CLEAN DIESEL DEMONSTRATION
PROGRAM
Diesel Emission Control Retrofit Users Conference
Pasadena, CA February 6 -7, 2001
Clean Diesel Demonstration Program ,.
OUTLINE NYCT Operations
Program Objectives; Partners and Roles
Project Work Plan Field Demonstration
Emissions Testing
Fuels Matrix Testing
Technology Issues
Current Results
Clean Diesel Demonstration Program ,.
NYCT Bus Operations
Number of Depots: 18
Employees: 12,159
Bus Routes / Bus Stops: 234 / 14,000
Ridership: 2.0 million weekday
Revenue Miles: 102 million annually
Diesel Fuel Used: 40 million US Gal. in
1999
Clean Diesel Demonstration Program ,.
NYCT Bus Fleet
2000 2006
3,862 2,022
280 660
148 629
90 649
10 390
Total 4,390 4,350
40' Hybrid Transit
40' Diesel Transit
45' Diesel Coach
60' Diesel Articulated
40' CNG Transit
Clean Diesel Demonstration Program ,.
PROJECT OBJECTIVES
Evaluate the particulate emissions reductions available using JMI’s CRT TM technology in conjunction with reduced sulfur diesel fuel
Evaluate the applicability of the technology to both new 4-stroke and older 2-stroke diesel engines
Evaluate the maintainability and durability of CRTs in rigorous New York City bus service
Evaluate fuel parameters that can enhance future commercial success
Clean Diesel Demonstration Program ,.
TECHNOLOGY
Continuously Regenerating Technology Oxidation catalyst and wall-flow ceramic filter
Packaged to replicate OEM muffler dimensions
No moving parts
No external energy requirements
Reduced Sulfur Diesel Fuel Base specification similar to #1 Diesel
Sulfur level of 30 ppm (350 - 500 ppm standard)
Lubricity enhancement
Clean Diesel Demonstration Program ,.
Johnson Matthey CRT TM
Inlet Section
CatalystSection
FilterSection
OutletSection
HoneycombCatalyst
Wall-flowFilter
Clean Diesel Demonstration Program ,.
PROJECT PARTNERS
Johnson Matthey - CRT technology
Corning - ceramic filters
Equilon - reduced sulfur diesel fuel
Environment Canada - emissions testing
New York State Department of Environmental Conservation - program development/testing
RAD Energy - fuel logistics
MTA New York City Transit - bus operations
Clean Diesel Demonstration Program ,.
Budget
CRT Purchase/Installation $497,055
Reduced Sulfur Fuel Purchase $761,364
Emissions Testing $228,678
Fuels Matrix Testing $311,826
Technical Support $170,470
Project Management $108,280
Total $2,077,673
Clean Diesel Demonstration Program ,.
PROJECT WORKPLAN
Fleet Demonstration In service test of 50 buses for 1 year
Emissions Testing Baseline testing
Durability testing
Fuels Matrix Evaluation Fuel additives
Sulfur sensitivity
Aromatics content
Clean Diesel Demonstration Program ,.
FLEET DEMONSTRATION
50 buses equipped with CRT systems in revenue service in Manhattan for one year 25 1999 buses with Detroit Diesel Series 50 engines
25 1993 buses with Detroit Diesel 6V92 DDEC engines
One entire depot (140 buses) to operate on reduced sulfur fuel for one year (1.2 mill gallons)
4 buses equipped with continuous data loggers; all others will be monitored monthly for changes in engine back-pressure, and fuel economy
Clean Diesel Demonstration Program ,.
EMISSIONS TESTING 4 buses tested at the beginning of the program
2 w/ DDC Series 50 engine; 2 w/ DDC 6V92 engine
Each bus tested with OEM muffler/standard fuel, with OEM muffler/30 ppm sulfur fuel, and with CRT system/30 ppm sulfur fuel
Test on chassis dynomometer using CBD and New York bus cycles
Collect info on criteria emissions (CO, HC,NOx, PM), plus particle size and toxicity
Re-test each bus after 9 - 12 months in service
Clean Diesel Demonstration Program ,.
FUELS MATRIX TESTING
Test various fuel formulations on engine dyno using a 1996 DDC Series 50 Urban bus engine
Fuel formulations will vary by sulfur content, aromatics content, proprietary additive packages
If a new formulations is judged superior to reference reduced sulfur fuel, perform limited field testing Equip 2 Series 50 OC Transpo Buses with CRTs and
data loggers, operate for 3 months Chassis dyno emissions test
Clean Diesel Demonstration Program ,.
FUEL LOGISTICS Purchase and use of non-commercial fuel
requires special handling Segregated bulk transportation (barge) Segregated bulk storage in NYC region Segregated delivery to depot
Project purchased all 1.2 million gallons in a single batch to ensure product consistency
Testing fuel came from same batch as fuel used in fleet demonstration
Handling is largest share of incremental cost
Clean Diesel Demonstration Program ,.
CURRENT RESULTS 6V92
Prototype CRT system successfully demonstrated in service for 4 weeks
In-service exhaust temperatures at lower margin of acceptable - especially with low ambient temp
Improved insulation of exhaust path has helped
3 CRT buses “plugged” in service - root cause under investigation; potential fuel effect unrelated to sulfur
Durability test suspended
Clean Diesel Demonstration Program ,.
CURRENT RESULTS S50 Prototype testing showed in-service exhaust
temperatures to be very acceptable
Nine month Fleet demonstration Completed CRT buses have logged over 750,000 miles (up to
40,000 miles/bus)
No CRT-related road calls; MBDF of CRT fleet is equivalent to non-CRT buses
No back-pressure problems
No measured loss of fuel economy
25 CRT buses still in service
Clean Diesel Demonstration Program ,.
S50 EXHAUST TEMPERATURE
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Temperature (C)
Fre
qu
en
cy (
ab
so
lute
)
0
5
10
15
20
25
30
35
40
45
50
Fre
qu
en
cy (
%)
Clean Diesel Demonstration Program ,.
S50 BACK PRESSURE*
0
1
2
3
4
5
6
8/26 8/27 8/28 8/29 8/30 8/31 9/1 9/2 9/3 9/4 9/5 9/6 9/7 9/8 9/9Date
Pre
ss
ure
Dro
p (
in.
Hg
)
Start Test
End Test
* No load wide open throttle test
Clean Diesel Demonstration Program ,.
Emissions Test Results: S50 on CBD
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
(mpg)FE
Kg/mileCO2
g/mileNOX/10
g/mileTHC*10
g/mileCO
g/milePM *10
BASELINE LSD ULSD ULSD-CRT
ULSD = 29 -78% ReductionULSD + CRT = 88 - 94% Reduction
Clean Diesel Demonstration Program ,.
Emissions Test Results: S50 on NYB
1.49
6.487.03
9.10
13.14
5.50
1.39
7.18 7.33
0.600.23 0.37
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
(mpg)FE
Kg/mileCO2
g/mileNOX/10
g/mileTHC*10
g/mileCO
g/milePM *10
BASELINE LSD
ULSD-CRT 93- 98%Reduction
Clean Diesel Demonstration Program ,.
FUTURE PROJECT SCHEDULE
Resolve 6V92 issues and re-start Fleet Demonstration if possible
Conduct Fuels Matrix Testing beginning March 2001
Durability emissions testing on-going. Complete and publish results summer 2001.
Clean Diesel Demonstration Program ,.
NYCT PLANS
Based on success of pilot program, NYCT has committed to aggressive implementation of Clean diesel technology fleet-wide Convert entire fleet to ULSD (completed 9/00)
Retrofit entire fleet with catalyzed filters (250 installed to date; 3,500+ NLT 12/03)
In addition, NYCT will retire all 2-stroke engines NLT 12/03 Will require “re-powering” up to 800 buses with
new 4-stroke EGR engines