STREETSCAPE TRANSIT 4-6 TRAVEL LANES TRANSIT STREETSCAPE

Figure 4-1

Regional Connector

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

STREETSCAPE STREETSCAPETRANSIT OR PARKING

2-4 TRAVEL LANES TRANSIT OR PARKING

Figure 4-2

Commercial Connector

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

STREETSCAPE BIKE 2-3 TRAVEL LANES BIKE STREETSCAPE ORTRANSIT

ORTRANSIT

Figure 4-3

Local Connector

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

STREETSCAPE PARKING BIKE 2-3 TRAVEL LANES BIKE PARKING STREETSCAPE

Figure 4-5

Mixed Use Street

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

STREETSCAPE 1-3 TRAVEL LANES STREETSCAPE

Figure 4-6

Industrial Access

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

STREETSCAPE 1-3 TRAVEL LANES STREETSCAPE

Figure 4-7

Green Street

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

STREETSCAPE PARKING 1-2 SHARED TRAVEL LANES

STREETSCAPE

Figure 4-8

Neighborhood Green Street without Curb

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

STREETSCAPE PARKING 1-2 TRAVEL LANES STREETSCAPE

Figure 4-9

Neighborhood Green Street with Curb

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

RIGHT-OF-WAY LINE

RIGHT-OF-WAYLINE

CATCH LINE

SLOPELINE

SLOPELINE

SIDEWALK PLANTING STRIP ROADWAY PLANTING STRIP SIDEWALK

STREET RIGHT-OF-WAY

2.0% 2.0% 2.0%

STREET TREE

6” CURB

GUTTER

PAVEMENT CROWN

STREET TREE

6” CURB

GUTTER

EXISTING GRADE

1

MAX 2

1

2 MAX2.0%

NEW GRADE

3.5’ MIN SETBACK

Figure 4-10

Standard Design Cross Section

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

CURB

LANE LINE

NO PARKING NO PARKING

PARKING

RIGHT-OF-WAY-LINE

R=20’ R=20’

12’

8’

20’

10’ MIN. CURB

Figure 4-14

Parking Curb Setback

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

EXISTING GROUND

ASPHALTCONCRETE OVERCRUSHED ROCK

COMPACTEDSUBGRADE PERSTD. SPEC 2-06

RIGHT-OF-WAY

1

MAX 22.0% 2.0% 2.0%

RIGHT-OF-WAY LINE

RIGHT-OF-WAY LINE

EXISTING ROADWAY

SHOULDER

LESS THAN10’ WIDE

5’

MIN

Figure 4-15

Asphalt Pedestrian Walkway

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

WIDTH PERBUILDINGGRADE SHEET 5’ 10’

2.0% 2.0% 2.0%

EXISTINGGROUND

ASPHALTCONCRETE OVERCRUSHED ROCK

COMPACTEDSUBGRADE PERSTD. SPEC. 2-06

MIN MIN

ABUTTING DEVELOPMENT

RIGHT-OF-WAY LINE

RIGHT-OF-WAY LINE

EXISTING ROADWAY

RIGHT-OF-WAY

Figure 4-16

Asphalt Pedestrian Walkway 10 Feet or More From Existing Roadway

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

Figure 4-17

Pavement Markings for Loop Detector Systems

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

L

PIER, ABUTTMENT, GRATE OR OTHER OBSTRUCTION

150 MM (6IN) SOLID WHITE MARKING

DIRECTION OF BICYCLE TRAVEL

FOR METRIC UNITS:L=0.62 WV, WHERE V IS BICYCLE APPROACH SPEED (KM/H)

FOR ENGLISH UNITS:L: WV, WHERE V IS BICYCLE APPROACH SPEED (MPH)

WW

Figure 4-20

Obstruction Warning Pavement Marking

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

September 2005Figure 4-21

Pedestrian Lighting Sections

SEATTLERIGHT-OF-WAY

manual

PROP WATER(NORTH OF CENTERLINE)

PROP WATER(EAST OF CENTERLINE)

VALVE LOCATION PERPENDICULAR OF CITY RIGHT-OF-WAY (ROW) BOUNDRY (TYPICAL)

ALIGN W/ ROW (TYP)

ALIGN W/ ROW (TYP)

CITY RIGHT-OF-WAY (ROW) BOUNDARY

ALIG

N W

/ RO

W (TY

P)

ALIG

N W

/ RO

W (TY

P)

Figure 4-22

Typical Valve Location

September 2005

N

S

EW

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

=MINIMUM SETBACK OF FINISHED BUILDING

OR STRUCTURE REQUIRED FOR UTILITY

CLEARANCE FROM SCL ELECTRICAL

OVERHEAD UTILITY.

TYPICAL SCL CONSTRUCTION

THE SEATTLE CITY LIGHT (SCL) 26KV OVERHEAD POWER

DISTRIBUTION REQUIRES A MINIMUM HORIZONTAL AND

VERTICAL CLEARANCE FROM BUILDINGS AND

STRUCTURES PER THE MOST RESTRICTIVE ELEMENTS

AMONGST CURRENT WASHINGTON ADMINISTRATIVE

CODE (WAC 296-155-428, WAC 296-24-960), NATIONAL

ELECTRIC SAFETY CODE (NESC-2002, RULES 236/237),

AND SCL CONSTRUCTION GUIDELINE (D2-3).

POLE LOCATION WITHIN STREET RIGHT-OF-WAY MUST

HAVE SDOT APPROVAL.

NOTE: ALL STRUCTURES, CONSTRUCTION AND MAINTENANCE ACTIVITIES PROHIBITED IN

THIS AREA. CLEARANCES MAY BE REQUIRED IF POLES AND WIRES ARE NOT PRESENT.

ADDITIONAL CLEARANCES ARE REQUIRED FOR BUILDING MAINTENANCE ACTIVITY.

EXAMPLE: POLE SET 7’ MINIMUM TO PROPERTY LINE

22’

10’+CLEARENCE

28’

(TYPICAL)

CW

7’

MINIMUM7’

PR

OP

ER

TY

LIN

E

PRIMARY ELECTRICAL DISTRIBUTION

TRANSFORMERS

PRIMARY NEUTRAL AND SECONDARY

ELECTRICAL DISTRIBUTION

STREETLIGHT

COMMUNICATIONS

43’

(TYPICAL)

Figure 4-23

Seattle City Light Utility Clearance

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

0

2

4

6

8

10

12

14

16

2 4 6 8 10 12 14 16 18 20 22 24

21

NO RAIL REQUIRED

HORIZONTAL DISTANCE FROM BACK OF SIDEWALK TO EDGE OF WALL OR TOP OF SLOPE (FEET)

HE

IGH

T O

F D

RO

P

(FE

ET)

RAILINGS SHALL BE DESIGNATED AS “HANDRAILS” OR “PEDESTRIAN RAILS” AND THEIR USAGE SHALL BE AS DETERMINED BY THE DIAGRAM. HANDRAILS SHALL BE DESIGNED IN ACCORDANCE WITH SEATTLE STANDARD PLAN 441 OR 443, AS APPROPRIATE. PEDESTRIAN RAILINGS SHALL BE DESIGNED IN ACCORDANCE WITH INSTRUCTIONS PROVIDED BY THE ENGINEERING SERVICES DIVISION OF THE ENGINEERING DEPARTMENT OR RULES DEVELOPED FOR THIS PURPOSE BY THE DIRECTOR OF ENGINEERING.

Figure 4-24

LEGEND

Determination of Handrails vs. Pedestrian Rails

Railing requirements to be determined by SDOT

Handrail or other barrier device as approved by SDOT

Pedestrian rail

September 2005

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

’ 06

NO PARKINGSIGNS REQUIRED

MAX. 8% SLOPE

MAX. 8% SLOPE

CURB/PAV. LINE

CURB/PAV. LINE

18’

’23

’23RIGHT-OF- WAY LINE

RIGHT-OF-WAY LINE

’22=

R ’22=R

WITHIN EXISTING 60’ RIGHT-OF-WAY

NEW PLATTED STREET

’53=R

’05=R

’05=R

September 2005Figure 4-25

Cul de Sacs

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

3’ 35’

33’ 22’ 40’ 10’

2’2’ 18’

’4

’1’2

’81

’81’1

’1

’3’3

’06 ’A’A

’A

’A

’ 12’53

FENCE SETBACK LINENO VERTICAL OBSTRUCTIONSHIGHER THAN 6’ IN THIS ZONE

PAVEMENT

RIGHTOF WAY

’02=R

’02=R

’02=

R

’02=

R

A = PER ALLEY OR EASEMENT WIDTH STANDARDS

RIGHT-OF-WAY

PAVEMENT

2’20’

September 2005Figure 4-26

Alley and Easement Turnarounds

NOT TO SCALE

SEATTLERIGHT-OF-WAY

manual

GENERAL REQUIREMENTS:

Use the latest updates of the Manual on Uniform Traffic Control Devices (MUTCD). Use terminology specified in the SDOT Standard Specifications for Road, Bridge, and Municipal Construction and the City-County Design standards. Use plan scale of 1 inch = 50 feet′. Show entire roadway width with all elements listed below. On city streets, where the proposed channelization matches the existing street sections, show no less than 200 feet of the existing street section beyond the match line(s) with all elements listed below. On intersecting roads and commerciaand multi-residential driveways, show no less than 100′ of the existing section beyond the match line(s) with all elements listed below. Show both the existing channelization on the base layer of the plan and the proposed channelization in bold with call outs consistent with the City of Seattle Standard Specifications (Section 8-22). Include dimensions of all channelization features where proposed improvement ties in with existing roadway, including any necessary transitions, even if they are proposed to be on a different side of an intersection. Provide an electronic copy of the CAD drawing, in *.dwg format, one full size (22 inch x 34 inch) and two half size (11 inch x 17 inch) white paper copies of the channelization plan(s). Full size mylar is required for final approval. Submit signing and channelization related design deviation(s) and/or evaluate upgrades (EU) requests for review and approval. Signing and Channelization Plan cannot be approved until these deviations and/or EU’s are approved.

REQUIRED ELEMENTS TO BE INCLUDED ON A SIGNING AND CHANNELIZATION PLAN:

Project Title with a north arrow the date and page number in the title block. Street and highway names. Right of way lines (City, County, and/or WSDOT). Posted speed, design speed, and design vehicle. NOTE: The minimum design vehicle is a single unit truck (SU-30), but the design vehicle will be determined by SDOT. Street classification. Edge of traveled way and edge of pavement lines. Intersecting streets, alleys and driveways - at least 100′ and identify business name. Widths of through lanes, turn lanes, and shoulders. Lengths of right and left turn storage lanes (Indicate recommended storage lengths in Traffic Analysis) Lengths of all channelization tapers and stripes (with callouts as per COS Standard Specification 8-22). Curb radii for all corners at intersections, and commercial and multi-residential driveways. Typical roadway sections showing all channelization features with dimensions (i.e. travel lanes, turn lanes, medians, shoulders, curb and gutter, bike lane, sidewalk etc.). Existing and proposed raised curbing Raised and painted islands. Separate sketch showing detail of islands including offsets of key locations from reference lines. Also indicate square footage of islands. All existing and proposed signage within the project area. Signature block for SDOT approval. P.E. stamp / seal signed and dated.

Figure 4-28

Channelization Check List

SEATTLERIGHT-OF-WAY

manual

September 2005