIC CALMING; TOWN OF AURORA; ERIE COUNTY. THE REGION/S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

0.996 0.030 0.966 0.000 0.000 AQC:D1 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

Page 7: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 7 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

4.000 NHPP 4.000 DETLDES2020DETLDES 1.000 1.000 2020NFA

0.800 NHPP 0.800 ROWACQU2020ROWACQU 0.200 0.200 2020NFA

4.576 4.576 CONINSPNHPP 2021CONINSP 1.144 1.144 2021NFA

61.776 61.776 CONSTNHPP 2021CONST 15.444 15.444 2021NFA

NYSDOT

547022

RT 198; SCAJAQUADA EXPRESSWAY PROJECT TO CONVERT RT 198 FROM AN URBAN EXPRESSWAY INTO AN URBAN BOULEVARD WITH TWO TRAVEL LANES IN EACH DIRECTION BETWEEN THE GRANT ST INTERCHANGE AND PARKSIDE AVE, IN ITS CURRENT LOCATION, IN THE CITY OF BUFFALO, ERIE CO

88.940 6.000 82.940 0.000 0.000 AQC:A2 TOTAL 4YR COST :ERIE TPC : $70-$130 M

0.200 CMAQ 0.200 PRELDES2020PRELDES 0.050 0.050 2020NFA

0.333 0.333 DETLDESCMAQ 2022DETLDES 0.083 0.083 2022NFA

0.518 0.518 CONINSPCMAQ 2023CONINSP 0.130 0.130 2023NFA

4.320 4.320 CONSTCMAQ 2023CONST 1.080 1.080 2023NFA

NYSDOT

558053

I-290 @ MAIN ST, INTERCHANGE RECONFIGURATION IN THE TOWN OF AMHERST, ERIE CO - TAP/CMAQ

6.714 0.250 0.000 0.416 6.048 AQC:D3 TOTAL 4YR COST :ERIE TPC : $6-$9.4 M

0.195 STBG LG URB 0.195 ROWACQU2020ROWACQU 0.049 0.049 2020NFA

0.049 0.049 CONINSPSTBG LG URB 2021CONINSP 0.012 0.012 2021NFA

0.408 0.408 CONSTSTBG LG URB 2021CONST 0.102 0.102 2021NFA

ERIE CO

575374

NORTH FOREST ROAD; ROUTE 263(MILLERSPORT)-DODGE; MILL & OVERLAY; TOWN OF AMHERST; ERIE CO

0.815 0.244 0.571 0.000 0.000 AQC:A10 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.002 STBG FLEX 0.002 ROWACQU2020 0.451 0.451 CONINSPSTBG FLEX 2022

CONINSP 0.112 0.112 2022NFA 3.917 3.917 CONSTSTBG FLEX 2022

CONST 0.979 0.979 2022NFA

NYSDOT

575436

STRUCTURAL BRIDGE REPLACEMENT OF BIN 6064850 AT RT951R, VANDALIA RD BR OVER ALLEGHENY RIVER; TN OF ALLEGANY; CATTARAUGUS CO

5.461 0.002 0.000 5.459 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $4.6-$7.5 M

Page 8: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 8 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.240 STBG LG URB 0.240 DETLDES2020DETLDES 0.060 0.060 2020NFA

0.160 STBG LG URB 0.160 ROWACQU2020ROWACQU 0.040 0.040 2020NFA

0.560 0.560 CONINSPSTBG LG URB 2021CONINSP 0.140 0.140 2021NFA

4.240 4.240 CONSTSTBG LG URB 2021CONST 1.060 1.060 2021NFA

LOCAL

575557

NEW HIGHWAY CONSTRUCTION, JOHN B DALY BLVD EXTENSION FROM NIAGARA ST TO PINE AVE; CITY OF NIAGARA FALLS; NIAGARA CO

6.500 0.500 6.000 0.000 0.000 AQC:NON TOTAL 4YR COST :NIAGARA TPC : $6-$9.4 M

1.013 HPP 1.013 DETLDES2020DETLDES 0.253 0.253 2020NFA

ESDC

575817

BUFFALO HARBOR BRIDGE AND TRANSPORTATION INFRASTRUCTURE IMPROVEMENTS, INNER HARBOR; CITY OF BUFFALO; ERIE CO. PROVIDE MULTIMODAL CONNECTIVITY BETWEEN DOWNTOWN & OUTER HARBOR WHILE REDUCING NEGATIVE IMPACT ON LOCAL STREET NETWORK.DEMO ID = NY100

1.266 1.266 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.143 0.143 CONINSPNHPP 2021CONINSP 0.008 0.008 2021NFA

1.686 1.686 CONSTNHPP 2021CONST 0.089 0.089 2021NFA

0.201 0.201 CONINSPSTBG LG URB 2021CONINSP 0.050 0.050 2021NFA

2.041 2.041 CONSTSTBG LG URB 2021CONST 0.510 0.510 2021NFA

CITY OF BUFFALO

575823

STRUCTURAL BR REPLACEMENT OF BIN 2260730 AT SOUTH OGDEN ST OVER BUFFALO RIVER; CITY OF BUFFALO; ERIE CO. THE NHPP FUNDING FOR THIS PROJECT, IS PART OF THE 2018 BRIDGENY PROGRAM AND THE NHPP FUNDS ARE 95% FEDERAL (USING 15% IN TOLL CREDITS) AND 5% LOCAL MATCH.

4.728 0.000 4.728 0.000 0.000 AQC:A19 TOTAL 4YR COST :ERIE TPC : $4.6-$7.5 M

0.060 0.060 CONINSPSTBG-OFF 2021CONINSP 0.015 0.015 2021NFA

0.412 0.412 CONSTSTBG-OFF 2021CONST 0.103 0.103 2021NFA

CITY OF BUFFALO

575824

STRUCTURAL BRIDGE REPLACEMENT OF BIN 2260590 AT SOUTH PARK LOOP OVER SOUTH PARK LAKE; CITY OF BUFFALO; ERIE COUNTY

0.590 0.000 0.590 0.000 0.000 AQC:A19 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

Page 9: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 9 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.001 STBG LG URB 0.001 DETLDES2020CONST 1.897 1.897 2021NFA

0.466 0.466 CONINSPSTBG LG URB 2021CONINSP 0.116 0.116 2021NFA

4.268 4.268 CONSTSTBG LG URB 2021CONST 1.067 1.067 2021NFA

CITY OF BUFFALO

575825

OHIO STREET LIFT BRIDGE; BRIDGE REPAIRS OF BIN 2260430 AT OHIO ST OVER BUFFALO RIVER; CITY OF BUFFALO, ERIE COUNTY

7.815 0.001 7.814 0.000 0.000 AQC:A19 TOTAL 4YR COST :ERIE TPC : $7.5-$12 M

0.139 STBG-OFF 0.139 CONINSP2020CONINSP 0.007 0.007 2020NFA

1.505 STBG-OFF 1.505 CONST2020CONST 0.103 0.103 2020NFA

CHAUTAUQUA CO

575845

STRUCTURAL BRIDGE REPLACEMENT OF BIN 3325180 AT CR 18 OVER PRENDERGAST CREEK; TN OF NORTH HARMONY; CHAUTAUQUA CO. FOR CONST AND CONINSP, PROJECT IS USING 95% FEDERAL FUNDING (OF WHICH 15% IS TOLL CREDITS) WITH 5% LOCAL MATCH

1.754 1.754 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :CHAUTAUQUA TPC : $1.2-$2.5 M

0.400 STBG-OFF 0.400 DETLDES2020DETLDES 0.100 0.100 2020NFA

1.160 1.160 CONINSPSTBG-OFF 2022CONINSP 0.290 0.290 2022NFA

11.600 11.600 CONSTSTBG-OFF 2022CONST 2.900 2.900 2022NFA

NYSDOT

575879

STRUCTURAL BRIDGE REPLACEMENT OF REDHOUSE BRIDGE BIN 6012230 (OLD RT 17) OVER ALLEGHENY RIVER; SENECA NATION; ALLEGANY TERRITORY

16.450 0.500 0.000 15.950 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $15-$25 M

0.110 STBG-OFF 0.110 DETLDES2020DETLDES 0.027 0.027 2020NFA

0.090 0.090 CONINSPSTBG-OFF 2021CONINSP 0.022 0.022 2021NFA

0.829 0.829 CONSTSTBG-OFF 2021CONST 0.207 0.207 2021NFA

NYSDOT

575971

STRUCTURAL BRIDGE REPLACEMENT OF BIN 6012220 AT RT 951T OVER COLD SPRING CREEK; TN OF COLDSPRING; SNI; CATTARAUGUS CO

1.285 0.137 1.148 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $1.2-$2.5 M

DETLDES 1.939 1.939 2022NFANYSDOT

576040

REPLACEMENT OF AMERICAN FALLS BRIDGES; BINS 5522000 & 5522010 IN THE CITY OF NIAGARA FALLS; NIAGARA CO

1.939 0.000 0.000 1.939 0.000 AQC:A19 TOTAL 4YR COST :NIAGARA TPC : $3.3-$5.6 M

Page 10: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 10 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.029 SAFE RT SCH 0.029 CONINSP2020CONINSP 0.098 0.098 2020NFA

0.245 SAFE RT SCH 0.245 CONST2020CONST 0.602 0.602 2020NFA

CITY OF BUFFALO

576067

PED/SIGNAL REPAIRS & IMPROVEMENTS NEAR PS #32 BENNET PARK MONTESSORI SCHOOL WITH THE CITY OF BUFFALO FUNDING ROADWAY UPGRADES ON CLINTON STREET; CITY OF BUFFALO, ERIE CO

0.974 0.974 0.000 0.000 0.000 AQC:D2 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

0.001 STBG FLEX 0.001 DETLDES2020 0.301 0.301 CONINSPSTBG LG URB 2021

CONINSP 0.075 0.075 2021NFA 3.827 3.827 CONSTSTBG LG URB 2021

CONST 0.957 0.957 2021NFA

CITY OF BUFFALO

576158

BUFFALO ROADWAY REHABS; VARIOUS LOCATIONS ON BAILEY, CHAPIN, DELAWARE, DINGINS, E HURON, W HURON, LAFAYETTE, SUFFOLK, TONAWANDA, AND WASHINGTON; IN THE CITY OF BUFFALO, ERIE CO

5.161 0.001 5.160 0.000 0.000 AQC:A10 TOTAL 4YR COST :ERIE TPC : $4.6-$7.5 M

0.048 STBG LG URB 0.048 CONINSP2020CONINSP 0.012 0.012 2020NFA

0.240 STBG LG URB 0.240 CONST2020CONST 0.060 0.060 2020NFA

0.001 STBG LG URB 0.001 DETLDES2020

CITY OF BUFFALO

576159

REHABILITATION OF THE PAVING SURFACE ON WALDEN AVE; GENESSEE ST TO SYCAMORE ST IN THE CITY OF BUFFALO IN ERIE CO

0.361 0.361 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.001 NHPP 0.001 DETLDES2020CONINSP 1.000 1.000 2021NFACONST 7.800 7.800 2021NFA

0.080 0.080 CONINSPNHPP 2021CONINSP 0.020 0.020 2021NFACONINSP 0.112 0.112 2021NFA

2.400 2.400 CONSTNHPP 2021CONST 0.600 0.600 2021NFACONST 0.210 0.210 2021NFA

2.400 2.400 CONSTSTBG LG URB 2021CONST 0.600 0.600 2021NFA

CITY OF BUFFALO

576160

COMPLETE STREET TREATMENT ON MAIN ST FROM GOODELL ST TO FERRY ST IN THE CITY OF BUFFALO IN ERIE CO

16.511 0.001 16.510 0.000 0.000 AQC:A2 TOTAL 4YR COST :ERIE TPC : $15-$25 M

Page 11: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 11 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.240 STBG FLEX 0.240 CONINSP2020CONINSP 0.060 0.060 2020NFA

2.222 STBG FLEX 2.222 CONST2020CONST 0.556 0.556 2020NFA

0.006 STBG FLEX 0.006 ROWACQU2020ROWACQU 0.002 0.002 2020NFA

NIAGARA CO

576165

NORTH CANAL RD REHAB, OLD NIAGARA RD TO ERIE CANAL, TN OF LOCKPORT, NIAGARA CO

3.086 3.086 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :NIAGARA TPC : $3.3-$5.6 M

0.001 STBG LG URB 0.001 DETLDES2020 0.001 STBG-OFF 0.001 DETLDES2020 0.163 0.163 CONINSPSTBG LG URB 2021

CONINSP 0.041 0.041 2021NFA 1.771 1.771 CONSTSTBG LG URB 2021

CONST 0.443 0.443 2021NFA 0.160 0.160 CONINSPSTBG-OFF 2021

CONINSP 0.040 0.040 2021NFA 1.224 1.224 CONSTSTBG-OFF 2021

CONST 0.306 0.306 2021NFA

CITY OF BUFFALO

576167

WARREN SPAHN WAY OVER CAZENOVIA CREEK (BIN 2260710), BRIDGE REHABILITATION AND RESURFACING & STREETSCAPE IMPROVEMENTS ON ABBOTT RD FROM SOUTHSIDE PKWY TO POTTERS RD, IN THE CITY OF BUFFALO IN ERIE CO.

4.150 0.002 4.148 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $4.6-$7.5 M

CONST 0.469 0.469 2020NFA 0.080 STBG-OFF 0.080 CONINSP2020

CONINSP 0.020 0.020 2020NFA 0.669 STBG-OFF 0.669 CONST2020

CONST 0.167 0.167 2020NFA 0.001 STBG-OFF 0.001 DETLDES2020 0.011 STBG-OFF 0.011 ROWACQU2020

ROWACQU 0.003 0.003 2020NFA

ERIE CO

576169

HILLCROFT DR/18 MILE CRK (BIN 3327840); BRIDGE REPLACEMENT, TN OF BOSTON, ERIE CO

1.420 1.420 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

Page 12: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 12 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.416 0.416 DETLDESSTBG LG URB 2021DETLDES 0.104 0.104 2021NFA

0.416 0.416 PRELDESSTBG LG URB 2021PRELDES 0.104 0.104 2021NFA

0.083 0.083 ROWACQUSTBG LG URB 2021ROWACQU 0.021 0.021 2021NFA

0.083 0.083 ROWINCDSTBG LG URB 2021ROWINCD 0.021 0.021 2021NFA

0.499 0.499 CONINSPSTBG LG URB 2022CONINSP 0.125 0.125 2022NFA

4.826 4.826 CONSTSTBG LG URB 2022CONST 1.206 1.206 2022NFA

CITY OF BUFFALO

576173

BRIDGE REPLACEMENT OF ELK ST OVER NORFOLK SOUTHERN, BIN 2255280, IN THE CITY OF BUFFALO IN ERIE CO

7.904 0.000 1.248 6.656 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $7.5-$12 M

CONST 3.900 3.900 2020NFA 0.160 STBG LG URB 0.160 CONINSP2020

CONINSP 0.040 0.040 2020NFA 1.600 STBG LG URB 1.600 CONST2020

CONST 0.400 0.400 2020NFA 0.001 STBG LG URB 0.001 DETLDES2020

ERIE CO

576176

MAPLE RD RESURFACING; FROM HOPKINS RD TO RT 78 IN THE TN OF AMHERST, ERIE CO

6.101 6.101 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $6-$9.4 M

CONST 0.272 0.272 2020NFA 0.080 STBG-OFF 0.080 CONINSP2020

CONINSP 0.020 0.020 2020NFA 0.919 STBG-OFF 0.919 CONST2020

CONST 0.229 0.229 2020NFA

ERIE CO

576177

STRUCTURAL BR REPLACEMENT OF PONTIAC RD OVER BIG SISTER CRK (BIN 3327820), IN THE TN OF EVANS, ERIE CO

1.520 1.520 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.005 STBG-OFF 0.005 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

ERIE CO

576178

STRUCTURAL BR REPLACEMENT OF CEDAR ST OVER LEDGE CRK (BIN 3326580), IN THE TOWN OF NEWSTEAD, ERIE CO

0.006 0.006 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

Page 13: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 13 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.077 HSIP 0.077 CONINSP2020CONINSP 0.009 0.009 2020NFA

0.497 HSIP 0.497 CONST2020CONST 0.055 0.055 2020NFACONST 0.420 0.420 2020NFA

0.160 STBG LG URB 0.160 CONINSP2020CONINSP 0.040 0.040 2020NFA

1.735 STBG LG URB 1.735 CONST2020CONST 0.433 0.433 2020NFA

NIAGARA CO

576179

WALMORE RD RESURFACING; FROM RT 62 TO LOCKPORT RD IN THE TN OF WHEATFIELD, NIAGARA CO. WORK WILL ALSO INCLUDE ADDING A RIGHT TURN LANE FOR WALMORE RD NB AND A LEFT TURN LANE FOR LOCKPORT RD WB. SHOULDERS WILL BE RECONSTRUCTED TO ACCOMMODATE PEDESTRIANS AND BICYCISTS. A NEW MAST ARM TRAFFIC SIGNAL WILL BE INSTALLED INCLUDING RETROREFLECTIVE BACKPLATES AND MANDATORY LANE MOVEMENT OVERHEAD SIGNS. THE TWO SIGNALS AT WALMORE RD AND LOCKPORT RD WILL BE INTERCONNECTED FOR TIME COORDINATED OPERATION. TRAFFIC SIGNS AND PAVEMENT MARKINGS WILL ALSO BE REPLACED TO MEET CURRENT MUTCD STANDARDS. THE WORK IN THIS PROJECT HAS BEEN REVIEWED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND USE OF HSIP FUNDS FOR THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL TRAFFIC ENGINEER.

3.426 3.426 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $3.3-$5.6 M

0.085 STBG LG URB 0.085 CONINSP2020CONINSP 0.021 0.021 2020NFA

1.440 STBG LG URB 1.440 CONST2020CONST 0.360 0.360 2020NFA

0.001 STBG LG URB 0.001 DETLDES2020

CITY OF NIAGARA FALL576181

BUFFALO AVE FROM RAINBOW BLVD TO 450 FT WEST OF 24TH ST IN THE CITY OF NIAGARA FALLS IN NIAGARA COUNTY CO

1.907 1.907 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $1.2-$2.5 M

0.001 STBG FLEX 0.001 DETLDES2020 0.008 STBG FLEX 0.008 ROWACQU2020

ROWACQU 0.003 0.003 2020NFA 0.082 0.082 CONINSPSTBG FLEX 2021

CONINSP 0.020 0.020 2021NFA 0.910 0.910 CONSTSTBG FLEX 2021

CONST 0.227 0.227 2021NFA

LOCAL

576182

BR REPLACEMENT OF FOOTE AVE OVER CHADAKOIN RIVER, BIN 2258390, IN THE CITY OF JAMESTOWN IN CHAUTAUQUA CO

1.251 0.012 1.239 0.000 0.000 AQC:A19 TOTAL 4YR COST :CHAUTAUQUA TPC : $1.2-$2.5 M

Page 14: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 14 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.140 STBG-OFF 0.140 PRELDES2020PRELDES 0.035 0.035 2020NFA

0.024 STBG-OFF 0.024 ROWINCD2020ROWINCD 0.006 0.006 2020NFA

0.143 0.143 DETLDESSTBG-OFF 2021DETLDES 0.036 0.036 2021NFA

0.016 0.016 ROWACQUSTBG-OFF 2021ROWACQU 0.004 0.004 2021NFA

0.166 0.166 CONINSPSTBG-OFF 2022CONINSP 0.042 0.042 2022NFA

1.497 1.497 CONSTSTBG-OFF 2022CONST 0.375 0.375 2022NFA

CHAUTAUQUA CO

576183

BR REPLACEMENT OF HOPKINS AVE OVER CHADAKOIN RIVER, BIN 2258430, IN THE CITY OF JAMESTOWN IN CHAUTAUQUA CO

2.484 0.205 0.199 2.080 0.000 AQC:A19 TOTAL 4YR COST :CHAUTAUQUA TPC : $2-$4 M

0.026 0.026 CONINSPSTBG FLEX 2021CONINSP 0.007 0.007 2021NFA

0.140 0.140 CONSTSTBG FLEX 2021CONST 0.036 0.036 2021NFA

CITY OF SALAMANCA

576186

MAIN ST OVER ALLEGANY RIVER; BIN 6600050; BRIDGE REHABILITATION, IN THE CITY OF SALAMANCA IN CATTARAUGUS CO

0.209 0.000 0.209 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : < $0.75 M

0.200 STBG LG URB 0.200 DETLDES2020DETLDES 0.050 0.050 2020NFA

0.200 STBG LG URB 0.200 PRELDES2020PRELDES 0.050 0.050 2020NFA

0.304 0.304 CONINSPSTBG LG URB 2021CONINSP 0.076 0.076 2021NFA

2.576 2.576 CONSTSTBG LG URB 2021CONST 0.644 0.644 2021NFA

CITY OF NIAGARA FALL576189

RT 265 (MILITARY RD) RECONSTRUCTION FROM NIAGARA FALLS BLVD TO CAYUGA DR AND CAYUGA DR RESURFACING FROM TUSCARORA RD TO BUFFALO AVE., IN THE CITY OF NIAGARA FALLS IN NIAGARA COUNTY. THIS PIN NOW INCLUDES PIN 576326.

4.100 0.500 3.600 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $3.3-$5.6 M

0.001 STBG FLEX 0.001 DETLDES2020 0.080 STBG LG URB 0.080 CONINSP2020

CONINSP 0.020 0.020 2020NFA 0.544 STBG LG URB 0.544 CONST2020

CONST 0.136 0.136 2020NFA

CITY OF BUFFALO

576191

REHABILITATION OF THE PAVING SURFACE ON FILLMORE AVENUE FROM EAST FERRY STREET TO GLENNY DRIVE IN THE CITY OF BUFFALO, ERIE COUNTY

0.781 0.781 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

Page 15: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 15 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.008 STBG FLEX 0.008 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.036 STBG FLEX 0.036 CONST2020CONST 0.009 0.009 2020NFA

0.050 STBG-OFF 0.050 CONINSP2020CONINSP 0.012 0.012 2020NFA

0.207 STBG-OFF 0.207 CONST2020CONST 0.052 0.052 2020NFA

CATTARAUGUS CO

576197

BR SEALING OF 22 BINS, TO INCLUDE 3320440, 3321690, 3322100, 3322910,3323030 & 3323170 AND WASHING OF 218 BINS IN CATTARAUGUS CO

0.376 0.376 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : < $0.75 M

0.002 STBG FLEX 0.002 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.020 STBG FLEX 0.020 CONST2020CONST 0.004 0.004 2020NFA

0.010 STBG-OFF 0.010 CONINSP2020CONINSP 0.003 0.003 2020NFA

0.067 STBG-OFF 0.067 CONST2020CONST 0.017 0.017 2020NFA

CHAUTAUQUA CO

576201

BR SEALING OF 9 BINS, 2212440, 2258400, 2258410, 3323950, 3324090, 3325300, 3325310, 3325410, 3325430 IN CHAUTAUQUA CO

0.125 0.125 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :CHAUTAUQUA TPC : < $0.75 M

CONINSP 0.025 0.025 2020NFACONST 0.200 0.200 2020NFA

0.064 STBG LG URB 0.064 CONINSP2020CONINSP 0.016 0.016 2020NFA

0.644 STBG LG URB 0.644 CONST2020CONST 0.161 0.161 2020NFA

0.016 STBG-OFF 0.016 CONINSP2020CONINSP 0.004 0.004 2020NFA

0.156 STBG-OFF 0.156 CONST2020CONST 0.039 0.039 2020NFA

ERIE CO

576204

BRIDGE REPAIRS, OVERLAYS AND JOINTS OF 7 BRIDGES, BINS 3327330, 3327340, 3327350, 3326930, 3327539, 3328640 & 3362480; VARIOUS LOCATIONS IN ERIE COUNTY

1.325 1.325 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

Page 16: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 16 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.020 STBG FLEX 0.020 CONINSP2020CONINSP 0.005 0.005 2020NFA

0.100 STBG FLEX 0.100 CONST2020CONST 0.025 0.025 2020NFA

0.020 STBG-OFF 0.020 CONINSP2020CONINSP 0.005 0.005 2020NFA

0.100 STBG-OFF 0.100 CONST2020CONST 0.025 0.025 2020NFA

ERIE CO

576205

BRIDGE WASHING OF 227 BRIDGES (TO INCLUDE BINS 1041600, 1046590, 2212850, 3326500 & 3327000) AT VARIOUS LOCATIONS IN ERIE COUNTY

0.300 0.300 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.052 STBG-OFF 0.052 CONINSP2020CONINSP 0.013 0.013 2020NFA

0.480 STBG-OFF 0.480 CONST2020CONST 0.122 0.122 2020NFA

ERIE CO

576207

BRIDGE PAINTING AND VERTICAL DOWN REPAIRS FOR BIN 3328840 IN THE TN OF WEST SENECA IN ERIE CO

0.667 0.667 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

CONST 0.063 0.063 2020NFA 0.147 REC TRAILS 0.147 CONST2020

CONST 0.037 0.037 2020NFA 0.015 REC TRAILS 0.015 DETLDES2020

DETLDES 0.004 0.004 2020NFA 0.028 REC TRAILS 0.028 PRELDES2020

PRELDES 0.007 0.007 2020NFA

OPRHP

576210

CONSTRUCTION OF THE WELCH RECREATIONAL TRAIL, A NON-MOTORIZED, SHARED-USE SEGMENT, APPROXIMATELY 1.25 MILES LONG LOCATED WITHIN THE BOUNDARIES OF THE VILLAGE OF WESTFIELD, RUNNING ADJACENT TO CHAUTAUQUA CREEK ON PROPERTY OWNED BY THE TOWN OF WESTFIELD, CHAUTAUQUA COUNTY. OPRHP PROJECT NUMBER 151803.

0.301 0.301 0.000 0.000 0.000 AQC:C2 TOTAL 4YR COST :CHAUTAUQUA TPC : < $0.75 M

0.016 REC TRAILS 0.016 CONINSP2020CONINSP 0.004 0.004 2020NFA

0.139 REC TRAILS 0.139 CONST2020CONST 0.036 0.036 2020NFA

OPRHP

576211

LACKAWANNA RECREATIONAL TRAIL RESTORATION. THIS TRAIL RESTORATION PROJECT WILL REPLACE THE ENTIRE 4278 LINEAR FEET OF TRAIL IN THE CITY OF LACKAWANNA IN ERIE CO. WORK WILL INCLUDE UNDERCUT AND BACKFILL, INSTALLATION OF 4\" HDPE UNDERDRAIN, INSTALLATION OF 12\" HDPE STORM SEWER, PRECAST CONCRETE CATCH BASIN AND APPLICATION OF TACK COAT, ASPHALT TOP COURSE AND ASPHALT BINDER COURSE. OPRHP PROJECT NUMBER 154121.

0.195 0.195 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

Page 17: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 17 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.119 STBG-OFF 0.119 CONINSP2020CONINSP 0.006 0.006 2020NFA

1.407 STBG-OFF 1.407 CONST2020CONST 0.074 0.074 2020NFA

0.001 STBG-OFF 0.001 DETLDES2020

CITY OF BUFFALO

576213

DEWEY AVE OVER CSXT (BIN 2260540), BR REPLACEMENT, IN THE CITY OF BUFFALO, ERIE CO

1.607 1.607 0.000 0.000 0.000 AQC:A19 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.001 STBG LG URB 0.001 DETLDES2020ERIE CO

576225

ABBOTT RD; RT 20 - MILESTRIP & MCKINLEY PKWY; RT 20 - WILLET & ARMOR DUELLS RD; ABBOTT - DUERR IN THE TN OF ORCHARD PARK IN ERIE CO.

0.001 0.001 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.001 CMAQ 0.001 DETLDES2020 0.004 CMAQ 0.004 ROWACQU2020

ROWACQU 0.001 0.001 2020NFA 0.180 0.180 CONINSPCMAQ 2021

CONINSP 0.046 0.046 2021NFA 1.048 1.048 CONSTCMAQ 2021

CONST 0.267 0.267 2021NFA

CITY OF BUFFALO

576228

City of Buffalo Bicycle Master Plan Implementation, Phase I. Upgrade bicycle facilities on various streets within the City of Buffalo. 2016 TAP-CMAQ Award.

1.547 0.006 1.541 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.001 CMAQ 0.001 DETLDES2020 0.426 CMAQ 0.426 MISC2020

MISC 0.106 0.106 2020NFA

CITY OF NIAGARA FALL576232

EXPANSION OF THE REGIONAL BIKE SHARING PROGRAM IN THE CITY OF NIAGARA FALLS, NIAGARA CO

0.533 0.533 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $0.6-$1.5 M

0.032 CMAQ 0.032 CONINSP2020CONINSP 0.008 0.008 2020NFA

0.216 CMAQ 0.216 CONST2020CONST 0.054 0.054 2020NFA

0.001 CMAQ 0.001 DETLDES2020 0.095 CMAQ 0.095 MISC2020

MISC 0.024 0.024 2020NFA

CITY OF JAMESTOWN

576234

DEVELOPMENT OF A COMPREHENSIVE WAYFINDING SYSTEM TO SUPPORT TOURISM & PARKING AVAILABILITY IN THE CITY OF JAMESTOWN, CHAUTAUQUA CO; CMAQ 2016 AWARD. THE SYSTEM WILL REDUCE TRAFFIC CONGESTION AND GAS EMISSIONS BY ASSISTING VISITIORS IN FINDING PARKING AND TRANSITIONING TO ALTERNATIVE MODES OF TRANSPORTATION.

0.430 0.430 0.000 0.000 0.000 AQC:C13 TOTAL 4YR COST :CHAUTAUQUA TPC : < $0.75 M

Page 18: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 18 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

CONINSP 0.139 0.139 2020NFACONST 1.320 1.320 2020NFA

0.044 TAP SM URBAN 0.044 CONINSP2020CONINSP 0.011 0.011 2020NFA

0.435 TAP SM URBAN 0.435 CONST2020CONST 0.109 0.109 2020NFA

0.001 TAP SM URBAN 0.001 DETLDES2020 0.010 TAP SM URBAN 0.010 ROWACQU2020

ROWACQU 0.003 0.003 2020NFA

CITY OF OLEAN

576236

WALKABLE OLEAN TRANSFORMATION PROJECT, PHASE II, IN THE CITY OF OLEAN, CATTARAUGUS COUNTY. THIS PROJECT WILL CONSTRUCT A ROUNDABOUT AT THE NORTH BARRY AND MAIN STREET INTERSECTION IN THE CITY OF OLEAN. THE WORK WILL ALSO INCLUDE NEW BIKE LANES, SIDEWALKS, TRAFFIC SIGNALS, AND A REDUCTION IN THE NUMBER OF TRAVEL LANES. WHEN COMPLETE, THE PROJECT WILL IMPROVE TRAFFIC FLOW, SAFETY, AND PEDESTRIAN CONNECTIVITY. TOTAL 2016 TAP-CMAQ FEDERAL AWARD AMOUNT IS $0.542M (TAP SMALL URBAN).

2.072 2.072 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $1.2-$2.5 M

0.001 HSIP 0.001 DETLDES2020 0.081 HSIP 0.081 ROWACQU2020

ROWACQU 0.009 0.009 2020NFA 0.126 0.126 CONINSPHSIP 2021

CONINSP 0.014 0.014 2021NFA 0.810 0.810 CONSTHSIP 2021

CONST 0.092 0.092 2021NFA

CITY OF BUFFALO

576238

RT 5 (MAIN ST) @ KENSINGTON AVE & HUMBOLDT PKWY, INTERSECTION IMPROVEMENTS; CITY OF BUFFALO, ERIE COUNTY. THIS PROJECT WILL IMPROVE GEOMETRIC AND OPERATING DEFICIENCIES THAT CONTRIBUTE TO ACCIDENTS AT THIS INTERSECTION, USING EFFECTIVE REDUCTION MEASURES TO IMPROVE SAFETY AND OPERATING CONDITIONS FOR VEHICLES, PEDESTRIANS AND BICYCLISTS. PROJECT HAS BEEN APPROVED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND SIGNED OFF BY THE REGIONAL TRAFFIC ENGINEER.

1.133 0.091 1.042 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

CONINSP 0.507 0.507 2021NFACONST 2.535 2.535 2021NFA

0.033 0.033 CONINSPNHPP 2021CONINSP 0.008 0.008 2021NFA

0.265 0.265 CONSTNHPP 2021CONST 0.066 0.066 2021NFA

CITY OF BUFFALO

576240

NIAGARA ST SUSTAINABLE CORRIDOR AND COMMUNITY INTEGRATION PROJECT, PHASE 5, FROM PORTER AVE TO HAMPSHIRE ST IN THE CITY OF BUFFALO, ERIE CO. WORK WILL INCLUDE REPAVING, RESTRIPING & STREETSCAPE ENHANCEMENTS. THE SCOPE FOR NIAGARA ST CONSISTS OF A SHALLOW (2-INCH) MILL AND INLAY OF THE EXISTING ASPHALT CONCRETE PAVEMENT. NEW SIGNS AND PAVEMENT MARKINGS WILL CREATE A 3-LANE SECTION WITH PROVISIONS FOR BICYCLISTS. CROSSWALKS, ADA-COMPLIANT CURB RAMPS AND NEW SIDEWALK WILL BE INSTALLED TO PROVIDE IMPROVED ACCOMMODATIONS FOR PEDESTRIANS. LANDSCAPING AND GREEN STORMWATER MANAGEMENT SOLUTIONS ARE ALSO PROPOSED. CURB EXTENSIONS WILL BE INSTALLED AT ALL SIGNALIZED INTERSECTIONS TO REDUCE CROSSING DISTANCE. ALL EXISTING SIGNALS WILL BE REPLACED AND THE PROPOSED EQUIPMENT WILL ACCOMMODATE BUSES, BICYCLES AND PEDESTRIANS IN ADDITION TO OTHER VEHICULAR TRAFFIC.

3.414 0.000 3.414 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

Page 19: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 19 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.024 STBG LG URB 0.024 CONINSP2020CONINSP 0.006 0.006 2020NFA

0.284 STBG LG URB 0.284 CONST2020CONST 0.071 0.071 2020NFA

NIAGARA CO

576244

BRIDGE PAINTING AND STEEL REPAIRS OF ROBINSON ROAD OVER ERIE CANAL; BIN 4454200; TOWNS OF PENDLETON AND LOCKPORT IN NIAGARA COUNTY

0.385 0.385 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : < $0.75 M

0.008 STBG FLEX 0.008 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.080 STBG FLEX 0.080 CONST2020CONST 0.020 0.020 2020NFA

0.008 STBG-OFF 0.008 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.080 STBG-OFF 0.080 CONST2020CONST 0.020 0.020 2020NFA

NIAGARA CO

576246

BRIDGE WASHING OF 82 BINS AND BRIDGE SEALING OF 9 BINS IN NIAGARA COUNTY.

0.220 0.220 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : < $0.75 M

0.002 NHPP 0.002 CONINSP2020CONINSP 0.001 0.001 2020NFA

0.017 NHPP 0.017 CONST2020CONST 0.004 0.004 2020NFA

0.002 STBG FLEX 0.002 CONINSP2020CONINSP 0.001 0.001 2020NFA

0.019 STBG FLEX 0.019 CONST2020CONST 0.005 0.005 2020NFA

0.004 STBG LG URB 0.004 CONINSP2020CONINSP 0.001 0.001 2020NFA

0.036 STBG LG URB 0.036 CONST2020CONST 0.009 0.009 2020NFA

0.008 STBG-OFF 0.008 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.064 STBG-OFF 0.064 CONST2020CONST 0.016 0.016 2020NFA

NIAGARA CO

576247

BRIDGE DECK MILL AND OVERLAY OF BINS 3090250, 3328930, 3329000, 3329550, 3329620 & 3329640, IN THE TOWNS OF HARTLAND, PENDLETON & WILSON IN NIAGARA CO.

0.191 0.191 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : < $0.75 M

Page 20: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 20 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.019 STBG LG URB 0.019 CONINSP2020CONINSP 0.005 0.005 2020NFA

0.181 STBG LG URB 0.181 CONST2020CONST 0.045 0.045 2020NFA

0.007 STBG-OFF 0.007 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.045 STBG-OFF 0.045 CONST2020CONST 0.011 0.011 2020NFA

LOCAL

576248

BRIDGE BEARINGS - NIAGARA CO; BINS 3367320, 4454030, 4454240, AND 4454290. THIS PROJECT WILL CLEAN AND LUBRICATE THE BRIDGE BEARINGS OF FOUR BRIDGES IN THE TOWNS OF PENDLETON & ROYALTON, & CITY OF LOCKPORT IN NIAGARA COUNTY. THIS WORK WILL PROLONG THE USEFUL LIFE & MINIMIZE FUTURE DETERIORATION.

0.315 0.315 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : < $0.75 M

0.018 STBG LG URB 0.018 CONINSP2020CONINSP 0.004 0.004 2020NFA

0.102 STBG LG URB 0.102 CONST2020CONST 0.026 0.026 2020NFA

CITY OF BUFFALO

576251

BRIDGE WASHING OF 38 BRIDGES IN THE CITY OF BUFFALO, ERIE CO

0.150 0.150 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.062 STBG LG URB 0.062 CONINSP2020CONINSP 0.016 0.016 2020NFA

0.354 STBG LG URB 0.354 CONST2020CONST 0.088 0.088 2020NFA

CITY OF BUFFALO

576252

CURB/JOINT REPAIRS - CITY OF BUFFALO: BINS 2001600, 2011930, 2028430, & 5043930; CITY OF BUFFALO; ERIE CO

0.520 0.520 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.054 STBG LG URB 0.054 CONINSP2020CONINSP 0.014 0.014 2020NFA

0.306 STBG LG URB 0.306 CONST2020CONST 0.077 0.077 2020NFA

CITY OF BUFFALO

576253

BR REPAIRS OF NIAGARA ST OVER SCAJAQUADA CK (BIN 2043900) IN THE CITY OF BUFFALO, ERIE CO. THE PROJECT WILL INCLUDE CONCRETE, STEEL AND JOINT REPAIRS ON THE BRIDGE.

0.451 0.451 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.054 STBG LG URB 0.054 CONINSP2020CONINSP 0.014 0.014 2020NFA

0.306 STBG LG URB 0.306 CONST2020CONST 0.077 0.077 2020NFA

CITY OF BUFFALO

576254

BR REPAIRS OF CAZENOVIA ST OVER CAZENOVIA CK (BIN 2260690) IN THE CITY OF BUFFALO, ERIE CO. THE PROJECT WILL INCLUDE CONCRETE, STEEL AND JOINT REPAIRS ON THE BRIDGE

0.451 0.451 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

Page 21: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 21 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.012 0.012 CONINSPSTBG FLEX 2021CONINSP 0.003 0.003 2021NFA

0.072 0.072 CONSTSTBG FLEX 2021CONST 0.018 0.018 2021NFA

0.024 0.024 CONINSPSTBG-OFF 2021CONINSP 0.006 0.006 2021NFA

0.144 0.144 CONSTSTBG-OFF 2021CONST 0.036 0.036 2021NFA

CHAUTAUQUA CO

576256

BRIDGE PAINTING OF 3 BRIDGES (BINS 3324170, 3324790 & 3367230) IN THE TNS OF HANOVER, CLYMER & ELLICOTT IN CHAUTAUQUA CO.

0.315 0.000 0.315 0.000 0.000 AQC:N/A TOTAL 4YR COST :CHAUTAUQUA TPC : < $0.75 M

0.005 STBG FLEX 0.005 CONINSP2020CONINSP 0.001 0.001 2020NFA

0.032 STBG FLEX 0.032 CONST2020CONST 0.008 0.008 2020NFA

0.026 STBG-OFF 0.026 CONINSP2020CONINSP 0.006 0.006 2020NFA

0.232 STBG-OFF 0.232 CONST2020CONST 0.059 0.059 2020NFA

CATTARAUGUS CO

576257

BRIDGE DECK SEAL/HEAL (8 BINS) - CATTARAUGUS CO; BINs 3320940, 3321010, 3321290, 3321560, 3321760, 3321920, 3322040, 3322020

0.369 0.369 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : < $0.75 M

0.066 STBG LG URB 0.066 CONINSP2020CONINSP 0.016 0.016 2020NFA

0.374 STBG LG URB 0.374 CONST2020CONST 0.094 0.094 2020NFA

CITY OF BUFFALO

576258

CURB AND JOINT REPAIRS OF THREE BRIDGES (BINS 2260410, 2260520 & 5512290) IN THE CITY OF BUFFALO, ERIE CO

0.550 0.550 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.065 STBG LG URB 0.065 CONINSP2020CONINSP 0.016 0.016 2020NFA

0.367 STBG LG URB 0.367 CONST2020CONST 0.092 0.092 2020NFA

CITY OF BUFFALO

576259

MICHIGAN AVE LIFT BRIDGE (BIN 2260450) SUBSTRUCTURE REPAIRS IN THE CITY OF BUFFALO, ERIE CO. THE PROJECT WILL MAKE CONCRETE REPAIRS TO THE PEDESTALS, BACKWALLS, WINGWALLS AND STEM WALLS ON THIS BRIDGE.

0.540 0.540 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

CONINSP 0.028 0.028 2020NFACONST 0.073 0.073 2020NFA

0.126 REC TRAILS 0.126 CONST2020CONST 0.031 0.031 2020NFA

OPRHP

576263

CANALWAY TRAIL & HOPKINS ROAD TRAIL SAFETY IMPROVEMENTS AND TRAIL ENHANCEMENTS IN THE TN OF AMHERST, ERIE CO. OPRHP PROJECT 173229.

0.258 0.258 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

Page 22: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 22 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

CONINSP 0.072 0.072 2020NFACONST 0.460 0.460 2020NFA

0.200 REC TRAILS 0.200 CONST2020CONST 0.050 0.050 2020NFA

OPRHP

576264

SHORELINE TRAIL ENHANCEMENT PROJECT FROM NIAWANDA PARK TO AQUA LANE PARK IN CITY OF TONAWANDA & TN OF TONAWANDA, ERIE CO. PROJECT COMPONENTS INCLUDE TRAIL WIDENING AND INSTALLATION OF BENCHES, LANDSCAPING, INTERPRETIVE SIGNAGE, MILEAGE MARKERS, AND BIKE REPAIR STATIONS. OPRHP PROJECT 175333.

0.782 0.782 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

0.159 HPP 0.159 CONINSP2020CONINSP 0.041 0.041 2020NFA

0.800 HPP 0.800 CONST2020CONST 0.204 0.204 2020NFA

0.001 HPP 0.001 DETLDES2020

CITY OF BUFFALO

576265

BNMC, PHASE 4 - COMPLETE STREETS FEATURES AROUND BUFFALO NIAGARA MEDICAL CAMPUS (BNMC) AND RESURFACING OF WASHINGTON & VIRGINIA STREETS IN THE CITY OF BUFFALO, ERIE COUNTY. HPP # NY691

1.205 1.205 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.001 HSIP 0.001 DETLDES2020 0.208 0.208 CONINSPHSIP 2021 1.460 1.460 CONSTHSIP 2021

CITY OF BUFFALO

576266

CITY OF BUFFALO PEDESTRIAN SAFETY IMPROVEMENTS (PSAP). THIS PROJECT WILL ENHANCE PEDESTRIAN SAFETY AT 15 UNCONTROLLED CROSSINGS AND 37 SIGNALIZED INTERSECTIONS - ALL LOCATIONS ARE FEDERAL-AID ELIGIBLE. WORK WILL INCLUDE INSTALLATION OF NEW PEDESTRIAN SIGNALIZATION OR REPAIR OF EXISTING PEDESTRIAN SIGNALIZATION AS NEEDED. THE REGION’S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

1.669 0.001 1.668 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.001 HSIP 0.001 DETLDES2020 0.050 0.050 CONINSPHSIP 2021 0.634 0.634 CONSTHSIP 2021

CITY OF NIAGARA FALL576267

CITY OF NIAGARA FALLS PEDESTRIAN IMPROVEMENTS (PSAP). THIS PROJECT WILL ENHANCE PEDESTRIAN SAFETY AT 1 UNCONTROLLED CROSSINGS AND 17 SIGNALIZED INTERSECTIONS - ALL LOCATIONS ARE FEDERAL-AID ELIGIBLE. WORK WILL INCLUDE INSTALLATION OF NEW PEDESTRIAN SIGNALIZATION OR REPAIR OF EXISTING PEDESTRIAN SIGNALIZATION AS NEEDED. THE REGION’S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

0.685 0.001 0.684 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $0.6-$1.5 M

Page 23: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 23 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.001 HSIP 0.001 DETLDES2020 0.021 0.021 CONINSPHSIP 2021 0.242 0.242 CONSTHSIP 2021

TN OF AMHERST

576268

TN OF AMHERST PEDESTRIAN IMPROVEMENTS (PSAP). THIS PROJECT WILL ENHANCE PEDESTRIAN SAFETY AT 1 UNCONTROLLED CROSSINGS AND 6 SIGNALIZED INTERSECTIONS - ALL LOCATIONS ARE FEDERAL-AID ELIGIBLE. WORK WILL INCLUDE INSTALLATION OF NEW PEDESTRIAN SIGNALIZATION OR REPAIR OF EXISTING PEDESTRIAN SIGNALIZATION AS NEEDED. THE REGION’S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

0.264 0.001 0.263 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.001 HSIP 0.001 DETLDES2020 0.022 0.022 CONINSPHSIP 2021 0.242 0.242 CONSTHSIP 2021

TN OF CHEEKTOWAGA

576269

TOWN OF CHEEKTOWAGA PEDESTRIAN IMPROVEMENTS (PSAP). THIS PROJECT WILL ENHANCE PEDESTRIAN SAFETY AT 9 SIGNALIZED INTERSECTIONS - ALL LOCATIONS ARE FEDERAL-AID ELIGIBLE. WORK WILL INCLUDE INSTALLATION OF NEW PEDESTRIAN SIGNALIZATION OR REPAIR OF EXISTING PEDESTRIAN SIGNALIZATION AS NEEDED. THE REGION’S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

0.265 0.001 0.264 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.001 HSIP 0.001 DETLDES2020 0.026 0.026 CONINSPHSIP 2021 0.254 0.254 CONSTHSIP 2021

ERIE CO

576270

ERIE CO PEDESTIRIAN IMPROVEMENTS (PSAP). THIS PROJECT WILL ENHANCE PEDESTRIAN SAFETY AT 34 UNCONTROLLED CROSSINGS AND 2 SIGNALIZED INTERSECTIONS - ALL LOCATIONS ARE FEDERAL-AID ELIGIBLE. WORK WILL INCLUDE INSTALLATION OF NEW PEDESTRIAN SIGNALIZATION OR REPAIR OF EXISTING PEDESTRIAN SIGNALIZATION AS NEEDED. THE REGION’S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

0.281 0.001 0.280 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.001 HSIP 0.001 DETLDES2020 0.026 0.026 CONINSPHSIP 2021 0.297 0.297 CONSTHSIP 2021

CITY OF NORTH TONAWA

576271

CITY OF NORTH TONAWANDA PEDESTRIAN IMPROVEMENTS (PSAP). THIS PROJECT WILL ENHANCE PEDESTRIAN SAFETY AT 3 SIGNALIZED INTERSECTIONS - ALL LOCATIONS ARE FEDERAL-AID ELIGIBLE. WORK WILL INCLUDE INSTALLATION OF NEW PEDESTRIAN SIGNALIZATION OR REPAIR OF EXISTING PEDESTRIAN SIGNALIZATION AS NEEDED. THE REGION’S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

0.324 0.001 0.323 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : < $0.75 M

Page 24: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 24 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.001 HSIP 0.001 DETLDES2020 0.023 0.023 CONINSPHSIP 2021 0.238 0.238 CONSTHSIP 2021

CITY OF OLEAN

576272

CITY OF OLEAN PEDESTRIAN SAFETY IMPROVEMENTS (PSAP). THIS PROJECT WILL ENHANCE PEDESTRIAN SAFETY AT 3 UNCONTROLLED CROSSINGS AND 3 SIGNALIZED INTERSECTIONS - ALL LOCATIONS ARE FEDERAL-AID ELIGIBLE. WORK WILL INCLUDE INSTALLATION OF NEW PEDESTRIAN SIGNALIZATION OR REPAIR OF EXISTING PEDESTRIAN SIGNALIZATION AS NEEDED. THE REGION’S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

0.262 0.001 0.261 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : < $0.75 M

0.001 HSIP 0.001 DETLDES2020 0.022 0.022 CONINSPHSIP 2021 0.249 0.249 CONSTHSIP 2021

TN OF TONAWANDA

576273

TN OF TONAWANDA PEDESTRIAN IMPROVEMENTS (PSAP). THIS PROJECT WILL ENHANCE PEDESTRIAN SAFETY AT 6 UNCONTROLLED CROSSINGS AND 6 SIGNALIZED INTERSECTIONS - ALL LOCATIONS ARE FEDERAL-AID ELIGIBLE. WORK WILL INCLUDE INSTALLATION OF NEW PEDESTRIAN SIGNALIZATION OR REPAIR OF EXISTING PEDESTRIAN SIGNALIZATION AS NEEDED. THE REGION’S TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

0.272 0.001 0.271 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

CONINSP 0.557 0.557 2020NFACONST 2.717 2.717 2020NFA

0.134 NHPP 0.134 CONINSP2020CONINSP 0.033 0.033 2020NFA

0.654 NHPP 0.654 CONST2020CONST 0.164 0.164 2020NFA

CITY OF BUFFALO

576290

NIAGARA ST SUSTAINABLE CORRIDOR AND COMMUNITY INTEGRATION PROJECT FROM HERTEL AVE TO ONTARIO ST, INCLUDING REPAVING, RESTRIPING, & STREETSCAPE ENHANCEMENTS; PHASE 4B; CITY OF BUFFALO, ERIE CO

4.259 4.259 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.012 0.012 CONINSPSTBG FLEX 2022CONINSP 0.003 0.003 2022NFA

0.072 0.072 CONSTSTBG FLEX 2022CONST 0.018 0.018 2022NFA

0.024 0.024 CONINSPSTBG-OFF 2022CONINSP 0.006 0.006 2022NFA

0.144 0.144 CONSTSTBG-OFF 2022CONST 0.036 0.036 2022NFA

CHAUTAUQUA CO

576291

BRIDGE PAINTING OF 3 BRIDGES; CHAUTAUQUA CO.

0.315 0.000 0.000 0.315 0.000 AQC:N/A TOTAL 4YR COST :CHAUTAUQUA TPC : < $0.75 M

Page 25: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 25 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

CONINSP 0.020 0.020 2020NFACONST 0.320 0.320 2020NFA

0.056 STBG-OFF 0.056 CONINSP2020CONINSP 0.014 0.014 2020NFA

0.264 STBG-OFF 0.264 CONST2020CONST 0.066 0.066 2020NFA

CATTARAUGUS CO

576292

BRIDGE PAINTING, 3 BINS, CATTARAUGUS CO; BINS 3321150, 3323210, 3321510; TNS OF EAST OTTO, SOUTH VALLEY & FREEDOM; CATTARAUGUS CO

0.740 0.740 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $0.6-$1.5 M

0.113 STBG-OFF 0.113 CONINSP2020CONINSP 0.006 0.006 2020NFA

0.942 STBG-OFF 0.942 CONST2020CONST 0.051 0.051 2020NFA

0.001 STBG-OFF 0.001 DETLDES2020

NIAGARA CO

576293

2018 BRIDGE NY PROGRAM: PORTER CENTER RD/SIXMILE CK; BIN 3329450; NIAGARA CO; BRIDGE NY PROJECT; TN OF PORTER; NIAGARA CO. PROJECT IS USING 95% FEDERAL FUNDING (OF WHICH 15% IS TOLL CREDITS) WITH 5% LOCAL MATCH.

1.113 1.113 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $1.2-$2.5 M

0.165 STBG-OFF 0.165 CONINSP2020CONINSP 0.009 0.009 2020NFA

0.984 STBG-OFF 0.984 CONST2020CONST 0.053 0.053 2020NFA

0.001 STBG-OFF 0.001 DETLDES2020

CATTARAUGUS CO

576294

2018 BRIDGENY PROGRAM: COUNTY ROAD 6/MUD CREEK; BIN 3322120; BRIDGE NY PROJECT; TN OF LEON; CATTARAUGUS CO; PROJECT IS USING 95% FEDERAL FUNDING (OF WHICH 15% IS TOLL CREDITS) WITH 5% LOCAL MATCH.

1.212 1.212 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $1.2-$2.5 M

0.001 STBG-OFF 0.001 DETLDES2020 0.178 0.178 CONINSPSTBG-OFF 2021

CONINSP 0.009 0.009 2021NFA 1.333 1.333 CONSTSTBG-OFF 2021

CONST 0.070 0.070 2021NFA

CATTARAUGUS CO

576295

2018 BRIDGE NY PROGRAM: DREDGE RD/CONEWANGO CK; BIN 3322290; BRIDGE NY PROJECT; TN OF LEON; CATTARAUGUS CO; PROJECT IS USING 95% FEDERAL FUNDING (OF WHICH 15% IS TOLL CREDITS) WITH 5% LOCAL MATCH.

1.591 0.001 1.590 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $1.2-$2.5 M

0.200 STBG-OFF 0.200 CONINSP2020CONINSP 0.011 0.011 2020NFA

1.700 STBG-OFF 1.700 CONST2020CONST 0.091 0.091 2020NFA

0.001 STBG-OFF 0.001 DETLDES2020

NIAGARA CO

576296

2018 BRIDGE NY PROGRAM: SLAYTON SETTLEMENT RD/EIGHTEEN MILE CK; BIN 3329570; BRIDGE NY PROJECT; TN OF ROYALTON; NIAGARA CO. PROJECT IS USING 95% FEDERAL FUNDING (OF WHICH 15% IS TOLL CREDITS) WITH 5% LOCAL MATCH.

2.003 2.003 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $2-$4 M

Page 26: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 26 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

CONST 0.107 0.107 2020NFA 0.054 STBG-OFF 0.054 CONINSP2020

CONINSP 0.003 0.003 2020NFA 0.470 STBG-OFF 0.470 CONST2020

CONST 0.026 0.026 2020NFA 0.001 STBG-OFF 0.001 DETLDES2020

TN OF LANCASTER

576297

2018 BRIDGE NY PROGRAM: AURORA ST/CAYUGA CRK; BIN 3213250; BRIDGE NY PROJECT; TN OF LANCASTER; ERIE CO; PROJECT IS USING 95% FEDERAL FUNDING (OF WHICH 15% IS TOLL CREDITS) WITH 5% LOCAL MATCH.

0.661 0.661 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

0.204 0.204 PRELDESSTBG LG URB 2021PRELDES 0.051 0.051 2021NFA

0.082 0.082 ROWINCDSTBG LG URB 2021ROWINCD 0.020 0.020 2021NFA

0.208 0.208 DETLDESSTBG LG URB 2022DETLDES 0.052 0.052 2022NFA

0.166 0.166 ROWACQUSTBG LG URB 2022ROWACQU 0.042 0.042 2022NFA

0.302 0.302 CONINSPSTBG LG URB 2023CONINSP 0.076 0.076 2023NFA

3.024 3.024 CONSTSTBG LG URB 2023CONST 0.756 0.756 2023NFA

NIAGARA CO

576312

RAPIDS RD; WISTERMAN - SANDERS TBD; HIGHWAY RECONSTRUCTION IN-KIND; TN OF LOCKPORT; NIAGARA CO

4.983 0.000 0.357 0.468 4.158 AQC:NON TOTAL 4YR COST :NIAGARA TPC : $4.6-$7.5 M

0.080 STBG FLEX 0.080 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.082 0.082 DETLDESSTBG FLEX 2021DETLDES 0.020 0.020 2021NFA

0.166 0.166 CONINSPSTBG FLEX 2022CONINSP 0.042 0.042 2022NFA

1.098 1.098 CONSTSTBG FLEX 2022CONST 0.275 0.275 2022NFA

NIAGARA CO

576313

AKRON RD; DYSINGER - LOCKPORT LINE; TN OF ROYALTON; NIAGARA CO

1.783 0.100 0.102 1.581 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $1.2-$2.5 M

Page 27: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 27 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.083 0.083 PRELDESSTBG FLEX 2021PRELDES 0.021 0.021 2021NFA

0.042 0.042 ROWINCDSTBG FLEX 2021ROWINCD 0.010 0.010 2021NFA

0.085 0.085 DETLDESSTBG FLEX 2022DETLDES 0.021 0.021 2022NFA

0.127 0.127 ROWACQUSTBG FLEX 2022ROWACQU 0.032 0.032 2022NFA

NIAGARA CO

576314

RAYMOND RD; DYSINGER - RAPIDS; TN OF LOCKPORT; NIAGARA CO

0.421 0.000 0.156 0.265 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $2-$4 M

0.061 STBG FLEX 0.061 PRELDES2020PRELDES 0.015 0.015 2020NFA

0.062 0.062 DETLDESSTBG FLEX 2021DETLDES 0.016 0.016 2021NFA

0.125 0.125 CONINSPSTBG FLEX 2022CONINSP 0.032 0.032 2022NFA

0.582 0.582 CONSTSTBG FLEX 2022CONST 0.148 0.148 2022NFA

NIAGARA CO

576315

BEAR RIDGE RD/TONAWANDA CK TRIBUTARY; BIN 3328880; TN OF PENDLETON; NIAGARA CO

1.041 0.076 0.078 0.887 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $0.6-$1.5 M

0.062 0.062 PRELDESSTBG FLEX 2021PRELDES 0.016 0.016 2021NFA

0.064 0.064 DETLDESSTBG FLEX 2022DETLDES 0.016 0.016 2022NFA

0.127 0.127 CONINSPSTBG FLEX 2023CONINSP 0.032 0.032 2023NFA

0.594 0.594 CONSTSTBG FLEX 2023CONST 0.151 0.151 2023NFA

NIAGARA CO

576316

EAST CANAL RD/DONNER CK; BIN 3329070; TN OF PENDLETON; NIAGARA CO

1.062 0.000 0.078 0.080 0.904 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $0.6-$1.5 M

0.224 STBG LG URB 0.224 DETLDES2020DETLDES 0.056 0.056 2020NFA

0.245 0.245 CONINSPSTBG LG URB 2021CONINSP 0.061 0.061 2021NFA

2.366 2.366 CONSTSTBG LG URB 2021CONST 0.592 0.592 2021NFA

CITY OF BUFFALO

576317

ALLEN ST - PHASE 2; DELAWARE - WADSWORTH (BNMC); CITY OF BUFFALO; ERIE CO

3.544 0.280 3.264 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

Page 28: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 28 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.110 0.110 PRELDESSTBG FLEX 2022PRELDES 0.028 0.028 2022NFA

0.112 0.112 DETLDESSTBG FLEX 2023DETLDES 0.028 0.028 2023NFA

CITY OF BUFFALO

576318

ABBOTT RD - PHASE 3; OAKMONT - SHENENDOAH/HOLLYWOOD; CITY OF BUFFALO; ERIE CO

0.278 0.000 0.000 0.138 0.140 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.085 0.085 PRELDESSTBG LG URB 2022PRELDES 0.021 0.021 2022NFA

0.086 0.086 DETLDESSTBG LG URB 2023DETLDES 0.022 0.022 2023NFA

CITY OF BUFFALO

576319

BAILEY COMPLETE STREET - PHASE 1; WINSPEAR - DARTMOUTH; CITY OF BUFFALO; ERIE CO

0.214 0.000 0.000 0.106 0.108 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.082 STBG LG URB 0.082 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.083 0.083 DETLDESSTBG LG URB 2021DETLDES 0.021 0.021 2021NFA

CITY OF BUFFALO

576320

BAILEY COMPLETE STREET - PHASE 2; DARTMOUTH - KENSINGTON; CITY OF BUFFALO; ERIE CO

0.206 0.102 0.104 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.082 STBG LG URB 0.082 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.125 0.125 DETLDESSTBG LG URB 2021DETLDES 0.031 0.031 2021NFACONINSP 0.080 0.080 2022NFACONST 0.795 0.795 2022NFA

0.104 0.104 CONINSPSTBG LG URB 2022CONINSP 0.026 0.026 2022NFA

0.832 0.832 CONSTSTBG LG URB 2022CONST 0.212 0.212 2022NFA

CITY OF BUFFALO

576321

JEFFERSON COMPLETE STREET - PHASE 1; FERRY - UTICA; CITY OF BUFFALO; ERIE CO

2.307 0.102 0.156 2.049 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

Page 29: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 29 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.104 0.104 PRELDESSTBG LG URB 2021PRELDES 0.026 0.026 2021NFA

0.106 0.106 DETLDESSTBG LG URB 2022DETLDES 0.026 0.026 2022NFACONINSP 0.216 0.216 2023NFACONST 1.485 1.485 2023NFA

0.212 0.212 CONINSPSTBG LG URB 2023CONINSP 0.054 0.054 2023NFA

1.802 1.802 CONSTSTBG LG URB 2023CONST 0.459 0.459 2023NFA

CITY OF BUFFALO

576322

JEFFERSON COMPLETE STREET - PHASE 2; DELAVAN - FERRY; CITY OF BUFFALO; ERIE CO

4.490 0.000 0.130 0.132 4.228 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.106 0.106 PRELDESSTBG LG URB 2022PRELDES 0.026 0.026 2022NFA

0.108 0.108 DETLDESSTBG LG URB 2023DETLDES 0.027 0.027 2023NFA

CITY OF BUFFALO

576323

JEFFERSON COMPLETE STREET - PHASE 3; MAIN - DELAVAN; CITY OF BUFFALO; ERIE CO

0.267 0.000 0.000 0.132 0.135 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.102 STBG LG URB 0.102 DETLDES2020DETLDES 0.026 0.026 2020NFA

0.100 STBG LG URB 0.100 PRELDES2020PRELDES 0.025 0.025 2020NFACONINSP 0.216 0.216 2022NFACONST 1.352 1.352 2022NFA

0.204 0.204 CONINSPSTBG LG URB 2022CONINSP 0.052 0.052 2022NFA

1.632 1.632 CONSTSTBG LG URB 2022CONST 0.416 0.416 2022NFA

CITY OF BUFFALO

576324

MICHIGAN COMPLETE STREET; SOUTH DIVISION - GENESEE; CITY OF BUFFALO; ERIE CO

4.125 0.253 0.000 3.872 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.110 0.110 PRELDESSTBG FLEX 2022PRELDES 0.028 0.028 2022NFA

0.112 0.112 DETLDESSTBG FLEX 2023DETLDES 0.028 0.028 2023NFA

CITY OF BUFFALO

576325

BUFFALO ROADWAY REHABS - PHASE 2; VARIOUS ROUTES; CITY OF BUFFALO; ERIE CO

0.278 0.000 0.000 0.138 0.140 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

Page 30: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 30 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.082 STBG LG URB 0.082 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.083 0.083 DETLDESSTBG LG URB 2021DETLDES 0.021 0.021 2021NFA

0.200 0.200 CONINSPSTBG LG URB 2023CONINSP 0.051 0.051 2023NFA

1.997 1.997 CONSTSTBG LG URB 2023CONST 0.509 0.509 2023NFA

CITY OF NIAGARA FALL576327

PINE AVE (RT 62A) PRESERVATION PROJECT; MAIN - PACKARD; CITY OF NIAGARA FALLS; NIAGARA CO

2.963 0.102 0.104 0.000 2.757 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $2-$4 M

0.058 0.058 PRELDESSTBG LG URB 2021PRELDES 0.015 0.015 2021NFA

0.059 0.059 DETLDESSTBG LG URB 2022DETLDES 0.015 0.015 2022NFA

0.051 0.051 CONINSPSTBG LG URB 2023CONINSP 0.013 0.013 2023NFA

0.424 0.424 CONSTSTBG LG URB 2023CONST 0.108 0.108 2023NFA

CITY OF NIAGARA FALL576328

COLLEGE AVE (RT 31) PRESERVATION PROJECT; MAIN - HIGHLAND; CITY OF NIAGARA FALLS; NIAGARA CO

0.743 0.000 0.073 0.074 0.596 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $0.6-$1.5 M

0.069 STBG LG URB 0.069 PRELDES2020PRELDES 0.017 0.017 2020NFA

0.071 0.071 DETLDESSTBG LG URB 2021DETLDES 0.018 0.018 2021NFA

0.083 0.083 CONINSPSTBG LG URB 2022CONINSP 0.021 0.021 2022NFA

0.607 0.607 CONSTSTBG LG URB 2022CONST 0.155 0.155 2022NFA

CITY OF NIAGARA FALL576329

77TH ST PRESERVATION PROJ; NFB (RT62) - BUFFALO AVE (RT384); CITY OF NIAGARA FALLS; NIAGARA CO

1.041 0.086 0.089 0.866 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $0.6-$1.5 M

PRELDES 0.021 0.021 2021NFADETLDES 0.031 0.031 2022NFA

0.042 0.042 CONINSPSTBG FLEX 2022CONINSP 0.011 0.011 2022NFA

0.254 0.254 CONSTSTBG FLEX 2022CONST 0.064 0.064 2022NFA

CITY OF NIAGARA FALL576330

LINDBERGH AVE/CAYUGA CK; BIN 2260900; CITY OF NIAGARA FALLS; NIAGARA CO

0.423 0.000 0.021 0.402 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : < $0.75 M

Page 31: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 31 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.122 STBG LG URB 0.122 DETLDES2020DETLDES 0.031 0.031 2020NFA

0.120 STBG LG URB 0.120 PRELDES2020PRELDES 0.030 0.030 2020NFA

0.245 0.245 CONINSPSTBG LG URB 2021CONINSP 0.062 0.062 2021NFA

1.469 1.469 CONSTSTBG LG URB 2021CONST 0.374 0.374 2021NFA

ERIE CO

576331

WEHRLE RD; HARLEM (RT 240) - AERO; TN OF CHEEKTOWAGA; ERIE CO

2.453 0.303 2.150 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.125 0.125 PRELDESSTBG LG URB 2021PRELDES 0.031 0.031 2021NFA

0.127 0.127 DETLDESSTBG LG URB 2022DETLDES 0.032 0.032 2022NFA

0.259 0.259 CONINSPSTBG LG URB 2023CONINSP 0.065 0.065 2023NFA

2.333 2.333 CONSTSTBG LG URB 2023CONST 0.583 0.583 2023NFA

ERIE CO

576332

MCKINLEY PKWY; QUINBY - SOUTHWESTERN BLVD (RT 20); TN OF HAMBURG; ERIE CO

3.555 0.000 0.156 0.159 3.240 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.200 STBG LG URB 0.200 PRELDES2020PRELDES 0.050 0.050 2020NFA

0.080 STBG LG URB 0.080 ROWINCD2020ROWINCD 0.020 0.020 2020NFA

0.204 0.204 DETLDESSTBG LG URB 2021DETLDES 0.051 0.051 2021NFA

0.163 0.163 ROWACQUSTBG LG URB 2021ROWACQU 0.041 0.041 2021NFA

0.594 0.594 CONINSPSTBG LG URB 2022CONINSP 0.148 0.148 2022NFA

5.258 5.258 CONSTSTBG LG URB 2022CONST 1.314 1.314 2022NFA

ERIE CO

576333

ELMWOOD AVE (CR 119); KENMORE AVE - KNOCHE; TN OF TONAWANDA & VIL OF KENMORE; ERIE CO

8.123 0.350 0.459 7.314 0.000 AQC:A19 TOTAL 4YR COST :ERIE TPC : $7.5-$12 M

0.122 STBG FLEX 0.122 PRELDES2020PRELDES 0.031 0.031 2020NFA

0.125 0.125 DETLDESSTBG FLEX 2021DETLDES 0.031 0.031 2021NFA

ERIE CO

576334

NORTH FRENCH RD (CR 299)/GOTT CK; BIN 3326760; TN OF AMHERST; ERIE CO

0.309 0.153 0.156 0.000 0.000 AQC:A19 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

Page 32: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 32 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.061 STBG FLEX 0.061 PRELDES2020PRELDES 0.015 0.015 2020NFA

0.062 0.062 DETLDESSTBG FLEX 2021DETLDES 0.016 0.016 2021NFA

0.125 0.125 CONINSPSTBG FLEX 2023CONINSP 0.032 0.032 2023NFA

0.998 0.998 CONSTSTBG FLEX 2023CONST 0.254 0.254 2023NFA

ERIE CO

576335

COUNTY RD (CR 282)/BEEMAN CK; BIN 3326680; TN OF CLARENCE; ERIE CO

1.563 0.076 0.078 0.000 1.409 AQC:A19 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.200 STBG LG URB 0.200 PRELDES2020PRELDES 0.050 0.050 2020NFA

0.080 STBG LG URB 0.080 ROWINCD2020ROWINCD 0.020 0.020 2020NFA

0.204 0.204 DETLDESSTBG LG URB 2021DETLDES 0.051 0.051 2021NFA

0.245 0.245 ROWACQUSTBG LG URB 2021ROWACQU 0.061 0.061 2021NFA

0.424 0.424 CONINSPSTBG LG URB 2023CONINSP 0.106 0.106 2023NFA

4.579 4.579 CONSTSTBG LG URB 2023CONST 1.145 1.145 2023NFA

ERIE CO

576336

WILLIAM ST (CR 338); TRANSIT (RT 20) - BOWEN (CR 242); TN OF LANCASTER; ERIE CO

7.165 0.350 0.561 0.000 6.254 AQC:A19 TOTAL 4YR COST :ERIE TPC : $6-$9.4 M

0.127 0.127 PRELDESSTBG FLEX 2022PRELDES 0.032 0.032 2022NFA

0.130 0.130 DETLDESSTBG FLEX 2023DETLDES 0.032 0.032 2023NFA

ERIE CO

576337

FOUR ROD RD/LITTLE BUFFALO CK; BRIDGE REPLACEMENT; BIN 3328050; TN OF MARILLA; ERIE CO

0.321 0.000 0.000 0.159 0.162 AQC:A19 TOTAL 4YR COST :ERIE TPC : $2-$4 M

Page 33: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 33 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

PRELDES 0.051 0.051 2020NFADETLDES 0.051 0.051 2021NFA

0.041 0.041 CONINSPSTBG FLEX 2022CONINSP 0.011 0.011 2022NFA

0.224 0.224 CONSTSTBG FLEX 2022CONST 0.057 0.057 2022NFA

0.041 0.041 CONINSPSTBG-OFF 2022CONINSP 0.011 0.011 2022NFA

0.224 0.224 CONSTSTBG-OFF 2022CONST 0.057 0.057 2022NFA

ERIE CO

576338

ERIE COUNTY BRIDGE PAINTING/VERTICAL DOWN; SFY 2021; VARIOUS LOCATIONS; ERIE CO

0.768 0.051 0.051 0.666 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

DETLDES 0.026 0.026 2021NFAPRELDES 0.026 0.026 2021NFA

0.021 0.021 CONINSPSTBG FLEX 2022CONINSP 0.005 0.005 2022NFA

0.150 0.150 CONSTSTBG FLEX 2022CONST 0.037 0.037 2022NFA

0.021 0.021 CONINSPSTBG-OFF 2022CONINSP 0.005 0.005 2022NFA

0.150 0.150 CONSTSTBG-OFF 2022CONST 0.037 0.037 2022NFA

ERIE CO

576339

ERIE COUNTY BRIDGE DECK SEALING; VARIOUS LOCATIONS; ERIE CO

0.478 0.000 0.052 0.426 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

DETLDES 0.026 0.026 2021NFAPRELDES 0.026 0.026 2021NFA

0.021 0.021 CONINSPSTBG FLEX 2022CONINSP 0.005 0.005 2022NFA

0.125 0.125 CONSTSTBG FLEX 2022CONST 0.031 0.031 2022NFA

0.021 0.021 CONINSPSTBG-OFF 2022CONINSP 0.005 0.005 2022NFA

0.125 0.125 CONSTSTBG-OFF 2022CONST 0.031 0.031 2022NFA

ERIE CO

576340

ERIE COUNTY BRIDGE WASHING; VARIOUS LOCATIONS; ERIE CO

0.416 0.000 0.052 0.364 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

Page 34: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 34 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

PRELDES 0.051 0.051 2021NFADETLDES 0.052 0.052 2022NFA

0.030 0.030 CONINSPSTBG FLEX 2023CONINSP 0.007 0.007 2023NFA

0.161 0.161 CONSTSTBG FLEX 2023CONST 0.040 0.040 2023NFA

0.030 0.030 CONINSPSTBG-OFF 2023CONINSP 0.007 0.007 2023NFA

0.161 0.161 CONSTSTBG-OFF 2023CONST 0.040 0.040 2023NFA

ERIE CO

576341

ERIE COUNTY BRIDGE PAINTING/VERTICAL DOWN; VARIOUS LOCATIONS; ERIE CO

0.579 0.000 0.051 0.052 0.476 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

PRELDES 0.051 0.051 2021NFADETLDES 0.052 0.052 2022NFA

0.030 0.030 CONINSPSTBG FLEX 2023CONINSP 0.007 0.007 2023NFA

0.161 0.161 CONSTSTBG FLEX 2023CONST 0.040 0.040 2023NFA

0.030 0.030 CONINSPSTBG-OFF 2023CONINSP 0.007 0.007 2023NFA

0.161 0.161 CONSTSTBG-OFF 2023CONST 0.040 0.040 2023NFA

ERIE CO

576342

ERIE COUNTY BRIDGE DECK OVERLAY/JOINT REPLACEMENTS; VARIOUS LOCATIONS; ERIE CO

0.579 0.000 0.051 0.052 0.476 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

PRELDES 0.052 0.052 2022NFADETLDES 0.053 0.053 2023NFA

ERIE CO

576343

ERIE COUNTY BRIDGE OVERLAYS & JOINT REPLACEMENT; VARIOUS LOCATIONS; ERIE CO

0.105 0.000 0.000 0.052 0.053 AQC:N/A TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

0.001 NHPP 0.001 DETLDES2020 0.163 0.163 CONINSPNHPP 2021

CONINSP 0.041 0.041 2021NFA 1.224 1.224 CONSTNHPP 2021

CONST 0.306 0.306 2021NFA

CITY OF BUFFALO

576344

MAIN ST REHABILITATION; FERRY ST - DELAVAN AVE; CITY OF BUFFALO; ERIE CO

1.735 0.001 1.734 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

Page 35: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 35 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.200 CMAQ 0.200 DETLDES2020DETLDES 0.050 0.050 2020NFA

0.120 CMAQ 0.120 PRELDES2020PRELDES 0.030 0.030 2020NFA

0.080 CMAQ 0.080 ROWACQU2020ROWACQU 0.020 0.020 2020NFA

0.016 CMAQ 0.016 ROWINCD2020ROWINCD 0.004 0.004 2020NFA

0.236 0.236 CONINSPCMAQ 2021CONINSP 0.059 0.059 2021NFA

2.400 2.400 CONSTCMAQ 2021CONST 0.600 0.600 2021NFA

VIL OF LANCASTER

576345

VIL OF LANCASTER - CONSTRUCTION OF NEW ROUNDABOUTS @ CENTRAL AND PLEASANT AVES - TAP/CMAQ; ERIE CO

3.815 0.520 3.295 0.000 0.000 AQC:D1 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.032 CMAQ 0.032 DETLDES2020DETLDES 0.008 0.008 2020NFA

0.020 CMAQ 0.020 PRELDES2020PRELDES 0.005 0.005 2020NFA

0.024 0.024 CONINSPCMAQ 2021CONINSP 0.006 0.006 2021NFA

0.224 0.224 CONSTCMAQ 2021CONST 0.056 0.056 2021NFA

TN OF GRAND ISLAND

576346

TOWN OF GRAND ISLAND - NEW PEDESTRIAN ACCESSIBILITY ENHANCEMENTS ALONG BASELINE ROAD - TAP/CMAQ; ERIE CO

0.375 0.065 0.310 0.000 0.000 AQC:C2 TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.004 CMAQ 0.004 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.004 CMAQ 0.004 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.916 0.916 CONSTCMAQ 2021CONST 0.229 0.229 2021NFA

TN OF TONAWANDA

576347

TOWN OF TONAWANDA - CONSTRUCTION OF NEW MINI-ROUNDABOUTS ALONG PARKER BLVD CORRIDOR- TAP/CMAQ; ERIE CO

1.155 0.010 1.145 0.000 0.000 AQC:C2 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

Page 36: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 36 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.114 TAP LG URBAN 0.114 DETLDES2020DETLDES 0.029 0.029 2020NFA

0.112 TAP LG URBAN 0.112 PRELDES2020PRELDES 0.028 0.028 2020NFA

0.114 0.114 CONINSPTAP LG URBAN 2021CONINSP 0.029 0.029 2021NFA

0.780 0.780 CONSTTAP LG URBAN 2021CONST 0.199 0.199 2021NFA

CITY OF BUFFALO

576348

CITY OF BUFFALO - CONSTRUCTION OF NEW TRAFFIC CALMING MEASURES AND DEDICATION BIKE INFRASTRUCTURE ALONG BUSTI AVENUE CORRIDOR - TAP/CMAQ; ERIE CO

1.405 0.283 1.122 0.000 0.000 AQC:C2 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.020 CMAQ 0.020 DETLDES2020DETLDES 0.005 0.005 2020NFA

0.008 CMAQ 0.008 PRELDES2020PRELDES 0.002 0.002 2020NFA

0.024 0.024 CONINSPCMAQ 2021CONINSP 0.006 0.006 2021NFA

0.207 0.207 CONSTCMAQ 2021CONST 0.052 0.052 2021NFA

ERIE CO

576349

ERIE COUNTY - INSTALLATION OF NEW ELECTRIC VEHICLE CHARGING STATIONS - CMAQ

0.324 0.035 0.289 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.048 TAP LG URBAN 0.048 DETLDES2020DETLDES 0.012 0.012 2020NFA

0.024 TAP LG URBAN 0.024 PRELDES2020PRELDES 0.006 0.006 2020NFA

0.072 0.072 CONINSPTAP LG URBAN 2021CONINSP 0.018 0.018 2021NFA

0.745 0.745 CONSTTAP LG URBAN 2021CONST 0.186 0.186 2021NFA

VIL OF HAMBURG

576350

VIL OF HAMBURG - CONSTRUCTION OF NEW PEDESTRIAN ACCESSIBILITY ENHANCEMENTS - TAP/CMAQ; ERIE CO

1.111 0.090 1.021 0.000 0.000 AQC:C2 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

DETLDES 0.050 0.050 2020NFAPRELDES 0.020 0.020 2020NFA

0.012 0.012 CONINSPCMAQ 2021CONINSP 0.003 0.003 2021NFA

0.306 0.306 CONSTCMAQ 2021CONST 0.076 0.076 2021NFACONINSP 0.025 0.025 2021NFA

CITY OF NORTH TONAWA

576351

CITY OF NORTH TONAWANDA - CONSTRUCTION OF A NEW CONNECTION TO EMPIRE STATE TRAIL ALONG THE ERIE CANAL - TAP/CMAQ; ERIE CO

0.492 0.070 0.422 0.000 0.000 AQC:C2 TOTAL 4YR COST :NIAGARA TPC : < $0.75 M

Page 37: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 37 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.072 TAP FLEX 0.072 DETLDES2020DETLDES 0.018 0.018 2020NFA

0.072 TAP FLEX 0.072 PRELDES2020PRELDES 0.018 0.018 2020NFA

0.073 0.073 CONINSPTAP FLEX 2021CONINSP 0.018 0.018 2021NFA

0.507 0.507 CONSTTAP FLEX 2021CONST 0.127 0.127 2021NFA

CITY OF BUFFALO

576352

CITY OF BUFFALO - INSTALLATION OF NEW SCHOOL ZONE SAFETY SIGNAGE WITH FLASHING BEACONS - TAP; ERIE CO

0.905 0.180 0.725 0.000 0.000 AQC:A7 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

0.120 TAP SM URBAN 0.120 DETLDES2020DETLDES 0.030 0.030 2020NFA

0.176 TAP SM URBAN 0.176 PRELDES2020PRELDES 0.044 0.044 2020NFA

0.144 0.144 CONINSPTAP SM URBAN 2021CONINSP 0.036 0.036 2021NFA

1.038 1.038 CONSTTAP SM URBAN 2021CONST 0.259 0.259 2021NFA

CITY OF DUNKIRK

576353

CITY OF DUNKIRK - BIKE/PED ENHANCEMENTS ALONG LAKE SHORE AVENUE CORRIDOR - TAP/CMAQ; CHAUTAUQUA CO

1.847 0.370 1.477 0.000 0.000 AQC:C2 TOTAL 4YR COST :CHAUTAUQUA TPC : $1.2-$2.5 M

0.128 TAP SM URBAN 0.128 DETLDES2020DETLDES 0.032 0.032 2020NFA

0.120 TAP SM URBAN 0.120 PRELDES2020PRELDES 0.030 0.030 2020NFA

0.004 TAP SM URBAN 0.004 ROWACQU2020ROWACQU 0.001 0.001 2020NFA

0.004 TAP SM URBAN 0.004 ROWINCD2020ROWINCD 0.001 0.001 2020NFACONST 1.200 1.200 2021NFA

0.128 0.128 CONINSPTAP SM URBAN 2021CONINSP 0.032 0.032 2021NFA

0.279 0.279 CONSTTAP SM URBAN 2021CONST 0.070 0.070 2021NFA

CITY OF OLEAN

576354

OLEAN - NEW MULTI-USE PATH ALONG EAST STATE ST - TAP; CITY OF OLEAN; CATTARAUGUS CO

2.029 0.320 1.709 0.000 0.000 AQC:C2 TOTAL 4YR COST :CATTARAUGUS TPC : $1.2-$2.5 M

Page 38: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 38 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.286 TAP RURAL 0.286 DETLDES2020DETLDES 0.071 0.071 2020NFA

0.176 TAP RURAL 0.176 PRELDES2020PRELDES 0.044 0.044 2020NFA

0.032 TAP RURAL 0.032 ROWACQU2020ROWACQU 0.008 0.008 2020NFA

0.008 TAP RURAL 0.008 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.190 0.190 CONINSPTAP RURAL 2021CONINSP 0.048 0.048 2021NFA

1.320 1.320 CONSTTAP RURAL 2021CONST 0.330 0.330 2021NFA

TN OF RANDOLPH

576356

TOWN OF RANDOLPH - CONSTRUCTION OF NEW PEDESTRIAN ACCESSABILITY ENHANCEMENTS, INSTALLATION OF SOLAR RADAR SPEED SIGNS & OTHER TRAFFIC CALMING MEASURES ALONG MAIN STREET SCHOOL CORRIDOR - TAP; CATTARAUGUS CO

2.515 0.627 1.888 0.000 0.000 AQC:C2 TOTAL 4YR COST :CATTARAUGUS TPC : $2-$4 M

0.080 TAP FLEX 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.100 0.100 CONINSPTAP FLEX 2021CONINSP 0.025 0.025 2021NFA

1.411 1.411 CONSTTAP FLEX 2021CONST 0.353 0.353 2021NFA

CITY OF TONAWANDA

576357

TONAWANDA PEDESTRIAN BRIDGE REHABILITATION PROJECT - TAP; CITY OF TONAWANDA; ERIE CO

1.989 0.100 1.889 0.000 0.000 AQC:C2 TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.336 CMAQ 0.336 DETLDES2020DETLDES 0.084 0.084 2020NFA

0.080 CMAQ 0.080 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.216 CMAQ 0.216 ROWACQU2020ROWACQU 0.054 0.054 2020NFA

0.040 CMAQ 0.040 ROWINCD2020ROWINCD 0.010 0.010 2020NFA

0.240 0.240 CONINSPCMAQ 2021CONINSP 0.060 0.060 2021NFA

2.137 2.137 CONSTCMAQ 2021CONST 0.535 0.535 2021NFACONST 0.218 0.218 2021NFA

CITY OF NIAGARA FALL576358

NIAGARA FALLS CONNECTION TRAIL - CMAQ; CITY OF NIAGARA FALLS; NIAGARA CO

4.030 0.840 3.190 0.000 0.000 AQC:C2 TOTAL 4YR COST :NIAGARA TPC : $3.3-$5.6 M

Page 39: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 39 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.020 0.020 CONINSPHPP 2022CONINSP 0.005 0.005 2022NFA

0.225 0.225 CONSTHPP 2022CONST 0.056 0.056 2022NFACONINSP 0.023 0.023 2022NFACONST 0.211 0.211 2022NFA

TOWN OF CLARENCE

576359

ERIE COUNTY PEDESTRIAN ACCOMMODATIONS IN THE TOWN OF CLARENCE. TRANSFERRED EARMARK: NY727 (PROGRAM CODE RPS2)

0.540 0.000 0.000 0.540 0.000 AQC:C2 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

0.044 NHPP 0.044 CONINSP2020CONINSP 0.011 0.011 2020NFA

0.368 NHPP 0.368 MISC2020MISC 0.092 0.092 2020NFA

0.045 0.045 CONINSPNHPP 2021CONINSP 0.011 0.011 2021NFA

0.375 0.375 MISCNHPP 2021MISC 0.094 0.094 2021NFA

0.046 0.046 CONINSPNHPP 2022CONINSP 0.011 0.011 2022NFA

0.382 0.382 MISCNHPP 2022MISC 0.095 0.095 2022NFA

0.047 0.047 CONINSPNHPP 2023CONINSP 0.012 0.012 2023NFA

0.389 0.389 MISCNHPP 2023MISC 0.097 0.097 2023NFA

NYSDOT

580665

MAINTENANCE AND REPLACEMENT OF ITS EQUIPMENT AT VARIOUS LOCATIONS IN ERIE COUNTY. WORK WILL INCLUDE REPLACEMENT OF EXISTING ITS FIELD CABINETS WITH NEW ITS FIELD CABINETS, UPGRADING EXISTING ITS SITES TO PROPER ELECTRIC CODE, AND REPLACEMENT OF EXISTING ITS FIELD EQUIPMENT (I.E. CAMERAS, MANAGED ETHERNET SWITCHES, CAMERA POLES WITH LOWERING DEVICE, POWER DISTRIBUTION UNITS).

2.119 0.515 0.525 0.534 0.545 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.237 NHPP 0.237 CONINSP2020CONINSP 0.059 0.059 2020NFA

1.976 NHPP 1.976 CONST2020CONST 0.494 0.494 2020NFA

0.051 STBG FLEX 0.051 CONINSP2020CONINSP 0.013 0.013 2020NFA

0.424 STBG FLEX 0.424 CONST2020CONST 0.106 0.106 2020NFA

NYSDOT

580911

PMI-BRIDGE PAINTING; BINS 6012240, 6041450, 6060710, 6072771, 6072772, & 6600179; TOWNS OF CARROLLTON, AND COLLINS; CITY OF SALAMANCA; COUNTIES OF ERIE AND CATTARAUGUS

3.360 3.360 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 40: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 40 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.245 NHPP 0.245 MISC2020MISC 0.061 0.061 2020NFA

0.250 0.250 MISCNHPP 2021MISC 0.062 0.062 2021NFA

0.254 0.254 MISCNHPP 2022MISC 0.064 0.064 2022NFA

0.259 0.259 MISCNHPP 2023MISC 0.065 0.065 2023NFA

NYSDOT

580938

HIGHWAY EMERGENCY LOCAL PATROL (HELP) PROGRAM ON I-290, IN THE TOWNS OF AMHERST & TONAWANDA IN ERIE COUNTY

1.260 0.306 0.312 0.318 0.324 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.265 NHPP 0.265 MISC2020MISC 0.066 0.066 2020NFA

0.270 0.270 MISCNHPP 2021MISC 0.068 0.068 2021NFA

0.276 0.276 MISCNHPP 2022MISC 0.069 0.069 2022NFA

0.281 0.281 MISCNHPP 2023MISC 0.070 0.070 2023NFA

NYSDOT

580939

FUNDING FOR HIGHWAY EMERGENCY LOCAL PATROL (HELP) ON RT 33 IN THE TOWN OF CHEEKTOWAGA & THE CITY OF BUFFALO IN ERIE COUNTY. PORTION OF COST FUNDED WITH CMAQ THROUGH 2016 TAP-CMAQ AWARD.

1.365 0.331 0.338 0.345 0.351 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.538 CMAQ 0.538 DETLDES2020DETLDES 0.134 0.134 2020NFA

0.347 0.347 CONINSPCMAQ 2021CONINSP 0.087 0.087 2021NFA

2.896 2.896 CONSTCMAQ 2021CONST 0.724 0.724 2021NFA

NYSDOT

580973

BUFFALO NIAGARA REGIONAL ARTERIAL MANAGEMENT SYSTEM; TRAFFIC SIGNAL COORDINATION ON RTS 62,75,130,240,324,325,384, 952Q, 952Q; TOWNS OF AMHERST, CHEEKTOWAGA, HAMBURG, LANCASTER, TONAWANDA & WEST SENECA, VILLAGES OF DEPEW & SLOAN; ERIE COUNTY

4.726 0.672 4.054 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $4.6-$7.5 M

Page 41: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 41 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.041 HSIP 0.041 CONINSP2020CONINSP 0.005 0.005 2020NFA

0.339 HSIP 0.339 CONST2020CONST 0.038 0.038 2020NFA

0.045 NHPP 0.045 CONINSP2020CONINSP 0.011 0.011 2020NFA

0.372 NHPP 0.372 CONST2020CONST 0.093 0.093 2020NFA

0.200 NHPP 0.200 DETLDES2020DETLDES 0.050 0.050 2020NFA

0.050 NHPP 0.050 PRELDES2020PRELDES 0.013 0.013 2020NFA

0.018 STBG FLEX 0.018 CONINSP2020CONINSP 0.004 0.004 2020NFA

0.150 STBG FLEX 0.150 CONST2020CONST 0.037 0.037 2020NFA

0.051 STBG FLEX 0.051 DETLDES2020DETLDES 0.013 0.013 2020NFA

0.013 STBG FLEX 0.013 PRELDES2020PRELDES 0.003 0.003 2020NFA

NYSDOT

581076

ADA COMPLIANCE & PEDESTRIAN SIGNAL UPGRADES. THIS PROJECT WILL IMPROVE PEDESTRIAN MOBILITY BY BRINGING VARIOUS FEDERAL AID ELIGIBLE LOCATIONS ON NY 78, NY 324, POTTERS RD, NY 16, IN THE TOWNS OF NEWFANE, TONAWANDA AND WEST SENECA IN ERIE AND NIAGARA COUNTIES INTO COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA) REQUIREMENTS FOR ACCESSIBILITY. THE WORK WILL INCLUDE CURB RAMP INSTALLATIONS/UPGRADES AND SIDEWALK RECONSTRUCTION. THE REGIONL TRAFFIC AND SAFETY ENGINEER HAS REVIEW AND APPROVED THE WORK THAT IS USING HSIP FUNDING.

1.546 1.546 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.105 NHPP 0.105 CONINSP2020CONINSP 0.026 0.026 2020NFA

0.871 NHPP 0.871 CONST2020CONST 0.218 0.218 2020NFA

0.020 STBG FLEX 0.020 CONINSP2020CONINSP 0.005 0.005 2020NFA

0.170 STBG FLEX 0.170 CONST2020CONST 0.042 0.042 2020NFA

NYSDOT

581081

GUIDERAIL REPLACEMENT; SAFETY WORK INVOLVING GUIDERAIL IMPROVEMENTS AT VARIOUS FEDERAL-AID ELIGIBLE LOCATIONS IN ERIE CO. WORK WILL ALSO INCLUDE CURB INSTALLATION, SIGNING AND SLOPE STABILIZATION, AS WELL AS, MITIGATION OF IMPACT TO AFFECTED DRAINAGE STRUCTURES WITHIN THE LIMITS OF THE PROJECT.

1.457 1.457 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.071 NHPP 0.071 CONINSP2020CONINSP 0.018 0.018 2020NFA

0.599 NHPP 0.599 CONST2020CONST 0.150 0.150 2020NFA

0.041 NHPP 0.041 DETLDES2020DETLDES 0.010 0.010 2020NFA

NYSDOT

581082

GUIDERAIL REPLACEMENTON US RT 62; SAFETY WORK INVOLVING GUIDERAIL IMPROVEMENTS AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS & ERIE COS.

0.889 0.889 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 42: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 42 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.104 NHPP 0.104 CONINSP2020CONINSP 0.026 0.026 2020NFA

0.867 NHPP 0.867 CONST2020CONST 0.217 0.217 2020NFA

0.004 STBG FLEX 0.004 CONINSP2020CONINSP 0.001 0.001 2020NFA

0.035 STBG FLEX 0.035 CONST2020CONST 0.009 0.009 2020NFA

NYSDOT

581089

PMI-BR CLEANING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN ERIE & NIAGARA COS.

1.263 1.263 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.008 STBG FLEX 0.008 DETLDES2020DETLDES 0.002 0.002 2020NFA

0.048 STBG FLEX 0.048 PRELDES2020PRELDES 0.012 0.012 2020NFA

0.073 0.073 CONINSPNHPP 2021CONINSP 0.018 0.018 2021NFA

0.612 0.612 CONSTNHPP 2021CONST 0.153 0.153 2021NFA

0.024 0.024 CONINSPSTBG FLEX 2021CONINSP 0.006 0.006 2021NFA

0.204 0.204 CONSTSTBG FLEX 2021CONST 0.051 0.051 2021NFA

NYSDOT

581090

PMI-BR CLEANING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA CO

1.211 0.070 1.141 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.080 NHPP 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.080 NHPP 0.080 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.294 0.294 CONINSPNHPP 2021CONINSP 0.073 0.073 2021NFA

2.448 2.448 CONSTNHPP 2021CONST 0.612 0.612 2021NFA

NYSDOT

581092

PMI-BRIDGE PAINTING, BINS 1062601, 1062602, 1062662, 1071510, 1071890, 1071900, 1071910, 1071921, 1071922, 1091760, 1091901, 1091902; TNS OF MINA, ELLERY, POLAND AND NORTH HARMONY, CHAUTAUQUA CO

3.627 0.200 3.427 0.000 0.000 AQC:N/A TOTAL 4YR COST :CHAUTAUQUA TPC : $3.3-$5.6 M

Page 43: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 43 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.074 NHPP 0.074 CONINSP2020CONINSP 0.018 0.018 2020NFA

0.616 NHPP 0.616 CONST2020CONST 0.154 0.154 2020NFA

0.002 STBG FLEX 0.002 CONINSP2020 0.016 STBG FLEX 0.016 CONST2020

CONST 0.004 0.004 2020NFA

NYSDOT

581094

OVERHEAD SIGN STRUCTURES & SIGN PANEL PROGRAM; VARIOUS FEDERAL AID ELIGIBLE LOCATIONS; CHAUTAUQUA, ERIE & NIAGARA COS.

0.884 0.884 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.290 NHPP 0.290 CONINSP2020CONINSP 0.072 0.072 2020NFA

2.412 NHPP 2.412 CONST2020CONST 0.603 0.603 2020NFA

0.098 STBG FLEX 0.098 CONINSP2020CONINSP 0.024 0.024 2020NFA

0.814 STBG FLEX 0.814 CONST2020CONST 0.203 0.203 2020NFA

NYSDOT

581097

PAVT MARKINGS (LINE-2) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA & ERIE COS.

4.516 4.516 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.022 NHPP 0.022 DETLDES2020DETLDES 0.006 0.006 2020NFA

0.006 NHPP 0.006 PRELDES2020PRELDES 0.001 0.001 2020NFA

0.010 STBG FLEX 0.010 DETLDES2020DETLDES 0.002 0.002 2020NFA

0.002 STBG FLEX 0.002 PRELDES2020PRELDES 0.001 0.001 2020NFA

0.117 0.117 CONINSPNHPP 2021CONINSP 0.030 0.030 2021NFA

0.979 0.979 CONSTNHPP 2021CONST 0.245 0.245 2021NFA

0.052 0.052 CONINSPSTBG FLEX 2021CONINSP 0.013 0.013 2021NFA

0.435 0.435 CONSTSTBG FLEX 2021CONST 0.108 0.108 2021NFA

NYSDOT

581098

PAVT MARKINGS (LINE-1) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

2.029 0.050 1.979 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 44: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 44 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.136 STBG FLEX 0.136 DETLDES2020DETLDES 0.034 0.034 2020NFA

0.400 STBG FLEX 0.400 ROWACQU2020ROWACQU 0.100 0.100 2020NFA

0.056 0.056 CONINSPNHPP 2021CONINSP 0.014 0.014 2021NFA

0.469 0.469 CONSTNHPP 2021CONST 0.117 0.117 2021NFA

0.225 0.225 CONINSPSTBG FLEX 2021CONINSP 0.056 0.056 2021NFA

1.877 1.877 CONSTSTBG FLEX 2021CONST 0.469 0.469 2021NFA

0.169 0.169 CONINSPSTBG-OFF 2021CONINSP 0.042 0.042 2021NFA

1.408 1.408 CONSTSTBG-OFF 2021CONST 0.352 0.352 2021NFA

NYSDOT

581268

BRIDGE REPAIRS (BIN 6600180) & REPAIR/REPLACE LARGE CULVERTS (C540135, C510207, & C510225) IN THE TOWNS OF COLD SPRING, ALLEGANY, SALAMANCA, AND PERRYSBURG, AND THE CITY OF SALAMANCA IN CATTARAUGUS COUNTY AND SNI TERRITORY

5.924 0.670 5.254 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $4.6-$7.5 M

0.249 NHPP 0.249 CONINSP2020CONINSP 0.063 0.063 2020NFA

2.491 NHPP 2.491 CONST2020CONST 0.635 0.635 2020NFA

NYSDOT

581269

BR MBC & PRESERVATION PROGRAM; REHAB OF BINS 1092021, 1092022, 1071071, 1011072, 1071081 & 1071082; CATTARAUGUS & ERIE COUNTIES

3.438 3.438 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.044 NHPP 0.044 CONINSP2020CONINSP 0.011 0.011 2020NFA

0.370 NHPP 0.370 CONST2020CONST 0.092 0.092 2020NFA

0.044 STBG FLEX 0.044 CONINSP2020CONINSP 0.011 0.011 2020NFA

0.370 STBG FLEX 0.370 CONST2020CONST 0.092 0.092 2020NFA

NYSDOT

581271

PAVT MARKINGS (REQ) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA COS

1.034 1.034 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 45: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 45 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.114 NHPP 0.114 DETLDES2020DETLDES 0.029 0.029 2020NFA

0.022 NHPP 0.022 PRELDES2020PRELDES 0.006 0.006 2020NFA

0.049 STBG FLEX 0.049 DETLDES2020DETLDES 0.012 0.012 2020NFA

0.010 STBG FLEX 0.010 PRELDES2020PRELDES 0.002 0.002 2020NFA

0.016 STBG FLEX 0.016 ROWINCD2020ROWINCD 0.004 0.004 2020NFA

0.147 0.147 ROWACQUSTBG FLEX 2021ROWACQU 0.037 0.037 2021NFA

0.149 0.149 CONINSPNHPP 2022CONINSP 0.037 0.037 2022NFA

1.240 1.240 CONSTNHPP 2022CONST 0.310 0.310 2022NFA

0.070 0.070 CONINSPSTBG FLEX 2022CONINSP 0.018 0.018 2022NFA

0.582 0.582 CONSTSTBG FLEX 2022CONST 0.146 0.146 2022NFA

NYSDOT

581274

SIGNAL REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COUNTIES

3.000 0.264 0.184 2.552 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.041 STBG FLEX 0.041 DETLDES2020DETLDES 0.010 0.010 2020NFA

0.040 STBG FLEX 0.040 PRELDES2020PRELDES 0.010 0.010 2020NFA

0.008 STBG FLEX 0.008 ROWACQU2020ROWACQU 0.002 0.002 2020NFA

0.004 STBG FLEX 0.004 ROWINCD2020ROWINCD 0.001 0.001 2020NFA

0.077 0.077 CONINSPNHPP 2022CONINSP 0.019 0.019 2022NFA

0.640 0.640 CONSTNHPP 2022CONST 0.160 0.160 2022NFA

0.070 0.070 CONINSPSTBG FLEX 2022CONINSP 0.018 0.018 2022NFA

0.584 0.584 CONSTSTBG FLEX 2022CONST 0.146 0.146 2022NFA

NYSDOT

581276

SMALL CULVERT MAINTENANCE AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS ON NY 242, NY 83, NY 240, NY 104, & NY 270; TOWNS OF LITTLE VALLEY, MANSFIELD, ELLINGTON, VILLENOVA, COLDEN, AURORA, LEWISTON, LOCKPORT, & CAMBRIA; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA COS

1.830 0.116 0.000 1.714 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 46: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 46 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.065 NHPP 0.065 DETLDES2020DETLDES 0.016 0.016 2020NFA

0.008 NHPP 0.008 PRELDES2020PRELDES 0.002 0.002 2020NFA

0.095 0.095 CONINSPNHPP 2021CONINSP 0.024 0.024 2021NFA

0.790 0.790 CONSTNHPP 2021CONST 0.198 0.198 2021NFA

NYSDOT

581277

OVERHEAD SIGN STRUCTURES & SIGN PANEL PROGRAM; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA CO

1.198 0.091 1.107 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.061 NHPP 0.061 DETLDES2020DETLDES 0.015 0.015 2020NFA

0.012 NHPP 0.012 PRELDES2020PRELDES 0.003 0.003 2020NFA

0.020 STBG FLEX 0.020 DETLDES2020DETLDES 0.005 0.005 2020NFA

0.004 STBG FLEX 0.004 PRELDES2020PRELDES 0.001 0.001 2020NFA

0.075 0.075 CONINSPNHPP 2021CONINSP 0.019 0.019 2021NFA

0.624 0.624 CONSTNHPP 2021CONST 0.156 0.156 2021NFA

0.025 0.025 CONINSPSTBG FLEX 2021CONINSP 0.006 0.006 2021NFA

0.208 0.208 CONSTSTBG FLEX 2021CONST 0.052 0.052 2021NFA

NYSDOT

581278

GUIDERAIL REPLACEMENT; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA CO

1.286 0.121 1.165 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.160 NHPP 0.160 DETLDES2020DETLDES 0.040 0.040 2020NFA

0.047 0.047 CONINSPNHPP 2021CONINSP 0.012 0.012 2021NFA

0.396 0.396 CONSTNHPP 2021CONST 0.099 0.099 2021NFA

NYSDOT

581292

SAFETY ENHANCEMENTS FOR INTELLIGENT TRANSPORTATION SYSTEM (ITS) INFRASTRUCTURE WITHIN THE ROUTE 33, ROUTE 198, I-290, AND I-990 CORRIDORS IN ERIE COUNTY. WORK WILL INCLUDE BRINGING EXISTING POWER UP TO CURRENT ELECTRICAL CODE AND IMPROVING SITE SAFETY.

0.754 0.200 0.554 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

Page 47: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 47 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.086 HSIP 0.086 CONINSP2020CONINSP 0.010 0.010 2020NFA

0.719 HSIP 0.719 CONST2020CONST 0.080 0.080 2020NFA

0.266 NHPP 0.266 CONINSP2020CONINSP 0.067 0.067 2020NFA

2.214 NHPP 2.214 CONST2020CONST 0.553 0.553 2020NFA

NYSDOT

581300

MILL & OVERLAY OF RT 5 FROM RT 62 TO I290; CITY OF BUFFALO; TOWN OF AMHERST; ERIE COUNTY. THIS PROJECT INCLUDES COUNT DOWN TIMERS, AUDBLE PEDESTRIAN SIGNAL AND CURB EXTENSION CONSTRUCTION PER THE PSAP.

3.995 3.995 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.128 NHPP 0.128 DETLDES2020DETLDES 0.032 0.032 2020NFA

0.032 STBG FLEX 0.032 DETLDES2020DETLDES 0.008 0.008 2020NFA

0.089 STBG FLEX 0.089 ROWACQU2020ROWACQU 0.022 0.022 2020NFA

0.051 STBG FLEX 0.051 ROWINCD2020ROWINCD 0.013 0.013 2020NFA

0.162 0.162 CONINSPNHPP 2021CONINSP 0.042 0.042 2021NFA

1.353 1.353 CONSTNHPP 2021CONST 0.345 0.345 2021NFA

0.049 0.049 CONINSPSTBG FLEX 2021CONINSP 0.012 0.012 2021NFA

0.408 0.408 CONSTSTBG FLEX 2021CONST 0.104 0.104 2021NFA

NYSDOT

581307

ADA COMPLIANCE PROJECT; THIS PROJECT WILL IMPROVE PEDESTRIAN MOBILITY BY BRINGING VARIOUS LOCATIONS IN THE TOWNS OF ORCHARD PARK, TONAWANDA, AMHERST, FREDONIA, CITY OF NIAGARA FALLS, AND THE HAMLET OF RANSOMVILLE IN THE COUNTIES OF CATTARAUGUS, CHAUTAUQUA, ERIE, AND NIAGARA INTO COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA) REQUIREMENTS FOR ACCESSIBILITY. THE WORK WILL INCLUDE CURB RAMP INSTALLATIONS/UPGRADES, PEDESTRIAN SIGNAL UPGRADES, AND SIDEWALK RECONSTRUCTION AS NEEDED.

2.850 0.375 2.475 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.048 0.048 DETLDESSTBG FLEX 2021DETLDES 0.012 0.012 2021NFA

0.075 0.075 CONINSPNHPP 2022CONINSP 0.019 0.019 2022NFA

0.624 0.624 CONSTNHPP 2022CONST 0.156 0.156 2022NFA

0.025 0.025 CONINSPSTBG FLEX 2022CONINSP 0.006 0.006 2022NFA

0.208 0.208 CONSTSTBG FLEX 2022CONST 0.052 0.052 2022NFA

NYSDOT

581308

BRIDGE CLEANING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, EREI & NIAGARA COUNTIES

1.225 0.000 0.060 1.165 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 48: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 48 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.067 0.067 DETLDESNHPP 2021DETLDES 0.017 0.017 2021NFA

0.065 0.065 PRELDESNHPP 2021PRELDES 0.016 0.016 2021NFA

0.017 0.017 DETLDESSTBG FLEX 2021DETLDES 0.004 0.004 2021NFA

0.016 0.016 PRELDESSTBG FLEX 2021PRELDES 0.004 0.004 2021NFA

0.250 0.250 CONINSPNHPP 2022CONINSP 0.062 0.062 2022NFA

2.080 2.080 CONSTNHPP 2022CONST 0.520 0.520 2022NFA

0.050 0.050 CONINSPSTBG FLEX 2022CONINSP 0.012 0.012 2022NFA

0.416 0.416 CONSTSTBG FLEX 2022CONST 0.104 0.104 2022NFA

NYSDOT

581309

BRIDGE PAINTING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COUNTIES

3.700 0.000 0.206 3.494 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.113 NHPP 0.113 CONINSP2020CONINSP 0.028 0.028 2020NFA

0.941 NHPP 0.941 CONST2020CONST 0.235 0.235 2020NFA

0.108 NHPP 0.108 DETLDES2020DETLDES 0.027 0.027 2020NFA

NYSDOT

581310

LG CULVERT REPLACEMENTS ON US 20A & US 62; TOWNS OF EDEN & ORCHARD PARK; ERIE COUNTY

1.452 1.452 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

Page 49: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 49 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.041 STBG FLEX 0.041 ROWINCD2020ROWINCD 0.010 0.010 2020NFA

0.101 0.101 DETLDESNHPP 2021DETLDES 0.026 0.026 2021NFA

0.028 0.028 DETLDESSTBG FLEX 2021DETLDES 0.007 0.007 2021NFA

0.204 0.204 ROWACQUSTBG FLEX 2021ROWACQU 0.051 0.051 2021NFA

0.216 0.216 CONINSPNHPP 2022CONINSP 0.054 0.054 2022NFA

1.816 1.816 CONSTNHPP 2022CONST 0.454 0.454 2022NFA

0.041 0.041 CONINSPSTBG FLEX 2022CONINSP 0.009 0.009 2022NFA

0.333 0.333 CONSTSTBG FLEX 2022CONST 0.083 0.083 2022NFA

NYSDOT

581311

LARGE CULVERT REPAIRS & REPLACEMENTS. THIS PROJECT WILL REPLACE OR REPAIR LARGE CULVERTS AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS ON NY RTS 18, 93 & 277, US RTS 219 & 20, AND I-990, IN ERIE AND NIAGARA COUNTIES.

3.474 0.051 0.417 3.006 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.052 NHPP 0.052 DETLDES2020DETLDES 0.013 0.013 2020NFA

0.004 NHPP 0.004 PRELDES2020PRELDES 0.001 0.001 2020NFA

0.011 STBG FLEX 0.011 DETLDES2020DETLDES 0.003 0.003 2020NFA

0.002 STBG FLEX 0.002 PRELDES2020PRELDES 0.001 0.001 2020NFA

0.053 0.053 CONINSPNHPP 2021CONINSP 0.013 0.013 2021NFA

0.439 0.439 CONSTNHPP 2021CONST 0.109 0.109 2021NFA

0.029 0.029 CONINSPSTBG FLEX 2021CONINSP 0.007 0.007 2021NFA

0.235 0.235 CONSTSTBG FLEX 2021CONST 0.058 0.058 2021NFA

NYSDOT

581312

PAVT MARKINGS (REQ) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.030 0.087 0.943 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 50: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 50 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.025 0.025 DETLDESNHPP 2021DETLDES 0.006 0.006 2021NFA

0.005 0.005 PRELDESNHPP 2021PRELDES 0.001 0.001 2021NFA

0.017 0.017 DETLDESSTBG FLEX 2021DETLDES 0.004 0.004 2021NFA

0.003 0.003 PRELDESSTBG FLEX 2021PRELDES 0.001 0.001 2021NFA

0.062 0.062 CONINSPNHPP 2022CONINSP 0.016 0.016 2022NFA

0.520 0.520 CONSTNHPP 2022CONST 0.130 0.130 2022NFA

0.037 0.037 CONINSPSTBG FLEX 2022CONINSP 0.009 0.009 2022NFA

0.312 0.312 CONSTSTBG FLEX 2022CONST 0.078 0.078 2022NFA

NYSDOT

581313

PAVT MARKINGS (REQ) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.226 0.000 0.062 1.164 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.180 0.180 CONINSPNHPP 2021CONINSP 0.045 0.045 2021NFA

1.498 1.498 CONSTNHPP 2021CONST 0.374 0.374 2021NFA

0.029 0.029 DETLDESNHPP 2021DETLDES 0.007 0.007 2021NFA

0.014 0.014 PRELDESNHPP 2021PRELDES 0.003 0.003 2021NFA

0.080 0.080 CONINSPSTBG FLEX 2021CONINSP 0.020 0.020 2021NFA

0.666 0.666 CONSTSTBG FLEX 2021CONST 0.166 0.166 2021NFA

0.012 0.012 DETLDESSTBG FLEX 2021DETLDES 0.003 0.003 2021NFA

0.006 0.006 PRELDESSTBG FLEX 2021PRELDES 0.002 0.002 2021NFA

NYSDOT

581314

PAVT MARKINGS (LINE-2) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS

3.105 0.000 3.105 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 51: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 51 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.024 0.024 DETLDESSTBG FLEX 2021DETLDES 0.006 0.006 2021NFA

0.050 0.050 CONINSPSTBG FLEX 2022CONINSP 0.012 0.012 2022NFA

0.416 0.416 CONSTSTBG FLEX 2022CONST 0.104 0.104 2022NFA

0.051 0.051 CONINSPSTBG FLEX 2023CONINSP 0.013 0.013 2023NFA

0.424 0.424 CONSTSTBG FLEX 2023CONST 0.106 0.106 2023NFA

NYSDOT

581318

BRIDGE JOC AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.206 0.000 0.030 0.582 0.594 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.032 NHPP 0.032 DETLDES2020DETLDES 0.008 0.008 2020NFA

0.008 NHPP 0.008 PRELDES2020PRELDES 0.002 0.002 2020NFA

0.039 0.039 CONINSPNHPP 2021CONINSP 0.010 0.010 2021NFA

0.326 0.326 CONSTNHPP 2021CONST 0.082 0.082 2021NFA

NYSDOT

581319

ITS SYSTEM REHABILITATION; RT 33, RT 198, I-290 & I-990; TOWNS OF AMHERST, CHEEKTOWAGA, & TONAWANDA; CITY OF BUFFALO; ERIE CO

0.507 0.050 0.457 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.032 NHPP 0.032 DETLDES2020DETLDES 0.008 0.008 2020NFA

0.008 NHPP 0.008 PRELDES2020PRELDES 0.002 0.002 2020NFA

0.040 0.040 CONINSPNHPP 2021CONINSP 0.010 0.010 2021NFA

0.333 0.333 CONSTNHPP 2021CONST 0.083 0.083 2021NFA

NYSDOT

581320

ITS SYSTEM REHABILITATION AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS

0.516 0.050 0.466 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 52: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 52 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.294 NHPP 0.294 DETLDES2020DETLDES 0.073 0.073 2020NFA

0.098 STBG FLEX 0.098 DETLDES2020DETLDES 0.024 0.024 2020NFA

0.032 STBG FLEX 0.032 PRELDES2020PRELDES 0.008 0.008 2020NFA

0.334 0.334 CONINSPNHPP 2021CONINSP 0.084 0.084 2021NFA

2.778 2.778 CONSTNHPP 2021CONST 0.695 0.695 2021NFA

0.069 0.069 CONINSPSTBG FLEX 2021CONINSP 0.017 0.017 2021NFA

0.571 0.571 CONSTSTBG FLEX 2021CONST 0.143 0.143 2021NFA

NYSDOT

581321

BRIDGE MBC & PRESERVATION PROGRAM; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA CO

5.220 0.529 4.691 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.279 STBG FLEX 0.279 DETLDES2020DETLDES 0.070 0.070 2020NFA

0.023 STBG FLEX 0.023 PRELDES2020PRELDES 0.006 0.006 2020NFA

0.211 0.211 CONINSPNHPP 2021CONINSP 0.054 0.054 2021NFA

1.763 1.763 CONSTNHPP 2021CONST 0.449 0.449 2021NFA

0.068 0.068 CONINSPSTBG FLEX 2021CONINSP 0.018 0.018 2021NFA

0.571 0.571 CONSTSTBG FLEX 2021CONST 0.146 0.146 2021NFA

NYSDOT

581322

BRIDGE MBC & PRESERVATION PROGRAM; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA CO

3.658 0.378 3.280 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 53: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 53 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.028 STBG FLEX 0.028 PRELDES2020PRELDES 0.007 0.007 2020NFA

0.208 0.208 DETLDESNHPP 2021DETLDES 0.052 0.052 2021NFA

0.064 0.064 DETLDESSTBG FLEX 2021DETLDES 0.016 0.016 2021NFA

0.219 0.219 CONINSPNHPP 2022CONINSP 0.055 0.055 2022NFA

1.830 1.830 CONSTNHPP 2022CONST 0.458 0.458 2022NFA

0.077 0.077 CONINSPSTBG FLEX 2022CONINSP 0.019 0.019 2022NFA

0.639 0.639 CONSTSTBG FLEX 2022CONST 0.160 0.160 2022NFA

NYSDOT

581323

BRIDGE MBC & PRESERVATION PROGRAM; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA CO

3.832 0.035 0.340 3.457 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.032 STBG FLEX 0.032 PRELDES2020PRELDES 0.008 0.008 2020NFA

0.300 0.300 DETLDESNHPP 2021DETLDES 0.075 0.075 2021NFA

0.100 0.100 DETLDESSTBG FLEX 2021DETLDES 0.025 0.025 2021NFA

0.369 0.369 CONINSPNHPP 2022CONINSP 0.093 0.093 2022NFA

3.078 3.078 CONSTNHPP 2022CONST 0.770 0.770 2022NFA

0.080 0.080 CONINSPSTBG FLEX 2022CONINSP 0.020 0.020 2022NFA

0.666 0.666 CONSTSTBG FLEX 2022CONST 0.166 0.166 2022NFA

NYSDOT

581324

BRIDGE MBC & PRESERVATION PROGRAM IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COUNTIES

5.782 0.040 0.500 5.242 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 54: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 54 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.122 NHPP 0.122 DETLDES2020DETLDES 0.031 0.031 2020NFA

0.021 0.021 CONINSPHSIP 2021CONINSP 0.002 0.002 2021NFA

0.171 0.171 CONSTHSIP 2021CONST 0.019 0.019 2021NFA

0.198 0.198 CONINSPNHPP 2021CONINSP 0.051 0.051 2021NFA

1.650 1.650 CONSTNHPP 2021CONST 0.421 0.421 2021NFA

NYSDOT

581343

PMI - RESURFACING OF RT 417 RT 353 - RT 219 & RT 219; RT 417 - SALAMANCA NCL IN THE CITY OF SALAMANCA AND THE SNI ALLEGANY TERRITORY IN CATTARAUGUS COUNTY. WORK INCLUDES DRAINAGE STRUCTURE REPAIRS AND REPLACEMENT OF NON-COMPLIANT ADA CURB RAMPS AS NEEDED. ADDITIONALLY, ONE SIGNAL WILL BE MODIFIED WITHIN THE PROJECT LIMITS TO INCLUDE INSTALLATION OF PED BUTTONS/SIGNALS, COUNTDOWN TIMERS AND BACK PLATES. THE WORK IN THIS PROJECT HAS BEEN REVIEWED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND USE OF HSIP FUNDS FOR THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL TRAFFIC ENGINEER.

2.686 0.153 2.533 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : $2-$4 M

0.134 STBG LG URB 0.134 DETLDES2020DETLDES 0.034 0.034 2020NFA

0.446 0.446 CONSTHPP 2021CONST 0.112 0.112 2021NFA

0.029 0.029 CONINSPHSIP 2021CONINSP 0.003 0.003 2021NFA

0.239 0.239 CONSTHSIP 2021CONST 0.027 0.027 2021NFA

0.208 0.208 CONINSPSTBG LG URB 2021CONINSP 0.052 0.052 2021NFACONINSP 0.048 0.048 2021NFA

1.285 1.285 CONSTSTBG LG URB 2021CONST 0.321 0.321 2021NFACONST 0.402 0.402 2021NFA

NYSDOT

581348

PMI - MILL AND RESURFACE NIAGARA STREET, FROM 1ST ST TO JOHN B DALY BLVD, AND JOHN B DALY BLVD, FROM BUFFALO AVE TO NIAGARA ST, IN THE CITY OF NIAGARA FALLS, NIAGARA COUNTY. WORK WILL ALSO INCLUDE RECONSTRUCTION OF PEDESTRIAN CURB RAMPS AND CROSSWALKS ALONG NIAGARA STREET AND UPGRADING PEDESTRIAN SIGNALS TO BRING THEM INTO ADA COMPLIANCE, WHERE NEEDED. AFTER PAVING, ALL IMPACTED SIGNAL LOOPS WILL BE REPLACED AND PAVEMENT MARKINGS (INCLUDING CROSSWALKS) WILL BE REPLACED TO CURRENT STANDARDS. THE WORK IN THIS PROJECT HAS BEEN REVIEWED BY THE REGIONAL SAFETY EVALUATION ENGINEER AND USE OF HSIP FUNDS FOR THIS PROJECT HAS BEEN APPROVED BY THE REGIONAL TRAFFIC ENGINEER. TRANSFERRED EARMARKS: NY052 (PROGRAM CODE RNZ1), AND NY290 & NY607 (PROGRAM CODE RPS1).

5.139 0.168 4.971 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $4.6-$7.5 M

0.013 HSIP 0.013 CONINSP2020CONINSP 0.001 0.001 2020NFA

0.108 HSIP 0.108 CONST2020CONST 0.012 0.012 2020NFA

0.141 NHPP 0.141 CONINSP2020CONINSP 0.035 0.035 2020NFA

1.172 NHPP 1.172 CONST2020CONST 0.293 0.293 2020NFA

0.079 NHPP 0.079 DETLDES2020DETLDES 0.020 0.020 2020NFA

NYSDOT

581359

PMI - MILL AND RESURFACE NY 265 (MILITARY RD); US 62 (NIAGARA FALLS BLVD) TO NY 182 (PACKARD RD) IN THE TOWN OF NIAGARA AND CITY OF NIAGARA FALLS, NIAGARA COUNTY. NHPP FUNDING WILL BE USED FOR THE MILL AND RESURFACING AS WELL AS DRAINAGE STRUCTURE MAINTENANCE AND CORRIDOR SIGN REPLACEMENTS. HSIP FUNDING WILL BE USED TO PERFORM TRAFFIC SIGNAL REPAIRS AND PEDESTRIAN SIGNAL UPGRADES AS NEEDED AT FEDERAL AID ELIGIBLE LOCATIONS. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK THAT IS USING HSIP FUNDING.

1.874 1.874 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $1.2-$2.5 M

Page 55: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 55 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.017 HSIP 0.017 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.140 HSIP 0.140 CONST2020CONST 0.016 0.016 2020NFA

0.155 STBG LG URB 0.155 CONINSP2020CONINSP 0.040 0.040 2020NFA

1.292 STBG LG URB 1.292 CONST2020CONST 0.329 0.329 2020NFA

0.084 STBG LG URB 0.084 DETLDES2020DETLDES 0.021 0.021 2020NFA

NYSDOT

581360

PMI - RT 952A (GENESEE ST); BUFFALO CITY LINE TO I-90 (BIN 1023160); TOWN OF CHEEKTOWAGA, ERIE COUNTY. HSIP FUNDING WILL BE USED TO PERFORM TRAFFIC SIGNAL REPAIRS AND PEDESTRIAN SIGNAL UPGRADES AS NEEDED AT FEDERAL AID ELIGIBLE LOCATIONS. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

2.096 2.096 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

0.074 NHPP 0.074 DETLDES2020DETLDES 0.018 0.018 2020NFA

0.028 0.028 CONINSPHSIP 2021CONINSP 0.003 0.003 2021NFA

0.234 0.234 CONSTHSIP 2021CONST 0.026 0.026 2021NFA

0.803 0.803 CONINSPNHFP 2021CONINSP 0.201 0.201 2021NFA

6.697 6.697 CONSTNHFP 2021CONST 1.674 1.674 2021NFA

0.103 0.103 CONINSPNHPP 2021CONINSP 0.026 0.026 2021NFA

0.862 0.862 CONSTNHPP 2021CONST 0.215 0.215 2021NFA

NYSDOT

581361

THE PROJECT WILL MILL AND RESURFACE NY ROUTE 78 (TRANSIT ROAD), FROM FRENCH ROAD TO WEHRLE DRIVE, IN THE TOWNS OF AMHERST, CHEEKTOWAGA, CLARENCE AND LANCASTER AND VILLAGE OF DEPEW, ERIE COUNTY. WORK WILL INCLUDE THE CONSTRUCTION OF A NEW TRAVEL LANE FROM THE I-90 INTERCHANGE @ RT 78 TO RT 33 (GENESEE STREET). NON-COMPLIANT ADA CURB RAMPS AND CROSSWALKS WILL BE REPLACED AS NEEDED. DRAINAGE STRUCTURE MAINTENANCE, CORRIDOR SIGN REPLACEMENT, TRAFFIC SIGNAL REPAIRS, AND PEDESTRIAN SIGNAL UPGRADES WILL ALSO BE COMPLETED AS NECESSARY.. HSIP FUNDING WILL BE USED TO PERFORM TRAFFIC SIGNAL REPAIRS AND PEDESTRIAN SIGNAL UPGRADES AS NEEDED AT FEDERAL AID ELIGIBLE LOCATIONS. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

10.964 0.092 10.872 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $9.5-15.5 M

Page 56: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 56 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.110 NHPP 0.110 DETLDES2020DETLDES 0.028 0.028 2020NFA

0.160 NHPP 0.160 ROWACQU2020ROWACQU 0.040 0.040 2020NFA

0.046 0.046 CONINSPHSIP 2021CONINSP 0.005 0.005 2021NFA

0.380 0.380 CONSTHSIP 2021CONST 0.042 0.042 2021NFA

0.218 0.218 CONINSPNHPP 2021CONINSP 0.054 0.054 2021NFA

1.814 1.814 CONSTNHPP 2021CONST 0.454 0.454 2021NFA

NYSDOT

581362

PMI - US 20/NY 78 (TRANSIT RD); FRENCH RD (BIN 1015550) TO NY 130 (BROADWAY, BIN 1015560) IN THE TOWNS OF CHEEKTOWAGA & LANCASTER AND VILLAGE OF DEPEW; ERIE COUNTY. HSIP FUNDING WILL BE USED TO PERFORM TRAFFIC SIGNAL REPAIRS AND PEDESTRIAN SIGNAL UPGRADES AS NEEDED AT FEDERAL AID ELIGIBLE LOCATIONS. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

3.351 0.338 3.013 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.029 HSIP 0.029 CONINSP2020CONINSP 0.003 0.003 2020NFA

0.243 HSIP 0.243 CONST2020CONST 0.027 0.027 2020NFACONST 1.534 1.534 2020NFA

0.465 NHPP 0.465 CONINSP2020CONINSP 0.116 0.116 2020NFA

3.873 NHPP 3.873 CONST2020CONST 0.968 0.968 2020NFA

0.238 NHPP 0.238 DETLDES2020DETLDES 0.060 0.060 2020NFA

NYSDOT

581363

PMI - NY 5; BIG TREE RD TO KANE ST IN THE CITY OF LACKAWANNA AND THE TOWN OF HAMBURG, ERIE COUNTY. HSIP FUNDING WILL BE USED TO PERFORM TRAFFIC SIGNAL REPAIRS AND PEDESTRIAN SIGNAL UPGRADES AS NEEDED AT FEDERAL AID ELIGIBLE LOCATIONS. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

7.556 7.556 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $6-$9.4 M

Page 57: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 57 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.014 HSIP 0.014 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.119 HSIP 0.119 CONST2020CONST 0.013 0.013 2020NFA

0.094 NHPP 0.094 CONINSP2020CONINSP 0.023 0.023 2020NFA

0.781 NHPP 0.781 CONST2020CONST 0.195 0.195 2020NFA

0.122 STBG FLEX 0.122 CONINSP2020CONINSP 0.031 0.031 2020NFA

1.018 STBG FLEX 1.018 CONST2020CONST 0.255 0.255 2020NFA

0.090 STBG FLEX 0.090 DETLDES2020DETLDES 0.022 0.022 2020NFA

NYSDOT

581364

THE PROJECT WILL MILL AND RESURFACE US ROUTE 20, FROM NY ROUTE 394 TO PROSPECT ROAD, IN THE VILLAGE OF WESTFIELD AND NY ROUTE 83, FROM THE VILLAGE OF CHERRY CREEK SOUTH VILLAGE LINE TO THE NORTH VILLAGE LINE, IN CHAUTAUQUA COUNTY. NON-COMPLIANT ADA CURB RAMPS AND CROSSWALKS WILL BE REPLACED AS NEEDED, DRAINAGE STRUCTURE MAINTENANCE WILL BE COMPLETED AS NECESSARY AND COMPLETE STREETS FEATURES WILL BE CONSIDERED. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THIS WORK.

2.779 2.779 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :CHAUTAUQUA TPC : $2-$4 M

0.127 NHPP 0.127 DETLDES2020DETLDES 0.032 0.032 2020NFA

0.026 0.026 CONINSPHSIP 2021CONINSP 0.003 0.003 2021NFA

0.216 0.216 CONSTHSIP 2021CONST 0.024 0.024 2021NFA

0.199 0.199 CONINSPNHPP 2021CONINSP 0.050 0.050 2021NFA

1.654 1.654 CONSTNHPP 2021CONST 0.414 0.414 2021NFA

NYSDOT

581365

THE PROJECT WILL MILL AND RESURFACE NY ROUTE 417 (BROAD STREET), FROM WEST OF NY ROUTE 353 (CENTER STREET) TO MAIN STREET, IN THE CITY OF SALAMANCA AND SENECA NATION OF INDIANS ALLEGANY TERRITORY, CATTARAUGUS COUNTY. NON-COMPLIANT ADA CURB RAMPS AND CROSSWALKS WILL BE REPLACED AS NEEDED. DRAINAGE STRUCTURE MAINTENANCE, CORRIDOR SIGN REPLACEMENT, TRAFFIC SIGNAL REPAIRS, AND PEDESTRIAN SIGNAL UPGRADES WILL BE COMPLETED AS NECESSARY. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED WORK.

2.745 0.159 2.586 0.000 0.000 AQC:A10 TOTAL 4YR COST :CATTARAUGUS TPC : $2-$4 M

Page 58: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 58 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.023 HSIP 0.023 CONINSP2020CONINSP 0.003 0.003 2020NFA

0.191 HSIP 0.191 CONST2020CONST 0.021 0.021 2020NFA

0.133 NHPP 0.133 CONINSP2020CONINSP 0.034 0.034 2020NFA

1.107 NHPP 1.107 CONST2020CONST 0.276 0.276 2020NFA

0.036 STBG FLEX 0.036 CONINSP2020CONINSP 0.009 0.009 2020NFA

0.301 STBG FLEX 0.301 CONST2020CONST 0.075 0.075 2020NFA

0.090 STBG FLEX 0.090 DETLDES2020DETLDES 0.022 0.022 2020NFA

NYSDOT

581366

PMI - RT 265 (RIVER RD); ERIE CO LINE - FELTON ST; CITY OF NORTH TONAWANDA, NIAGARA COUNTY. HSIP FUNDING WILL BE USED TO PERFORM TRAFFIC SIGNAL REPAIRS AND PEDESTRIAN SIGNAL UPGRADES AS NEEDED AT FEDERAL AID ELIGIBLE LOCATIONS. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

2.321 2.321 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $2-$4 M

0.094 0.094 DETLDESNHPP 2021DETLDES 0.023 0.023 2021NFA

0.018 0.018 PRELDESNHPP 2021PRELDES 0.004 0.004 2021NFA

0.005 0.005 DETLDESSTBG FLEX 2021DETLDES 0.001 0.001 2021NFA

0.002 0.002 PRELDESSTBG FLEX 2021PRELDES 0.001 0.001 2021NFA

0.218 0.218 CONINSPNHPP 2022CONINSP 0.054 0.054 2022NFA

1.828 1.828 CONSTNHPP 2022CONST 0.457 0.457 2022NFA

0.006 0.006 CONINSPSTBG FLEX 2022CONINSP 0.002 0.002 2022NFA

0.056 0.056 CONSTSTBG FLEX 2022CONST 0.015 0.015 2022NFA

NYSDOT

581367

ADA COMPLIANCE PROJECT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS; CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS

2.784 0.000 0.148 2.636 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 59: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 59 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.040 STBG FLEX 0.040 PRELDES2020PRELDES 0.010 0.010 2020NFA

0.041 0.041 DETLDESSTBG FLEX 2021DETLDES 0.010 0.010 2021NFA

0.008 0.008 ROWACQUSTBG FLEX 2021ROWACQU 0.002 0.002 2021NFA

0.004 0.004 ROWINCDSTBG FLEX 2021ROWINCD 0.001 0.001 2021NFA

0.051 0.051 CONINSPNHPP 2022CONINSP 0.013 0.013 2022NFA

0.424 0.424 CONSTNHPP 2022CONST 0.106 0.106 2022NFA

0.051 0.051 CONINSPSTBG FLEX 2022CONINSP 0.013 0.013 2022NFA

0.424 0.424 CONSTSTBG FLEX 2022CONST 0.106 0.106 2022NFA

NYSDOT

581370

SMALL CULVERT MAINTENANCE AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.304 0.050 0.066 1.188 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.042 0.042 DETLDESNHPP 2021DETLDES 0.010 0.010 2021NFA

0.008 0.008 PRELDESNHPP 2021PRELDES 0.002 0.002 2021NFA

0.030 0.030 CONINSPNHPP 2022CONINSP 0.008 0.008 2022NFA

0.254 0.254 CONSTNHPP 2022CONST 0.064 0.064 2022NFA

NYSDOT

581371

OVERHEAD SIGN STRUCTURES AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.418 0.000 0.062 0.356 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 60: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 60 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.062 0.062 DETLDESNHPP 2021DETLDES 0.016 0.016 2021NFA

0.012 0.012 PRELDESNHPP 2021PRELDES 0.003 0.003 2021NFA

0.021 0.021 DETLDESSTBG FLEX 2021DETLDES 0.005 0.005 2021NFA

0.004 0.004 PRELDESSTBG FLEX 2021PRELDES 0.001 0.001 2021NFA

0.076 0.076 CONINSPNHPP 2022CONINSP 0.019 0.019 2022NFA

0.636 0.636 CONSTNHPP 2022CONST 0.159 0.159 2022NFA

0.025 0.025 CONINSPSTBG FLEX 2022CONINSP 0.006 0.006 2022NFA

0.212 0.212 CONSTSTBG FLEX 2022CONST 0.053 0.053 2022NFA

NYSDOT

581372

GUIDERAIL REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.310 0.000 0.124 1.186 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.079 NHPP 0.079 PRELDES2020PRELDES 0.019 0.019 2020NFA

0.019 STBG FLEX 0.019 PRELDES2020PRELDES 0.005 0.005 2020NFA

0.042 0.042 ROWINCDSTBG FLEX 2021ROWINCD 0.010 0.010 2021NFA

0.239 0.239 DETLDESNHPP 2022DETLDES 0.060 0.060 2022NFA

0.060 0.060 DETLDESSTBG FLEX 2022DETLDES 0.015 0.015 2022NFA

0.250 0.250 ROWACQUSTBG FLEX 2022ROWACQU 0.062 0.062 2022NFA

0.305 0.305 CONINSPNHPP 2023CONINSP 0.076 0.076 2023NFA

2.544 2.544 CONSTNHPP 2023CONST 0.636 0.636 2023NFA

0.061 0.061 CONINSPSTBG FLEX 2023CONINSP 0.015 0.015 2023NFA

0.509 0.509 CONSTSTBG FLEX 2023CONST 0.127 0.127 2023NFA

NYSDOT

581373

LARGE CULVERT PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

5.133 0.122 0.052 0.686 4.273 AQC:N/A TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 61: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 61 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.033 0.033 DETLDESNHPP 2021DETLDES 0.008 0.008 2021NFA

0.008 0.008 PRELDESNHPP 2021PRELDES 0.002 0.002 2021NFA

0.040 0.040 CONINSPNHPP 2022CONINSP 0.011 0.011 2022NFA

0.339 0.339 CONSTNHPP 2022CONST 0.085 0.085 2022NFA

NYSDOT

581374

ITS SYSTEM REHABILITATION AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.526 0.000 0.051 0.475 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.050 0.050 PRELDESSTBG FLEX 2021PRELDES 0.012 0.012 2021NFA

0.407 0.407 DETLDESSTBG FLEX 2022DETLDES 0.102 0.102 2022NFA

0.305 0.305 CONINSPNHPP 2023CONINSP 0.076 0.076 2023NFA

2.544 2.544 CONSTNHPP 2023CONST 0.636 0.636 2023NFA

0.102 0.102 CONINSPSTBG FLEX 2023CONINSP 0.025 0.025 2023NFA

0.848 0.848 CONSTSTBG FLEX 2023CONST 0.212 0.212 2023NFA

NYSDOT

581375

BRIDGE MBC & PRESERVATION PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

5.319 0.000 0.062 0.509 4.748 AQC:N/A TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.051 0.051 DETLDESSTBG FLEX 2022DETLDES 0.013 0.013 2022NFA

0.008 0.008 PRELDESSTBG FLEX 2022PRELDES 0.002 0.002 2022NFA

0.076 0.076 CONINSPNHPP 2023CONINSP 0.019 0.019 2023NFA

0.636 0.636 CONSTNHPP 2023CONST 0.159 0.159 2023NFA

0.025 0.025 CONINSPSTBG FLEX 2023CONINSP 0.006 0.006 2023NFA

0.212 0.212 CONSTSTBG FLEX 2023CONST 0.053 0.053 2023NFA

NYSDOT

581377

BRIDGE CLEANING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.260 0.000 0.000 0.074 1.186 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 62: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 62 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.068 0.068 DETLDESNHPP 2022DETLDES 0.017 0.017 2022NFA

0.067 0.067 PRELDESNHPP 2022PRELDES 0.017 0.017 2022NFA

0.017 0.017 DETLDESSTBG FLEX 2022DETLDES 0.004 0.004 2022NFA

0.017 0.017 PRELDESSTBG FLEX 2022PRELDES 0.004 0.004 2022NFA

0.254 0.254 CONINSPNHPP 2023CONINSP 0.064 0.064 2023NFA

2.120 2.120 CONSTNHPP 2023CONST 0.530 0.530 2023NFA

0.051 0.051 CONINSPSTBG FLEX 2023CONINSP 0.013 0.013 2023NFA

0.424 0.424 CONSTSTBG FLEX 2023CONST 0.106 0.106 2023NFA

NYSDOT

581378

BRIDGE PAINTING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

3.773 0.000 0.000 0.211 3.562 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.193 0.193 CONINSPNHPP 2022CONINSP 0.049 0.049 2022NFA

1.611 1.611 CONSTNHPP 2022CONST 0.403 0.403 2022NFA

0.023 0.023 DETLDESNHPP 2022DETLDES 0.006 0.006 2022NFA

0.006 0.006 PRELDESNHPP 2022PRELDES 0.001 0.001 2022NFA

0.102 0.102 CONINSPSTBG FLEX 2022CONINSP 0.025 0.025 2022NFA

0.848 0.848 CONSTSTBG FLEX 2022CONST 0.212 0.212 2022NFA

0.011 0.011 DETLDESSTBG FLEX 2022DETLDES 0.002 0.002 2022NFA

0.002 0.002 PRELDESSTBG FLEX 2022PRELDES 0.001 0.001 2022NFA

NYSDOT

581379

PAVT MARKINGS (LINE-1) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

3.495 0.000 0.000 3.495 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.043 0.043 DETLDESSTBG FLEX 2023DETLDES 0.011 0.011 2023NFA

0.008 0.008 PRELDESSTBG FLEX 2023PRELDES 0.002 0.002 2023NFA

NYSDOT

581380

PAVT MARKINGS (REQ) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.064 0.000 0.000 0.000 0.064 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 63: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 63 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.025 0.025 DETLDESNHPP 2022DETLDES 0.006 0.006 2022NFA

0.005 0.005 PRELDESNHPP 2022PRELDES 0.001 0.001 2022NFA

0.017 0.017 DETLDESSTBG FLEX 2022DETLDES 0.004 0.004 2022NFA

0.003 0.003 PRELDESSTBG FLEX 2022PRELDES 0.001 0.001 2022NFA

0.064 0.064 CONINSPNHPP 2023CONINSP 0.016 0.016 2023NFA

0.530 0.530 CONSTNHPP 2023CONST 0.132 0.132 2023NFA

0.038 0.038 CONINSPSTBG FLEX 2023CONINSP 0.010 0.010 2023NFA

0.318 0.318 CONSTSTBG FLEX 2023CONST 0.080 0.080 2023NFA

NYSDOT

581381

PAVT MARKINGS (REQ) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.250 0.000 0.000 0.062 1.188 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.051 0.051 PRELDESSTBG FLEX 2022PRELDES 0.013 0.013 2022NFA

0.415 0.415 DETLDESSTBG FLEX 2023DETLDES 0.104 0.104 2023NFA

NYSDOT

581382

BRIDGE MBC & PRESERVATION PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.583 0.000 0.000 0.064 0.519 AQC:N/A TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

0.043 0.043 PRELDESNHPP 2023PRELDES 0.011 0.011 2023NFA

0.009 0.009 PRELDESSTBG FLEX 2023PRELDES 0.002 0.002 2023NFA

NYSDOT

581383

BRIDGE MBC & PRESERVATION PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.065 0.000 0.000 0.000 0.065 AQC:N/A TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 64: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 64 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.067 0.067 PRELDESNHPP 2021PRELDES 0.017 0.017 2021NFA

0.017 0.017 PRELDESSTBG FLEX 2021PRELDES 0.004 0.004 2021NFA

0.042 0.042 ROWINCDSTBG FLEX 2022ROWINCD 0.011 0.011 2022NFA

0.204 0.204 DETLDESNHPP 2023DETLDES 0.051 0.051 2023NFA

0.051 0.051 DETLDESSTBG FLEX 2023DETLDES 0.013 0.013 2023NFA

0.254 0.254 ROWACQUSTBG FLEX 2023ROWACQU 0.064 0.064 2023NFA

NYSDOT

581384

LARGE CULVERT PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.795 0.000 0.105 0.053 0.637 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.068 0.068 PRELDESNHPP 2022PRELDES 0.017 0.017 2022NFA

0.017 0.017 PRELDESSTBG FLEX 2022PRELDES 0.004 0.004 2022NFA

0.043 0.043 ROWINCDSTBG FLEX 2023ROWINCD 0.011 0.011 2023NFA

NYSDOT

581385

LARGE CULVERT PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.160 0.000 0.000 0.106 0.054 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.042 0.042 DETLDESNHPP 2022DETLDES 0.011 0.011 2022NFA

0.008 0.008 PRELDESNHPP 2022PRELDES 0.002 0.002 2022NFA

0.030 0.030 CONINSPNHPP 2023CONINSP 0.009 0.009 2023NFA

0.259 0.259 CONSTNHPP 2023CONST 0.065 0.065 2023NFA

NYSDOT

581386

OVERHEAD SIGN STRUCTURES AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.426 0.000 0.000 0.063 0.363 AQC:N/A TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.043 0.043 DETLDESNHPP 2023DETLDES 0.011 0.011 2023NFA

0.008 0.008 PRELDESNHPP 2023PRELDES 0.002 0.002 2023NFA

NYSDOT

581387

OVERHEAD SIGN STRUCTURES AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.064 0.000 0.000 0.000 0.064 AQC:N/A TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 65: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 65 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.052 0.052 DETLDESSTBG FLEX 2023DETLDES 0.013 0.013 2023NFA

0.017 0.017 PRELDESSTBG FLEX 2023PRELDES 0.004 0.004 2023NFA

NYSDOT

581388

BRIDGE CLEANING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.086 0.000 0.000 0.000 0.086 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.017 0.017 PRELDESSTBG FLEX 2023PRELDES 0.004 0.004 2023NFA

NYSDOT

581389

BRIDGE CLEANING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.021 0.000 0.000 0.000 0.021 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.069 0.069 DETLDESNHPP 2023DETLDES 0.017 0.017 2023NFA

0.068 0.068 PRELDESNHPP 2023PRELDES 0.017 0.017 2023NFA

0.017 0.017 DETLDESSTBG FLEX 2023DETLDES 0.004 0.004 2023NFA

0.017 0.017 PRELDESSTBG FLEX 2023PRELDES 0.004 0.004 2023NFA

NYSDOT

581390

BRIDGE PAINTING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.213 0.000 0.000 0.000 0.213 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.069 0.069 PRELDESNHPP 2023PRELDES 0.017 0.017 2023NFA

0.017 0.017 PRELDESSTBG FLEX 2023PRELDES 0.004 0.004 2023NFA

NYSDOT

581391

BRIDGE PAINTING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.107 0.000 0.000 0.000 0.107 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 66: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 66 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.068 0.068 DETLDESNHPP 2022DETLDES 0.017 0.017 2022NFA

0.014 0.014 PRELDESNHPP 2022PRELDES 0.003 0.003 2022NFA

0.017 0.017 DETLDESSTBG FLEX 2022DETLDES 0.004 0.004 2022NFA

0.003 0.003 PRELDESSTBG FLEX 2022PRELDES 0.001 0.001 2022NFA

0.078 0.078 CONINSPNHPP 2023CONINSP 0.019 0.019 2023NFA

0.648 0.648 CONSTNHPP 2023CONST 0.162 0.162 2023NFA

0.026 0.026 CONINSPSTBG FLEX 2023CONINSP 0.006 0.006 2023NFA

0.216 0.216 CONSTSTBG FLEX 2023CONST 0.054 0.054 2023NFA

NYSDOT

581392

GUIDERAIL REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.336 0.000 0.000 0.127 1.209 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.069 0.069 DETLDESNHPP 2023DETLDES 0.017 0.017 2023NFA

0.014 0.014 PRELDESNHPP 2023PRELDES 0.003 0.003 2023NFA

0.017 0.017 DETLDESSTBG FLEX 2023DETLDES 0.004 0.004 2023NFA

0.003 0.003 PRELDESSTBG FLEX 2023PRELDES 0.001 0.001 2023NFA

NYSDOT

581393

GUIDERAIL REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.128 0.000 0.000 0.000 0.128 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.041 0.041 PRELDESSTBG FLEX 2021PRELDES 0.010 0.010 2021NFA

0.042 0.042 DETLDESSTBG FLEX 2022DETLDES 0.011 0.011 2022NFA

0.052 0.052 CONINSPNHPP 2023CONINSP 0.013 0.013 2023NFA

0.432 0.432 CONSTNHPP 2023CONST 0.108 0.108 2023NFA

0.052 0.052 CONINSPSTBG FLEX 2023CONINSP 0.013 0.013 2023NFA

0.432 0.432 CONSTSTBG FLEX 2023CONST 0.108 0.108 2023NFA

NYSDOT

581394

SMALL CULVERT MAINTENANCE AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

1.314 0.000 0.051 0.053 1.210 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 67: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 67 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.042 0.042 PRELDESSTBG FLEX 2022PRELDES 0.010 0.010 2022NFA

0.043 0.043 DETLDESSTBG FLEX 2023DETLDES 0.011 0.011 2023NFA

NYSDOT

581395

SMALL CULVERT MAINTENANCE AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.106 0.000 0.000 0.052 0.054 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.009 0.009 PRELDESSTBG FLEX 2023PRELDES 0.002 0.002 2023NFA

NYSDOT

581396

PAVT MARKINGS (REQ) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.011 0.000 0.000 0.000 0.011 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.187 0.187 CONINSPNHPP 2023CONINSP 0.046 0.046 2023NFA

1.555 1.555 CONSTNHPP 2023CONST 0.389 0.389 2023NFA

0.030 0.030 DETLDESNHPP 2023DETLDES 0.008 0.008 2023NFA

0.015 0.015 PRELDESNHPP 2023PRELDES 0.004 0.004 2023NFA

0.083 0.083 CONINSPSTBG FLEX 2023CONINSP 0.021 0.021 2023NFA

0.691 0.691 CONSTSTBG FLEX 2023CONST 0.173 0.173 2023NFA

0.013 0.013 DETLDESSTBG FLEX 2023DETLDES 0.003 0.003 2023NFA

0.006 0.006 PRELDESSTBG FLEX 2023PRELDES 0.001 0.001 2023NFA

NYSDOT

581397

PAVT MARKINGS (LINE-2) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

3.225 0.000 0.000 0.000 3.225 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.009 0.009 PRELDESSTBG FLEX 2023PRELDES 0.002 0.002 2023NFA

NYSDOT

581398

PAVT MARKINGS (LINE-1) AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.011 0.000 0.000 0.000 0.011 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

Page 68: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 68 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.153 0.153 DETLDESNHPP 2022DETLDES 0.038 0.038 2022NFA

0.034 0.034 PRELDESNHPP 2022PRELDES 0.008 0.008 2022NFA

0.038 0.038 DETLDESSTBG FLEX 2022DETLDES 0.010 0.010 2022NFA

0.008 0.008 PRELDESSTBG FLEX 2022PRELDES 0.002 0.002 2022NFA

0.204 0.204 CONINSPNHPP 2023CONINSP 0.052 0.052 2023NFA

1.696 1.696 CONSTNHPP 2023CONST 0.432 0.432 2023NFA

0.051 0.051 CONINSPSTBG FLEX 2023CONINSP 0.013 0.013 2023NFA

0.424 0.424 CONSTSTBG FLEX 2023CONST 0.108 0.108 2023NFA

NYSDOT

581402

ADA COMPLIANCE PROJECT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

3.271 0.000 0.000 0.291 2.980 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.033 0.033 PRELDESNHPP 2022PRELDES 0.008 0.008 2022NFA

0.008 0.008 PRELDESSTBG FLEX 2022PRELDES 0.002 0.002 2022NFA

0.153 0.153 DETLDESNHPP 2023DETLDES 0.038 0.038 2023NFA

0.038 0.038 DETLDESSTBG FLEX 2023DETLDES 0.010 0.010 2023NFA

NYSDOT

581403

ADA COMPLIANCE PROJECT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.290 0.000 0.000 0.051 0.239 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.082 STBG FLEX 0.082 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.666 0.666 DETLDESSTBG FLEX 2022DETLDES 0.166 0.166 2022NFA

0.458 0.458 CONINSPNHPP 2023CONINSP 0.114 0.114 2023NFA

3.816 3.816 CONSTNHPP 2023CONST 0.954 0.954 2023NFA

0.153 0.153 CONINSPSTBG FLEX 2023CONINSP 0.038 0.038 2023NFA

1.272 1.272 CONSTSTBG FLEX 2023CONST 0.318 0.318 2023NFA

NYSDOT

581406

THIS PROJECT WILL REHABILITATE THE NY ROUTE 400 SOUTHBOUND AND NORTHBOUND BRIDGES OVER THE B & P RAILROAD (BINS 1047611 & 1047612) IN THE TOWN OF ELMA, ERIE COUNTY TO RESTORE THE INTEGRITY OF STRUCTURAL BRIDGE ELEMENTS.

8.057 0.102 0.000 0.832 7.123 AQC:N/A TOTAL 4YR COST :ERIE TPC : $7.5-$12 M

Page 69: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 69 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.083 0.083 PRELDESSTBG FLEX 2022PRELDES 0.021 0.021 2022NFA

0.691 0.691 DETLDESSTBG FLEX 2023DETLDES 0.173 0.173 2023NFA

NYSDOT

581407

BRIDGE - MINOR REHAB/PRESERVATION-DECKS AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.968 0.000 0.000 0.104 0.864 AQC:N/A TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

0.068 0.068 PRELDESNHPP 2023PRELDES 0.017 0.017 2023NFA

0.017 0.017 PRELDESSTBG FLEX 2023PRELDES 0.004 0.004 2023NFA

NYSDOT

581408

BRIDGE - MINOR REHAB/PRESERVATION-DECKS AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.106 0.000 0.000 0.000 0.106 AQC:N/A TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

0.044 0.044 DETLDESNHPP 2021DETLDES 0.011 0.011 2021NFA

0.006 0.006 PRELDESNHPP 2021PRELDES 0.001 0.001 2021NFA

0.019 0.019 DETLDESSTBG FLEX 2021DETLDES 0.004 0.004 2021NFA

0.002 0.002 PRELDESSTBG FLEX 2021PRELDES 0.001 0.001 2021NFA

0.051 0.051 CONINSPNHPP 2022CONINSP 0.013 0.013 2022NFA

0.424 0.424 CONSTNHPP 2022CONST 0.106 0.106 2022NFA

0.020 0.020 CONINSPSTBG FLEX 2022CONINSP 0.005 0.005 2022NFA

0.170 0.170 CONSTSTBG FLEX 2022CONST 0.042 0.042 2022NFA

NYSDOT

581409

SIGNS & SIGN PANELS AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.919 0.000 0.088 0.831 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 70: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 70 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.045 0.045 DETLDESNHPP 2022DETLDES 0.012 0.012 2022NFA

0.006 0.006 PRELDESNHPP 2022PRELDES 0.001 0.001 2022NFA

0.019 0.019 DETLDESSTBG FLEX 2022DETLDES 0.004 0.004 2022NFA

0.002 0.002 PRELDESSTBG FLEX 2022PRELDES 0.001 0.001 2022NFA

0.052 0.052 CONINSPNHPP 2023CONINSP 0.013 0.013 2023NFA

0.432 0.432 CONSTNHPP 2023CONST 0.108 0.108 2023NFA

0.021 0.021 CONINSPSTBG FLEX 2023CONINSP 0.005 0.005 2023NFA

0.173 0.173 CONSTSTBG FLEX 2023CONST 0.043 0.043 2023NFA

NYSDOT

581410

SIGNS & SIGN PANELS AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.937 0.000 0.000 0.090 0.847 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.065 0.065 DETLDESSTBG FLEX 2023DETLDES 0.016 0.016 2023NFA

0.008 0.008 PRELDESSTBG FLEX 2023PRELDES 0.002 0.002 2023NFA

NYSDOT

581411

SIGNS & SIGN PANELS AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.091 0.000 0.000 0.000 0.091 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.034 0.034 DETLDESNHPP 2022DETLDES 0.008 0.008 2022NFA

0.008 0.008 PRELDESNHPP 2022PRELDES 0.002 0.002 2022NFA

0.041 0.041 CONINSPNHPP 2023CONINSP 0.011 0.011 2023NFA

0.346 0.346 CONSTNHPP 2023CONST 0.086 0.086 2023NFA

NYSDOT

581412

ITS SYSTEM REHABILITATION AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.536 0.000 0.000 0.052 0.484 AQC:N/A TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.035 0.035 DETLDESNHPP 2023DETLDES 0.009 0.009 2023NFA

0.008 0.008 PRELDESNHPP 2023PRELDES 0.002 0.002 2023NFA

NYSDOT

581413

ITS SYSTEM REHABILITATION AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.054 0.000 0.000 0.000 0.054 AQC:N/A TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 71: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 71 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.104 NHPP 0.104 DETLDES2020DETLDES 0.027 0.027 2020NFA

0.026 STBG FLEX 0.026 DETLDES2020DETLDES 0.007 0.007 2020NFA

0.034 STBG FLEX 0.034 PRELDES2020PRELDES 0.008 0.008 2020NFA

0.041 STBG FLEX 0.041 ROWINCD2020ROWINCD 0.010 0.010 2020NFA

0.204 0.204 ROWACQUSTBG FLEX 2021ROWACQU 0.051 0.051 2021NFA

0.110 0.110 CONINSPNHPP 2022CONINSP 0.027 0.027 2022NFA

0.915 0.915 CONSTNHPP 2022CONST 0.229 0.229 2022NFA

0.029 0.029 CONINSPSTBG FLEX 2022CONINSP 0.008 0.008 2022NFA

0.250 0.250 CONSTSTBG FLEX 2022CONST 0.062 0.062 2022NFA

NYSDOT

581419

LARGE CULVERT REPAIRS OR REPLACEMENTS; CATT, CHAUT & ERIE COS; NY 39, NY 394, NY 60, US 219, US 20, & I-86; TOWNS OF CONCORD, PERRYSBURG, GREAT VALLEY, ALLEGANY, HINSDALE, RIPLEY, NORTH HARMONY, & POMFRET

2.142 0.257 0.255 1.630 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.039 NHPP 0.039 PRELDES2020PRELDES 0.010 0.010 2020NFA

0.010 STBG FLEX 0.010 PRELDES2020PRELDES 0.002 0.002 2020NFA

0.004 0.004 ROWINCDSTBG FLEX 2021ROWINCD 0.001 0.001 2021NFA

0.106 0.106 DETLDESNHPP 2022DETLDES 0.027 0.027 2022NFA

0.027 0.027 DETLDESSTBG FLEX 2022DETLDES 0.006 0.006 2022NFA

0.008 0.008 ROWACQUSTBG FLEX 2022ROWACQU 0.002 0.002 2022NFA

0.163 0.163 CONINSPNHPP 2023CONINSP 0.040 0.040 2023NFA

1.357 1.357 CONSTNHPP 2023CONST 0.339 0.339 2023NFA

0.040 0.040 CONINSPSTBG FLEX 2023CONINSP 0.011 0.011 2023NFA

0.339 0.339 CONSTSTBG FLEX 2023CONST 0.085 0.085 2023NFA

NYSDOT

581420

LARGE CULVERT PRESERVATION AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

2.616 0.061 0.005 0.176 2.374 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 72: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 72 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.040 0.040 PRELDESNHPP 2021PRELDES 0.010 0.010 2021NFA

0.010 0.010 PRELDESSTBG FLEX 2021PRELDES 0.002 0.002 2021NFA

0.004 0.004 ROWINCDSTBG FLEX 2022ROWINCD 0.001 0.001 2022NFA

0.108 0.108 DETLDESNHPP 2023DETLDES 0.028 0.028 2023NFA

0.028 0.028 DETLDESSTBG FLEX 2023DETLDES 0.006 0.006 2023NFA

0.008 0.008 ROWACQUSTBG FLEX 2023ROWACQU 0.002 0.002 2023NFA

NYSDOT

581421

LARGE CULVERT PRESERVATION AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.247 0.000 0.062 0.005 0.180 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.038 0.038 PRELDESNHPP 2022PRELDES 0.010 0.010 2022NFA

0.013 0.013 PRELDESSTBG FLEX 2022PRELDES 0.003 0.003 2022NFA

0.004 0.004 ROWINCDSTBG FLEX 2023ROWINCD 0.001 0.001 2023NFA

NYSDOT

581422

LARGE CULVERT PRESERVATION AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.069 0.000 0.000 0.064 0.005 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

0.023 0.023 PRELDESNHPP 2021PRELDES 0.006 0.006 2021NFA

0.010 0.010 PRELDESSTBG FLEX 2021PRELDES 0.002 0.002 2021NFA

0.119 0.119 DETLDESNHPP 2022DETLDES 0.030 0.030 2022NFA

0.051 0.051 DETLDESSTBG FLEX 2022DETLDES 0.013 0.013 2022NFA

0.017 0.017 ROWINCDSTBG FLEX 2022ROWINCD 0.004 0.004 2022NFA

0.153 0.153 ROWACQUSTBG FLEX 2023ROWACQU 0.038 0.038 2023NFA

NYSDOT

581430

SIGNAL REPLACEMENT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS.

0.466 0.000 0.041 0.234 0.191 AQC:N/A TOTAL 4YR COST :MULTI TPC : $2-$4 M

Page 73: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 73 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.200 STBG FLEX 0.200 PRELDES2020PRELDES 0.050 0.050 2020NFA

NYSDOT

581435

THIS PROJECT WILL STUDY FEASIBLE ALTERNATIVES TO ADDRESS NON-STANDARD VERTICAL PROFILE FEATURES AND POOR PAVEMENT CONDITIONS ADJACENT TO A SLOPE FAILURE AREA ON NY ROUTE 353 FROM JEFFERSON STREET TO THE CATTARAUGUS NORTH VILLAGE LINE IN CATTARAUGUS COUNTY.

0.250 0.250 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :CATTARAUGUS TPC : < $0.75 M

0.148 STBG FLEX 0.148 DETLDES2020DETLDES 0.037 0.037 2020NFA

0.080 STBG FLEX 0.080 PRELDES2020PRELDES 0.020 0.020 2020NFA

0.040 STBG FLEX 0.040 ROWACQU2020ROWACQU 0.010 0.010 2020NFA

0.008 STBG FLEX 0.008 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.014 0.014 CONINSPHSIP 2021CONINSP 0.002 0.002 2021NFA

0.118 0.118 CONSTHSIP 2021CONST 0.013 0.013 2021NFA

0.080 0.080 CONINSPNHPP 2021CONINSP 0.020 0.020 2021NFA

0.667 0.667 CONSTNHPP 2021CONST 0.167 0.167 2021NFA

0.232 0.232 CONINSPSTBG FLEX 2021CONINSP 0.058 0.058 2021NFA

1.932 1.932 CONSTSTBG FLEX 2021CONST 0.483 0.483 2021NFA

NYSDOT

581436

PMI - RT 430 & 60 (WASHINGTON ST); 2ND TO FLUVANNA AVE & RT 394 (FAIRMOUNT); MCDANIEL AVE TO FAIRMOUNT AVE/6TH ST; CITY OF JAMESTOWN; CHAUTAUQUA CO. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS APPROVED THE WORK.

4.131 0.345 3.786 0.000 0.000 AQC:A10 TOTAL 4YR COST :CHAUTAUQUA TPC : $3.3-$5.6 M

Page 74: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 74 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.136 NHPP 0.136 DETLDES2020DETLDES 0.034 0.034 2020NFA

0.057 NHPP 0.057 PRELDES2020PRELDES 0.014 0.014 2020NFA

0.200 NHPP 0.200 ROWACQU2020ROWACQU 0.050 0.050 2020NFA

0.040 NHPP 0.040 ROWINCD2020ROWINCD 0.010 0.010 2020NFA

0.231 0.231 CONINSPNHPP 2022CONINSP 0.058 0.058 2022NFA

1.931 1.931 CONSTNHPP 2022CONST 0.483 0.483 2022NFA

NYSDOT

581437

THIS PROJECT WILL MILL AND RESURFACE US ROUTE 62, NIAGARA FALLS BOULEVARD FROM NY ROUTE 324, SHERIDAN DRIVE TO GREEN ACRES ROAD IN THE TOWNS OF AMHERST AND TONAWANDA, ERIE COUNTY. DETERIORATED DRAINAGE STRUCTURES, NON-COMPLIANT ADA CURB RAMPS, CORRIDOR SIGNS, AND TRAFFIC SIGNAL REPAIRS/UPGRADES WILL BE ADDRESSED AS NEEDED.

3.244 0.541 0.000 2.703 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.041 NHPP 0.041 DETLDES2020DETLDES 0.010 0.010 2020NFA

0.018 NHPP 0.018 PRELDES2020PRELDES 0.004 0.004 2020NFA

0.126 0.126 CONINSPNHPP 2021CONINSP 0.032 0.032 2021NFA

1.053 1.053 CONSTNHPP 2021CONST 0.263 0.263 2021NFA

NYSDOT

581438

PMI - CONCRETE JOINT RESEALING ON RTS 20, 62, 75, 78, & 391; TOWNS OF AMHERST, CLARENCE & HAMBURG AND VILLAGE OF HAMBURG, ERIE CO

1.547 0.073 1.474 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $1.2-$2.5 M

Page 75: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 75 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.073 NHPP 0.073 DETLDES2020DETLDES 0.018 0.018 2020NFA

0.031 NHPP 0.031 PRELDES2020PRELDES 0.008 0.008 2020NFA

0.046 STBG FLEX 0.046 DETLDES2020DETLDES 0.012 0.012 2020NFA

0.020 STBG FLEX 0.020 PRELDES2020PRELDES 0.005 0.005 2020NFA

0.028 0.028 CONINSPHSIP 2021CONINSP 0.003 0.003 2021NFA

0.234 0.234 CONSTHSIP 2021CONST 0.026 0.026 2021NFA

0.115 0.115 CONINSPNHPP 2021CONINSP 0.029 0.029 2021NFA

0.960 0.960 CONSTNHPP 2021CONST 0.240 0.240 2021NFA

0.074 0.074 CONINSPSTBG FLEX 2021CONINSP 0.018 0.018 2021NFA

0.614 0.614 CONSTSTBG FLEX 2021CONST 0.153 0.153 2021NFA

NYSDOT

581439

PMI - RT 240/277; RT 20 - RT 952J (NEW ARMOUR DUELLS); TOWN OF ORCHARD PARK & VILLAGE OF ORCHARD PARK, ERIE CO. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

2.707 0.213 2.494 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

0.119 NHPP 0.119 DETLDES2020DETLDES 0.030 0.030 2020NFA

0.051 NHPP 0.051 PRELDES2020PRELDES 0.013 0.013 2020NFA

0.213 0.213 CONINSPNHPP 2021CONINSP 0.053 0.053 2021NFA

1.774 1.774 CONSTNHPP 2021CONST 0.444 0.444 2021NFA

NYSDOT

581440

PMI - RT 400; RT 16 - RT 20A; TOWN OF AURORA; ERIE CO

2.697 0.213 2.484 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : $2-$4 M

Page 76: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 76 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.104 STBG LG URB 0.104 DETLDES2020DETLDES 0.026 0.026 2020NFA

0.045 STBG LG URB 0.045 PRELDES2020PRELDES 0.011 0.011 2020NFA

0.040 STBG LG URB 0.040 ROWACQU2020ROWACQU 0.010 0.010 2020NFA

0.008 STBG LG URB 0.008 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.011 0.011 CONINSPHSIP 2022CONINSP 0.001 0.001 2022NFA

0.094 0.094 CONSTHSIP 2022CONST 0.010 0.010 2022NFA

0.185 0.185 CONINSPSTBG LG URB 2022CONINSP 0.046 0.046 2022NFA

1.544 1.544 CONSTSTBG LG URB 2022CONST 0.386 0.386 2022NFA

NYSDOT

581441

THIS PROJECT WILL MILL AND OVERLAY THE EXISTING PAVEMENT ON NY ROUTE 61 (HYDE PARK BOULEVARD), FROM BIN 1060190 (LOCKPORT ROAD) TO NY ROUTE 104 (LEWISTON ROAD) IN THE CITY OF NIAGARA FALLS AND TOWNS OF NIAGARA AND LEWISTON IN NIAGARA COUNTY. DRAINAGE, SIGNS, AND SIGNAL REPAIRS WILL BE MADE AS NECESSARY. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK.

2.523 0.246 0.000 2.277 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $2-$4 M

0.165 NHPP 0.165 DETLDES2020DETLDES 0.041 0.041 2020NFA

0.070 NHPP 0.070 PRELDES2020PRELDES 0.018 0.018 2020NFA

0.288 0.288 CONINSPNHPP 2021CONINSP 0.073 0.073 2021NFA

2.396 2.396 CONSTNHPP 2021CONST 0.610 0.610 2021NFA

NYSDOT

581442

THIS PROJECT WILL MILL AND OVERLAY THE EXISTING PAVEMENT ON I-190 NORTHBOUND, FROM NY ROUTE 384 (BUFFALO AVENUE) TO NY ROUTE 31 (WITMER ROAD) IN THE CITY OF NIAGARA FALLS AND THE TOWN OF NIAGARA IN NIAGARA COUNTY. WORK WILL INCLUDE DRAINAGE REPAIRS AND SIGN REPLACEMENTS AS NEEDED.

3.661 0.294 3.367 0.000 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $3.3-$5.6 M

Page 77: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 77 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.080 STBG LG URB 0.080 DETLDES2020DETLDES 0.020 0.020 2020NFA

0.034 STBG LG URB 0.034 PRELDES2020PRELDES 0.009 0.009 2020NFA

0.040 STBG LG URB 0.040 ROWACQU2020ROWACQU 0.010 0.010 2020NFA

0.008 STBG LG URB 0.008 ROWINCD2020ROWINCD 0.002 0.002 2020NFA

0.028 0.028 CONINSPHSIP 2022CONINSP 0.003 0.003 2022NFA

0.234 0.234 CONSTHSIP 2022CONST 0.026 0.026 2022NFA

0.118 0.118 CONINSPSTBG LG URB 2022CONINSP 0.029 0.029 2022NFA

0.980 0.980 CONSTSTBG LG URB 2022CONST 0.244 0.244 2022NFA

NYSDOT

581443

THIS PROJECT WILL MILL AND OVERLAY THE EXISTING PAVEMENT ON NY ROUTE 18F (CENTER STREET), FROM THE NIAGARA SCENIC PARKWAY SOUTHBOUND RAMP TO SOUTH 4TH STREET IN THE VILLAGE OF LEWISTON, NIAGARA COUNTY. WORK ALSO INCLUDES REMOVAL OF BRICK PAVER CROSSWALKS AND REPLACEMENT WITH ASPHALT SECTION AND HIGH VISIBILITY CROSSWALK MARKINGS. DRAINAGE, SIGNS, AND SIGNAL REPAIR/UPGRADES WILL BE MADE AS NEEDED. THIS PROJECT PROPOSES REPLACING EXISTING BLOCK/CONCRETE CROSSWALKS WITH HIGH-VISIBILITY CROSSWALKS. THERE WILL ALSO BE PEDESTRIAN SIGNAL UPGRADES.

1.865 0.203 0.000 1.662 0.000 AQC:N/A TOTAL 4YR COST :NIAGARA TPC : $1.2-$2.5 M

0.070 NHPP 0.070 CONINSP2020CONINSP 0.018 0.018 2020NFA

0.585 NHPP 0.585 CONST2020CONST 0.146 0.146 2020NFA

0.008 STBG FLEX 0.008 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.066 STBG FLEX 0.066 CONST2020CONST 0.017 0.017 2020NFA

NYSDOT

581444

PMI-BRIDGE CLEANING AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS & CHAUTAUQUA COS.

0.912 0.912 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

1.985 NHPP 1.985 OPER2020OPER 0.496 0.496 2020NFA

2.024 2.024 OPERNHPP 2021OPER 0.505 0.505 2021NFA

2.063 2.063 OPERNHPP 2022OPER 0.515 0.515 2022NFA

2.102 2.102 OPERNHPP 2023OPER 0.525 0.525 2023NFA

nysdot

581445

NITTEC TOC ANNUAL STAFFING

10.215 2.481 2.529 2.578 2.627 AQC:N/A TOTAL 4YR COST :ERIE TPC : $12.5-$19 M

Page 78: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 78 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.048 STBG FLEX 0.048 CONINSP2020CONINSP 0.012 0.012 2020NFA

0.404 STBG FLEX 0.404 CONST2020CONST 0.101 0.101 2020NFA

NYSDOT

581447

PMI - DRAINAGE SWEEPING; ON VARIOUS FEDERAL AID ELIGIBLE ROUTES; ERIE COUNT. WORK WILL REMOVE DEBRIS BEFORE SPRING STORMS WASH THIS MATERIAL INTO THE CLOSED DRAINAGE SYSTEMS. SWEEPING ALONG RAISED MEDIANS AND CONCRETE MEDIAN BARRIER WILL BE INCLUDED WITHIN THE PROPOSED SWEEPING LIMITS.

0.565 0.565 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.021 HSIP 0.021 CONINSP2020CONINSP 0.002 0.002 2020NFA

0.173 HSIP 0.173 CONST2020CONST 0.019 0.019 2020NFA

0.042 NHPP 0.042 CONINSP2020CONINSP 0.010 0.010 2020NFA

0.354 NHPP 0.354 CONST2020CONST 0.088 0.088 2020NFA

0.016 STBG FLEX 0.016 CONINSP2020CONINSP 0.004 0.004 2020NFA

0.134 STBG FLEX 0.134 CONST2020CONST 0.034 0.034 2020NFA

NYSDOT

581448

ADA COMPLIANCE AND PEDESTRIAN SIGNAL UPGRADES. THIS PROJECT WILL IMPROVE PEDESTRIAN MOBILITY BY BRINGING VARIOUS FEDERAL AID ELIGIBLE LOCATIONS ON US 20, US 62, NY 39, NY 426, NY 430, IN THE TOWNS OF HAMBURG, DAYTON, PERSIA, PERRYSBURG, MINA, FRENCH CREEK, SHERMAN, CHAUTAUQUA, MAYVILLE, VILLAGE OF PERRYSBURG IN CATTARAUGUS, CHAUTAUQUA AND ERIE COUNTIES INTO COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA) REQUIREMENTS FOR ACCESSIBILITY. THE WORK WILL INCLUDE CURB RAMP INSTALLATIONS/UPGRADES AND SIDEWALK RECONSTRUCTION. THE REGIONAL TRAFFIC AND SAFETY ENGINEER HAS REVIEWED AND APPROVED THE WORK USING HSIP FUNDING.

0.897 0.897 0.000 0.000 0.000 AQC:A7 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

15.719 FTA 5307 15.719 MISC2020MISC 3.930 3.930 2020NFA

NFTA

590021

BUS PREVENTATIVE MAINTENANCE

19.649 19.649 0.000 0.000 0.000 AQC:B3 TOTAL 4YR COST :MULTI TPC : $15-$25 M

2.994 FTA 5307 2.994 MISC2020MISC 0.748 0.748 2020NFA

NFTA

590022

RAIL PREVENTATIVE MAINTENANCE

3.742 3.742 0.000 0.000 0.000 AQC:B9 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

16.033 16.033 MISCFTA 5307 2021MISC 4.008 4.008 2021NFA

NFTA

590023

BUS PREVENTATIVE MAINTENANCE

20.041 0.000 20.041 0.000 0.000 AQC:B3 TOTAL 4YR COST :MULTI TPC : $15-$25 M

Page 79: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 79 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

3.054 3.054 MISCFTA 5307 2021MISC 0.764 0.764 2021NFA

NFTA

590024

RAIL PREVENTATIVE MAINTENANCE

3.818 0.000 3.818 0.000 0.000 AQC:B9 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

16.354 16.354 MISCFTA 5307 2022MISC 4.088 4.088 2022NFA

NFTA

590025

BUS PREVENTATIVE MAINTENANCE

20.442 0.000 0.000 20.442 0.000 AQC:B3 TOTAL 4YR COST :MULTI TPC : $15-$25 M

3.115 3.115 MISCFTA 5307 2022MISC 0.778 0.778 2022NFA

NFTA

590026

RAIL PREVENTATIVE MAINTENANCE

3.893 0.000 0.000 3.893 0.000 AQC:B9 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

16.681 16.681 MISCFTA 5307 2023MISC 4.170 4.170 2023NFA

NFTA

590027

BUS PREVENTATIVE MAINTENANCE

20.851 0.000 0.000 0.000 20.851 AQC:B3 TOTAL 4YR COST :MULTI TPC : $15-$25 M

3.177 3.177 MISCFTA 5307 2023MISC 0.794 0.794 2023NFA

NFTA

590028

RAIL PREVENTATIVE MAINTENANCE

3.971 0.000 0.000 0.000 3.971 AQC:B9 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

3.411 FTA 5337 3.411 MISC2020MISC 0.852 0.852 2020NFA

NFTA

590031

RAIL PREVENTATIVE MAINTENANCE

4.263 4.263 0.000 0.000 0.000 AQC:B9 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

3.479 3.479 MISCFTA 5337 2021MISC 0.870 0.870 2021NFA

NFTA

590032

RAIL PREVENTATIVE MAINTENANCE

4.349 0.000 4.349 0.000 0.000 AQC:B9 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

Page 80: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 80 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

3.549 3.549 MISCFTA 5337 2022MISC 0.888 0.888 2022NFA

NFTA

590033

RAIL PREVENTATIVE MAINTENANCE

4.437 0.000 0.000 4.437 0.000 AQC:B9 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

3.619 3.619 MISCFTA 5337 2023MISC 0.904 0.904 2023NFA

NFTA

590034

RAIL PREVENTATIVE MAINTENANCE

4.523 0.000 0.000 0.000 4.523 AQC:B9 TOTAL 4YR COST :ERIE TPC : $3.3-$5.6 M

0.846 FTA 5339 0.846 MISC2020MISC 0.212 0.212 2020NFA

NFTA

590036

PURCHASE REVENUE VEHICLES

1.058 1.058 0.000 0.000 0.000 AQC:B11 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.846 FTA 5339 0.846 MISC2020MISC 0.212 0.212 2020NFA

NFTA

590037

PURCHASE PARATRANSIT VEHICLES

1.058 1.058 0.000 0.000 0.000 AQC:B11 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.148 FTA 5339 0.148 MISC2020MISC 0.038 0.038 2020NFA

NFTA

590038

PURCHASE BUS SHELTERS

0.186 0.186 0.000 0.000 0.000 AQC:B7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.863 0.863 MISCFTA 5339 2021MISC 0.216 0.216 2021NFA

NFTA

590039

PURCHASE REVENUE VEHICLES

1.079 0.000 1.079 0.000 0.000 AQC:B11 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.863 0.863 MISCFTA 5339 2021MISC 0.216 0.216 2021NFA

NFTA

590040

PURCHASE PARATRANSIT VEHICLES

1.079 0.000 1.079 0.000 0.000 AQC:B11 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

Page 81: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 81 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.151 0.151 MISCFTA 5339 2021MISC 0.038 0.038 2021NFA

NFTA

590041

PURCHASE BUS SHELTERS

0.189 0.000 0.189 0.000 0.000 AQC:B7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.881 0.881 MISCFTA 5339 2022MISC 0.220 0.220 2022NFA

NFTA

590042

PURCHASE REVENUE VEHICLES

1.101 0.000 0.000 1.101 0.000 AQC:B11 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.881 0.881 MISCFTA 5339 2022MISC 0.220 0.220 2022NFA

NFTA

590043

PURCHASE PARATRANSIT VEHICLES

1.101 0.000 0.000 1.101 0.000 AQC:B11 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.153 0.153 MISCFTA 5339 2022MISC 0.038 0.038 2022NFA

NFTA

590044

PURCHASE BUS SHELTERS

0.191 0.000 0.000 0.191 0.000 AQC:B7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.898 0.898 MISCFTA 5339 2023MISC 0.224 0.224 2023NFA

NFTA

590045

PURCHASE REVENUE VEHICLES

1.122 0.000 0.000 0.000 1.122 AQC:B11 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.898 0.898 MISCFTA 5339 2023MISC 0.224 0.224 2023NFA

NFTA

590046

PURCHASE PARATRANSIT VEHICLES

1.122 0.000 0.000 0.000 1.122 AQC:B11 TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.156 0.156 MISCFTA 5339 2023MISC 0.040 0.040 2023NFA

NFTA

590047

PURCHASE BUS SHELTERS

0.196 0.000 0.000 0.000 0.196 AQC:B7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

Page 82: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 82 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.088 DISCR FA 0.088 MISC2020 0.778 FTA MISC 0.778 MISC2020

MISC 0.194 0.194 2020NFA

NFTA

590051

THIS PROJECT WILL DEVELOP A COMPREHENSIVE PLAN THAT ENACTS REGULATORY AMENDMENTS AND INCENTIVES TO SUPPORT TOD ALONG THE AMHERST-BUFFALO METRO RAIL CORRIDOR, OPERATIONALIZE A REGIONAL TOD COMMITTEE, CAPITALIZE A REGIONAL TOD FUND, AND IMPLEMENT VALUE CAPTURE MECHANISMS TO ENCOURAGE SUSTAINABLE DEVELOPMENT PATTERNS THROUGHOUT THE CORRIDOR.

1.060 1.060 0.000 0.000 0.000 AQC:C3 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

0.120 FTA 5339 0.120 MISC2020MISC 0.030 0.030 2020NFA

NFTA

590052

THIS PROJECT WILL PROVIDE FOR THE PROCUREMENT AND INSTALLATION OF 15 REPLACEMENT BUS SHELTERS.

0.150 0.150 0.000 0.000 0.000 AQC:B7 TOTAL 4YR COST :MULTI TPC : < $0.75 M

0.274 FTA 5339 0.274 MISC2020MISC 0.068 0.068 2020NFA

NFTA

590053

THIS PROJECT WILL PROVIDE FOR THE DESIGN AND REPLACEMENT OF PAVEMENT AT THE UTICA METRO RAIL STATION BUS LOOP.

0.342 0.342 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : < $0.75 M

5.000 CMAQ 5.000 MISC2020MISC 1.250 1.250 2020NFA

NFTA

590054

2019 TAP CMAQ AWARD - NFTA 11 NEW ACCESSIBLE CLEAN FUELED BUSES

6.250 6.250 0.000 0.000 0.000 AQC:B10 TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

0.774 CMAQ 0.774 MISC2020MISC 0.194 0.194 2020NFA

NFTA

590055

NFTA - GO BUFFALO NIAGARA TDM PROJECT - CMAQ; INCLUDES BIKE SHARE, VANPOOL & CARPOOL PROGRAMS

0.968 0.968 0.000 0.000 0.000 AQC:NON TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

0.085 NHPP 0.085 MISC2020MISC 0.021 0.021 2020NFA

0.287 0.287 MISCNHPP 2021MISC 0.072 0.072 2021NFA

0.245 0.245 MISCNHPP 2022MISC 0.061 0.061 2022NFA

0.250 0.250 MISCNHPP 2023MISC 0.063 0.063 2023NFA

NYSDOT

5B1001

BIKE/PED PROJECT AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS - BLOCK FUND

1.084 0.106 0.359 0.306 0.313 AQC:C2 TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

Page 83: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 83 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.160 NHPP 0.160 MISC2020MISC 0.040 0.040 2020NFA

0.163 0.163 MISCNHPP 2021MISC 0.041 0.041 2021NFA

0.166 0.166 MISCNHPP 2022MISC 0.041 0.041 2022NFA

0.170 0.170 MISCNHPP 2023MISC 0.042 0.042 2023NFA

NYSDOT

5B1423

SIDEWALK PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS - BLOCK FUND.

0.823 0.200 0.204 0.207 0.212 AQC:N/A TOTAL 4YR COST :MULTI TPC : $0.6-$1.5 M

1.281 1.281 MISCNHPP 2022MISC 0.320 0.320 2022NFA

1.638 1.638 MISCSTBG LG URB 2022MISC 0.410 0.410 2022NFA

14.080 14.080 MISCNHPP 2023MISC 3.520 3.520 2023NFA

6.934 6.934 MISCSTBG LG URB 2023MISC 1.734 1.734 2023NFA

NYSDOT

5B1555

PMI-PAVT MAINT LET & VPP AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS - BLOCK FUND

29.917 0.000 0.000 3.649 26.268 AQC:N/A TOTAL 4YR COST :MULTI TPC : $50-$85 M

0.452 NHPP 0.452 MISC2020MISC 0.113 0.113 2020NFA

0.465 0.465 MISCNHPP 2021MISC 0.116 0.116 2021NFA

0.936 0.936 MISCNHPP 2022MISC 0.234 0.234 2022NFA

0.966 0.966 MISCNHPP 2023MISC 0.241 0.241 2023NFA

NYSDOT

5B2003

STATE INFRASTRUCTURE PROGRAM - AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS - BLOCK FUND

3.523 0.565 0.581 1.170 1.207 AQC:N/A TOTAL 4YR COST :MULTI TPC : $12.5-$19 M

0.487 0.487 MISCNHPP 2021MISC 0.122 0.122 2021NFA

0.242 0.242 MISCNHPP 2022MISC 0.061 0.061 2022NFA

0.588 0.588 MISCHSIP 2023MISC 0.065 0.065 2023NFA

2.313 2.313 MISCNHPP 2023MISC 0.578 0.578 2023NFA

NYSDOT

5B2006

HSIP/NHPP STATE SAFETY PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS - BLOCK FUND

4.456 0.000 0.609 0.303 3.544 AQC:N/A TOTAL 4YR COST :MULTI TPC : $7.5-$12 M

Page 84: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 84 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.840 0.840 MISCHSIP 2023MISC 0.093 0.093 2023NFA

NYSDOT

5B2011

HSIP CARDS/PED SIGNAL PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS - BLOCK FUND

0.933 0.000 0.000 0.000 0.933 AQC:N/A TOTAL 4YR COST :MULTI TPC : $1.2-$2.5 M

0.200 CMAQ 0.200 MISC2020MISC 0.050 0.050 2020NFA

0.208 0.208 MISCCMAQ 2021MISC 0.052 0.052 2021NFA

2.540 2.540 MISCCMAQ 2022MISC 0.635 0.635 2022NFA

0.212 0.212 MISCCMAQ 2023MISC 0.053 0.053 2023NFA

NYSDOT

5B2016

CMAQ PROGRAM AT VARIOUS FEDERAL AID ELIGIBLE LOCATIONS IN CATTARAUGUS, CHAUTAUQUA, ERIE & NIAGARA COS - BLOCK FUND

3.950 0.250 0.260 3.175 0.265 AQC:N/A TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

0.103 0.103 MISCSTBG LG URB 2021MISC 0.026 0.026 2021NFA

1.278 1.278 MISCSTBG-OFF 2021MISC 0.319 0.319 2021NFA

0.329 0.329 MISCSTBG LG URB 2022MISC 0.082 0.082 2022NFA

1.512 1.512 MISCSTBG-OFF 2022MISC 0.378 0.378 2022NFA

0.284 0.284 MISCSTBG LG URB 2023MISC 0.071 0.071 2023NFA

1.396 1.396 MISCSTBG-OFF 2023MISC 0.349 0.349 2023NFA

CATTARAUGUS, CHAUTAU

5B6146

LOCAL BRIDGE MAINTENANCE PROGRAM; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA COS - BLOCK FUND

6.127 0.000 1.726 2.301 2.100 AQC:N/A TOTAL 4YR COST :MULTI TPC : $6-$9.4 M

1.116 HSIP 1.116 MISC2020MISC 0.124 0.124 2020NFA

1.116 1.116 MISCHSIP 2021MISC 0.124 0.124 2021NFA

1.071 1.071 MISCHSIP 2022MISC 0.119 0.119 2022NFA

1.071 1.071 MISCHSIP 2023MISC 0.119 0.119 2023NFA

CATTARAUGUS, CHAUTAU

5B6151

HSIP LOCAL ROAD PROGRAM; CATTARAUGUS, CHAUTAUQUA, ERIE, & NIAGARA COS - BLOCK FUND

4.860 1.240 1.240 1.190 1.190 AQC:N/A TOTAL 4YR COST :MULTI TPC : $4.6-$7.5 M

Page 85: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 85 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

1.520 STBG FLEX 1.520 MISC2020MISC 0.380 0.380 2020NFA

1.808 STBG-OFF 1.808 MISC2020MISC 0.452 0.452 2020NFA

CATTARAUGUS, CHAUTAU

5B6281

LOCAL INFRASTRUCTURE RENEWAL; CATTARAUGUS & CHAUTAUQUA COS - BLOCK FUND

4.160 4.160 0.000 0.000 0.000 AQC:N/A TOTAL 4YR COST :MULTI TPC : $3.3-$5.6 M

0.452 NHPP 0.452 CONST2020CONST 0.113 0.113 2020NFA

NYSDOT

5V2011

THIS PROJECT WILL REHABILITATE I-86 EB & WB FROM EAST OF THE NATURAL AREA TO EXIT 24 IN THE TOWN OF ALLEGANY, CATTARAUGUS COUNTY, WITH A HMA OVERLAY OF THE EXISTING PAVEMENT.

0.565 0.565 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :CATTARAUGUS TPC : < $0.75 M

0.519 NHPP 0.519 CONST2020CONST 0.130 0.130 2020NFA

NYSDOT

5V2012

THIS PROJECT WILL REHABILITATE US 219 FROM JACKMAN HILL ROAD TO PLATO ROAD IN THE TOWN OF ELLICOTTVILLE IN CATTARAUGUS COUNTY WITH A SINGLE COURSE MILL AND OVERLAY OF THE EXISTING PAVEMENT.

0.649 0.649 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :CATTARAUGUS TPC : $0.6-$1.5 M

0.560 NHPP 0.560 CONST2020CONST 0.140 0.140 2020NFA

NYSDOT

5V2013

THIS PROJECT WILL REHABILITATE I-86 EAST BOUND AND WEST BOUND FROM BIN 1062681 TO BIN 1062700 IN THE TOWN OF RANDOLPH, CATTARAUGUS COUNTY WITH A HMA OVERLAY OF THE EXISTING PAVEMENT.

0.700 0.700 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :CATTARAUGUS TPC : $0.6-$1.5 M

0.591 STBG FLEX 0.591 CONST2020CONST 0.148 0.148 2020NFA

NYSDOT

5V2021

THIS PROJECT WILL REHABILITATE NY ROUTE 83 FROM US ROUTE 62 TO THE CHERRY CREEK SOUTH VILLAGE LINE, IN THE TOWN OF CHERRY CREEK, CHAUTAUQUA COUNTY.

0.739 0.739 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :CHAUTAUQUA TPC : $0.6-$1.5 M

0.484 STBG FLEX 0.484 CONST2020CONST 0.121 0.121 2020NFA

NYSDOT

5V2022

THIS PROJECT WILL REHABILITATE NY 430 FROM NY 426 TO MAYVILLE IN THE TOWNS OF MINA, SHERMAN, CHAUTAUQUA AND THE VILLAGES OF SHERMAN AND MAYVILLE IN CHAUTAUQUA COUNTY, BY APPLYING A CHIP SEAL TREATMENT OVER THE EXISTING PAVEMENT.

0.605 0.605 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :CHAUTAUQUA TPC : < $0.75 M

Page 86: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 86 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.504 STBG FLEX 0.504 CONST2020CONST 0.126 0.126 2020NFA

NYSDOT

5V2023

THIS PROJECT WILL REHABILITATE NY 426 IN THE TOWNS OF FRENCH CREEK AND MINA IN CHAUTAUQUA COUNTY, BY APPLYING A CHIP SEAL TREATMENT OVER THE EXISTING PAVEMENT. IN ADDITION, A 2.1 MILE SEGMENT OF NY 426 AROUND FINDLAY LAKE WILL RECEIVE A HEATER SCARIFICATION TREATMENT PRIOR TO THE CHIP SEAL.

0.630 0.630 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :CHAUTAUQUA TPC : $0.6-$1.5 M

0.228 STBG FLEX 0.228 CONST2020CONST 0.057 0.057 2020NFA

NYSDOT

5V2024

THIS PROJECT WILL REHABILITATE NY 76 FROM NY 430 TO CR 9 IN THE TOWNS OF SHERMAN, WESTFIELD AND RIPLEY, VILLAGE OF SHERMAN IN CHAUTAUQUA COUNTY, BY APPLYING A CHIP SEAL TREATMENT OVER THE EXISTING PAVEMENT.

0.285 0.285 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :CHAUTAUQUA TPC : < $0.75 M

0.488 NHPP 0.488 CONST2020CONST 0.122 0.122 2020NFA

NYSDOT

5V2031

THIS PROJECT WILL REHABILITATE NY ROUTE 324 FROM NY ROUTE 325 TO NY ROUTE 384 IN THE TOWN OF TONAWANDA, ERIE COUNTY WITH A 1\" HMA OVERLAY OF THE EXISTING PAVEMENT.

0.610 0.610 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.495 STBG FLEX 0.495 CONST2020CONST 0.124 0.124 2020NFA

NYSDOT

5V2041

THIS PROJECT WILL REHABILITATE NY 75 FROM OREGON RD TO US 62 IN THE TOWN OF EDEN, ERIE COUNTY WITH A SINGLE COURSE HMA OVERLAY OF THE EXISTING PAVEMENT SURFACE.

0.619 0.619 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :ERIE TPC : $0.6-$1.5 M

0.307 STBG FLEX 0.307 CONST2020CONST 0.077 0.077 2020NFA

NYSDOT

5V2042

THIS PROJECT WILL REHABILITATE NY 952J IN THE TOWN OF ORCHARD PARK, ERIE COUNTY BY TREATING THE PAVEMENT WITH A HEATER SCARIFICATION THEN FOLLOWING WITH A HMA OVERLAY.

0.384 0.384 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :ERIE TPC : < $0.75 M

0.508 STBG FLEX 0.508 CONST2020CONST 0.127 0.127 2020NFA

NYSDOT

5V2051

THIS PROJECT WILL REHABILITATE NY ROUTE 93 FROM DYSINGER ROAD TO THE NIAGARA COUNTY LINE IN THE TOWN OF ROYALTON, NIAGARA COUNTY WITH A CHIP SEAL OF THE EXISTING PAVEMENT.

0.635 0.635 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :NIAGARA TPC : $0.6-$1.5 M

0.218 STBG FLEX 0.218 CONST2020CONST 0.054 0.054 2020NFA

NYSDOT

5V2052

THIS PROJECT WILL REHABILITATE NY ROUTE 93 FROM NY ROUTE 425 TO NY ROUTE 104 IN THE TOWN OF CAMBRIA, NIAGARA COUNTY WITH A HEATER SCARIFICATION AND A CHIP SEAL OVERLAY OF THE EXISTING PAVEMENT.

0.272 0.272 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :NIAGARA TPC : < $0.75 M

Page 87: ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ...for region 05 total project cost hsip 2020 0.359 coninsp 0.359 hsip 2020 2.995 const 2.995 nysdot 50ps04 pedestrian safety action

COUNTY

AGENCY

PIN

PROJECT DESCRIPTION

FUND SOURCES FFY

TOTAL 4-YEAR

PROGRAM

in millionsof dollars

PHASE

AQ CODE

FFY 2022

FFY 2023

FFY 2021

FFY 2020

4-YEAR PROGRAM (FFY)

Starting October 01, 2019

Monday, March 2, 2020 Page 87 of 87

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

for REGION 05

TOTAL PROJECT COST

0.400 STBG FLEX 0.400 CONST2020CONST 0.100 0.100 2020NFA

NYSDOT

5V20CS

THIS PROJECT WILL APPLY CRACK SEAL TO VARIOUS FEDERAL AID ELIGIBLE ROUTES IN CATTARAUGUS, CHAUTAUQUA, ERIE AND NIAGARA COUNTY.

0.500 0.500 0.000 0.000 0.000 AQC:A10 TOTAL 4YR COST :MULTI TPC : < $0.75 M