13
Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image Image

Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

Embed Size (px)

Citation preview

Page 1: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

Interconnecting DERWith Electric PowerSystems

POWER SYSTEM 2002 CONFERENCE-- IMPACT OF DISTRIBUTED GENERATION

Image Image

Page 2: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

2

Interconnecting DER with Electric Power Systems

Existing IEEE Standards Standards Coordinating Committee 21:

IEEE Standard 929-2000 Recommended Practice for Utility Interface of Photovoltaic (PV) Systems

Standards Coordinating Committee 23 IEEE Standard 1001-1988 Guide for Interfacing Dispersed Storage and

Generation Facilities with Electric Utility Systems

Current IEEE Standards Work IEEE P-1547 Standard for Interconnecting Distributed Resources with

Electric Power Systems

Page 3: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

3

Interconnecting DER with Electric Power Systems

Definitions:

POINT OFCOM M ON

COUPLING(PCC)

A

B

C

G

PHASE TOGROUND

PHASE TOPHASE

THREE PHASE

L

LPOINT OF

INTERCONNECTION(PI)

DISTRIBUTEDRESOURCE

DISTRIBUTEDRESOURCE

PCC PCC

Are

a E

PS

Fac

ility

Page 4: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

4

Interconnecting DER with Electric Power Systems

P-1547 Project Approved in March 1999 4 - 6 meetings of Working Group per year since then Working Group Members

More than 200 names on Working Group Roster 100+ members attend each Working Group Meeting

Page 5: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

5

Interconnecting DER with Electric Power Systems

Three Official IEEE Balloting Member Categories User

The user is the person who will apply the standard when interconnecting DER to the electric power system. For example, the utility, the DER owner, etc.

Producer The producer is the person who will apply the standard when producing

equipment that will be interconnected to the electric power system. For example, equipment manufacturers, installers, etc.

General Interest The general interest person is one who is interested, but not directly

involved in interconnecting DER to the electric power system. For example, regulatory agencies, financial institutions, advocacy groups, etc.

Page 6: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

6

Interconnecting DER with Electric Power Systems

Draft 7 circulated for ballot --- closing date of April 1, 2001 Vote Results:

66% Affirmative, not enough for approval (75% required)

VOTE COUNT --- DRAFT 7

Voter Category Affirmative Negative Totals

User 31 23 54

Producer 37 12 49General Interest 30 15 45

Totals 98 50 148

Page 7: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

7

Interconnecting DER with Electric Power Systems

Draft 8 circulated for ballot -- closing date of October 2, 2001 Vote Results

66% Affirmative, not enough for approval (75% required)

VOTE COUNT --- DRAFT8

Voter Category Affirmative Negative Totals

User 25 33 58

Producer 43 6 49General Interest 35 14 49

Totals 103 53 156

Page 8: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

8

Interconnecting DER with Electric Utility Systems

IEEE Standard 929 Aimed at Photovoltaic Generator Systems, using solid-state inverters for

interconnection Usually low kilowatt capacity Inverter inherently limits fault current Inverter tends to shut down automatically upon overload or reverse power

IEEE Proposed Standard P-1547 Intended to address DER without regard to prime mover (wind, fuel cell, etc) Attempts to address systems up to 10 Mw in size Seeks to provide ‘universal’ solution

Page 9: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

9

Interconnecting DER with Electric Power Systems

“User” Concerns Safety of Personnel

Personnel must be able to work on the EPS and DER facility without undue risk of injury or death

General public should not be exposed to hazardous conditions Fault duty, including DER, should not exceed ratings of distribution system

equipment, including customer-owned equipment connected to the system Equipment damage, downed conductors, vault fires, etc.

Normal load-carrying and interrupting capabilities, including DER, should not be exceeded Reduction of system reliability, premature failure of equipment

Protective relaying and control equipment, should not be subject to mis-operation as a result of DER additions More and longer interruptions, high/low voltage problems

Page 10: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

10

Interconnecting DER with Electric Power Systems

Producer and General Interest Concerns Interconnection costs must be minimal

Interconnection equipment should be some fraction of the cost of the DER being connected.

Utility involvement should be minimized Impact studies cost too much Some utilities use interconnection standards as a means of ‘killing’

DER Interconnection must be ‘simple’ so that it won’t discourage DER applications Interconnection apparatus should be ‘maintenance free’ as much as possible Interconnection operation should be ‘automatic’

Page 11: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

11

Interconnecting DER with Electric Power Systems

Basic Problem:

Most Utility Electric Power Systems (EPS) were/are not designed to accommodate active generation and energy storage at the distribution level.

Basic Need:

Develop technology and operational concepts that will enable realization of DR benefits while avoiding negative impacts on system reliability and safety

Page 12: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

12

Interconnecting DER with Electric Power Systems

Significant Problem Areas Scaling

“My typical distribution feeder has a peak load of 4 Mw. Adding a few kW of PV is a whole different problem than adding 400 kW.”

Islanding

Utility is still responsible for voltage and frequency of all its customer connections. Creating an island where some utility customers are supplied with un-controlled voltage or frequency is unacceptable

Safety

Personnel working on the distribution system MUST be protected from backfeed or accidental energization

Protection System Design

Radial distribution line protection is designed and coordinated for ‘one way’ power flow. Bi-directional flow in some part or all of a feeder is a whole new world of problems

Networked Distribution System

Consideration postponed to future updates

Page 13: Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image

©A

BB

Ltd

. P

age

13

Interconnecting DER With Electric Power Systems

What’s Next? Working Group meeting to discuss ballot results, possible resolution was held

January 30-February 1

Writing Group to meet and attempt to resolve negative ballots received on Draft 8

New Draft of P-1547 to be circulated for ballot before mid-year

Still optimistic on submitting proposed standard to IEEE Standards Board before the end of 2002