Aim of project
• To promote the use of e-learning by developing interoperability between, B-net (the College Intranet system), SITs (MIS) and Skillnet (VLE).
• To provide a cost effective solution that can be applied to all colleges,
© Banff and Buchan College 2002
Objectives
• Link the student record system in SITS to the user accounts system in Skillnet and the college Intranet
• To automate enrolments for online courses and share access to support materials
• Enable transfer of data between components to create a synchronous lifelong learning log
• Exchange content between repositories of the systems
• Use IMS standards to achieve the above.
© Banff and Buchan College 2002
Why this project?
• College keen to develop a cost effective MLE
• College needed support of partners with skills and experience
• College keen to support the development of SUfI (Learndirect)
• College keen to develop its own intranet to current standards
© Banff and Buchan College 2002
Main activities
• Working with the VLE vendor to propagate student enrolments across all of the necessary domains via a central staging point for student records (central database server). System user information stored as XML data that conforms to LIP standard.
© Banff and Buchan College 2002
Main activities
• Converted our existing Intranet content repository to a system that is capable of handling legacy documents and learning objects that conform approximately to the Dublin Core spec for learning objects.
© Banff and Buchan College 2002
Main activities
• Working towards publishing content to the VLE environment.
• Attempting automatic propagation of VLE access from student enrolment process.
© Banff and Buchan College 2002
Benefits
• Accelerated our understanding of the complex issues surrounding interoperability
• Increased our commitment to the development of a functional MLE.
© Banff and Buchan College 2002
Challenges
Original scope of the project was probably too ambitious – leading to;
• tension in workloads
• lack of staff expertise and resources
• massive learning curve
• maintaining effective project management
(especially given our remoteness)
© Banff and Buchan College 2002
Results/outputs/findings
• The project was of great benefit to the college, as it developed skills knowledge and competence previously lacking within the college staff.
• The development of interoperability between systems creates a need for a detailed overview of all college processes.
© Banff and Buchan College 2002
• The project has shown that interoperability is achievable between the SRS and B-net and from B-net to the Skillnet VLE. - after a lot of development
• The partnership approach has been successful. Both organisations have benefited from the project,
© Banff and Buchan College 2002
Contact details
Graeme WattICT Manager / Project Manager at BBCFE1Tel: (01346) 586100 ext: 2151Email: [email protected]
David HerdLecturer and Intranet / Web Developer at BBCFETel: (01346) 515777 ext: 2183Email: [email protected]
Paul SherringtonDepute Principal / Project Director at BBCFETel: (01346) 515777 ext: 2102Email: [email protected]
© Banff and Buchan College 2002
Henderson Road, Fraserburgh, AB43 9GA
Tel: (01346) 515777 Fax: (01346) 515370
www.banff-buchan.ac.uk