Upload
keaton
View
19
Download
0
Tags:
Embed Size (px)
DESCRIPTION
“ LEONARDO DA VINCI II ” TRANSFER PROQUALINDT “ TRANSFERING EUROPEAN TRAINING PROGRAMME FOR THE QUALIFICATION OF NDT PERSONNEL ” “ R O N C S OLÁSMENTES VIZSGÁLÓK MINŐSÍTÉSE – EURÓPAI KÉPZÉSI PROGRAM TOVÁBBADÁSA ”. Premises (2004–2006) : - PowerPoint PPT Presentation
Citation preview
“LEONARDO DA VINCI II”
TRANSFER PROQUALINDT
“TRANSFERING EUROPEAN TRAININGPROGRAMME FOR THE QUALIFICATION OF NDT PERSONNEL”
“RONCSOLÁSMENTES VIZSGÁLÓK MINŐSÍTÉSE – EURÓPAI KÉPZÉSI PROGRAM TOVÁBBADÁSA”
Premises (2004–Premises (2004–2006)2006)::
CNFPO (ESP)CNFPO (ESP), , AENDAEND (ESP), (ESP), COFRENDCOFREND (FRA), (FRA), DGZfP DGZfP (GER), (GER), BINDTBINDT (UK)(UK)
•• didactics,guidelinesdidactics,guidelines •• course notescourse notes •• professional professional ref.booksref.books ET, MT, PT, RT, ET, MT, PT, RT, UTUT Level 1 – 2 – 3Level 1 – 2 – 3
New projectsNew projects::
„„TransmitTransmit””
Oct.2011. – Sept.2013. Oct.2011. – Sept.2013. CNFPOCNFPO, , AENDAEND (ESP), (ESP), MAROVISZMAROVISZ (HUN), (HUN), RELACRERELACRE (POR), (POR), CrSNDTCrSNDT (CRO), (CRO), ČNDTČNDT (CZE) (CZE)
•• renewal of the documentsrenewal of the documents (CEN ISO/TR 25107, new technics)(CEN ISO/TR 25107, new technics)
•• translations, archiving of matstranslations, archiving of mats (printed adn electronic versions)(printed adn electronic versions)
•• circulate of knolidgecirculate of knolidge (presentations, meetings, flyers)(presentations, meetings, flyers)
1. („kick-off meeting1. („kick-off meeting””))::
8-9. Febr., Cartagena8-9. Febr., Cartagena
•• deteiled presentation of the projectdeteiled presentation of the project •• contractingcontracting
EU: EU: 28.877,09 EUR (69,9%)28.877,09 EUR (69,9%)MAROVISZ:MAROVISZ: 12.434,91 EUR 12.434,91 EUR
(30,1%)(30,1%)Project value :Project value : 41.312,00 EUR41.312,00 EUR
•• compliance of the working methodscompliance of the working methods •• discussion about the didactic discussion about the didactic guidelinesguidelines (remarks, consensus)(remarks, consensus)
•• abstract of the conclusionsabstract of the conclusions
Where we are now?Where we are now?::
•• adaptation of didactic guidelines adaptation of didactic guidelines (AEND)(AEND)
•• stand up the hungarian organistionstand up the hungarian organistion (participants, administration, finans)(participants, administration, finans)
•• the first presentations of the project the first presentations of the project in Huin HuThe European Committee gave support The European Committee gave support to the costs of this project.to the costs of this project.
This announcement reflects the opinion This announcement reflects the opinion of the Eurpean Committee but it is not of the Eurpean Committee but it is not responsible for the usage of the responsible for the usage of the content .content .
5th Meeting of the EFNDT FORUMRailway Forum
5th Meeting 18-19.April 2012 Monor,Budapest
5th Meeting of the EFNDT Railway Forum
5th Meeting 18-19.April 2012 Monor,Budapest
CEN TC256/SC2/ Survay group NDT results
Krémer Miklós Knorr-Bremse VJR Hungária Kft.
5th Meeting of the EFNDT Railway Forum
5th Meeting 18-19.April 2012 Monor,Budapest
Scope of the new EN• It is proposed to define one new EN standard associated to the WG 11 that deals
with the maintenance of Wheelsets.
• Proposed Title : requirements for non destructive technique on running gears in railway maintenance
• Deals at least with Axle ; recommended to include the wheelset and bogie
• This standard applies to testing of Running Gears of the Rolling Stock Material for detecting the internal and surface defects, during in-service and off-vehicle maintenance
• This standard do not address the quality of running gears delivered by the manufacturers which is defined in the product standards (ex. EN 13261)
• It specifies requirements specific to the Rolling Stock Materiel Maintenance and ask for a definition of the Railway Maintenance Sector and Rolling Stock Material Sub-Sectors
5th Meeting of the EFNDT Railway Forum
5th Meeting 18-19.April 2012 Monor,Budapest
Proposed Main clauses of the new EN1. Definition of the Railway Maintenance Sector
• Definition of Railway Maintenance sectors
• Definitions of Rolling Stock Material Sub-Sectors
2. Qualification and certification in NDT for Railways Maintenance
• Requirements for certification procedures of NDT operatives
• Additional specific requirements for Railway Maintenance Sector
3. In-service and off-vehicle NDT requirements for maintenance
• NDT plan design justification
• definition and references for defects and NDT Methods
• Traceability of maintenance results
4. NDT procedures and instructions
• NDT Procedure and Instruction for RSM
• Author
• Validation
5. Authorization of NDT equipments and new NDT techniques