21

# MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

Embed Size (px)

Citation preview

Page 1: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________
Page 2: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

MAIN SUPPLY ROUTE &

CONVOY SUPPORT CENTER SELECTION

PRIMARY INSTRUCTOR:________________________

ALTERNATE INSTRUCTOR:________________________

Page 3: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

TASK:

Establish a primary Main Supply Route (MSR)

and determine possible TTP and CSC requirements

CONDITION:

Given a class room enviroment with a 1:250,000 map board determine primary MSR’s and determine type and placement of appropriate CSC locations.

STANDARD:

Upon completion each individual will have a working knowledge of the difficulties, and restrictions involved in determining a MSR and adequate Support Center requirements.

Page 4: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

RESOURCE REFERENCES

REFERENCES:

FM 55 - 30

FM 55 - 10

SAFETY BOOK

FM 5 - 36

REFERENCES:

FM 55 - 30

FM 55 - 10

SAFETY BOOK

FM 5 - 36

Page 5: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

PRE-TEST1. What are the three types of road classifications as determined by STANAG 2174?

A) 1,2,3 B) X,Y,Z C)Traffic, oversized, limited

2. The highest bridge road classification determines the military load class of a route.

A) True B) False

3. When identifying a prospective route for oversized use the followinglimitations must be followed.

A) 7%> grades B) 10%>grades C) 5%>grades D) 12%>grades 25M< curve 50M< curve 35M< curve 60M<curve Class 120 Class 80 Class 50 Class 60

Page 6: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

PRE-TEST

4. How is a tunnel depicted on a military map?

A) by a arrow from the symbol to the location of the entranceB) by a half circle with arrow from the symbol to the tunnel entranceC) by a bridge symbol with an arrow above it

5. How many different types of Convoy Support Centers are there?

A) five B) four C) three D) two

6. The third type (Complete CSC stop) contains the following support?

A) 1,2,4,6,7, B) 1,2,3,4,5,6,7,8 C) 1,2,3,4,5,7,8 D) 1,2,3,4,5,6

1.latrines 2. water 3. fuel 4. maint 5.security 6. TTP area 7. showers 8. beds

Page 7: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

PRE-TEST

7. International boundaries are depicted by the following symbol on a military map or overlay?

A) + + + + + + + B) ------------ C)

8. What is the map sheet number that you are currently using?

A) NM32-10 B) NM32-7 C) NM32-4 D) NM31-9

9. What is the name of the map sheet you are currently using?

A) METZ, B) SAARBRUCKEN C) TRIER D) LUXEMBOURG

Page 8: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

PRE-TEST

10. Determine the road distance from the town of Contweg (LV 856565 ) to the town of Sarnstall (MV 228515) along route #10.

A) 26 MILES B) 29.5 MILES C) 28.5 MILES

Page 9: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

MAP RECON

Maps provide a basic source of terrain information. The reliability of a map is determined by the data used to prepare it. Maps are supplemented by aerial or ground photos, sketches, and visual observation.

Special maps and overlays are designed for specific purposes, such as trafficability, transportation facilities, and soils, and are of particular value in terrain evaluation.

Page 10: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

ROUTE PLANNING FACTORS

OVERSIZED VEHICLES

HEIGHT: 4.5 M

WIDTH: 3.7 M

WEIGHT(LOADED): 110 TONS

OVERSIZED VEHICLES

HEIGHT: 4.5 M

WIDTH: 3.7 M

WEIGHT(LOADED): 110 TONS

Page 11: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

EXAMPLE OF A PLANNED VEHICLE ROUTE FOR OVERSIZED VEHICLES

ALTERNATE HET ROUTE

SLAV BROD - ZAGREB : 179KM

ZAGREB - VARAZDIN : 65KM

VARAZDIN - LETENYE : 39KM

LETENYE - TASZAR : 123KM

TOTAL : 406KM

PRIMARY HET ROUTE

SLAV BROD - KUTINA : 116KM

KUTINA - BARCS : 91KM

BARCS - TASZAR : 86KM

TOTAL : 293KM

TASZAR

BARCS

VEROVITICA

NASICE

DAKOVO

VALICAKOPANICA

OKUCANI

SZIGETVAR

MSR CUPID

MSR PAUL

MSR STEVE

V. ZDENCI

KUTINA

MSR

SN

YD

ER

MSR HOWDY

PECS

DRAVASZABOLCS

HTD

KAPOSVAR

BOSNIA

SLAVONSKIBROD

CROATIA8TH MCT

ZAGREB

LETENYE

VARAZDIN

E70

61

3

12

7

12

CSC PLESORON

®

©

®

MSR BRANDON

KUTINA ROM

ZELINA

® ©

ROM POINT

CSC/ RON

CHOKE POINTS

LEGEND

LIPOVAC

Page 12: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

• ASSIGN PRIORITY BASED ON TIME-DISTANCE

• CONSIDER SUSTAINMENT CAPABILITY OF THE MSR

• SEPARATE TRAFFIC FROM PEDESTRIANS

• SEPARATE CIVILIAN AND MILITARY TRAFFIC

• ASSIGN PRIORITY BASED ON TIME-DISTANCE

• CONSIDER SUSTAINMENT CAPABILITY OF THE MSR

• SEPARATE TRAFFIC FROM PEDESTRIANS

• SEPARATE CIVILIAN AND MILITARY TRAFFIC

HIGHWAY TRAFFIC PRINCIPLES

Page 13: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

• CAPABLE OF SUPPORTING TRAFFIC VOLUME

• NORMALLY BEST ROUTE

• MUST INCLUDE ALTERNATES

• RECOMMENDED MOVEMENT PLANNER

• APPROVED BY G - 3

• CAPABLE OF SUPPORTING TRAFFIC VOLUME

• NORMALLY BEST ROUTE

• MUST INCLUDE ALTERNATES

• RECOMMENDED MOVEMENT PLANNER

• APPROVED BY G - 3

• MSR SELECTION CRITERIA IS BASED ON:

• ROAD CHARACTERISTICS

• VEHICLE CHARACTERISTICS

• SUPPLY CLASSIFICATION

• DELIVERY TIME-LINE AND SPECIAL REQUIREMENTS

• MSR SELECTION CRITERIA IS BASED ON:

• ROAD CHARACTERISTICS

• VEHICLE CHARACTERISTICS

• SUPPLY CLASSIFICATION

• DELIVERY TIME-LINE AND SPECIAL REQUIREMENTS

MAIN SUPPLY ROUTE CRITERIA AND SELECTION

Page 14: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

TRAFFIC ROUTE FUNDAMENTALS

• BALANCE• SEPARATION• DISTRIBUTION

RECON FACTORS IN SELECTION OF MSR’S

ROUTE INFORMATION SOURCES

• MAPS• INTEL REPORTS• LOCAL POPULATION• MP HASTE RECON • PHOTO’S

• ROAD SPACE• ROAD WIDTH• RESTRICTIVE FEATURES• BRIDGE CLASSIFICATIONS

CLASSIFICATION ISSUES

Page 15: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

DETERMINE CRITICAL POINTS• LIMITING ROADWAY STRUCTURES/CHARACTERISTICS• CROSSROADS AT GRADE LEVEL

DETERMINE CRITICAL POINTS• LIMITING ROADWAY STRUCTURES/CHARACTERISTICS• CROSSROADS AT GRADE LEVEL

ESTABLISH CHECKPOINTS• GEOGRAPHIC BOUNDARIES• TERMINALS/SUPPLY POINTS/CRITICAL POINTS• REGULATE AND CONTROL MOVEMENT• SEGMENT THE MSR INTO MANAGEABLE BLOCKS

ESTABLISH CHECKPOINTS• GEOGRAPHIC BOUNDARIES• TERMINALS/SUPPLY POINTS/CRITICAL POINTS• REGULATE AND CONTROL MOVEMENT• SEGMENT THE MSR INTO MANAGEABLE BLOCKS

MSR PROBLEM AREAS

Page 16: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

• ROAD SURFACE AND TYPE

• ROAD/BRIDGE MLC 100 MINIMUM

• OVERHEAD CLEARANCES (i.e. WIRES, TREES, TUNNELS , OVERPASSES, etc.)

• SUPPLY CLASS AND DELIVERY SCHEDULE

• POPULATION AND CIVILIAN TRAFFIC

• ROAD GRADE AND CURVATURE

• CHOKE POINTS/BOTTLE NECKS

• DISTANCE/TIME/SECURITY

• ESCORT AVAILABILITY

• OVERSIZED VEHICLE FUEL TANK CAPABILITY 250 GALLONS VS. MILES PER GALLON

• ROM/RON REQUIREMENTS BASED ON ABOVE

• ROAD SURFACE AND TYPE

• ROAD/BRIDGE MLC 100 MINIMUM

• OVERHEAD CLEARANCES (i.e. WIRES, TREES, TUNNELS , OVERPASSES, etc.)

• SUPPLY CLASS AND DELIVERY SCHEDULE

• POPULATION AND CIVILIAN TRAFFIC

• ROAD GRADE AND CURVATURE

• CHOKE POINTS/BOTTLE NECKS

• DISTANCE/TIME/SECURITY

• ESCORT AVAILABILITY

• OVERSIZED VEHICLE FUEL TANK CAPABILITY 250 GALLONS VS. MILES PER GALLON

• ROM/RON REQUIREMENTS BASED ON ABOVE

SPECIFICS

Page 17: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

• NAME MSRs

• DETERMINE CRITICAL POINTS

• ESTIMATE CHECKPOINT TO SEGMENT

• ESTABLISH CONTROL MEASURES

• DEVELOP TRAFFIC CIRCULATION PLAN

• STAFF AND COORDINATE

• NAME MSRs

• DETERMINE CRITICAL POINTS

• ESTIMATE CHECKPOINT TO SEGMENT

• ESTABLISH CONTROL MEASURES

• DEVELOP TRAFFIC CIRCULATION PLAN

• STAFF AND COORDINATE

• ROUTES: ENGINEERING, RECON OR CLASSIFICATION

• TRAFFIC DENSITY: TOE, TASK ORGANIZATION

• TERMINALS AND FACILITIES: GUIDES, LOG ANNEX

• COMMO: OPLANS, ORDERS, ESTIMATES

• WEATHER: STAFF OFFICERS

• INTELLIGENCE: INTELLIGENCE SUMMARY

• CONCEPT OF OPERATION: OPLANS AND ORDERS

• ROUTES: ENGINEERING, RECON OR CLASSIFICATION

• TRAFFIC DENSITY: TOE, TASK ORGANIZATION

• TERMINALS AND FACILITIES: GUIDES, LOG ANNEX

• COMMO: OPLANS, ORDERS, ESTIMATES

• WEATHER: STAFF OFFICERS

• INTELLIGENCE: INTELLIGENCE SUMMARY

• CONCEPT OF OPERATION: OPLANS AND ORDERS

MSR DEVELOPMENT

AND SUPPORT

Page 18: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

GUIDELINES:GUIDELINES:

REST STOP EVERY TWO HOURS ENROUTE

REFUEL AT MIDDLE OF VEHICLE RANGE

RON AFTER 14 HOUR WORKDAY

FOOD SERVICE BASED ON TOTAL TIME ENROUTE (MRE, SOUP, T-RATIONS)

CONVOY SUPPORT CENTERS

LEVEL 2:

LATRINES, WATER, SECURITY, REFUEL, MAINTENANCE, LIMITED RECOVERY, PARKING

LEVEL 2:

LATRINES, WATER, SECURITY, REFUEL, MAINTENANCE, LIMITED RECOVERY, PARKING

LEVEL 3:

LATRINES, WATER, SECURITY, REFUEL, MAINTENANCE, RECOVERY, PARKING, SHOWERS, BEDS,

LEVEL 3:

LATRINES, WATER, SECURITY, REFUEL, MAINTENANCE, RECOVERY, PARKING, SHOWERS, BEDS,

LEVEL 1:

LATRINES, WATER, SECURITY, EMERGENCY FUEL, SMALL REPAIRS

LEVEL 1:

LATRINES, WATER, SECURITY, EMERGENCY FUEL, SMALL REPAIRS

LEVEL 0:

REST STOP ONLY

NO SERVICE OR SUPPORT

LEVEL 0:

REST STOP ONLY

NO SERVICE OR SUPPORT

Page 19: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

PRIMARY ISSUES

• PARKING AVAILABILITY / SURFACE

• ACCESSIBILITY FROM MSR

• LSA

• HAZARDOUS WASTE REQUIREMENTS

• ROM CAPACITIES: i.e. 4PT, 6PT, 8PT

• LOCATION: i.e WHERE AND WHY

• TIME / DISTANCE OF MSR DETERMINES CSC LEVEL

PRIMARY ISSUES

• PARKING AVAILABILITY / SURFACE

• ACCESSIBILITY FROM MSR

• LSA

• HAZARDOUS WASTE REQUIREMENTS

• ROM CAPACITIES: i.e. 4PT, 6PT, 8PT

• LOCATION: i.e WHERE AND WHY

• TIME / DISTANCE OF MSR DETERMINES CSC LEVEL

SECONDARY ISSUES

• HOST NATION RESTRICTIONS

• CONTRACT REQUIREMENTS

• LIGHTING

• HEATING

SECONDARY ISSUES

• HOST NATION RESTRICTIONS

• CONTRACT REQUIREMENTS

• LIGHTING

• HEATING

CONVOY SUPPORT CENTER LOCATION CRITERIA

Page 20: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

PLANNING FACTORS

Turnaround time

turnaroundtime =

2 x distance+ delays

rate of march (MIH)

Line haul leg

distance = hr per operating shift - delay time x rate (MIH)

2

Page 21: # MAIN SUPPLY ROUTE & CONVOY SUPPORT CENTER SELECTION PRIMARY INSTRUCTOR : ________________________ ALTERNATE INSTRUCTOR: ________________________

/ #

27TH TRANSPORTATION BATTALION (MC)27TH TRANSPORTATION BATTALION (MC)

EXERCISE PLANNING FACTORS

TYPE OF VEHICLES: M915/M872

LOAD: 2 EA. M577 (FST) PER SEMITRAILER

DRIVER LIMITATION: 10 HOUR PERIODS

ONE WAY HAULING DISTANCE LIMITATION: 90 MILES

CONVOY SPEED: 20 mph (MIH)

AVAILABLE TRANSPORTATION COMPANIES: TWO

DELAY PERIODS: 1) CSC#1 (30 MIN) 2) CSC#2 (1 HOUR) 3) CSC#3 (8 HOUR) 4) TTP (1 HOUR)