incorporates

gas collection, storage and compressor system

leachate collection, storage and treatment facilities.

prevent leachate leakage into ground water

Page 3: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

gas leakage detection p robes.

leachate monitoring well and ground water monitoring well

Page 4: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

Design & operation SLF Several important factors must be

considered:

land area cover material cell design and construction equipment requirement personnel requirement financedrainage

Page 5: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

spread and compaction water supply fire prevention facilities fencing - gatehouse operation time land use after completion of

landfill wheel cleaning notice board

Page 6: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

Population protection site location rainfall temperatureSoil type windHydrological properties and water

table

Page 7: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

compaction landfill

essential to reduce settlement

take about 2 years

prevent fire

eliminates odour, flies & vermin

for building structure – 10 – 12 years

Page 8: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

ideally compacted fill should have density of 900 – 950 kg/m3

densities are measure by using backhoe method and auger method.

the values depend on:

Page 9: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

Type of waste

Pretreatment

Composting of waste

Time of landfill

Moisture content

Type of landfill

Stage of compaction

Page 10: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 11: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 12: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 13: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 14: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 15: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

Leachate

define as liquid that has percolated through solid waste and has extracted Dissolved or suspended material

Page 16: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

average amount of leachate generated is 150L//tonne

contain organic matter, nitrogen (ammoniacal), suspended solid salts & colouring matter.

constration of eluted matters will be highest the first 3 – 8 years.

Page 17: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

quantity of leachate produced depend on factors:

Soil type

Waste composition

Degree of composition

Rainfall

Evaporation

Landfill type and age

Page 18: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

incorporates

gas collection, storage and compressor system

leachate collection, storage and treatment facilities.

prevent leachate leakage into ground water

Page 19: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

gas leakage detection p robes.

leachate monitoring well and ground water monitoring well

Page 20: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

Design & operation SLF Several important factors must be

considered:

land area cover material cell design and construction equipment requirement personnel requirement financedrainage

Page 21: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

spread and compaction water supply fire prevention facilities fencing - gatehouse operation time land use after completion of

landfill wheel cleaning notice board

Page 22: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

Population protection site location rainfall temperatureSoil type windHydrological properties and water

table

Page 23: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

compaction landfill

essential to reduce settlement

take about 2 years

prevent fire

eliminates odour, flies & vermin

for building structure – 10 – 12 years

Page 24: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

ideally compacted fill should have density of 900 – 950 kg/m3

densities are measure by using backhoe method and auger method.

the values depend on:

Page 25: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

Type of waste

Pretreatment

Composting of waste

Time of landfill

Moisture content

Type of landfill

Stage of compaction

Page 26: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 27: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 28: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 29: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 30: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into
Page 31: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

Leachate

define as liquid that has percolated through solid waste and has extracted Dissolved or suspended material

Page 32: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

average amount of leachate generated is 150L//tonne

contain organic matter, nitrogen (ammoniacal), suspended solid salts & colouring matter.

constration of eluted matters will be highest the first 3 – 8 years.

Page 33: incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into

quantity of leachate produced depend on factors:

Soil type

Waste composition

Degree of composition

Rainfall

Evaporation

Landfill type and age