28
_____________________________________ __ M. Ranganai - Director _____________________________________ _ T & Q Conference and Workshop Champagne Sports Resort, Drakensberg, SOUTH AFRICA 7-10 November 2010

_______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

Embed Size (px)

Citation preview

Page 1: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

_______________________________________

M. Ranganai - Director______________________________________

T & Q Conference and WorkshopChampagne Sports Resort,

Drakensberg,SOUTH AFRICA

7-10 November 2010

Page 2: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

SIRDC

Strategic Research Institution

Established in 1993

Research Act of 1986

Constitution – Institutes (NMI 1/11)

Page 3: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

SIRDC

Page 4: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

Top Management Decision

Communication within NMI

Internal Gap Analysis

Human Resource Development

ISO/IEC 17025 Dev & Implementation

Page 5: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

NMI MANDATE

Custodians of National Standards

Establish International Equivalence

Disseminate Measurement Traceability

R & D of Standards and Equipment

Page 6: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

Application for Accreditation

Pre(p)- Assessment

Initial Assessment

Current Status

Plans for the future

Page 7: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

CONSCIOUS

COMMITMENT

INVOLVEMENT

MOTIVATION

MOBILIZING RESOURCES (SDL, SIRDC, DONORS)

Page 8: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

CEO

EXECUTIVE DIRECTOR-TECHNICAL

DIRECTOR//TECHNICAL REPRESENTATIVE

SECRETARY HEAD-

QUALITY ASSURANCE

SCIENTISTS

TECHNICIANS

SIRDC – NMI QUALITY TEAM ORGANOGRAM

Page 9: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

SIGNIFICANCE/BENEFITS

DEMANDS/ROLES

MILESTONES

CHALLANGES

GAME PLAN

Page 10: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

DIRECTOR - NMI

HEAD -

QUALITY ASSURANCE SECRETARY

Head- VOLUME Head -

DIMENSIONALHead –

CHEMICAL

Head-

MASS

Head –

TEMPERATURE

TECHNICIAN TECHNICIAN TECHNICIAN

SIRDC – NMI TECHNICAL TEAM ORGANOGRAM

Page 11: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

SCOPE Vs ISO/IEC 17025

STAFF COMPETENCE

METHODS/PROCEDURE – Validity/Fitness

STANDARDS/EQUIPMENT – Calibration/Traceability

LAB ENVIRONMENT /CONDITIONS

Page 12: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

RELEVANT TRAINING

TECHNICAL DISCIPLINES (BASIC & ADVANCED)

MULTI-SKILLING

ISO/IEC 17025 MANAGEMENT & TECH REQUIREMENTS

WORKING VISITS ( Regional/International)

Page 13: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

TRAINING

TECHNICAL(Basic, Advanced, Sec)

ISO/IEC 17025

UoM/ Basic Metrology Interpretation

Mass Implementation

Volume Procedure Writing

Dimensional Quality auditing

Temperature

Preparation of CMCs

Sponsors: EU/SADC Project, PTB, SDL

Page 14: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

QUALITY MANUAL ( Top Management)

SETTING OF OBJECTIVES

PROCEDURE WRITING

RECORDS GENERATION

Page 15: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

QUALITY AUDITS

MANAGEMENT REVIEW

DOCUMENT REVIEW

REVIEW OF OBJECTIVES

Page 16: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

COMPETENCE BUILDING

MASS INTERLABORATORY COMPARISON

TEMPERATURE INTERLABORATORY COMPARISON

DIMENSIONAL INTERLABORATORY COMPARISON

VOLUME INTERLABORATORY COMPARISON

Page 17: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

MSB

BOBS

TBS (Pilot)

NMISA (REF LAB)

ZABS

Page 18: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

INNOQ (Moza)

SBS (Seychelles)

OCC (DRC)

NIS (Egypt)

SIRDC-NMI (Zim)

Page 19: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

MSB (PILOT LAB)

BOBS

TBS

NMISA (REF LAB)

SIRDC-NMI( 2 SETS OF RESULTS)

Sponsor : EU/SADC Project

Page 20: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

VERNIER

MICROMETER

DIAL TEST INDICATOR

STEEL RULE

Page 21: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

AUDITS REVEALED READINESS

MANAGEMENT REVIEW - DECISION

SADCAS/SANAS TWINNING PROJECT

3 PARAMETERS (D,T & V)

1 PARAMETER (M) – Sponsored by PTB

Page 22: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

24-28 MAY 2010

GROOMING

GAP ANALYSIS

SYSTEM AND

VERTICAL AUDITS

Sponsor : EU/SADC Project

Page 23: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

28 & 29 JUNE 2010

SANAS/SADCAS TWINNING PROJECT

SYSTEM & VERTICAL (M, V, T &D)

FUNDED BY EU/SADC PROECT

Page 24: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

SYSTEM

TEMPERATURE

DIMENSIONAL

VOLUME

MASS

Page 25: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

CORRECTIVE ACTIONFINDINGS CORRECTIVE ACTION

SYSTEM DONE

MASS DONE

VOLUME DONE

DIMENSIONAL DONE

TEMPERATURE PENDING

Page 26: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

AS OF 14 SEPTEMBER 201026

Argentina

Australia

Austria

Belgium

Brazil

Bulgaria

Cameroon

Canada

Chile

China

Albania LithuaniaMacedonia, the FYR of

MaltaMoldova, Republic ofPanama

Denmark

Egypt

Finland

France

Germany

Hungary

India

Indonesia

Ireland

Israel

Italy

Japan

The Netherlands

Norway

Pakistan

Poland

Portugal

Romania

Serbia

Singapore

SlovakiaSouth Africa

Spain

Sweden

Switzerland

Korea, DPR of

Malaysia

Mexico Thailand

UK

USA

Uruguay

Venezuela

Turkey

Croatia

Kazakhstan

Kenya

Philippines

Slovenia

Sri Lanka

Tunisia

Ukraine

Vietnam

CARICOM

Greece New Zealand

Paraguay

Peru

Czech Republic

Dominican Republic

Iran, Islamic Republic of

Russian Federation

Korea Republic of

CURRENT STATUSCURRENT STATUSCURRENT STATUSCURRENT STATUS

BIPM Members 54 Associates to the CGPM 30

Belarus

BoliviaChinese TaipeiCosta Rica

Ecuador

Cuba

Estonia

Jamaica

Georgia

Saudi Arabia

Hong Kong (China)

Ghana

2010

Bangladesh

Latvia

Seychelles

Zimbabwe

Page 27: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,

CIPM MRA SIGNATURE

5 – YEAR ILC PLAN - EXECUTION

ILCs IN ELECTIRAL, PRESSURE, FORCE

PT - MiC

ACCREDITATION IN MORE PARAMETERS

Page 28: _______________________________________ M. Ranganai - Director ______________________________________ T & Q Conference and Workshop Champagne Sports Resort,