© Copyright 2013 TONE SOFTWARE CORPORATION
New Client Turn-Up Overview
© Copyright 2013 TONE SOFTWARE CORPORATION
New Client Turn-Up Process
Þ Ready for New Client
Turn-Up Process
Þ Step 1 - 2 Standard DAP Configurations for Hardware
Þ Step 2 - DAP Hardware Sourcing and Lead Process
Þ Step 3 - MSP Personnel for DAP SW Installation, Configuration and Shipment
Þ Step 4 - Process for On-Site Client Installation for DAP HW
Pre-Requisites New Client Turn-Up Process
© Copyright 2013 TONE SOFTWARE CORPORATION
New Client Turn-Up Process – Prerequisite Recommendations and Dependent on Existing MSP Process
Þ Ready for New Client
Turn-Up Process
Þ Step 1 - 2 Standard DAP Configurations for Hardware
Þ Step 2 - DAP Hardware Sourcing and Lead Process
Þ Step 3 - MSP Personnel for DAP SW Installation, Configuration and Shipment
Þ Step 4 - Process for On-Site Client Installation for DAP HW
© Copyright 2013 TONE SOFTWARE CORPORATION
Prerequisite Step 1: 2 Standard DAP HW Recommendations
1. Small DAP – Assumed Rack Server is Preferred Monitoring Capacity:
1 PBX 10 SNMP Devices
HW Minimum Specification
Hardware Example – Dell PowerEdge R210 II Rack Mounted Server
Processor Intel Celeron G530 2.4 GHz, 2M Cache, Dual CoreMemory 2GBHard Drive 2 x 500GB 7.2K RPM SATARAID Controller PERC S100 RAID 1OS CentOS Linux or Red Hat LinuxNetwork Controller On-Board Dual Gigabit Network AdapterApproximate Cost $1000
© Copyright 2013 TONE SOFTWARE CORPORATION
Prerequisite Step 1: 2 Standard DAP HW Recommendations
2. Large DAP – Assumed Rack Server is Preferred Monitoring Capacity:
10 PBXs – Alarming and Traffic 100 SNMP Devices
HW Minimum Specifications
Hardware Example – Dell PowerEdge R210 II Rack Mounted Server
Processor Intel Xeon E3-1230v2 3.30 GHz, 8M Cache, Quad CoreMemory 8GBHard Drive 2 x 500GB 7.2K RPM SATARAID Controller PERC S100 RAID 1OS CentOS Linux or Red Hat LinuxNetwork Controller On-Board Dual Gigabit Network AdapterApproximate Cost $1500
© Copyright 2013 TONE SOFTWARE CORPORATION
Prerequisite Step 2: DAP HW Sourcing and Lead Process
Considerations for MSP
1. Will Manufacturer Install Linux or Will MSP?
2. Standardize on Model and Configuration from the Manufacturer
3. Manufacturer Lead Times on New Orders
4. Does MSP want spare units pre-configured for New Clients?
© Copyright 2013 TONE SOFTWARE CORPORATION
Prerequisite Step 3: MSP Personnel for DAP SW Install and Config
Assuming MSP Will Install DAP OS and SW
1. General Linux OS Installation Time – 1 – 2 Hours (Min – Max)
2. DAP SW Installation and Configuration Time – 1 – 2 Hours (Min – Max) Documented Steps by Tone Software Includes:
Transfer DAP SW files to the DAP Server Execute a set of Installation Scripts with Prompts Install the Certificate Key for Secured Connection Configure the ReliaTel Host IP and Port
3. DAP System Validation – 2 – 4 Hours (Min – Max)
4. Total Install and Config Time – Approximately 4 – 8 Hours (Min – Max)
5. Total Shipment Process and Timeframe to Client Site – X Days
© Copyright 2013 TONE SOFTWARE CORPORATION
Prerequisite Step 4: On-Site Client DAP Installation Process
Considerations for MSP
1. Process for On-Site Installation for Client
2. On-Site Client DAP HW Installation Requirements 1U Rack Space (Assuming Dell Server) with Power and Ethernet Drop 1 IP Address with Outbound IP Access to the ReliaTel Server IP Address and 443 Port A temporary local Keyboard and Monitor for any troubleshooting if-required IP Access from the DAP Ethernet Interface to the Client Monitored Devices
3. Role of MSP In Walking Client through the DAP HW Install and Connection
4. Administrator Configure and Validate Remote DAP on the ReliaTel Portal
© Copyright 2013 TONE SOFTWARE CORPORATION
New Client Turn-Up Process – Configure Client’s ReliaTel Portal
Þ Acquire DAP HW from Manufacturer:
Þ X Days
Þ Install, Configure and Validate DAP HW and SW:
Þ 4–8 Hours
Þ Ship DAP to Client:
Þ X Days
Þ Onsite Client DAP HW Installation and Validation:
Þ X Days
Þ Configure ReliaTel Portal with Client Devices for Monitoring:
Þ X Hours
Þ Validate Data and Final Client Turn-Up:
Þ 1 Day
Þ Hand Off from Deployment to Operations
New Client Deployment
Operational Support
Pitfalls:
1. Lead Times
2. HW Changes
3. HW Defects
Pitfalls:
1. HW Changes
2. HW Defects
3. Connectivity
Pitfalls:
1. Timeframes
2. Damages
Pitfalls:
1. Client Knowledge
2. Meeting Requisites
3. IP Connectivity
Pitfalls:
1. IP Connectivity
2. IP Troubleshooting
Pitfalls:
1. IP Connectivity
2. IP Troubleshooting
© Copyright 2013 TONE SOFTWARE CORPORATION
New Client Turn-Up Process – Configure Client Devices & Final Turn-up
ReliaTel Device Configuration :
1. Obtain all device monitoring information and requirements Utilize Device & User Information templates provided byTone Software
2. Configure devices for monitoring Utilize Tone’s Foundation Kit & Sample Device Templates Reference Tone’s Quick Start Guide for Device Configuration
3. Validate Data and Final Client Turn-up – MSP Process